Report .• , iS 1 ZOo&.�t
Portland, Oregon I Kansas City, Missouri
1� VISTA
\ -.11400 —STRUCTURAL —
•
June 29, 2021
Mountainwood Homes
Re: 12655 SW 11th PI
Vista Structural Engineering, LLC,was asked to address the following questions for the renovation of the house at
12655 SW 11th Pl.:
The new ledger board between the existing exterior wall and the new addition,is attached to the existing stem
wall and the existing exterior stud wall. How to properly attach the new ledger at the stud wall,and concrete
stem wall?
At the location indicated per the attached partial plan snip on the following page,a new 2x10 ledger is supporting
new 2x10 floor joists at an existing exterior wall.A step in the stem wall occurs at the point between the existing
crawlspace and existing concrete slab garage.
Per the attached calculations and detail on the following page, the ledger board is attached to the stem wall with
5"long x%"diameter TITEN HD concrete screws at 8"on center, and each screw resists 211Ibs of shear. This
loading is below the allowable concrete breakout design strength of 11531bs for each bolt, therefore, we
recommend approving this attachment method.
At the stud wall location, the ledger board is attached to each stud with(2)5"long Simpson SDS screws. Per the
attached calculations and detail on the following pages, each SOS screw resists 2111bs of shear. This load is below
the allowable shear strength of 3501bs for each SDS screw, therefore, we recommend approving this attachment
method.
Our firm appreciates the opportunity to serve you. If you have any questions or if you need anything further,
please feel free to contact us.
Sincerely,
Vista Structural Engineering, LLC
r-c—D PRODennis Heier, P.E. 85273
OREGON
NN
0 1, 14.
EXPIRES:6✓3O/2021
VISTA STRUCTURAL ENGINEERING, LLC
14718 NW DELIA STREET PHONE: 971.645.0901
PORTLAND, OREGON 97229 - 1 - VISTASTRUCTURAL.COM
i .
.
Portland,Oregon
641114t) V I S T A Kansas City,Missouri .
11% 1.0 —STRUCTURAL—
-,...
/ / ,,/
1 / / /
/ /(E)CRAVASPACE , / /
,----
,-/ / /. // ,/ / OS / 1 /I 2.1
/ /
/ /7 / /iuir , i ...:,..4......0.11 ,
-,/ / / '"/ _,. - -
_ k SIMPSON LLIS2.10 WD=5.75'x 15 psf=86#41
-7-7,2•4-7- - "-- - ',„ HANGERS,'NA.
/ -.1 / / 1
/ /- ' - - t., 1 WL.5_75 x 40 psI=230#111
,/'• 7/:
D+L=316 e
t
/ / //7i -- / j't INTO CONCRETE;5"-LONG x 1;2"-DIAMETER TITEN
/ / ./ / 7 / I I HD SCREWS @ 8'/BOLT (0 67FT;BOLT)
/ '''" t t
/// / i r g
,/ / / . AT CONCRETE:
316#4t x 0 67 FT;E3OLT.211#;BOLT
Z. _ - _
'/ • /. • .. ; • -,/HD. n" ' ' AT STUDS.
/1 I.,
&'i- 31 6#41 X 1 33 ft;slud.422Nrstud
• I \ c),f.
4— INSTALL TWO SCREWS @ EACH STUD;
/Y.': V UPGRADE EXISTING WAIL TO 'I. 0 f& THEREFORE,CAPACITY OF EACH SCREW
MATCH NOTED SKARWALL / •'
,F=1,4.2
REQUIREMENTS WITH OWL AND/ I REQUIRED.211#;SCREW(MIN.)
.y/.. / EPDXY ANCHORS PER 7/52.1 F.
, -.-q
= • / HOLDOWNS AND TITEN HD SO ii,I.-LT / A'
/ . PtATE ANCHORS PER THE/ , I 54
•=,,,-.• SHEARWALL SCHEME. .1 ' • PER SIMPSON MANUAL,5"SDS SCREW WITH 1
1.2'SIDE PLATE MEMBER HAS SHEAR VALUE OF
//`•'/1 • V / 9 I'''
r , - ,; .- '• •• -. /I 3504;SCREW THEREFORE.TWO SCREWS PER
STUD IS SUFFICIENT
/ //y z / •,./ /. . ,,
•: 7' --• '- /' /' /*" /. I-v ,/ /' L
Z. 1 1
HD-1101.12, 4
Al OM GRADE .,"
,.• , •• / / / / / ,, F
/.'../:4` ./ -i< /' •::',:/-, /1 ,:
• / '/./ ./.- '-2 ' / -' A ' -
"/:>./.- ink 7.I ENO BEARING&I
. .' /• / • ==".==1 /„‘'',•IFIP .. ', I POCKET,v./35"AIR SP
/ '// .7.' //,/ , <' I. AT END&SIDES,
/,' I/-.• -/:/ ..= . • :. '/'- I (56)
-/
/' j / / .,' • %*1
Partial foundation& main floor framing plan @ existing wall to new ledger connection.
