Loading...
Report LL OFFICE COPY 6 (AA) d F yn E COMcheck Software Version 4.1.5.1 RECEIVED ii( Mechanical Compliance Certificate 16SEP 2 7 2021 CITY OF TIGAFID PfEG2O2i- 007 / BUILDING DIVISION Project Information f/50 ,cj� ar' Energy Code: 90.1 (2016)Standard o Project Title: Array Apartments Location: Portland, Oregon Climate Zone: 4c Project Type: New Construction Construction Site: Owner/Agent: Designer/Contractor: 11508 SW Bull Mountain Rd- Mark Denyer Building E MFIA Tigard, OR 97224 2007 SE Ash St Portland, OR 97214 503-234-0548 mark.denyer@mfia-eng.com Mechanical Systems List Quantity System Type&Description 1 HVAC System 1 (Single Zone): Split System Heat Pump Heating Mode:Capacity=19 kBtu/h, Proposed Efficiency= 10.15 HSPF, Required Efficiency=8.20 HSPF Cooling Mode:Capacity=18 kBtu/h, Proposed Efficiency=20.50 SEER, Required Efficiency: 14.00 SEER Fan System: FAN SYSTEM 1 I lobby--Compliance(Motor nameplate HP method):Passes Fans: FAN 1 Supply,Constant Volume,600 CFM,0.1 motor nameplate hp,85.0 fan efficiency grade Mechanical Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed mechanical systems have been designed to meet the 90.1 (2016)Standard requirements in COMcheck Version 4.1.5.1 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Mark Denyer _ 9-21-21 Name-Title Signature Date Project Title: Array Apartments Report date: 09/21/21 Data filename: G:\Jacobs Heating &Air Conditioning\10273_Array Apartments\Energy Forms\Array Mech Page 1 of 10 ComCheck.cck IPA COMcheck Software Version 4.1.5.1 1 Inspection Checklist Energy Code: 90.1 (2016) Standard Requirements: 93.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section i # I Plan Review Complies? Comments/Assumptions & Req.ID 4.2.2, Plans, specifications, and/or ❑Complies Requirement will be met. 6.4.4.2.1, calculations provide all information ❑Does Not 6.7.2 with which compliance can be [PR2]1 determined for the mechanical ❑Not Observable systems and equipment and ❑Not Applicable document where exceptions to the standard are claimed. Load calculations per acceptable engineering standards and handbooks. 4.2.2, Plans, specifications, and/or ❑Complies 8.4.1.1, calculations provide all information ❑Does Not 8.4.1.2, with which compliance can be 8.7 determined for the electrical systems ❑Not Observable [PR6J2 and equipment and document where ❑Not Applicable exceptions are claimed. Feeder connectors sized in accordance with approved plans and branch circuits sized for maximum drop of 3%. 6.7.2.4 Detailed instructions for HVAC ❑Complies Exception: Requirement does not apply. [PR5]1 systems commissioning included on ❑Does Not the plans or specifications for projects ❑Not Observable >=50,000 ft2. 1 ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Array Apartments Report date: 09/21/21 Data filename: G:\jacobs Heating &Air Conditioning\10273_Array Apartments\Energy Forms\Array Mech Page 2 of 10 ComCheck.cck Section Footing/Foundation Inspection Complies? Comments/Assumptions & Re .ID 6.4.3.7 Freeze protection and snow/ice ❑Complies Exception: Requirement does not apply. [FO9]3 melting system sensors for future ❑Does Not connection to controls. ['Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Array Apartments Report date: 09/21/21 Data filename: G:\Jacobs Heating &Air Conditioning\10273_Array Apartments\Energy Forms\Array Mech Page 3 of 10 ComCheck.cck Section Mechanical Rough-In Plans Verified Field Verified # Complies? Comments/Assumptions & Re .ID Inspection Value Value 6.4.1.4, HVAC equipment efficiency Efficiency: Efficiency: ❑Complies See the Mechanical Systems list 6.4.1.5 verified. Non-NAECA HVAC ❑Does Not for values. [MU]2 equipment labeled as meeting 90.1. ❑Not Observable ❑Not Applicable 6.4.3.4.1 Stair and elevator shaft vents ❑Complies Exception: Requirement [ME3J3 have motorized dampers that ❑Does Not does not apply. automatically close. ❑Not Observable ❑Not Applicable 6.4.3.4.2, Outdoor air and exhaust systems ❑Complies Exception: Gravity dampers 6.4.3.4.3 have motorized dampers that ❑Does Not acceptable in buildings 3 [ME4]3 automatically shut when not in stories. use and meet maximum leakage Not Observable rates. Check gravity dampers ❑Not Applicable where allowed. 