June 22, 2021
Kazem Abunnadi,
Subject: Residential Remodel
12280 SW Summer St.,Tigard,OR
UTF Consulting Job Number:21-006
Mr.Abunnadi,
This letter is in reference to a request by the City of Tigard inspection team for this office to
provide a structural summary letter for the above listed residence.
Geoffrey D.Wright, PE has been on site multiple times during construction to observe the
structural supporting elements of the remodeled residence, including items the inspection team
requested specific review.
Specific items include,but are not limited to:
• Roof Eaves/bearing seat at south roof rafters, including the additional splice plates,
• Floor framing support at bathroom area,
• Strapping/hangers at various locations, including;
o Roof ridge to support columns
o Rear sliding glass door at SW Bedroom
After review, I take no exceptions with the structural framing supports that I have reviewed, and
conclude that the meet or exceed the minimum building code requirements.
If you have any questions or require additional information, please do not hesitate to contact
this office.
Respectfully,
(4-viNee \\\
At....A4. ,,o6ii, .1 N4,---,,
UTF Consulting�1 Q0047Geoffrey D.Wright, PE, \ "A.�-trrn.,2w%'
Principal RFY D'
EXPIRES' 06,30/2C22...
i
UTF Consulting(P)503-522-2849 geoff@utfconsulting.com