Loading...
Report COMcheck Software Version 4.1.5.3 Iib15Stu PdcciFG „ A Envelope Compliance Certificate RECEIVE® AUG 04 2021 CITY OF IGARD Project Information BUILDING DIVISION Energy Code: 2012 IECC Project Title: AFC Tigard Location: Tigard, Oregon Climate Zone: 4c Project Type: Addition Vertical Glazing/Wall Area: 21% Construction Site: Owner/Agent: Designer/Contractor: 11675 SW Pacific Hwy Wilsal LLC CIDA, Inc Tigard, OR 97223 7286 SW Ascot Ct 15895 SW 72nd Ave., Suite 200 Portland, OR 97225 Portland, OR 97224 (503) 709-6975 503-226-1285 lesliej@cidainc.com Building Area Floor Area 1-Health care clinic : Nonresidential 864 Envelope Assemblies Assembly Gross Area Cavity Cont. Proposed Budget U- or R-Value R-Value U-Factor Factorial Perimeter Floor 2:Slab-On-Grade:Unheated,Vertical 1 ft.,[Bldg. Use 1 -Health 121 --- 10.0 0.580 0.540 care clinic](c) Roof 1:Attic Roof with Wood Joists, [Bldg. Use 1 -Health care clinic] 886 49.0 0.0 0.021 0.027 NORTH Exterior Wall 1:Concrete Block:8", Partially Grouted,Cells Empty, Light 332 13.0 0.0 0.071 0.078 Density, Furring:Wood,[Bldg.Use 1 -Health care clinic] Window 1:Metal Frame:Fixed, Perf.Specs.:Product ID Arcadia 156 --- --- 0.390 0.380 AG451T,SHGC 0.41,[Bldg.Use 1 -Health care clinic](b) Exterior Wall 5:Wood-Framed, 16"o.c.,[Bldg. Use 1 -Health care 6 21.0 0.0 0.062 0.064 clinic] Exterior Wall 3:Wood-Framed, 16"o.c.,[Bldg.Use 1 -Health care 22 26.0 0.0 0.056 0.064 clinic] EAST Exterior Wall 6:Wood-Framed, 16"o.c.,[Bldg.Use 1 -Health care 236 21.0 0.0 0.062 0.064 clinic] WEST Exterior Wall 4:Wood-Framed, 16"o.c.,[Bldg. Use 1 -Health care 236 21.0 0.0 0.062 0.064 clinic] Door 1:Insulated Metal,Swinging,[Bldg.Use 1 -Health care clinic] 21 --- --- 0.200 0.370 (a) Budget U-factors are used for software baseline calculations ONLY,and are not code requirements. (b) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. (c) Slab-On-Grade proposed and budget U-factors shown in table are F-factors. Project Title: AFC Tigard Report date: 07/29/21 Data filename: F:\GENADMINIPROJECTS121\0085.01 AFC Tigard Landlord (jhc)1COMCheck.cck Page 1 of 12 l Envelope PASSES: Design 3%better than code Envelope Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit a plication.The proposed envelope systems have been designed to meet the 2012 IECC requirements in COMcheck V on 4.1. .3 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. ILS ivnes kssoc $ of-zO2-) Name-Title Si ture Date Project Title: AFC Tigard Report date: 07/29/21 Data filename: F:\GENADMIN\PROJECTS121\0085.01 AFC Tigard Landlord (jhc)\COMCheck.cck Page 2 of 12 ` COMcheck Software Version 4.1.5.3 ilInspection Checklist Energy Code: 2012 IECC Requirements: 0.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions & Req.ID C103.2 Plans and/or specifications provide all NComplies [PR1]1 information with which compliance ❑Does Not can be determined for the building envelope and document where ❑Not Observable exceptions to the standard are ❑Not Applicable claimed. C406 Plans, specifications, and/or ❑Complies [PR9]1 calculations provide all information ❑Does Not with which compliance can be determined for the additional energy ❑Not Observable efficiency package options. LAJNot Applicable C402.3.1 The vertical fenestration area <= 30 'XComplies [PR10i1 percent of the gross above-grade wall ❑Does Not area. ❑Not Observable ❑Not Applicable C402.3.1 The skylight area <= 3 percent of the ❑Complies [PR11]1 gross roof area. ❑Does Not ['Not Observable ICINot Applicable C402.3.2 In enclosed spaces > 10,000 ft2 ❑Complies [PR14]1 directly under a roof with ceiling ❑Does Not heights >15 ft. and used as an office, lobby, atrium, concourse,corridor, ❑Not Observable storage, gymnasium/exercise center, XNot Applicable convention center, automotive service, manufacturing, non- refrigerated warehouse, retail store, distribution/sorting area, transportation, or workshop,the following requirements apply: (a)the daylight zone under skylights is >= half the floor area; (b) the skylight area to daylight zone is >= 3 percent with a skylight VT>= 0.40; or a minimum skylight effective aperture >= 1 percent. C402.3.2. Skylights in office, storage, ❑Complies 2 automotive service, manufacturing, ❑Does Not [PR15]1 non-refrigerated warehouse, retail ❑Not Observable store, and distribution/sorting area have a measured haze value > 90 C&INot Applicable percent unless designed to exclude direct sunlight. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact(Tier 3) Project Title: AFC Tigard Report date: 07/29/21 Data filename: F:\GENADMIN\PROJECTS\21\0085.01 AFC Tigard Landlord (jhc)\COMCheck.cck Page 6 of 12 Section Footing / Foundation Inspection Complies? Comments/Assumptions & Req.ID C104 Installed slab-on-grade insulation type :❑Complies See the Envelope Assemblies table for values. [FO312 and R-value consistent with insulation ❑Does Not specifications reported in plans and ❑Not Observable COMcheck reports. ®Not Applicable C303.2 Slab edge insulation installed per 1NIComplies [FO4]2 manufacturer's instructions. ❑Does Not ❑Not Observable ONot Applicable C402.2.6 Slab edge insulation depth/length. ®Complies See the Envelope Assemblies table for values. [FO5]2 Slab insulation extending away from ❑Does Not building is covered by pavement or ❑Not Observable >= 10 inches of soil. ENot Applicable C403.2.8. Exterior insulation protected against ®Complies 1 damage, sunlight, moisture, wind, ❑Does Not [FO6]3 landscaping and equipment ❑Not Observable maintenance activities. DNot Applicable C402.2.8 Bottom surface of floor structures ❑Complies See the Envelope Assemblies table for values. [FO12]3 incorporating radiant heating ❑Does Not insulated to >=R-3.5. ❑Not Observable NNot Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact(Tier 3) Project Title: AFC Tigard Report date: 07/29/21 Data filename: F:\GENADMIN\PROJECTS\21\0085.01 AFC Tigard Landlord (jhc)\COMCheck.cck Page 7 of 12 Section # Framing /Rough-In Inspection Complies? , Comments/Assumptions & Req.ID C402.4.1, The building envelope contains a [XComplies C402.4.2 continuous air barrier that is sealed in ❑Does Not [FR16]1 an approved manner and either ❑Not Observable constructed or tested in an approved manner. Air barrier penetrations are ❑Not Applicable sealed in an approved manner. C402.4.3, Factory-built fenestration and doors ®Complies C402.4.4 are labeled as meeting air leakage ❑Does Not [FR18]3 requirements. ['Not Observable ❑Not Applicable C402.4.7 Vestibules are installed on all building ❑Complies [FR17]3 entrances. Doors have self-closing ❑Does Not devices. ❑Not Observable 21Not Applicable C402.3.3, Vertical fenestration U-Factor. ®Complies See the Envelope Assemblies table for values. C402.3.4 ❑Does Not [FR8]1 [Not Observable ❑Not Applicable C402.3.3 Vertical fenestration SHGC value. ®Complies See the Envelope Assemblies table for values. [FR1O]1 ❑Does Not ❑Not Observable ❑Not Applicable C303.1.3 Fenestration products rated in IX Complies [FR12]2 accordance with NFRC. ❑Does Not ❑Not Observable ❑Not Applicable C303.1.3 Fenestration products are certified as DAComplies [FR13]1 to performance labels or certificates ❑Does Not provided. [Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: AFC Tigard Report date: 07/29/21 Data filename: F:\GENADMIN\PROJECTS\21\0085.01 AFC Tigard Landlord (jhc)\COMCheck.cck Page 8 of 12 Section Insulation Inspection Complies? I Comments/Assumptions & Req.ID C402.4.1. All sources of air leakage in the XComplies 1 building thermal envelope are sealed. EDoes Not [IN1]1 caulked, gasketed, weather stripped ❑Not Observable or wrapped with moisture vapor- permeable wrapping material to ENot Applicable minimize air leakage. C402.4.2. Roof R-value. For some ceiling CRComplies See the Envelope Assemblies table for values. 1 systems, verification may need to ❑Does Not [IN2]1 occur during Framing Inspection. [Not Observable ❑Not Applicable C303.2 Roof insulation installed per ®Complies [IN3]1 manufacturer's instructions. Blown or ❑Does Not poured loose-fill insulation is installed [Not Observable only where the roof slope is <=3 in 12. ❑Not Applicable C303.2 Above-grade wall insulation installed XComplies [IN7]1 per manufacturer's instructions. EDoes Not ❑Not Observable ❑Not Applicable C104 Installed floor insulation type and R- ❑Complies See the Envelope Assemblies table for values. [INB]2 value consistent with insulation EDoes Not specifications reported in plans and ❑Not Observable COMcheck reports. ( Not Applicable C303.1 Building envelope insulation is labeled {Complies [IN10]2 with R-value or insulation certificate EDoes Not providing R-value and other relevant ❑Not Observable data. ❑Not Applicable C303.2.1 Exterior insulation is protected from ®Complies [IN14]2 damage with a protective material. EDoes Not Verification for exposed foundation ❑Not Observable insulation may need to occur during Foundation Inspection. ❑Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: AFC Tigard Report date: 07/29/21 Data filename: F:\GENADMIN\PROJECTS\21\0085.01 AFC Tigard Landlord (jhc)1COMCheck.cck Page 10 of 12 Q Section # Final Inspection Complies? Comments/Assumptions & Req.ID C402.4.6 Weatherseals installed on all loading ❑Complies [FI37]1 dock cargo doors. ❑Does Not ['Not Observable KINot Applicable C402.4.8 Recessed luminaires in thermal ❑Complies [F126]3 envelope to limit infiltration and be IC ❑Does Not rated and labeled. Seal between interior finish and luminaire housing. ❑r�Not Observable yty Not Applicable Additional Comments/Assumptions: I. [High Impact (Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: AFC Tigard Report date: 07/29/21 Data filename: F:\GENADMIN\PROJECTS\21\0085.01 AFC Tigard Landlord (jhc)\COMCheck.cck Page 11 of 12 Project Title: AFC Tigard Report date: 07/29/21 Data filename: F:\GENADMIN\PROJECTS\21\0085.01 AFC Tigard Landlord (jhc)\COMCheck.cck Page 12 of 12