Loading...
PFI2021-00342 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT III I ' COMMUNITY DEVELOPMENT Permit#: PFI2021-00342 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 09/27/2021 Parcel: SEG1586 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE Job#M2977515 Project Description: PGE to replace pole 5221 *Pole set only*will apply for additional permits for additional work to replace guy wire, install underground service and overhead guy Class of Work: FEES Type 1 - Utilities (gas, electric,data) Description Date Amount PFI Permit Fee 09/27/2021 $300.00 Total $300.00 Owner: REQUIRED INSPECTIONS Call 503-639-4175 for the IVR inspection request line or visit the City of PHONE: Tigard website at www.tigard-or.gov to schedule inspections online. Contractor: PHONE: Applicant: BRIANA FOGH 2213 SW 153RD DR BEAVERTON, OR 97003 PHONE: 5034634355 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: Seefp application N ' Issued By: 161111A A iht Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PFI2021-00342 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services Association [ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire& Rescue) and to 503-962-8140(Tri-Met)and 503-431-2345 (Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours (min.) before initiation of construction work. PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. 72nd Ave is an Arterial.Work only between the hours of 9:00am to 3:00pm PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m, unless authorized by the City Engineer. PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads,ditches, etc.)as may be necessary, as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>,to establish a preconstruction meeting. PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24) hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. Contact Ken Fisher at 503 816 6146 or kenny@tigard-or.gov. PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms,conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector. PFI_Utilities 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two (2) persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing,of any/all assignment changes. PFI_Utilities 26 -RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements,shall be provided to the City. The City shall in no way be construed to be liable for the applicants failure to obtain or provide for proof of right-of-entry or easements. PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI_Utilities 28-AS-BUILT DRAWING Applied Notice 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also,any improvement which may impact an existing public system or facility,shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements,including any revision made to the previously approved construction plans and,also,any improvement which may impact an existing public system or facility,shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also,any improvement which may impact an existing public system or facility,shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI_Utilities 31 -OTHER Applied Notice Other fill City