Loading...
PFI2021-00301 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT COMMUNITY DEVELOPMENT Permit#: PFI2021-00301 Date Issued: 10/04/2021 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Parcel: SEG406 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: OR217 Auxilliary Lanes Project Description: Highway improvements to OR217 and associated work on local streets (Cascade, Shady Ln, Pfaffle) Class of Work: FEES Type 3-Street Improvements Description Date Amount PFI Permit Fee 08/17/2021 $655.74 PFI Permit Fee 09/29/2021 $5,901.67 Owner: Total $6,557.41 REQUIRED INSPECTIONS PHONE: Call 503-639-4175 for the IVR inspection request line or visit the City of Tigard website atwww.tioard-or qov to schedule inspections online. Contractor: PHONE: Applicant: KELLY MARTIN 123 NW FLANDERS ST PORTLAND, OR 97209 PHONE: 5037313001 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: See application Issued By: ATM i `M on"'-„_." Special Conditions(See Attached) UU Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12021-00301 Tyne: Condition Name: Status: Severity: PFI_Street Imp 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Street Imp 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Street Imp 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Street Imp 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes,etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Street Imp 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services Association [ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Street Imp 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Street Imp 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire& Rescue) and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District) and other service providers impacted by such closure. PFI_Street Imp 08 -TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.) before initiation of construction work. PFI_Street Imp 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Street Imp 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. PFI_Street Imp 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Street Imp 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Street Imp 14- UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules,contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Street Imp 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicants expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Street Imp 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Street Imp 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities (roads,ditches, etc.)as may be necessary, as determined by the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Street Imp 18-SEWER SYSTEM TEST Applied Notice A sewer system air-test and/or DVD T.V.test report and one set of"As-Builts"shall be provided for review and approval. PFI_Street Imp 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>, to establish a preconstruction meeting. PFI_Street Imp 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24) hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Street Imp 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Street Imp 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector. PFI_Street Imp 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Street Imp 24-VALIDATION OF MATERIAUCONSTRUCTION Applied Notice The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Street Imp 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two (2) persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Street Imp 26- RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Street Imp 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI_Street Imp 28-AS-BUILT DRAWING Applied Notice One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI_Street Imp 31 -OTHER Applied Notice City of TigardIN PFI�#: PFI2021-00301 n ENGINEERING DEPARTMENT TIGARD Public Facilities Improvement (PFI) Permit PROJECT INFORMATION TYPE OF WORK Project name: 0R217 Auxiliary Lanes o TYPE 1—Franchise Utility Work performed by NWN,PGE, or utility Brief description of project: Highway improvements to OR217 and agency associated work on local streets. ❑ TYPE 2—ROW Sidewalk/Driveway/Sewer Work performed for the purpose of: • Sidewalk installation or repair • Driveway approach installation and repair SITE INFORMATION • Sanitary sewer lateral installation and Location (address if available): 0R217: OR10 to OR99W Sec. main line tap [X TYPE 3—Full Scale Development Work performed with land use approval which includes any of the following: • Subdivisions or Partitions APPLICANT INFORMATION • Street widening Name: Oregon Department of Transportation • Mainlinetom installationrTiarfor sanitary, n sewer,d storm sewer, Tigard water, and Tigard Mailing address: 123 NW Flanders St water service area City/State: Portland. OR Zip: 97209 ❑ TYPE 4-Small Cell Technology El TYPE 5—Tigard Triangle Phone: Email: Phone: NOTE: Type I and 2 applications may be Contact name: Kelly R.H. Martin, Region 1 Transportation Project Manager 3 emailed to rowpermitsatigard or.gov. Phone: 503-731-3001 Email: Kelly.R.MARTIN@odot.state.or.us CONTRACTOR INFORMATION [XI Same as applicant (Construction contractor information to be furnished after bid opening.) Name: CCB Number: Mailing address: City/State: Zip: Phone: Email: ENGINEER INFORMATION Name: DOWL, LLC Mailing address: 920 Country Club Rd,Suite 100E City/State: Eugene. OR Zip: 97401 Phone: 503-620-6103 Email: WSchmidt@dowl.com ADDITIONAL INFORMATION Estimated value of work is required(if over$5,000):$ 93,677.28 (within the public right-of-way) Is work related to a LAND USE DECISION? IXI Yes 0 No Case number: CPA2020-00003 and SLR2020-00010 City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 1 of 4 APPLICANTS NOTE: Person specified as`Applicant"shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.04.140. * With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application. I, the applicant,certify that: • To the best of my knowledge, all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. Kelly R.H. Martin Av yS%z ODOT Region 1 Transportation Project Manager 3 8/6/2021 Applicant or authorized agent's signature Print name Date Property owner's signature (if required) Print name Date has: 7PP STAFF I. ONI.1 Case No: PF12021-00301 Permit fee:/ 6, 55 7.4-1 I Received by: HPollard Date: 8/11/2021 Approved by: .Brrc�/ 8 Date: 41,40/?0ZI Notified by: Date: I6 L (,Zl City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 2 of 4 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI)Permit: INITIAL PFI PERMIT FEE Part 1: Required submittal fee is 10%of the Net PFI Permit Fee.See below for calculations.Minimum of$300. NET PFI PERMIT FEE Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PFI Permit Fee). WATER LINE CONSTRUCTION FEE Part 3: All public water system improvements engineer's estimate X 12%. FOR STAFF USE ONLY FOR STAFF USE ONLY TYPE 4: SMALL WIRELESS FACILITY TYPE 1—3:DETAILED SUBMITTAL CHECKLIST REQUIREMENTS Does applicant have a right-of-way license? 