VISTA STRUCTURAL ENGINEERING, LLC
14718 NW DELIA STREET PHONE: 971.645.0901
PORTLAND, OREGON 97229 - 2 - VISTASTRUCTURAL.COM
r 1
•
SIMPSON Anchor Designer TM Company: Vista Structural Engineering Date: 6/29/2021
Engineer: JTS Page: 1/5
Strong-Tie Software Project: #3174
Version 3.0.7808.0 Address: 14718 NW Delia St, Portland, OR 97229
Phone: 971.645.0901
E-mail: jon@vistastructural.com
1.Project information
Customer company: Mountainwood Homes Project description: 12655 SW 11th PI
Customer contact name: Location:
Customer e-mail: Fastening description:
Comment:
2.Input Data&Anchor Parameters
General Base Material
Design method:ACI 318-14 Concrete: Normal-weight
Units: Imperial units Concrete thickness,h(inch):6.00
State: Cracked
Anchor Information: Compressive strength,fc(psi):2500
Anchor type:Concrete screw 'Pc,v: 1.0
Material:Carbon Steel Reinforcement condition: B tension, B shear
Diameter(inch):0.500 Supplemental reinforcement: Not applicable
Nominal Embedment depth(inch):3.500 Reinforcement provided at corners: No
Effective Embedment depth, her(inch):2.560 Ignore concrete breakout in tension: No
Code report: ICC-ES ESR-2713 Ignore concrete breakout in shear: No
Anchor category: 1 Ignore 6do requirement: Not applicable
Anchor ductility: No Build-up grout pad: No
hmin(inch):5.42
can(inch):3.88
Cmin(inch): 1.75
Smin(inch): 3.00
Recommended Anchor
Anchor Name:Titen HD®-1/2"01 Titen HD, hnom:3.5"(89mm)
Code Report: ICC-ES ESR-2713
II \ \ \ \ \ \ \ \ \
Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility.
Simpson Strong-lie Company inc 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847 3871 www.strongtie.com
•
•
Portland,Oregon � —STRUCTURAL
`�j - Kansas City,Missouri
•
��
VaSTA
AL—
,
-TT"-
WALL
DEM EXTERIOR
ABOVE
I BOUNDARY EDGE NAILING PER PLAN
(N)PLYWOOD
SHEATHING PER PLAN
(E)ELOOR SHEATHING (N)FLOOR JOISTS PER PLAN
(E)FLOOR FRAMING J HANGER PER PLAN
PER PLAN
(E)ANCHOR BOLTS (N)2x1O LEDGER FASTENED TO(El
STEMWALL WI 34'0 SIMPSON MEN HD ET
B"0.C.(STAGGERED)WI 3 W MIN.EMBED
(E)CONCRETE STEM WALL 1
VAPOR BARRIER
Ledger to existing concrete stem wall detail.
(N)PLYWOOD
SHEATHING PER PLAN
(L)2x STUD WALL W/
STUDS AT 16"D.C. (N)FLOOR JOISTS PER PLAN
II
IIIIIII
(E)CONCRETE SLAB ON GRADE . HANGER PER PLAN
) (N)WO LEDGER FASTENED W/(2)0,'O x 5"
A' 1 SIMPSON SOS SCREWS IN EA STUD
FIELD VERIFY(E)WALL ANCHORAGE. i
PROVIDE T@TEN HD ANCHORS IF(El
ANCHORS DO NOT MEET MIN. I
REQUIREMENTS PER SHEARWALL N. (E)CONCRETE STEM WALL
SCHEDULE
j z- VAPOR BARRIER
Ledger to existing stud wall detail.
VISTA STRUCTURAL ENGINEERING, LLC
, 14718 NW DELIA STREET PHONE: 971.645.0901
PORTLAND, OREGON 97229 - 3 - VISTASTRUCTURAL.COM
SIMPSON Anchor Designer TM Company: Vista Structural Engineering Date. 6/29/2021
Engineer: JTS Page: 3/5
Strong-Tie Software Project: #3174
Version 3.0.7808.0 Address: 14718 NW Delia St, Portland, OR 97229
Phone: 971.645.0901
E-mail: jon@vistastructural.com
<Figure 2>
•
CD
•
V
2.00 16.00
Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company inc. 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.strongtie.com
SIMPSON Anchor DesignerTM Company: Vista Structural Engineering Date: 6/29/2021
Engineer: JTS Page: 2/5
S ngTie Software Project: #3174
�7 1 Version 3.0.7808.0 Address: 14718 NW Delia St, Portland,OR 97229
® Phone: 971.645.0901
E-mail: jon@vistastructural.com
Load and Geometry
Load factor source:ACI 318 Section 5.3
Load combination: not set
Seismic design:No
Anchors subjected to sustained tension: Not applicable
Apply entire shear load at front row: No
Anchors only resisting wind and/or seismic loads: No
Strength level loads:
Nua[Ib]:0
V.[Ib]:0
Vuay[lb]:211
<Figure 1>
0 lb
Z
IP
t
I
Yv., / .._,,.,..
