Loading...
Report ►td( T202.I_0012.7 11917 NE 95rr Street,Vancouver,Washington 98682 Geotechnical s Environmental . Special Inspections Phone: lumbi weste,Fax: ringic 3-2901 Columbia West www.columbiawestengineering.com V ii c) n e e r I r g , Inc • ''‘gc\ 143.9PRIETARY ANCHORS INSPECTION REPORT PROJE CLIENT PROJECT NO. REPORT DATE 11065 SW 79th Avenue TGK Construction LLC 21207 08-18-21 Tigard,OR 97223 Portland,Oregon 97211 PERMIT NO, REPORT NO. MST-2021-00127 21207-081821-PA1 INSPECTOR INSPECTOR ID# MDK SI-01250 CONTRACTOR(S) PROJECT REPRESENTATIVE(S) WEATHER PAGE TGK Tom clear 1 of 1 TYPE OF INSPECTION FREQUENCY OF INSPECTION ®Adhesive Anchors ❑Mechanical Anchors ®New Inspection ❑Re-Inspection ®Continuous ❑ Periodic LOCATION(S)/ITEM(S) Existing foundation @ 3/C&D REFERENCED DOCUMENTS 6/9/21—Shts.—S1.1—S2.2 detail-2 PRODUCT/ANCHOR DETAILS MANUFACTURER/DESCRIPTION LOT NUMBER(S) ADHESIVE EXPIRATION DATE(S) Simpson Set—XP22-N 1000158155 4/20/23 ANCHOR TYPE ❑All-Thread Rod ®Reinforcing Steel(Rebar) ❑ Expansion Anchor ❑Screw Anchor El Other: MATERIAL/COATING GRADE(ASTM) DIAMETER(in.) LENGTH(in.) ❑Stainless Steel ❑Galvanized ❑Zinc ®Other:none A615 %z" 48" BASE MATERIAL TYPE STRENGTH(psi) THICKNESS(inches) TEMPERATURE(°F) ®NW Concrete ❑LW Concrete ❑Brick ❑CMU ❑Other: unknown 24" 60 APPLICATION ORIENTATION(check all that apply) SPACING(in.) EDGE DISTANCE(in.) EMBEDMENT(in.) TORQUE(ft-Ib)—WRENCH/IMPACT ®Horizontal ❑ Inclined ❑Vertical El Overhead 12" N/A 6" N/A Hole preparation and installation per project documents,manufacturer specifications and evaluation report? ®Yes ❑ No NARRATIVE Arrived on site as scheduled for proprietary anchor inspection, observed the placement of four#4A615 dowels placed in clean dry holes and epoxied into place with Simpson Set—XP22-N epoxy system. PARTIES NOTIFIED: ®General Contractor 0 Subcontractor 0 Architect 0 Engineer ❑Owner 0 Other: 0 Standby time: ® To the best of my knowledge,the work inspected above was in general accordance with approved project documents,specifications and applicable workmanship provisions of the International Building Code. El NCR Issued ❑Except As Noted ❑Requires Engineer's Acceptance ❑Re-Inspection Required ❑Unapproved Drawings/Plans/Materials This report may not be reproduced except in full without prior written authorization by Columbia West Engineering,Inc. COLUMBIA WEST ENGINEERING,INC. authorized signature C W E-c16-r02/24/20