0 Yes 0 No TYPE 1 AND TYPE 2-Must include a sketch showing: Under the wireless facilities standards,is the proposal ❑ Dimensions considered?(check all that apply): 0 Small Cell 0 Macro 0 Street Name How many install sites are proposed as part of this permit ❑ Site Address application? TYPE 3-Must provide 4 sets of plans (sized 24 x 36 or 22 x 34) and an electronic version of all submittal The proposed equipment is located on which of the following. items. The plans must that include: 0 Public Right-of-Way 0 Private Property 0 Cover—Site,Vicinity,Abbreviation,Legend If equipment is to be located on private property,describe the 0 General Notes(City,Water,Sewer,etc.) type&use: ❑ Street(Plan,Profile) ❑ Water,Storm and Sanitary(Plan Profile) ❑ Water Quality Facilities ❑ Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm, Sanitary,Water,Signage,Street Lights,etc.) ❑ Details O Traffic Sight Distance O Signing and Striping ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) ❑ Engineer's Construction Estimate Additional Submittals (per land use conditions,if applicable) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design ❑ Water Provider Approval City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 3 of 4 III r City of Tigard TIGARD Road Closure Permit Authorization OR217: OR10 -0R99W SEC. PFI Permit No. Project Name Beaverton-Tigard Highway Applicant name Oregon Department of Transportation Date 06/08/2021 Contractor's Name Engineer's Name Matthew Phillips PE, on behalf of Oregon Department of Transportation (1) Emergency Contact (24/7) Name Rick Smith, PE Phone Number 971-279-9701 ODOT PM (2) Emergency Contact (24/7) Name Thor Alvarado, CWI Phone Number 503-572-2860 ODOT APM Scope of Work/Event (be specific) SW Pfaffle St.will be closed at the intersection with Hall Blvd to facilitate the construction of the new Hall bridge over OR217. The bridge end panel extends into the intersection.A crane and other construction equipment will require operating space within the intersection. Additional work at the intersection to reconstruct pavement grades, sidewalks, waterlines, and storm lines will occur within the same closure window. Where SW Pfaffle St from SW 84th Ave to SW Hall Blvd (Road name) (address) (address) Length of Closure 470 0 miles ® feet Will road be open to traffic during non-construction hours? YES ❑ NO IX Local access to 8465 8470, 8485, 8530, &8585 on Pfaffle St/will be maintained. Page 1 of 3 ft Detour Route (Include map): Starting at Pfaffle St is an Urban Major Collector with an intersection at OR99W. The detour route for the closure of Pfaffle St. at Hall Blvd. is OR99W to SW 71st Ave to SW Oak St, to Hall Blvd. A detour map is attached. Hall Blvd will be closed at the same time from Pfaffle St. to 500' south of the intersection for the replacement of the Hall bridge over OR217. Dates of Closure Fall of 2023 to Summer of 2024 (MM/DD/YYYY) (MM/DD/YYYY) City Engineer Chief of Police Agencies to Notify: TVFR TTSD Pride Disposal Tri-Met A copy of this agreement shall be on file at the City of Tigard Engineering Department Page 2of3 ROAD CLOSURE AUTHORIZATION DETOUR EXHIBIT z s�w' a F r. , t $w p MAPLE 141 i" .� LT C f SW MAPLELEAE ST ✓ j N il �r-. SW OAK S - n a"._ Cf .:. .; z WAY n �� �Y - SSWII6Ak 51 r Oe�'tAy fes:wes N.w -__ `� ....._.. SW OAK 5' • OAN 51 I S % G WASHINGTON 5W PINT SI Villa Ridge 6 SW SPRUCE ST 1 w PcO w;u,c p SW Ny -Irvo � .