of Tigard PFI $: PFI2021-00342 ENGINEERING DEPARTMENT 111 1 I<„1 K I) Public Facilities Improvement (PFI) Permit PROJECT INFORMATION TYPE OF WORK Project name: PGE Job # M2977515 ® TYPE 1—Franchise Utility Work Brief description of project: PGE to replace pole 5221 *Pole set performed byNWN,PGE, or utility agency only*will apply for additional permits for additional work to replace ❑ TYPE 2—ROW Sidewalk/Driveway/Sewer guy wire, install underground service and overhead guy Workperformedforthepurposeof: • Sidewalk installation or repair • Driveway approach installation and repair SITE INFORMATION • Sanitary sewer lateral installation and Location (address if available): 7298 SW Tech Center Dr main line tap 0 TYPE 3—Full Scale Development Work Tigard, OR 97223 performed with land use approval which includes any of the following. • Subdivisions or Partitions APPLICANT INFORMATION • Street widening PGE [Briana Fogh for Hap English] • Mainline installation for sanitary sewer, Name: storm sewer, Tigard water, and Tigard Mailing address: 2213 SW 153rd Dr water service area City/State: Beaverton Zip: 97003 0 TYPE 4—Small Cell Technology Phone: 503.463.4355 ❑ TYPE 5—Tigard Triangle Email: Crewcoordination-westerntppgn.com Phone: NOTE: Type 1 and 2 applications may be Contact name: Hap English emailed to rowpermits(dJtigard-or.gov. Phone: 503.672.5489 Email: Crewcoordination-western@pgn.com CONTRACTOR INFORMATION 0 Same as applicant Name: CCB Number: Mailing address: City/State: Zip: Phone: Email: ENGINEER INFORMATION Name: Mailing address: City/State: Zip: Phone: Email: ADDITIONAL INFORMATION Estimated value of work is required(if over$5,000):$ (within the public right-of-way) Is work related to a LAND USE DECISION? ❑Yes ElNo Case number: n .2It iS - ,1 /t.T42,a i • %Ai14ZALv.-r17 'gt t,L/ Q:Cah",-- ?;c" IL City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97 23 • wwwtigard-or.gov • 503-718-2421 • Page 1 of 4 APPLICANTS NOTE: Person specified as`Applicant"shall be designated "Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.04.140. With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application. I,the applicant,certify that: • To the best of my knowledge, all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. Briana Fogh 9/20/2021 Applicant's or authorized agent's signature Print name Date Property owner's signature (if required) Print name Date STAFF USE ONLY Case No: PFI2021-00342 Permit fee: �� •� Received by: HPollard Date: 9/20/2021 Approved by:/4. 1�i s Date: ct- 2 Z Zr Z/ Notified by: Date: Zo2I City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-ocgov • 503-718-2421 • Page 2 of 4 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI)Permit: INITIAL PFI PERMIT FEE Part 1: Required submittal fee is 10%of the Net PFI Permit Fee.See below for calculations.Minimum of$300. NET PFI PERMIT FEE Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PH Permit Fee). WATER LINE CONSTRUCTION FEE Part 3: All public water system improvements engineer's estimate X 12%. FOR STAFF USE ONLY FOR STAFF USE ONLY TYPE 4: SMALL WIRELESS FACILITY TYPE 1—3:DETAILED SUBMITTAL CHECKLIST REQUIREMENTS Does applicant have a right-of-way license? 