6.4.3.4.5 Enclosed parking garage ❑Complies Exception: Requirement [ME39]3 ventilation has automatic ❑Does Not does not apply. contaminant detection and capacity to stage or modulate [Not Observable fans to 50%or less of design ❑Not Applicable capacity. 6.4.3.4.4 Ventilation fans >0.75 hp have ❑Complies Requirement will be met. [ME5]3 automatic controls to shut off fan ❑Does Not when not required. ❑Not Observable ❑Not Applicable 6.4.3.8 Demand control ventilation ❑Complies Requirement will be met. [ME6]1 provided for spaces >500 ft2 and ❑Does Not >25 people/1000 ft2 occupant density and served by systems El Not Observable with air side economizer, auto ❑Not Applicable modulating outside air damper control, or design airflow>3,000 cfm. 6.5.3.2.1 DX cooling systems >= 75 kBtu/h ❑Complies Requirement will be met. [ME40]2 (>= 65 kBtu/h effective 1/2016) ❑Does Not and chilled-water and See the Mechanical Systems list evaporative cooling fan motor hp ❑Not Observable for values. >= 1/4 designed to vary supply ❑Not Applicable fan airflow as a function of load and comply with operational requirements. 6.4.4.1.1 Insulation exposed to weather ❑Complies Requirement will be met. [ME7J3 protected from damage. ❑Does Not Insulation outside of the conditioned space and associated ❑Not Observable with cooling systems is vapor ❑Not Applicable retardant. 6.4.4.1.2 HVAC ducts and plenums R- R- DComplies Requirement will be met. [ME812 insulated per Table 6.8.2. Where ❑Does Not ducts or plenums are installed in or under a slab,verification may DNot Observable need to occur during Foundation ❑Not Applicable Inspection. 6.4.4.1.3 HVAC piping insulation thickness. in. in. ❑Complies Exception: Requirement [ME9J2 Where piping is installed in or DDoes Not does not apply. under a slab,verification may need to occur during Foundation ❑Not Observable Inspection. ❑Not Applicable 1 High Impact(Tier 1) [ 2 TMedium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Array Apartments Report date: 09/21/21 Data filename: G:\jacobs Heating &Air Conditioning\10273_Array Apartments\Energy Forms\Array Mech Page 4 of 10 ComCheck.cck Section Tcomrnentsi*ssu,nptions &Req.ID Inspection Value Value 6.4.4.1.4 Thermally ineffective panel ❑Complies Exception: Requirement [ME41]3 surfaces of sensible heating ❑Does Not does not apply. panels have insulation >= R-3.5. ❑Not Observable ❑Not Applicable 6.4.4.2.1 Ducts and plenums having ❑Complies Requirement will be met. [ME10]2 pressure class ratings are Seal ❑Does Not Class A construction. [Mot Observable ❑Not Applicable 6.4.4.2.2 Ductwork operating>3 in. water ❑Complies Requirement will be met. [ME11]3 column requires air leakage ❑Does Not testing. Location on plans/spec: [Mot Observable Plans ENot Applicable 6.5.2.3 Dehumidification controls ❑Complies Requirement will be met. [ME19]3 provided to prevent reheating, ❑Does Not recooling, mixing of hot and cold airstreams or concurrent heating :Mot Observable and cooling of the same ❑Not Applicable airstream. 6.5.2.4.1 Humidifiers with airstream ❑Complies Exception: Requirement [ME68]3 mounted preheating jackets have ❑Does Not does not apply. preheat auto-shutoff value set to activate when humidification is Not Observable not required. ❑Not Applicable 6.5.2.4.2 Humidification system dispersion ❑Complies Exception: Requirement [ME69]3 tube hot surfaces in the ❑Does Not does not apply. airstreams of ducts or air- handling units insulated >= R ❑Not Observable 0.5. ❑Not Applicable 6.5.2.5 Preheat coils controlled to stop ❑Complies Requirement will be met. [ME70]3 heat output whenever ❑Does Not mechanical cooling, including economizer operation, is active. ❑Not Observable ❑Not Applicable 6.5.2.6 Units that provide ventilation air ❑Complies Exception: Requirement [ME106]3 to multiple zones and operate in ❑Does Not does not apply. conjunction with zone heating and cooling systems are ❑Not Observable prevented from using heating or ❑Not Applicable heat recovery to warm supply air above 60°F when representative building loads or outdoor air temperature indicate that most zones demand cooling. 