Loading...
Report GEOPACIFIC Job No. 18-5046 Lot 1 Trillium Hill We have prepared this report for David Weekly Homes, and it should not be relied upon by third parties without consulting GeoPacific. Within the limitations of scope, schedule and budget, GeoPacific attempted to execute these services in accordance with generally accepted professional principles and practices in the fields of geotechnical engineering and engineering geology at the time the report was prepared. The conclusions and interpretations presented in this report should not be construed as a warranty of the subsurface conditions. No warranty, expressed or implied, is made. The scope of our work did not include flood hazard evaluations, environmental assessments, the presence or absence of wetlands; or potential hazardous substances in the soil, surface water, or groundwater at this site. We appreciate this opportunity to be of service. Sincerely, GEOPACIFIC ENGINEERING, INC. - RED PRO �'\,n G I N E6- s�o N4 > 14743PE) 11 / OREGON ��✓4N•23,AO MES D.me' EXPIRES:06/30l20 James D. Imbrie, G.E. Geotechnical Engineer , 404 ULHERN -KU .P RESIDENTIAL S TRUCTURAL Et: 7220 Trade Street,Suite 350,San Diego,CA 92121►p 619-550-0010►rlrultlernkulp.corn June 10, 2021 Elizabeth Morse DAVID WEEKLEY HOMES 1905 NW 169th Place Suite 210 Beaverton,OR 97006 TRILLIUM COMMUNITY - ALL MODELS TALL CRAWLSPACE FND WALL WITH FRAMED WALL ABOVE M+K Project#: 211-21000 Reference Structural Plans,prepared by Mulhem d Kulp Tall Craw/space Fnd Wall with Framed Wall Above,Detail SK-i Elizabeth: Pursuant to your request,we are providingthis letter to address the crawls ace foundation walls at sloping grade q p p g g ade conditions for lots in the Trillium Community.It has been reported that when sloping grade conditions occur the concrete foundation walls at the side and rear of the hope step down per the grade and have a 2x framed wall to the underside of the main floor framing.It has been requested that a general detail be created to document the maximum allowable concrete wall and 2x framed wall heights. Based on our evaluation,please see the following foundation detail for the required framed wall and concrete wall specifications for the tall crawispace conditions. co tiNG1NEFg Respectfully, tcr y 93737PE c" MULHERN &KULP STRUCTURAL ENGINEERING, INC. '}`tom,.l l Nicholas J.Dastalfo Project Engineer 2 Nicholas 1.Martignetti P.E. Associate Owner+San Diego Office Director y0 4 Y i o, 24 4� e4S J. MO \G EXPIRES: 12131 m..:�2 P VCllent Filesl211-David Weekiey-P0R12021121000-General Client Admin12021-06-08-Tall Crawlspace Fnd Wallsl2021-06-10-T ilium-Tall Crawl with Framed Wall Above.docx V 2x EXTERIOR 1 IEAR WALL FASTEN SOLE PLATE TO RIM BOARD w/3"xO.13I" NAILS @ 6" O.G. SHTG. SPLICE „ ,,—,,(ir,,,,,,,,,,,.i(, 0/8" 05B RIM BOARD II aI FLOOR SYSTEM FASTENED TO DBL. TOP II II (SEE PLANS) PLATE w/(I) SIMPSON . 1 A35 CLIP @ 24" O.G. I 11 I I SHTG. SPLICE PROVIDE SOLID BLOCKING 2x6 P.T. SILL PLATE /� OR MATCHING PO5T5 TO FND. wITYP. ANCHOR BOLTS V UNDER ALL POSTS ABOVE -5EE I/5D-I 5' 2x6 DF #2 GRADE (OR BE I I tR) 1 ® 16" O.G. EXT. WALL w/36" 05B - 't SHTG. FASTENED PER 3" O.G. GRADE EDGE NAIL SPEC. `1- __..1 1 I ( I I— Id 8" THICK w/(I) #4 HORIZ. 0 1 I1 11 I 11 $ TOP OF WALL 4 (I) i w ca I I —G MID-HEIGHT Ci o —1 I I„ - .,�X Q j •: 1,. i Q VAPOR BARRIER PER ARCH Qw O •�a • O - T"x15" GONG. FTC. w/(I) #4 CONT. 4 #4 X Q = . On DOWELS ® 48" O.G. PROVIDE STND. p a d HOOK 4 EXTEND TO TOP OF STEM WALL - R z0 • DIRECTION OF HOOKS) 11 v 1—III ,,,,/_(ALTERNATE III;,IiI- a f ea TALL GRAW S LSPAGE FNn WALL �,:�,NG "FR sow w/ FRAMED HALL ABOVE 93737PE ASCALE: 3/4•=1'-O• , „ OREGON 0 ��� CO G4 10, 2Q� �� 9S J. MA?' EXPIRES: 12*:=fzo M&K project number: 2 1 I—21000 44 M U LH ERN+KU LP TRILLIUM HILLS project mgr: NJM RESIDENTIAL STRUCTURAL ENGINEERING drawn by: NJD 7220 Trade So►eec,Suite35o.San Diego,CA921z1 GA 1t 9 OR issue date: 06—I0-2021 p 619-650-0010►mulhemkulp.c*om sheet no.: 5K—I