0 Yes 0 No TYPE 1 AND TYPE 2 -Must include a sketch showing: Under the wireless facilities standards,is the proposal 0 Dimensions considered?(check all that apply): 0 Small Cell 0 Macro ❑ Street Name How many install sites are proposed as part of this permit ❑ Site Address application? TYPE 3-Must provide 4 sets of plans (sized 24 x 36 or 22 x 34) and an electronic version of all submittal The proposed equipment is located on which of the following: items. The plans must that include: ❑Public Right-of-Way ❑Private Property ❑ Cover—Site,Vicinity,Abbreviation,Legend If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc.) type&use: ❑ Street(Plan,Profile) ❑ Water,Storm and Sanitary(Plan Profile) ❑ Water Quality Facilities ❑ Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm, Sanitary,Water,Signage,Street Lights,etc.) ❑ Details ❑ Traffic Sight Distance ❑ Signing and Striping ❑ Street Light Plan and Photometric O Engineers seal/signature O Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) ❑ Engineer's Construction Estimate Additional Submittals (per land use conditions,if applicable) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design ❑ Water Provider Approval City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-otgov • 503-718-2421 • Page 3 of 4 Edge of Pavement Streetlight -- Ditch '— Aah.Drain Li ,,,.!„ `. „� I T--rar I rsziwa TIn �J 1 I. 1 PI I Existing House ur I Existing F1 Q+ �� Driveway • �i of 1 I _ ° .1 >< ' I. „A/Tr! ii I r1 al i A. 1 co 1 i I . Existing Shop Power`= I I I o . o Ia 95' �o a Llne �•—� ' I IN i1 Fire Hydrant(FH) 1 I I Scale: ?"=30' I ! 1 I I TYPE 1 AND TYPE 2: MINIUM SKETCH REQUIREMENTS (Put N/A if not applicable) North arrow Property lines&dimensions Existing utilities locations (sewer,storm,water) Street&street names All existing structures Proposed work Existing curb or edge of pavement Utility&street light poles Existing S/W or D/W apron Slope of property Trees City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 4 of 4 A �\ COMMERCIAL LEGEND Read Side31r F_ N ,•\ f• 6W MM NEW PGE FACILITIES TO BE INSTALLED LEG - SW SANDBURG ST (UNLESS OTHERWISE SPECIFIED! ND o to REMOVE FACILEGES INSTALL FACILITIES J6. no M1Im.S J in MIA r O 1«la.T .bN ME INSTALL ADDITIONAL ONA FACILITIES M ES hex6 O ie1m:MAIN /MODIFY _ 1 IV OMRmOtnl PpeeEE TOO INSTALL 14 W Y ATTERAL ONETMCTEW 0 FAULT INDICATOR LWMbe In Min tia INSTALLCIRWF 1L $RE FUSING ASE)TED INN II.Trench WO Gar INSTALL 1-I IJ AL-TX LEE JRi PRIMARY M/'PVC LONDVi 'PROVIDED 8 INSTALLED BY POE CONTRACTOR —_ - INSTALL 4TI A.M ERR JET PRIMARY IN M PVC CCNDLIT 'PROVIDED B INSTALLED BY POE CONTRACTOR t .INSTALL 1.350 AL-TX SECONDARY IN 1-3-PVC CONDUIT Ca I'Ot0 �2,y yMEWO PROVIDED B INSTALLED BY POE CONTRACTOR c2l.n'D �MEA i.' I INSTALL OH GUY AS NOTED 6-wm .FrN.