Loading...
Permit III CITY OF TIGARD REROOF PERMIT COMMUNITY DEVELOPMENT Permit#: RER2020-00017 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 1/4/2021 TIGARD 9 Parcel: 1S135DC00600 Jurisdiction: Tigard Site address: 11765 SW GREENBURG RD Project: Bodyfelt Subdivision: TIGARDVILLE PARK Lot: 8 Project Description: Re-roof-remove and replace. Contractor: COLUMBIA ROOFING&SHEET METAL Owner: BODYFELT, SCOTT B 18525 SW 126TH PL 11765 SW GREENBURG RD TUALATIN, OR 97062 TIGARD, OR 97223 PHONE: 503-684-9123 PHONE: FAX: 503-684-1458 FEES Description Date Amount Permit Fee 01/04/2021 $377.90 Specifics: 12%State Surcharge-Building 01/04/2021 $45.35 Type of Use: COM Class of Work: ALT Type of Const: Occupancy Load: Stories: 1 Height: 0 ft Project Valuation: $20,000.00 General Information Building Area: 0 Re-Roof Area: 0 Roof Class: Tear Off: Overlay: Existing Roof Layers: Parapets: Total $423.25 Required Items and Reports(Conditions) This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: `hl c�Cti,`� ec� Permittee Signature: �, Q`D, t tL4�`� v }�G_ i�+, t Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. r Building Permit Application R EC E I! E- 121 S1120 Re-Roof FOR OFFICE USE ON I.1 DEC 3 1. 2020 Received City of Tigard DoeBy: ►2131 120 E MC Pennit K 2020—OOfx 13 125 SW Hall Blvd.,Tigard,OR 97223 p)ao pn eW 1 Phone: 503.718.2439 Fax: 503.598.1960 CITY OF TIGAR_oatde : Other Permit: t Inspection Line: 503.639.4175 al)II_fllN( fI\fl ' DatcRudymy: 0 BaPgelrar Internet: www.tigard-ot.gov Notified/Method: SupptemaoW Inrarmatton TYPE OF WORK REQUIRED DATAt 1-AND 2-FAMILT DWELLING ❑New construction ❑Demolition Permit fees'are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ I-and 2-family dwelling ❑CommetcialRndustrial Valuation: S ❑Accessory building 0 Multi-family Number of bedrooms: ❑Master builder ❑Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 11765 SW Greenburg Rd New dwelling area: square feet City/StatealP: Tigard, OR 97223 Crarage/`'arpO1t8!L8: square feet Suite/bldgJapt.no.: Project name: Bodyfelt 2020 Covered porch area: square feet Cross street/directions to job site: Deck area: square feet _ Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot no.: Permit fees'are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Tax map/parcel no.: equipment,materials,labor,overhead,and the profit for the DESCRD'TION OF WORK work indicated on this application. Please see attached scope of work Valuation: $20,000.00 Existing building area: 2,300 square feet New building area: 2,300 square feet RI PROPERTY OWNER 0 TENANT Number of stories: 1 Name: Dr Scott Bodyfelt Type of construction: Re-roof Address: 13760 SW Twelve Oaks Ct Occupancy groups: City/State/ZIP: Tigard,OR 97224 Existing: Phone:(503)330-2271 Fax:( ) New: I APPLICANT 0 CONTACT PERSON NOTICE Business name: Columbia Roofing and Sheet Metal All contractors and subcontractors are required to be Contact name. licensed with the Oregon Construction Contractors Board Pedro Cruz under ORS 701 and may be required to be licensed in the Address: 18525 SW 126th Place jurisdiction in which work is being performed.If the applicant is exempt from licensing,the following reasons CRY/State/ZIP: Tualatin, OR 97062 Phone:(503 )684-9123 Fax::(503 )684-1458 E marl: paigeOreroofnow.com CONTRACTOR Business name:Same as Applicant BUILDING PERMIT FEES* (Nom refer to fee sehedsW Address: Structural plan review fee(or deposit): City/State/ZIP: FLS plan review fee(if applicable): Phone:( ) Fax:( ) Total fees due upon application: CCB lic.: naid7 Amount received: Authorized signature: This permit application expires If a permit Is not obtained / within 180 days after it has been accepted as complete. Print name:pdwi,_ �� -w,7 Date: 1 ] ( ?f13U • Fcc methodology set by Tri-County Building Industry /{ Service Board. r:taumfn%PereaMOOFAtrmitAw.doc 101911,09 4404613T111eNCOMlwea) RECEIVED City of Tigard: Re-Roofing Permit Checklist DEC 31 Z020 Page 2-Supplemental Information CITY OF TIGARD RI III nwr DIVISION RESIDENTIAL(One-&Two-Family Dwelling) ❑ REPAIR(major)plan review required by plans examiner: building permit is required when structural changes are made or the space sheathing is removed or replaced. SUBMIT TWO(2) SETS OF PLANS SPECIFYING: A. Roof area and nearest street. B. Attic vents: Provide 1 sq.ft.for each 150 sq. ft.of attic space. Vents shall be located in the upper 1/3 of the roof. Provide 1 sq. ft. for each 300 sq. ft.when cave and attic venting is provided. ote: No permit is required for residential re-roof if not more than two(2)layers of roofing will exist upon completion of the re-roofing. COMMERCIAL(includes multi-family and condominiums) ® RE-ROOF: Pre-inspection is required