Loading...
Correspondence Dianna Ornelas HST-2021-00352. From: Sean O'Neill <sean@canopypdx.com> Sent: Wednesday, August 11, 2021 9:10 AM To: Nikki Tuason; Samedy Kern- Designer Cc: #Building Permit Technicians; Agnes Lindor Subject: Re: FW: 15754 SW 76th Ave - Lot 3 /4 A/9u55 S(A-/32 ((u S /O Attachments: WaterMeters_070121_New-15754 SW 76th.pdf;WaterMeters_070121_New-15752 SW 76th.pdf; Lot 3 Site Plan 08112021.pdf Warning!This message was sent from outside your organization and we are unable to verify the sender. Hi Nikki, Sam has updated the drawing to show the tree. He also has updated the structurals and building plans and taken them in for delivery last week. The plans should already be at the City. Also, I have attached 2 of the water meter fixture count sheets. Note, our expectation and hope is to have a single 1" water meter service for both units and that we will submeter the units from there. I just want to make sure nothing we are doing now will preclude us from doing that. gal /J/"✓G- /' TA /h7/ / 7#A/1G /47JS 7?) Thank You, s /ZE ¢ IV 7-41-1 °/- Sean O'Neill a ,n4_0e/`7S O/— f/2/ /1 ,,"- - 77) 7� ''A E J -�- S.6 C-s � - / elf / J , On Tue, Aug 10, 2021 at 4:57 PM Nikki Tuason<nikkitCa@tigard-or.gov>wrote: _ `2/ of:X Hi Sean, j Apologies for the double email but I wanted to correct the information below, please submit two (2) sets of engineering calculations rather than three (3) and please submit a Utility Billing worksheet for each address on the property (not just the ADU).The worksheet will need to be completed for each address so that we are able to assess the correct fees to charge on the sewer permit. Thanks, Nikki • From: Nikki Tuason Sent:Tuesday, August 10, 2021 3:49 PM To:Sean O'Neill <sean@canopypdx.com> Cc:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov>; Agnes Lindor<agnesl@tigard-or.gov> Subject: RE: FW: 15754 SW 76th Ave - Lot 3 1 E i • Dianna Ornelas From: #Building Permit Technicians Sent: Monday, August 16, 2021 12:18 PM To: Sean O'Neill Cc: Nikki Tuason Subject: FW: Building Permit Submittal/SDC Deferral/Exemption Questions Attachments: address_application.pdf; BUP_RES_PermitApp.pdf; MEC_PermitApp_082520.pdf; ELC_PermitApp_ELR_ERE_061715.pdf; PLMU_PermitApp.pdf; Fees_SDC_Charges_070121 _DRAFT.pdf Importance: High Hello Sean, I understand that you have submitted additional information for Nikki Tuason to review. Planning has not deemed this a complete review and routed to building division, however I noticed that there are no mechanical, electrical or plumbing permit applications in the application packet for the primary(15754) or ADU (15752) per my instructions highlighted below. Please complete the attached forms, (1) set for each address, and email them to TigardBuildingPermits@tigard-or.gov at your earliest convenience so that there is no further delay. If you do not have a licensed contractor selected, it is ok to submit applications with TBD under the contractor section, however we will need the contractor information and the electrical application signed by the signing electrical supervisor before we can issue the permits. Thank you and please let me know if you have any questions. r Dianna L. Ornelas Building Division Services Supervisor City of Tigard I Community Development 13125 SW Hall Blvd I Tigard, OR 97223 503-718-2430 Direct 1503-718-2439 Permits From:#Building Permit Technicians Sent:Thursday,June 17, 2021 5:47 PM To:Sean O'Neill<sean@scotiawsh.com> Cc: Nikki Tuason <nikkit@tigard-or.gov> Subject: RE: Building Permit Submittal/SDC Deferral/Exemption Questions Hello Sean, Thank you for contacting us regarding your ADU submittal. Here is some information regarding the permit process: • Land Use Approval: A land use application for an ADU must be submitted and approved prior to submittal of building permit applications. Please contact the planner on duty at PlannerOnDuty@tigard-or.gov regarding the land use approval process, zoning, setbacks, etc. Done: Land use case ADU2021-00016 was approved on 3/23/2021. 