X '''1►
Y
O lb
211 lb
:7
1
F
r
r, Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.strongtie.com
,r,,
F
t�
SIMPSON Anchor Designer TM Company: Vista Structural Engineering Date: 6/29/2021
Engineer: JTS Page: 5/5
Strong-Tie Software Project: #3174
Version 3.0.7808.0 Address: 14718 NW Delia St, Portland, OR 97229
Phone: 971.645.0901
E-mail: jon@vistastructural.com
kcp ANc(in2) ANco(in2) V'ed,N YjC,N Pcp,N Nb(Ib) 0 OVcp(lb)
2.0 44.85 58.98 0.856 1.000 1.000 3482 0.70 3174
11.Results
11.Interaction of Tensile and Shear Forces(Sec.D.7)?
Shear Factored Load,V.(Ib) Design Strength,reVn(Ib) Ratio Status
Steel 211 4473 0.05 Pass
T Concrete breakout y+ 211 1153 0.18 Pass(Governs)
II Concrete breakout x- 211 2562 0.08 Pass(Governs)
Pryout 211 3174 0.07 Pass
1/2"0 Titen HD,hnom:3.5"(89mm)meets the selected design criteria.
12.Warnings
-Designer must exercise own judgement to determine if this design is suitable.
-Refer to manufacturer's product literature for hole cleaning and installation instructions.
Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925 560.9000 Fax:925.847.3871 www.strongtie.com
SIMPSON Anchor DesignerTM Company: Vista Structural Engineering Date: 6/29/2021
Engineer: JTS Page: 4/5
Stroh Tie Software Project: #3174
Strong-Tie 3.0.7808.0 Address: 14718 NW Delia St, Portland,OR 97229
Phone: 971.645.0901
E-mail: jon@vistastructural.com
3.Resulting Anchor Forces
Anchor Tension load, Shear load x, Shear load y, Shear load combined,
N.(lb) V.(Ib) Vuay(Ib) 4(Vuax)2+(Vuay)2(lb)
1 0.0 0.0 211.0 211.0
Sum 0.0 0.0 211.0 211.0
Maximum concrete compression strain(%o):0.00
Maximum concrete compression stress(psi):0
Resultant tension force(Ib):0
Resultant compression force(Ib):0
Eccentricity of resultant tension forces in x-axis,e'Nx(inch):0.00
Eccentricity of resultant tension forces in y-axis,e'Ny(inch):0.00
Eccentricity of resultant shear forces in x-axis,e'vx(inch):0.00
Eccentricity of resultant shear forces in y-axis,e'vy(inch):0.00
8.Steel Strength of Anchor in Shear(Sec.17.5.11
Vsa(lb) Ogrout 0 bgiout0Vsa(Ib)
7455 1.0 0.60 4473
9.Concrete Breakout Strength of Anchor in Shear(Sec.17.5.2)
Shear perpendicular to edge in y-direction:
Vby=minI7(le/da)024daA.a4fccall 5;92a4fccall.sl(Eq. 17.5.2.2a&Eq. 17.5.2.2b)
/e(in) da(in) Aa fc(psi) cal(in) Vby(Ib)
2.56 0.500 1.00 2500 4.00 2745
bVcby=0(Avc/Av )YvYvPvVy(Sec. 17.3.1 &Eq. 17.5.2.la)o , ', h, b
Avc(in2) Av.(in2) Y'ed,v Y'c,v Th,v Vby(Ib) 0 tbVcby(Ib)
48.00 72.00 0.900 1.000 1.000 2745 0.70 1153
Shear parallel to edge in x-direction:
Vby=minl7(/e/da)024da laIfcCal1 s;92allfcCa11•5I(Eq. 17.5.2.2a&Eq. 17.5.2.2b)
le(in) da(in) Aa fc(psi) cal(in) Vby(Ib)
2.56 0.500 1.00 2500 4.00 2745
0Vcbx=0(2)(Avc/Avco)w.ed,vw_c,vYyh,vV.by(Sec. 17.3.1, 17.5.2.1(c)&Eq. 17.5.2.1a)
Avc(in2) Av.(in2) 'Yed,v Y'qv Vh,v Vby(Ib) 0 fVcbx(Ib)
48.00 72.00 1.000 1.000 1.000 2745 0.70 2562
10.Concrete Pryout Strength of Anchor in Shear(Sec.17.5.31
0Vcp=0kcpNcb=Okcp(ANo/ANco)Yed,N-c,NY'cp,NNb(Sec. 17.3.1 &Eq. 17.5.3.1a)
Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.strongtie.com
•
Bend Office (541)330-9155
Geotechnical Office (503)601-8250
Carlson Testing, Inc. Eugene Office Salem Office (541)345-0289
(503)589-1252
Tigard Office (503)684-3460
Daily Report of Proprietary Anchors
Project: / �;4 Sth par' r;n
Address: /765`7 :Si;i �u 7,‘4. c CTIJob#: 7'Z/O31'6Z.