•, v . SW SIEVE R1W j > < W F m p w v. m � Dtik i sw LE55r N Wnr L A W A tE i v. n N `♦ HS m er N �'��' $A,PI KieI[., a ': t.• 1 O. m City of Tigard street PP OPOSE[1 p0 SW Ali AHTA ST 1 Concurrent ODOT c o closure Hwy closure ? F 1.- W 6AYLOR.T P1 P 111 4�G 1 SW SOUTHV'IEW r 1, 1 ST yi PRELIMINARY ESTIMATE FOR THE IMPROVEMENT of Prepared by OR217:OR10-OR99W Sec. Tina Adams (Improvements in City of Tigard Right-of-Way of SW Cascade Ave,SW Shady Ln,and SW Pfeifle Rd) Casso Consulting 7/15/2021 Item Sheet-Note Quantity Unit Est Unit Cost Est Cost Comment DRAINAGE AND UTILITIES Adjust Inlet C10C,Note S1 1 EA $ 1,250.00 $ 1,250.00 Cascade Ave Remove 12"Pipe C10C,Note S2 138 FT $ 44.00 $ 6,072.00 Cascade Ave Connect to Extg.Structure C10C,Note S2 1 EA $ 1,000.00 $ 1,000.00 Cascade Ave 12"Storm Sewer Pipe C10C,Note S2 9 FT $ 110.00 $ 990.00 Cascade Ave 18"Storm Sewer Pipe C12C,Note S15 62 FT $ 175.00 $ 10,850.00 Shady Ln Type D Inlet,Flow Control C12C,Notes S13 0 EA $ - $ - ODOT facility,including pipe &S14 between structures Sloped End Section,12" C10C,Note S2 1 EA $ 300.00 $ 300.00 Cascade Ave Sloped End Section,18" C12C,Note S15 1 EA $ 425.00 $ 425.00 Shady Ln Paved End Slope C10C,Note S2 26 SF $ 45.00 $ 1,170.00 Cascade Ave Loose Riprap,Class 50 C12C,Note S15 3 CY $ 145.00 $ 435.00 Shady Ln Riprap Geotextile,Type 2 C12C,Note S15 9 SY $ 10.00 $ 90.00 Shady Ln Trench Resurfacing C12C,Note S15 16 SY $ 140.00 $ 2,240.00 Shady Ln Bioretention Pond(DFI#D01369) C10C,Note S6 0 LS $ - $ - ODOT facility bordering &HA011 Cascade Ave Storage Pond(DFI#D01370) C12C,Note S12 0 LS $ - $ - ODOT facility bordering Shady Ln Adjust Sanitary Manhole C14D,Note 49 2 EA $ 1,250.00 $ 2,500.00 Add-work agreement Adjust Box C14D,Note 54 1 EA $ 500.00 $ 500.00 Add-work agreement Trench Resurfacing R01 10 SY $ 140.00 $ 1,400.00 Pfaffle St for TVWD PAVEMENTS AND SURFACES General Excavation C14G 427 CY $ 23.00 $ 9,821.00 Pfaffle St Subgrade Geotextile BA72 430 SY $ 2.00 $ 860.00 Pfaffie St Aggregate Base BA72 360 TON $ 28.00 $ 10,080.00 Pfeifle St Page 1 of 3 PRELIMINARY ESTIMATE FOR THE IMPROVEMENT of Prepared by 0R217:OR10-0R99W Sec. Tina Adams (Improvements in City of Tigard Right-of-Way of SW Cascade Ave,SW Shady Ln,and SW Pfaffle Rd) Casso Consuking 7/15/2021 Item Sheet-Note Quantity Unit Est Unit Cost Est Cost 'Comment Curb and Gutter C14A,Note 13,LT 100 FT $ 40.00 $ 4,000.00 Pfaffle St Curb and Gutter C14A,Note 13,RT 100 FT $ 40.00 $ 4,000.00 Pfaffle St Standard Curb BA72,RT,back of walk 65 FT $ 30.00 $ 1,950.00 Pfaffle St P.C.Concrete Sidewalk CI4A,Note 15,LT 558 SF $ 13.00 $ 7,254.00 Pfaffle St P.C.Concrete Sidewalk C14A,Note 15,RT 558 SF $ 13.00 $ 7,254.00 Pfaffle St Extra for New Curb Ramps C14A 0 EA $ - $ - In ODOT RIW Yellow Truncated Domes C14A 0 SF $ - $ - In ODOT RIW Level 3,1/2 inch ACP-6'Depth BA72 140 TON $ 73.25 $ 10,255.00 Pfaffle St PG 64-22 Asphalt in 1/2 inch ACP BA72 8 TON $ 500.00 $ 4,000.00 Pfaffle St. PERMANENT TRAFFIC CONTROL Removal of Existing Signs LA24 1 LS $ 100.00 $ 100.00 Pfaffle St Sign,No Thru Trucks LA24,Sign 446 12.25 SF $ 22.00 $ 269.50 Pfaffle St Wood Sign Posts LA24,Sign 446 16 FBM $ 6.00 $ 96.00 Pfaffle St Sign,Bike Lane Ends LA24,Sign 414 4.33 SF $ 22.00 $ 95.26 Pfaffle St Perforated Square Tube Sign Support LA24,Sign 414 1 EA $ 120.00 $ 120.00 Pfaffle St Sign,No Parking LA24,Sign 436 1.5 SF $ 22.00 $ 33.00 Pfaffle St Wood Sign Posts LA24,Sign 436 14 FBM $ 6.00 $ 84.00 