6.5.3.6 Motors for fans>= 1/12 hp and ❑Complies Requirement will be met. [ME72]2 < 1 hp are electronically- ❑Does Not commutated motors or have a minimum motor efficiency of Not Observable 70%.These motors are also ❑Not Applicable speed adjustable for either balancing or remote control. 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Array Apartments Report date: 09/21/21 Data filename: G:"Jacobs Heating &Air Conditioning\10273_Array Apartments\Energy Forms\Array Mech Page 5 of 10 ComCheck.cck Section Mechanical Rough-In Plans Verified Field Verified Complies? Comments/Assumptions & Re .ID Inspection Value Value 6.5.3.4 Parallel-flow fan-powered VAV air ❑Complies Exception: Requirement [ME108)2 terminals have automatic ❑Does Not does not apply. controls to a)turn off the terminal fan except when space DNot Observable heating is required or if required ❑Not Applicable for ventilation; b)turn on the terminal fan as the first stage of heating before the heating coil is activated; and c) during heating for warmup or setback temperature control, either operate the terminal fan and heating coil without primary air or reverse the terminal damper logic and provide heating from the central air handler through primary air. 6.5.3.7 Required minimum outdoor air e ^�❑Complies Requirement will be met. [ME109]2 rate is the larger of minimum ❑Does Not outdoor air rate or minimum exhaust air rate required by ❑Not Observable Standard 62.1, Standard 170, or ❑Not Applicable applicable codes or accreditation standards. Outdoor air ventilation systems shall comply with one of the following: a) design minimum system outdoor air provided < 135%of the required minimum outdoor air rate, b)dampers, ductwork, and controls allow the system to supply<= the required minimum outdoor air rate with a single set-point adjustment., or c)system includes exhaust air energy recovery complying with Section 6.5.6.1. 6.5.3.3 Multiple zone VAV systems with Exception: Requirement [ME42]3 DDC of individual zone boxes ❑Does Not does not apply. have static pressure setpoint reset controls. ❑Not Observable See the Mechanical Systems list ❑Not Applicable for values. 6.5.4.2 HVAC pumping systems with >= ❑Complies Exception: Requirement [ME25]3 3 control values designed for ❑Does Not does not apply. variable fluid flow(see section details). ❑Not Observable ❑Not Applicable 6.5.6.1 Exhaust air energy recovery on .Complies Exception: Requirement [ME56]1 systems meeting Tables 6.5.6.1- ❑Does Not does not apply. 1, and 6.5.6.1-2. ❑Not Observable ❑Not Applicable 6.5.7.1 Conditioned supply air to space ❑Complies Exception: Requirement (ME100)2 with mechanical exhaust<= the ❑Does Not does not apply. greater of criteria of supply flow, required ventilation rate, exhaust ❑Not Observable flow minu the available transffer CI Not Applicable air(see section details). 6.5.7.2.1 Kitchen hoods>5,000 cfm have ❑Complies Exception: Requirement [ME32)2 make up air>=50%of exhaust ❑Does Not does not apply. air volume. ❑Not Observable ❑Not Applicable 1 High Impact(Tier 1) ' 2 'Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Array Apartments Report date: 09/21/21 Data filename: G:Uacobs Heating &Air Conditioning\10273_Array Apartments\Energy Forms\Array Mech Page 6 of 10 ComCheck.cck Section Mechanical Rough-In I Plans Verified I Field Verified Complies? Comments/Assumptions &Re .ID Inspection i Value Value 6.5.7.2.4 Approved field test used to ❑Complies Exception: Requirement [ME49]3 evaluate design air flow rates ❑Does Not does not apply. and demonstrate proper capture and containment of kitchen ❑Not Observable exhaust systems. ❑Not Applicable 6.5.8.1 Unenclosed spaces that are ❑Complies Exception: Requirement [ME34]2 heated use only radiant heat. ❑Does Not does not apply. ❑Not Observable ❑Not Applicable 6.4.3.9 Heating for vestibules and air ❑Complies Exception: Requirement [ME63J2 curtains with integral heating ❑Does Not does not apply. include automatic controls that shut off the heating system when ❑Not Observable outdoor air temperatures >45F. ❑Not Applicable Vestibule heating and cooling systems controlled by a thermostat in the vestibule with heating setpoint<= 60F and cooling setpoint>= 80F. 6.5.10 Doors separating conditioned �wv ❑Complies Requirement will be met. [ME73]3 space from the outdoors have ['Does Not controls that disable/reset heating and cooling system when ❑Not Observable open. ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Array Apartments Report date: 09/21/21 Data filename: G:Uacobs Heating&Air Conditioning\10273_Array Apartments\Energy Forms\Array Mech Page 7 of 10 ComCheck.cck Section # Rough-In Electrical Inspection Complies? Comments/Assumptions & Req.ID 8.4.2 At least 50%of all 125 volt 15- and ❑Complies [EL10]2 20-Amp receptacles are controlled by ❑Does Not an automatic control device. ❑Not Observable ❑Not Applicable 8.4.3 New buildings have electrical energy ❑Complies [EL11]2 use measurement devices installed. ❑Does Not Where tenant spaces exist, each tenant is monitored separately. In ❑Not Observable buildings with a digital control system ❑Not Applicable the energy use is transmitted to to control system and displayed graphically. 10.4.1 Electric motors meet requirements ❑Complies Requirement will be met. [EL9]2 where applicable. ❑Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Array Apartments Report date: 09/21/21 Data filename: G:\Jacobs Heating &Air Conditioning\10273_Array Apartments\Energy Forms\Array Mech Page 8 of 10 ComCheck.cck Section # Final Inspection Complies?Ii MM Comments/Assumptions & Req.ID 6.4.3.1.2 Thermostatic controls have a 5 °F ❑Complies Requirement will be met. [F13]3 deadband. ❑Does Not ❑Not Observable ❑Not Applicable 6.4,3.2 Temperature controls have setpoint ❑Complies Requirement will be met. [FI20]3 overlap restrictions. ❑Does Not ❑Not Observable ❑Not Applicable 6.4.3.3.1 HVAC systems equipped with at least ❑Complies Exception: Systems with capacity 15,000 Btu/h and with [F121]3 one automatic shutdown control. ['Does Not manual controls. ❑Not Observable ❑Not Applicable 6.4.3.3.2 Setback controls allow automatic ❑Complies Exception: Systems with capacity 15,000 Btu/h and with [F122]3 restart and temporary operation as ❑Does Not manual controls. required for maintenance. ❑Not Observable ❑Not Applicable 6.4.3.5 Heat pump controls prevent ❑Complies Requirement will be met. [F15]3 supplemental electric resistance heat ❑Does Not from coming on when not needed. ❑Not Observable' ❑Not Applicable 6.4.3.6 When humidification and ❑Complies Requirement will be met. [FI6]3 dehumidification are provided to a ❑Does Not zone, simultaneous operation is prohibited. Humidity control prohibits Not Observable the use of fossil fuel or electricity to ❑Not Applicable produce RH > 30%in the warmest zone humidified and RH < 60%in the coldest zone dehumidified. 6.7.2.1 Furnished HVAC as-built drawings ❑Complies Requirement will be met. [F17]3 submitted within 90 days of system ❑Does Not acceptance. ,ONot Observable ❑Not Applicable 6.7.2.2 Furnished O&M manuals for HVAC ❑Complies Requirement will be met. (FI8]3 systems within 90 days of system ❑Does Not acceptance. ❑Not Observable ❑Not Applicable 6.7.2.3 An air and/or hydronic system ❑Complies Exception: Requirement does not apply. [FI9]1 balancing report is provided for HVAC ❑Does Not systems serving zones >5,000 ft2 of ❑Not Observable conditioned area. ❑Not Applicable 6.7.2.4 HVAC control systems have been DComplies Requirement will be met. [Fi10]' tested to ensure proper operation, ❑Does Not calibration and adjustment of controls. Observable ❑Not Applicable 10.4.3 Elevators are designed with the '❑Complies Exception: Requirement does not apply. [F124)2 proper lighting, ventilation power, and ❑Does Not standby mode. ['Not Observable ❑Not Applicable Additional Comments/Assumptions: F 1JHigh Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1Low Impact(Tier 3) Project Title: Array Apartments Report date: 09/21/21 Data filename: G:'Jacobs Heating&Air Conditioning\10273_Array Apartments\Energy Forms\Array Mech Page 9 of 10 ComCheck.cck Project Title: Array Apartments Report date: 09/21/21 Data filename: G:\Jacobs Heating&Air Conditioning\10273_Array Apartments\Energy Forms\Array Mech Page 10 of 10 ComCheck.cck