Correspondence M6e47-0 9-00 /69
Branden Taggart
From: Ripley, Guy <gripley@gpdgroup.com>
Sent: Wednesday, March 20, 2019 12:16 PM
To: Branden Taggart
Cc: #Building Permit Technicians
Subject: RE: Starbucks Permit Submittals: 16200 SW Pacific Hwy Z3
Attachments: Applications.pdf
Good Morning Branden,
I was able pull together the additional permit application information sooner than I expected so we will be sending you
hard copies of everything this evening. I've attached the completed applications for informational purposes in the
meantime.
For clarification,the entire project valuation is$812K, of which:
• $586K is for the building
• $125K is for the site work
• $72K is for the mechanical work
The applications have been completed/revised as necessary. I apologize for any inconvenience. Please let us know if you
need anything else.
Thank you,
Guy Ripley
Designer
GPD GROUP
ARCHITECTS• ENGINEERS • PLANNERS
T: 602.733.6202/ F: 602.772.3975
4600 East Washington Street, Suite 310, Phoenix, AZ 85034
gpd..roup.com
Confidentiality Notice: This email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and
privileged information.Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient, please contact the
sender by email and delete all copies of the original message. Please consider the environment before printing this email.
From: Ripley, Guy
Sent:Tuesday, March 19, 2019 2:15 PM
To: 'Branden Taggart' <brandent@tigard-or.gov>
Cc: Darwish, Rafia <rdarwish@gpdgroup.com>; #Building Permit Technicians<TigardBuildingPermits@tigard-or.gov>
Subject: RE: Starbucks Permit Submittals: 16200 SW Pacific Hwy Z3
Good Afternoon Branden,
Thanks for letting us know—I misunderstood the sub permit information requirements as communicated to me. We are
pulling the information together and will have it to you as soon as possible.
1
We will ship the additional full size sets to you, but is it acceptable to email the rest of the information (valuations and
completed apps)?
Thank you,
Guy Ripley
Designer
GPD GROUP
ARCHITECTS• ENGINEERS • PLANNERS
T: 602.733.6202/ F: 602.772.3975
4600 East Washington Street, Suite 310, Phoenix, AZ 85034
gpd, 9.9.Mom
Confidentiality Notice:This email message, including any attachments, is for the sole use of the intended recipient(s)and may contain confidential and
privileged information.Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient, please contact the
sender by email and delete all copies of the original message. Please consider the environment before printing this email.
From: Branden Taggart<brandent(a@tigard-or.gov>
Sent: Friday, March 15, 2019 4:48 PM
To: Ripley, Guy<gripley@gpdgroup.com>
Cc: Darwish, Rafia <rdarwish@gpdgroup.com>; #Building Permit Technicians<TigardBuildingPermits@tigard-or.gov>
Subject:Starbucks Permit Submittals: 16200 SW Pacific Hwy Z3
Hello Guy,
We received your permit submittals for the Starbucks located at 16200 SW Pacific Hwy Z3. However,we are missing
various information that we will need to process these permits and to complete plan review:
Site Work:
• The valuation on the application is the same as the building permit valuation: $812,000.00. What is the
valuation specifically for the site work? The site work valuation needs to be separate from the building permit
valuation.
• We received (1) set of site work plans. We will need to receive (2) additional sets of civil plans. I have attached
our site work permit application above for you to reference with the permit requirements listed.
• We did not receive a signature at the bottom of this application. We would appreciate it if you can sign, print,
and date the application and return it to us.
Mechanical:
• What is the valuation? We need the valuation of this work to determine fees. Please enter the valuation on the
application and return it to us.
Electrical:
• The application was missing the quantities in the fee schedule. Please enter the quantities on the application
and return it to us so that we may begin plan review.
Plumbing:
• We are missing the plumbing fixture quantities in the fee schedule. Please enter the quantities on the
application and return it to us.
2
.
.
' • The second page of the plumbing fixture application was not included with your submittal. Please submit the
second page with the completed Commercial Fixture Work section. I have attached the plumbing fixtures
permit application above for you.
If you have additional questions, please let me know.
Thank you,
___
Branden Taggart
City ofTigard
Senior Permit Technician
Community Development
me,i'i,,m .L|
13125 SW Hall Blvd
Tigard, OR 97223
(503)718-2449
brondrot@tigarU'mr.ouv
__, — � `
DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail
may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained
by the City of Tigard in compliance with the Oregon Administrative Rules "City General Records Retention Schedule."
3
1.
Branden Taggart
From: Branden Taggart
Sent: Friday, March 15, 2019 4:48 PM
To: gripley@gpdgroup.com
Cc: Darwish, Rafia;#Building Permit Technicians
Subject: Starbucks Permit Submittals: 16200 SW Pacific Hwy Z3
Attachments: Starbucks Permit Applications.pdf; SIT_PermitApp_080216.pdf; PLMF_PermitApp.pdf
Hello Guy,
We received your permit submittals for the Starbucks located at 16200 SW Pacific Hwy Z3. However, we are missing
various information that we will need to process these permits and to complete plan review:
Site Work:
• The valuation on the application is the same as the building permit valuation: $812,000.00. What is the
valuation specifically for the site work? The site work valuation needs to be separate from the building permit
valuation.
• We received (1) set of site work plans. We will need to receive (2) additional sets of civil plans. I have attached
our site work permit application above for you to reference with the permit requirements listed.
• We did not receive a signature at the bottom of this application. We would appreciate it if you can sign, print,
and date the application and return it to us.
Mechanical:
• What is the valuation? We need the valuation of this work to determine fees. Please enter the valuation on the
application and return it to us.
Electrical:
• The application was missing the quantities in the fee schedule. Please enter the quantities on the application
and return it to us so that we may begin plan review.
Plumbing:
• We are missing the plumbing fixture quantities in the fee schedule. Please enter the quantities on the
application and return it to us.
• The second page of the plumbing fixture application was not included with your submittal. Please submit the
second page with the completed Commercial Fixture Work section. I have attached the plumbing fixtures
permit application above for you.
If you have additional questions, please let me know.
Thank you,
1
Branden Taggart
City of Tigard
zk Senior Permit Technician
„.. Community Development
4,14/90):
13125 SW Hall Blvd
Tigard, OR 97223
(503)718-2449
brandent@tigard-or,gov
2