1 • New Address: A new address for the ADU must be applied for and received prior to submittal of building permit applications. See attached address application and contact the engineering technician Oscar Contreras at oscarc@tigard-or.gov if you have any questions about addressing. I see that 5 new addresses were assigned to this subdivision, however each dwelling unit, including ADUs, must have their own address. You will need the new ADU address assigned before you can submit building permit applications. We will add a $50.00 address fee to the ADU permit and provide instructions to pay the fee online. • SDC Exemptions: Some transportation and parks SDCs may be exempt for ADUs. Please contact Christine Moody at christine@tigard-or.gov for more information. The recorded exemption document must be submitted prior to issuance of the building permit. The SDCs are based on permit application submittal date and are subject to increase effective 7/1/2021. Please see attached SDC chart for the proposed rates. • SDC Deferrals: Tigard transportation and parks SDCs may be deferred to occupancy. Please contact Agnes Lindor at agnesl@tigard-or.gov for information and application forms to defer to occupancy. • Water Meters: Water meters are purchased after building permit is issued. Please contact Utility Billing division for the Tigard Water District at UBOnlinepay@tigard-or.gov for the purchase of water meters. If you are not in Tigard's district,you may need to contact the Tualatin Valley Water District. • Building Permit: A combination or'master' permit will be issued for each separate dwelling unit address. The master permit will encompasses structural, mechanical, electrical and plumbing work all under a single master permit, and we require that all four of the attached applications be completed and submitted together as a packet. Please see Page 2 of the residential building permit application for complete submittal requirements. In summary, we require: o Completed applications, including project valuation for each separate dwelling. o (3) copies of site plan, drawn to scale, no larger than 11x17. o (3) copies of construction plans that include both the primary and ADU dwelling units on the same set of plans. o (2) copies of engineering calculations. o (2) copies of truss details. • Sanitary Sewer: A 4" sanitary sewer line is required if the total#of bathrooms for the lot equals (4) or more, including the primary and ADU dwellings. o A sanitary sewer connection permit will be issued with the master permit and the fee is based on the total number of bedrooms for all dwelling units combined as follows: • First (5) bedrooms= (1) DU at$5,800 each DU; each additional (2) bedrooms= (1) DU; each additional (1) bedroom = (.5) DU. • If you have any building code questions, please contact the plans examiner Allyson Armstrong at a l lysona @tiga rd-or.gov. We require hardcopies of all application materials be submitted to a drop box in the lobby of the Permit Center, Monday-Thursday, 8 am to 5 pm. We are closed on Fridays. No appointment is necessary and no fees are due at application submittal. Once the application is deemed complete,the permit technicians will contact you to pay a plan review submittal fee online before routing offsite for plan review. The entire review process can take 4-8 weeks, and the permit technicians will contact you as soon as the permit is ready to issue. Please let me know if you have any questions. Thank you and we look forward to review of your project! Dianna L.Ornelas Building Division Services Supervisor City of Tigard I Community Development 13125 SW Hall Blvd I Tigard, OR 97223 503-718-2430 Direct 1503-718-2439 Permits 2 From: Sean O'Neill<sean@scotiawsh.com> Sent: Monday,June 7, 2021 11:39 AM To:#Building Permit Technicians<TigardBuildingPermits@tgard-or.gov> Subject: Building Permit Submittal/SDC Deferral/Exemption Questions 1 . ‘ Warning!This message was sent from outside your organization and we are unable to verify the sender. Hello, I am getting ready to submit an application for a building permit on a property in the City of Tigard. We will be submitted an application for a 2 unit structure (a primary residential structure with an attached ADU). Where do we provide this submittal? Is there an email we send it to or a portal we upload it to? Also, I am wanting to defer my SDCs as well as apply for SDC Exemption for the ADU. I have attached my partially completed application form to make sure I am using the correct form and have also attached the SDC Exemption form I am planning to submit as well. Can you confirm we are submitting the correct forms and also confirm where we should submit these forms? Also, can you let us know what we need to do as far as submitting for the deferral request? Please feel free to call me at 503 956 9307 with any questions. Thank You, Sean O'Neill 3 Agnes Lindor From: Agnes Lindor Sent: Tuesday, September 14, 2021 2:54 PM To: Sean O'Neill Cc: #Building Permit Technicians; Trent Brickey Subject: 15752/ 15754 SW 76th Ave/ MST2021-00352 and 353 Sean- These permits require revisions to the site plan. Please provide a revised site plan showing: - Vegetated filter strip; and - Utility laterals(storm sewer). If you have any questions, please contact Trent.Thanks Agnes Lindor I Associate Planner City of Tigard I Community Development 13125 