> Axs /y, • « POLES 577-AGE SWITCH VAULT 6 E CLASS (1,2,3,d,H1,H2,S) / iDL:P'oLrsm• MP POLE HEIGHT (FEEL) MRRM, mAtIGINNXA FRAMING —gam NY KM me rowan 4. TRANMLING a PSTMBURON(SEE CODES BELOW? ® I.IdaSEP Of Ip nJ ZI AT)41.1. FVIVITP181Rr[N 1C101 UnS Y MEO.lO R•pL m (SPH Ml CORNER FXIEROUBB~PCIYI 1/ DM 12 • MLIS y •i.. . Y O i 4'TO MLW SON • n:""Orr MC ANCHORS I'� i 3 �, VT MAP WO V�34 :WA 21 M, y y S 13 it nM LEAD) A rc l E A Pit?) b usHEBEWWs 4....r. viessa THINK ANCNMIIDOLE mppmm 'p°' ..... SAFETY I 111111,; a-peE.fw '., I _ FIR971 GUYING �;m 5' G :POS.ELSS 4 NEW 57 VI BY POE CONTRACTOR SWEEP EST DB 02 AL PRI INTO I GUT m©mag3M VT 31 w,IM "ea- ", V. ' l�. CONSTRUCTION NOTES: GUM/ 1.CUSTOMERSI RESPONSIBLE FOR ALL TRENCH..COMMIT,MILTS.PADS AND AS pN1Yi WMNs1RRe f11p0T i.*ppGESTTINOB ROAD V GREW IS RENAMED FOB g4MNCPLL EIERGMEU PGE VAULTS. VICINITY MAP II50' I ' MSCCEONBOXESANp Ellir.Z YAGMREB INGLUOXISCONEcTOM OR MSAUAl1N r. _ __ •T y5 y OF CONIXIRS AXb PULL STRINGS CALL SIRVIAE COORMM.MION AT 503.3mMIE 510lnla0P9 _ Fr y TO SCM1VLEAPCE 6iMLNV CREW. CZ a.PLL COMMITO REINSTALLED VEINY INCHES I MIN COVER AT TOP OE CONMRT ALLYFMIL CONDUCTORS 9 4.ALL PGE COMMIT TORE IIETAILEOIN COTS.BTE JO,ELECTRICAL GRDE. y1 jS¢-2C' • CCONJIIR LMHNYLON RILL 61PoN09(NN.SWAM.IEST ME TOOETERME WINn1an GMLRIN MO DM SIZE AND NUMBER OF CONDOS TECARED.YMNTMN IA vomIC U RICHES N0 S221 he HORIZONTAL INCHES VLEM.WCE BETWEEN MS NW OTHER URLTES AM ELBOWS OS 1-0ip 502 4INCH%WALLER TO BE bIM:H RADIUS.NL RENDSWBT RE FACTMVMMIE EMMe00 TEL ELBOWS LARGER MAN(INCE TO RE AO INCH moms ROM STEEL OR POE ki15•rvI'.et Al AORn B `'E PC TREE REMOVAL APPROVED NRERMASB BFNOS NM HEMMED EON RUNS OF 161 FEET OR LONOER. pRHOLe10-T16E.T PL-0BR1 POST-CON RER41ING OR FOP ANY LENGTH RIM MTN MORE THAN ISO DEOMES INBEOSEmCllISALE .A.L BY POE IANDSC/IR ND BdO9M PE NgnErIRUNI6O trIE EOr EN.FEET OR LESS.THE IMXMO.1101AL ,4L 52,0I6R I"r—SO21 DIRFCLIONPL RUTTING REGUSEMENiS:BLTCN TOPE(MbI0EN9T'PCLVElHY1ENEi DUCT P.I I=PRI 19.05M r_. VP RISPtW on 6CHEWLE SOWS WITXAµECXMVIL COMECIIMIL IFR„ALCR OR LFF. MECWRKFL .OMECndN PRCMICII 1EIWARVE TO XWE MK ME9WLL ET THE EGI ERR 18.004E O 4_.1 22,7099 .4 'Muir OF FJE SPECmCA1NWLCMI9(.LVMARLE AI REWESTFROY NOEL PIWJECT on Y MNA.GEqq E STPFETVREPSONITNEMICTSXLL XfB AREMES TXREEECJALEY6PACE IJ[I TEUT 1]9.5Ot PPo 1I.OTV .}' E UDEO S15001 STRIP, HISASPEQFlCAT pI 0.EWpTOIS �ESENT TEST OF PM 11.072P i SMEARED AFTER INSTALLATION VOTE WEIIEPECTM PR 19 LINE �/ 6.NL PCE lRPN6FOPAER9TORENELTMLID6=EET TIN F WFALTBOMVflKLE 1o.&ls PG NePXM1 NM HMNM1Q ,r` ® NEVI MR 1�!- BIMdW WMLpRSRUST BE NHM330 VMS ORMEARL SIRE YWIII Pan W Dragon L POE TRANSFORMERS RUSTDIE VATMI66FFETOFAONNFAMf AREA 41 R r,1Qcc. .n ..x 5A"IIE47n ALWAYS MAINTAIN IO FEET CLFNMTCE MiROXT R ME TRANSFORMERS. LNMRIiv MTINIMNCvrra9 '(M[i IC �,'"ram 1.TRALNSfdNMER PADS A11E Tat actin IS2RICES NOTE 'g80pr.INC CONDUI T, IWAORMEDAMUT ABOVE EIGO 0MPA0NMOI:ATEDIN WETµ 9 AMTOOOBIeS 1IMCN ALOVEQESTP &BTEELBLNXFR P06TS APE REWIRED AROM'D TPIRyOMAE0.9 THAT ARE EXPOSED IT S- . _ TOVENCLE6. 