Loading...
Permit 114 CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT Permit#: BUP2021-00206 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 9/15/2021 Parcel: 2S 101 DC04603 Jurisdiction: Tigard Site address: 7405 SW TECH CENTER DR Project: Leka Playland Subdivision: TECH CENTER BUSINESS PARK Lot: 2 Project Description: TI for new tenant: Demolition of a partition wall and doors with restroom modifications. Contractor: SPECIALTY SERVICES Owner: WPC TIGARD LLC PO BOX 1311 307 LEWERS ST 6TH FL CLACKAMAS, OR 97015 HONOLULU, HI 96815 PHONE: 503-307-2890 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 09/15/2021 $149.75 Occupancy Grp: A-3 Occupancy Load: 48 Demolition 12%State Surcharge-Building 09/15/2021 $17.97 Dwelling Units: 0 Plan Review 09/15/2021 $97.34 Stories: 0 Height: 0 ft Plan Review-Fire Life Safety 09/15/2021 $59.90 Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Lg$2.00(over 09/15/2021 $2.00 Value: $5,000 11x17) DC Provision Review,COM TI-Ping 09/15/2021 $110.00 Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $436.96 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: Hc,i4yam,De,we4a Permittee Signature: OwApp t,0n Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application ,—. • -� 12. 2� k R. -_,,,a h s, . i . ;Xi, Commercial FOR OFFICE USE ONLY City of Tigard RECEIVE'i�Rece14Ed Ii ,._ Date/Bv: Permit No.: �J V 13125 SW Hall Blvd,Tigard,OR 97223 �! tx g Plan Review ' •: Phone: 503-718-2439 Fax: 503-598-1960 4� .] Related Permit. AUGn n Date,'Sv: `` TIl,AR.0 Inspection Line: 503-639-4175 U 1 w2021 Date Ready/By l 9 inns. ® See Paget for Internet: www.hgard-or.gov Din ified,/Method / //���1; ]� Supplemental Information T, ;1^T ",P- ice_. . 1 El New construction TI PT; Of WORIL,,, . i . ' REQUIRED DATA. 1-.At"D2-I AAIIL). DM El I t` 1 ❑Demolition Permit fees*are based(1 1 the h aloe oh the work performed. 1 bullu ng permit for certificate Indicate the value(rounded to the nearest dollar)of all ❑Addition/alto,al,on'replacement j'l)thaer'. equipment,materials,labor,overhead,and the profit for the 1 CATEGORY OF C ONs'1RU('TIOV work indicated on this application- Valuation: $ I ❑ 1-and 2-family dwelling Commercial,industrial _l ❑Accessory building El Multi-familyNumber of bedrooms. I r❑Master builder 0 Other Number of bathrooms: {1i JOB SITE JNFORMATION AND LOCATION Total number of Boors: — LJob site address: 7405 SW Tech Center Dr New dwelling area. square feet j City/State/ZIP: Tigard, OR 97223 Garage/carport area: square feet Suite,bldg./apt.ii: 120 Project name: LEKA Playland Covered porch area: square feet Cross street'directions to job site: Deck area: square feet Other structure area: square feet "��;f`#0 OlVil1TgR(7AI,L;SI;C:tlECF_f.t';i Subdivision: Lot it: Permit fees`are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Tax map parcel# equipment,materials,labor,overhead,and the profit for the �::*** t ,'' work indicated on this appl .tion. Change of use from "office"to "indoor entertainment" Valuation: : ,5—r .CIZ— Applying for certificate of occupancy Existing building area: /i 617D square feet CLw N.,rsL..11d:..g o..a: square feet I I 0..PROPI;RTV °INNE t t EN4N 1' Number of stories: / Name. Elisabeth Utas Type of construction: vi Address: 5705 Southwood Dr Occupancy groups: ' City/State/ZIP: Lake Oswego 1 Existing: 8 Phone (408 368-2975 l av ( ) f New: �'APPLICANT: L0. (Q".i .C`t PERSON "$t LD NJ JIT FEES` L'nsn,escama LEKA Playland, Inc tPteak,r cke`f"iet Contact name: Elisabeth Utas Structural plan review fee(or deposit): r FLS plan review fee(if applicable): Address: 7405 SW Tech Center Dr. Suite 120 , iC ty,State/ZIP: Tigard, OR 97223 Total fees due upon application: Phone:( 408) 368-2975 Fax: :( ) T Amount received, E-ma l: eliSabeth.utaS@gmail.com I PIlOTC OI.TNIC SOLAR P.fi NEL SYSTEM FEE E -i_ ^7 q -. — Commercial and residential prescriptive installation of „ ', 4.a , ih, ; .,t t ,,;, , k*' roof-top mounted PhotoVoltaic Solar Panel System. 1 Business name: See code summary for the architect's contact info Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address: Solar Installation Specialty Code checklist. j City/State%ZIP Permit fee(includes plan review $18+i OC` f and administrative fees): ___� Phone: ( ) Fax:( ) State surcharge(12%of permit fee): $2LC0 I C:CB Lie.: Total fee due upon application: 5201.00 Authorized signature: This permit application expires if a per it is not obtained within 180 days after it has been accepted as complete. Print name: Mt-4 �g, t4J/ Date: 8/11/2021 * Fee methodology set by Tri-County Building Industry J J Service Board. 