for all roofs sloped 2:12 and less. Call 503.639.4175,for code 295 Miscellaneous inspection after permit is issued. PLAN REVIEW: Note: Depending on the conditions noted at the pre-inspection,plans may be required to address any non-conforming items. VALUATION OF PROJECT: $20,000.00 sq.ft. of roof area Permit Fee based on valuation: $ 377.90 (see Building Permit Fees chart) 12% State Surcharge: $ 45.35 65% Plan Review Fee: $ 245.64 (Required for major repairs of residential and special purpose roofing of commercial projects.) TOTAL: $ 688.89 t:lBuilding%Permits ROOF PermitApp.dcc 2 DocuSign Envelope ID:063E067C-782E-4DC3-8678-8FE7A774947D C(' Scope of Work RECEIVED TPO Mechanically Attached Systems DEC 31 2020 1. Tear off and dispose of base fleshings along parapet wall and around curb penetrations to allow for the proper CITY OF TIGARD installation of the new roofing system. 3UILDING DIVISION 2. Furnish and install a ''/:" EPS fan fold recover board over the existing roof system and mechanically attach.This will maintain the existing fire rating for the new roof assembly. 3. Over the recover board,furnish and install a new 60 mil reinforced TPO roof membrane and mechanically attach to the substrate. 4. All field and base flashing seams will be cleaned before being hot air welded. 5. Furnish and install new TPO base fleshings around all curb penetrations. 6. Furnish and install pre-manufactured inside/outside TPO corner fleshings at curb penetrations, thru wall scupper drains, pitch pans and wall fleshings. 7. Furnish and install new pre-manufactured pipe boots on all pipes up to 6"in diameter complete with a new stainless steel clamps and sealant. 8. All pipes larger than 6' in diameter will be field wrapped with unreinforced TPO membrane complete with a new stainless steel pipe clamp and sealant. 9. All pipes where a pre-manufactured pipe boot is not feasible will be field wrapped with unreinforced TPO membrane complete with a new stainless steel pipe clamp and sealant. 10. Furnish and install TPO patches at all T-Joints in the field membrane. 11. At all gas and electrical lines, furnish and install pre-manufactured TPO pitch pans. 12. Furnish and install pre-manufactured TPO pitch pans around the line sets off the condensing units. 13. Furnish and install a one part poly-urethane rubberized pitch pan sealant in each pitch pan. 14. Furnish and install new TPO base flashings at all parapet walls that will extend up and across the top of all walls. 15. Furnish and install new TPO base fleshings at all parapet walls that will extend up the wall a minimum of 8". 16. Furnish and install a metal anchor bar to the top of the flashing and mechanically attach every 12"on center. 17. Furnish and install new TPO membrane in the roof drain assemblies and set in water cut off mastic. Install the clamping ring to the drain body compressing the TPO membrane into the water cut off mastic to insure a watertight seal. Reinstall drain bolts complete with washers, replacing as needed on a time and materials basis. 18. Reinstall the drain screens back in place once the drain rings are installed. 19. Furnish and install new pressure treated wood blocking complete with TPO slip pads at all electrical and gas lines. Install new clamps to secure the lines to the new wood blocking. 20. Remove the existing wood blocking from under the HVAC units and replace with new pressure treated wood blocking. Furnish and install TPO slip pads under each sleeper to protect the new roof membrane. 21. Remove the existing wood blocking from under the condensing units and replace with new pressure treated wood blocking. Furnish and install new TPO slip pads under each sleeper to protect the new roof membrane. 22. Fabricate and install new 26 gauge galvanized clip metal to be installed along the outside of all parapet walls. Mechanically attach the clip to the wall. 23. Fabricate and install new pre-painted standard color 26 gauge galvanized standing seam coping cap around the perimeter of all parapet walls.All new metal coping caps will be installed by hooking the front face into the clip metal to secure the face of the metal to the building. Mechanically attach to the wall with new neoprene gasketed fasteners. 24. Fabricate and install new pre-painted standard color 26 gauge metal counter flashings around each HVAC unit and mechanically attach to the curb with new neoprene gasketed fasteners. 25. Upon completion of all the work we will have the manufacturer's representative inspect the roof for completeness and for the issuance of the factory warranty. 26. Upon completion of the above work, remove all tools and debris and leave the site in a clean and orderly condition.