Pfaffle St Sign,SW Pfaffle St LA24,Sign 457 x 2 7 SF $ 22.00 $ 154.00 In ODOT RAW Sign,SW Hall Blvd LA24,Sign 456 x 2 7 SF $ 22.00 $ 154.00 In ODOT RAN Sign,STOP LA24,Sign 301 9 SF $ 22.00 $ 198.00 In ODOT RAW Perforated Square Tube Sign Support LA24,sign tree 1 EA $ 120.00 $ 120.00 Pfaffle/Hall intersection,In ODOT RAN Thermoplastic,Extruded,Surface,Profiled QB22,W-2 600 FT $ 1.10 $ 660.00 Pfaffle St,4"line equivalent (8'White Line) Page 2 of 3 PRELIMINARY ESTIMATE FOR THE IMPROVEMENT of Prepared by 0R217:OR10-0R99W Sec. Tina Adams (Improvements in City of Tigard Right-of-Way of SW Cascade Ave,SW Shady Ln,and SW Pfaffle Rd) Casso Consulting 7/15/2021 Item Sheet-Note Quantity Unit Est Unit Cost Est Cost Comment Thermoplastic,Extruded,Surface,Profiled QB22,ND 280 FT $ 1.10 $ 308.00 Pfaffle St,4"line equivalent (Double No-Pass) Pavement Bar,Type B-HS(12"White Stop QB22,S 29 SF $ 10.00 $ 290.00 Pfeifle Bar) Pavement Legend,Type B-HS:Bicycle Lane QB22,BS 2 EA $ 300.00 $ 600.00 Pfeifle St Stencil Pavement Legend,Type B-HS:Arrows QB22,LA&RA 2 EA $ 275.00 $ 550.00 Pfeifle St Stripe Removal QB22,Rx ND 82 FT $ 0.36 $ 29.52 Pfeifle St,4"line equivalent RIGHT-OF-WAY DEVELOPMENT CL-6 Chain Link Fence C12A,Note S1 56 LF $ 20.00 $ 1,120.00 Portion at SW Shady Ln R/W line only NOTE:TVWD Waterline design was furnished by TVWD to ODOT under separate design contract,but will be constructed concurrently by the same contractor.City inspection of waterline is not required. Non-Water System Improvements Engineer's Estimate: $ 93,677.28 TOTAL PFI PERMIT FEE:Non-Water System Improvements Engineer's Extimate X 7% $ 6,557.41 INITIAL PFI PERMIT FEE DUE AT TIME OF SUBMITTAL $ 655.74 ESTIMATED NET PFI PERMIT FEE DUE AT TIME OF ISSUANCE: $ 5,901.67 Page 3 of 3 Sec. 15 & 22, T. 1 S, R.1 w, W.M. t/mr Notes See p1 . a for ConstrucSheer Cola 41,‘ C3 - " >`/w ur r I�.`. y., 7 iv test Con' .. © ©; -S' ! -16 ® .; CD } ::..--. m Z ®.• tRy�i 4 '�.,-'j" 2 • / m® 9 ram---�_. 1. -mai i �� .. �O 1f R 3' a • �` �1 11' 36" --_ d r f0 �� l� IS zr ._Y_. : t l� �/ / \ H lb--13' IR- O -r - NO.144) 531"01r3rE _. __!8 31' Cn Ilne IS"-64' 1Y-139' 0 32 i q 1r-I9' BEAVERTO t'11 TIGARO / Cyw ne 0 /I'-146' 1r-14' © 1 p© -� --y - - ® II ra-139^-_.__ . _ r fj . 110411 a ... • 64 r , � "At .. r•e JB A - ♦ - I � st : , • ® Ate* `r ... a2 Airiali ' D2'line� -- -hnn.eu. or.La.54'Cone rMR 7` u£ - UT'r s r - N -From CWS map.e36ls ; ',/ % -- Southe acific RailroadTnMet Westside Egress Service N - TV __ !I -_ r TV - CWS MH 0 R.R R / IV JUNCTION ID LEGEND___ r t - 88673 (rm.',In legend may lot appear on plans) 4r ./ --. • I CWS MH Remove manhole: ' ys ` )// JUNCTIONID 11780 in ae urr manhole a BRIDGE ABUTMENT eon``emletoe` ® POTHOLE EACH AREA ' iAemste inlet: )y /, Jt /Ad usNnlet R r / Coast,Inlet • �� /; P / E�0 PROf� OREGON DEPARTMENT / Chat,pme ditch: ® i j rid"t *\5�(p01NE� OF TRANSPORTATION • Plug and abandon pipe ca.4.•Cons`.pipe -_• l r F r Paved advert mdsbpe: m / , OR217:OR10-OR99W NOTE / ' I \\' BE0R217N-R1O-OR99w I. Confirm drainage structure rim elevations with roadway / I TIGARD HIGHWAY I ` `or finish grade surface ekwrbn prior to insra/larion. / f / I . V•41° 7-C) O / s/ 0 'V Mrnnan Mawr*Rssm Rewsr Wae I.meemw 1. See traffic sheets for_clonal and'Rumination talkies r r E R• p0 Lou-w..rw.R Mm.t m a..wM.,a eMmr not shown. /% t sweetwa. RENEWS:12-31-2021 DRAINAGE&UflLtt1E5 I CO2C H_K18841_dr_01.dgn c CO2C 6I2612020 1:28:65 PM hwyr88g NrwhE owl,ou REQUEST Rotation.0- Soak'1".100'