SW Hall Boulevard Tigard, Oregon 97223 Phone: 503.718.2429 Email: AgnesLPtigard-or.gov 1 Julie Drinkwater From: Sean O'Neill <sean@canopypdx.com> Sent: Tuesday, October 26, 2021 9:30 AM To: #Building Permit Technicians Subject: Re: FW: MST2021-00352, SWR2021-00228, & MST2021-00353, 15754 & 15752 SW 76, Knauss Estes, Lot 3, Primary&ADU Attachments: Scan_023015 (1).pdf; Scan_023017 (1).pdf Categories: Julie Warning!This message was sent from outside your organization and we are unable to verify the sender. Hi Julie, I have attached the Electric Permit Applications to submit. The mechanical contractor information is as follows: Jacobs Heating & Cooling 4474 SE Milwaukie Avenue Portland, OR 97202 503-369-5483 CCB 1441 Plumbing Contractor is as follows: Alliance Plumbing 146 W Historic Columbia River Highway Troutdale, OR 97060 503-577-6535 CCB: 184601 Please let me know if there is anything further you need from me to get these permits released. Thank you! Sean O'Neill On Tue, Oct 26, 2021 at 7:55 AM #Building Permit Technicians<TigardBuildingPermits@tigard-or.gov>wrote: Hello Sean Thank you for submitting the electrical permit applications for this project. 1 • I see that there are (2) attachments of the electrical permit application for the address of 15752. Couldyou please tell us which one you would prefer to submit? • We need to have the mechanical contractor information • We need to have the plumbing contractor information Once we have clarification regarding the electrical permit applications and the mechanical and plumbing contractor information, we will be able to issue the permits for you Thank you Julie Drinkwater Permit Technician City of Tigard I Building Department 13125 SW flail Blvd Tigard, OR 97223 503-718-2804 Due to an increased demand for services,please expect longer wait times for responses to emails,voice messages and building inspections. Requests for permit status may not be responded to until the permit is ready to issue. Other requests deemed non- essential,such as fee estimates, may take longer to respond. In the meantime, please view this quick guide on how to submit common service requests. From:Sean O'Neill<sean@canopypdx.com> Sent: Monday, October 25, 2021 9:54 AM To:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Subject: Re: MST2021-00352,SWR2021-00228, & MST2021-00353, 15754&15752 SW 76, Knauss Estes, Lot 3, Primary &ADU Hi Julie! 2 Thank you for getting these completed today! I appreciate it so much! I have attached receipts for these payments. The contractor's information for both permits is as follows: Canopy Building Group, LLC 15110 SW Boones Ferry Road Suite 500 Lake Oswego, OR 97035 CCB 232358 Contact: Sean O'Neill 503-956-9307 My electrician is completing and signing the forms now as well. Please let me know what, if anything, further you need from us to get these permits issued and how/where we can pick them up. Thank you! Sean On Mon, Oct 25, 2021 at 9:06 AM #Building Permit Technicians<TigardBuildingPermits@tigard-or.gov>wrote: Hello Sean The permits for Knauss Estes, Lot 3, Primary&ADU, are ready to be issued. The balance due is listed below. Attached please find the invoices for your review. Knauss Estates, Lot 3 3 Address Permit# Fee 15754 SW 76th Primary MST2021-00352 $ 26,646.07 15754 & 15752 Primary& ADU SWR2021-00228 $ 26,016.23 15752 SW 76th ADU MST2021-00353 $ 9,162.50 $ 61,824.80 The fees can be paid online at https://aca-prod.accela.com/TIGARD/Welcome.aspx by searching for the permit record number under the Building tab. There is a service fee of 3%for payments by card,and there no service fee for payments made by e-check. On the payment screen, select the payment method from the dropdown list next to the `payment' field. Please email the permit technicians at Tig_ardBuildingPermits@tigard-or.gov once the fees are paid so that they can issue the permit and make it available for pick up. I also wanted to mention that we will need to have the contractor information,for the primary address as well as the ADU,and a copy of the electrical permit applications with the authorized signing supervisor's signature before we can issue the permits for you. Thank you Julie Drink-water Permit Technician City of Tigard I Building Department 13125 SW I fall Blvd Tigard,OR 97223 503-718-2804 Due to an increased demand for services, please expect longer wait times for responses to emails,voice messages and building inspections. Requests for permit status may not be responded to until the permit is ready to issue. Other requests deemed non- essential,such as fee estimates, may take longer to respond. In the meantime, please view this quick guide on how to submit common service requests. 4