9,,„,,,„,,„„,,,,„., e NSE1 rw 'a CONDUIT B a.N0TWTCHV.RRLRTOBEETAT VAUL END LOPE EIIOO)M4S I105 LO ...: M1rs, COLIIITSAIOEOTO ENTER TIEVAVLT FND LONEA RNCIXdRB IIERY.AAlICT9 IEEE OETµ80N9NTCN NF INSTALL-POLE CONGIIT UNIT / PpB IRINI NsndlnOQ :I WITH 1ST THINGBRACKETS.31.13TERS C/O MOT 10 BEFORE BACANuaLL NEW VAULT PQ 1OSNq ISO BE6CT PAD LOMUTbN5 OSE'DDEP VEERI1ED1DI 8 LIDHRIING ARRESTERSWITH IMS AND CUSTOMER POE 016115D ROLE N.REfER TO PN FLAXTMCALSNMCE REOERESEMTs B1IaRCOIN FURRIER WTAXA PGE TO PULL 6 SFEOFIC 0.EpAHEIswS uNRTO TRANSFER SECONDARY II.DEMON IS BASSO ON STANDARD LM£RGRSSPC ENURIENT.NONSTANDARD •. ..b••,. TRANSFER STREET LIGHT i CUSTOMER. EOUPMENT MT SE AN ORTON AT AN ADTTINAL COST TO E®TRH 1RWIG 'AlSST OF Of1JER".WO]IVIAON Of V WNERSMP BETVEEV LXE CU6'OMER Pn'P 0 PGE PTRANSFER COMM f 51 'l wIu 11E AI lnE LINE 9DE OF TnE NEw CUBTOER aRONDED s:NTSI I SFPn :SW TOM Ave 8PGE CONSTRUCTION DRAWING $W JOB C d ❑TOPPED TO COMM I9 ��11'"""_""" DATE:/RR021 =AFENTS IAYYWNT'.10TDODI IAWD 100000454E W'M39T7515 1w CCLV . TITLE MUM Crary i,.II SITE II II ANY DEVIATION FROM THIS DESIGN MUST PGE-TECH CENTER ORB/2ND /� BE APPROVED BY PGE PROJECT MANAGER \ DROOP SAW 9 QGs6rrend CAME?' SERV E OORINA{OR / D RHNA-DURHMI IO 22 WS 236200 OR 80D51 1R CALL 811 BEFORE YOU DIG ��� �� SW Cory ATTENTION SW Comer of SW Tech Canker d end SW 72nd Ave.TIGARD RIGHT-OF-WAY PERMIT NOTICE: OREGON LAW REQUIRES YOU TO FOLLOW RUMS ADOPTED CESCRIOCvI BYTE OREGON ME1T9-NOTIFICATION CENTER REAL P.5221 WITH 50'FOR TRAFFIC SIGNAL CLEARANCE A PERMIT FROM THE LOCAL JURIBOICTRTM ISNED.IRED BEFORE ANY THOSE RULES ARE SET FORM M OAR 930001-0010 WORE wNn THEFT WORK IN TEPoOHT-CF-WAY SLAY BE PER FORMED. ONLY PGE APPROVED 1MROITON BTCALL02D.YOU MAN WAN COMES OFle COUNTY CRCN(9 IIRE-COAST RUCTION NC A TRENCH AND CONDUIT INSPECTION CONTRACTORS AND CONTRACTORS WHO HAVE MADE OTTER SPECIAL TEE RRULES EY CALLING THE OREGON UTILITY BEAVERTON WASHINGTON C21-01D I oc1 n PROJECT REWIRES A AREft' ;ION MEETING.CONTACT YOUR SERVICE B DESIGN AGREEMENTS WITH PGE WILE.BE ALLOWED TO WORI(TIOERAGES PERMIT. NTOREOTICN CENTER LOMMBTRATg .(503IS-L-I9ST UE Omen CENTER DE9ION RV �ME150 A/.AVWI RV 'N'CIKS MANAGER 7 TO tO WU T' AYn5 PRIOR TO EXCAVATION TO COORDINATE THE THE CONTRACTOR MUST NOTIFY THE LOCAL JURISDICTION M HOURS TO REQUEST UTILITY LOCATESCALL THE OREGON EMR69yFI YMEW- rv.WmOAl0ROR Hap ElpReh 672-5439 LANE1 WHITNEY '.ON.POE'S POLE CONSI IN nDINATOR 1KO MALL PROM LIT VOIM TRENCH BEFORE WORK IS TO BEGIN.A COPY OF THE PERMIT MUST BE ON SITE UTILITY NOTIFICATION CENTERSII AT LEAST IT IM1SAEf,TIONS. 2 BUCINEE S DAVO ORIOP TO ENf.PVnl If/TV CPU Wag T"EE' 0 PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED www.i nva rion.com DEVICE SPACING: N TAPER: 20' A II TANGENT:20' W3HV 11 TIUFPIC LM UT TO RE O OM I TURNED OFF DURING VON FLAGGRGOPERATIONS I 350'+/- ao19 01 I 038Ve3na 39 350'+/- ® I iI 350'+/- I T. 9 TT T 1 eo I oy,- 1 I SW Tech Center Dr p go O O1 O O �� jgo R .im to ? 700' 9 p ,•.• as Provide spotter(s)to �j�p� ,yyo el pedestrian traffice ' safely around work area. a\ ODOT PERMIT a . •� e�PPC a owls: + raoccr/uanaaaa- api 4 PGE(Wilsonville LCC) M29T7515 '�\ ys woven wrnµaaTwn: OTr/rT1R: ` QOCpFr• 9W TM Caner Dr&SW 77nd Me Tipti,Off S* MEW COnluao& PGE ��v'9 Le cPnlKreASe/1MYq: 'UAW Rap E^EWb/S024-71-5416 hev/. Rwown aw.Wb N y : TUR tprt &OWILWID \ C Borden Poteko Inc POTELCO INC All signs and devices SHALL conform to the MUTCD/OTTCH. Will adjust to fit field conditions as needed for safety. Plan NOT to scale.