CTI representative / +'< ?c%+,,rrrr' / 5 T 'c/y/ was on site this date r 70-7/ to perform
(Inspector Name&Cert.No.)
Special Inspection for rlLi permit DFS#(s) t;%('1'° jurisdiction
In some cases more than one box may be checked for a given item.
SCOPE OF INSPECTION Location of proprietary anchors inspected[to include grid
lines,elevations(floors)and drawing details]:
1.Checked in with superintendent or client representative. Li (-. f (-
Name: P . ijC rye tvr x,� �.
Name: t r �l<r,erf�' for ',
�f
Company: /I'1 r:rjh r+t n i 'rx '`(ltrar
`"LA' a.
fr r, r
2.Inspection was"IBC" El Continuous Periodic
PROPRIETARY ANCHORS , �' -;,4,,1•
Yes No N/A
1.Reviewed previous inspection reports?
2.Reviewed evaluation report?
REPORT SUMMARY
Verified following items meet manufacturer's
published installation instructions. 1.Work inspected was: El Completed El In progress
3.Verified minimum embedment depth of the 2.Completed work inspected a was El was not
anchors.
4.Verified installation of the anchors. in compliance with
5.Verified anchor diameter. Q Approved plans and specifications El Shop drawings
6.Verified steel grade. RFI Design change Submittal N/A
7.Verified hole diameter. Document#(s) Dated: '
8.Verified type of drill bit used. 3.Noncompliance item(s)were noted this date,details on
9.Verified hole cleaning method. following page(s). Yes No N/A
10.Verified adhesive application.
11.Verified edge distance. 4.Noncompliance item(s)were reinspected this date,details
12.Verified spacing. on following page(s). EI Yes No 0 N/A
13.Verified installation torque. Ej Conform ❑ Remain in progress
Evaluation report number&date: Report(s)findings were discussed and left with
77cv ` ffr Ju UY /
Of l/ 1,l[.!"ltra&V err"^ //[5r'r
Name of product being installed `e
Batch Number f0130/u/'MCC
Expiration Date ?��/� /
Based on the Code,approval is required from the Building Official before the SPECIAL INSPECTED items noted above can be
covered.Carlson Testing has no authority to direct work of contractors or subcontractors.
Inspector Signature:
See additional report page(s). El Distribute attachments. Page t of
PropAnchors V er.1 2/12/2009
Terms:
Client recognizes that construction observation and/or testing services provided by CTI are techniques
which may reduce the risk of construction defects, deficiencies, or omissions arising during or after con-
struction. Services performed by CTI do not constitute a warranty or guarantee of any type. Even with
diligent construction monitoring and/or testing by CTI, construction defects, deficiencies, or omissions
in the Contractor's work may exist. In all cases, Client and/or the Contractor shall assign the Contractor
the responsibility for the quality and completeness of the work and for adhering to plans and specifica-
tions. CTI's work or failure to perform same shall no in any way excuse any contractor, subcontractor,
or supplier from performance of its work in accordance with the contract documents.
CH will provide its professional services to Client with that degree of care and skill ordinarily exercised
under similar circumstances by members of its profession.. This representation is in lieu of other warran-
ty or representation, either expressed or implied. It is also understood and agreed that statements made
in CTI reports are observations based on technical judgements, and should not be construed to be con-
clusive representations of fact. If conditions different from what are indicated in the reports come to
Client's attention after receipt of the reports, it is recommended that Client contact CTI immediately to
authorize further appropriate evaluation.
CTI's work shall not include determining, supervising or implementing the means,methods,techniques,
sequences,or procedures of construction.CTI shall not be responsible for evaluating or repoi ting.job con-
ditions related to health, safety or welfare.