1:`.Building\Permits\BUY_COM_PernitApp.doc Rev.04/2112014 440-4613T(11i021COM/WEB) City of Tigard 1111111 COMMUNITY DEVELOPMENT DEPARTMENT T 1 G A R D Building Permit Review — Commercial - With Land Use Building Permit #: ,gi a+ -- a, Site Address: r OS S'tiLJ 1157,6 C 612- AV-C, Suite/Bldg#: t�,0 Project Name: U-1,b S7411` CA OD (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: InTn2102 QQ..A 1or1 , -TencihT 1 ( n77 le Verify site address/suite# exists and active in permit system. River Terrace Neighborhood: ❑ Yes rir-No d Use Case#: t4MO'7o2I- 000l2- 2 P/�--yy. ►' .tch Approved Land Use: Yi/Site Plan ❑ Landscape Plan 0 Other: ❑ Urban Forestry Plan 0 Elevation Plan ding Height: Maximum H ill t ��} A�.tua1 H,.i ht kb,- Or y�/Co ditions Met ❑ Prior m Submittal ssuance Business Liceens i Exists: IQ Yes ❑ No,applicant was provided a business license application Public Facilities Improvement (PFI) Permit: ^� Required: ❑ Yes, applicant was notified c 1V O Applied For: 0 Yes 0 No,stop intake Notes: Approved by Planning: Date: F/i)/fl ,+N;Aj- Revisions (after Building Submittal o y) Reviewer Date 9/7/.4 451.1) Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved 0 Not Approved Revision 3: 0 Approved 0 Not Approved Building Permit Submittal Original Submittal Date: /40-i Site Plans: # Nit Building Plans: # — Building Permit#: n//ter building permit#above. Workflow Routing: �� �'° for Planning geering i t Coordinator L— g Workflow Sign-off: FP-Si ff (include notes from planning review) Route Application Documents: L�J"Building: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable, etc. Notes: 4 c# By Permit Technician: ate: 7/A/3 1:\Building\Fonns\BldgPennitRvw COM WithLandUse 111819.docx Engineering Review E�r�S1ope at building pad: Zz [ PFI Permit#: /t/es- • ICT Conditions "Met"prior to issuance of building permit �'►(� / '/Easements (encroachments) per engineering conditions of approval and plat (not typical on SDR/CUP) „ r°- L�'Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes CeNo Assess Water Quantity Fee in-lieu: ❑ Yes C 'No LIDA Facility on lot: ❑ Yes F/No ❑ NOT Approved by Engineering: Date Notes: Approved by Engineering: �,, r.� Date: 1/1/024 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved E Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes 0 N/A (. [ca-t) Tigard Trans SDC: ❑ Yes N/A Parks SDC: ❑ Yes N/A 7'OK to Issue Permit Approved by Permit Coordinator: Date: ci l(q l2.02A • I:\Building\Fonns\B1dgPermitRvw_COM_W ithlandUse_111819.docx Branden Taggart From: Elisabeth Utas <elisabeth.utas@gmail.com> Sent: Tuesday, August 31, 2021 3:33 PM To: #Building Permit Technicians Cc: Holly Van De Wege Subject: Re: 7405 SW Tech Center Dr, 120 Categories: Branden Caution!This message was sent from outside your organization. I'd say about$5000 for the tenant portion.Thanks! On Tue,Aug 31, 2021 at 3:30 PM #Building Permit Technicians<TigardBuildingPermits@tigard-or.gov>wrote: Hi Elisabeth, Since the scope of work includes demolition of a partition wall and doors, along with the installation of new plumbing fixtures,we ask that you provide us with a valuation of the proposed work as we would with a normal tenant improvement permit. If no actual work was taking place, and the permit was just for the issuance of a Certificate of Occupancy,we would use the minimum valuation to base our fees off of. However, since this scope of work is considered to be a tenant improvement permit, we will need a valuation to proceed. What is the valuation? Thank you, Branden Taggart III s City of Tigard Senior Permit Technician Community Development TWARD 13125 SW Hall Blvd Tigard, OR 97223 (503)718-2449 brandent@tigard-or.gov From: Elisabeth Utas<elisabeth.utas@gmail.com> Sent: Tuesday, August 31, 2021 1:51 PM 1 To:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Subject: Re: 7405 SW Tech Center Dr, 120 Hi! I believe I did fill it out with "$0".We did paint and new floors. On Tue, Aug 31, 2021 at 1:18 PM #Building Permit Technicians<TigardBuildingPermits@tigard-or.gov>wrote: Hi Elisabeth, I was just processing this application and noticed that you forgot to include a project valuation. Please I provide that information and I will then be able to rout this for building review. Thanks, Holly Van De Wege Program Development Specialist City of Tigard I COMMUNITY DEVELOPMENT 13125 SW Hall Boulevard Tigard,Oregon 97223 www.tigard-or.gov From: Elisabeth Utas<elisabeth.utas@gmail.com> Sent:Tuesday, August 31, 2021 12:34 PM To:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Subject: Re: 7405 SW Tech Center Dr, 120 Hi there! just checking in how things are going. Any update? I'm hoping to open soon,just waiting for the occupancy permit :) On Mon,Aug 16, 2021 at 2:51 PM #Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> wrote: IHi Elisabeth, Thank you for your recent permit submittal. 1 2 This submittal has met the requirements needed to begin plan review. We will contact you for payment of a plan review submittal fee,if applicable, or when the permit is ready to issue. Please allow 4-8 weeks for processing. Thank you, Tina Escalera Isi Permit Tech Assistant City of Tigard I Community Development 13125 SW Hall Blvd.Tigard, OR 97223 DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e- mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules"City General Records Retention Schedule." 3