Loading...
Permit — .- _ .. CITY OF TIGARD BUILDING PERMIT IIIII s COMMUNITY DEVELOPMENT Permit#: BUP2021-00235 Date Issued: 10/6/2021 TIGARD 13125 SW Hat Blvd.,Tigard OR 97223 503.718.2439 Parcel: 1 S135DC10100 Jurisdiction: Tigard Site address: 11900 SW 95TH AVE Project: Weston Oaks Subdivision: 2020-016 PARTITION PLAT Lot: 2 Project Description: Demolition of a 950 sq.ft.dwelling on sewer and a 350 sq.ft.accessory structure. UPON FINAL INSPECTION, DEMO CREDITS FOR PARKS,TRANSPORTATION,AND SEWER SDC FEES WILL APPLY. Contractor: D &T EXCAVATION INC Owner: BOZMA LLC PO BOX 3767 14787 SW MILLIKAN WAY WILSONVILLE, OR 97070 BEAVERTON, OR 97003 PHONE: 503-263-2607 PHONE: FAX: 503-263-2648 Specifics: FEES Description Date Amount Type of Use: SF Class of Work: DEM Type of Const: Permit Fee-Additions,Alterations, 10/06/2021 $225.80 Demolition Occupancy Grp: Occupancy Load: Erosion Control w/Development 10/06/2021 $80.70 Dwelling Units: 0 Info Process/Archiving-Sm$0.50(up to 10/06/2021 $1.00 Stories: 0 Height: 0 ft 11x17) Bedrooms: 0 Bathrooms: 0 Misc Administration Fee 10/06/2021 $4.00 Value: $10,000 Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $311.50 Required: Required Items and Reports(Conditions) 1 Ersn Cntrl 503-639-4175 Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work wit be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR•-/001-0090.Y vy o.a - .•. of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: ` ittee Signature: SC.c ^c Call 503.63 75 by 7:00 a.m.for the next a .fable inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application '' MA E Residential FOR OFFICE USEONLY CityofT> and RECEIVED eBY y,/ab aI ,,, , 4I,6�aJ_ M5 g Permit No.: • ]3125 SW Hall Blvd.,Tigard,OR 97223 Plan Review s Phone: 503.718.2439 Fax: 503.598.1960 Date/By: Other Permit: Inspection Line: 503.639.4175 SEP 2$ qQqy TIGAtr Date Ready/By: hats: See Page 2 for Internet: www.eigard-or.gov Notified/Method: %31(ir I led Supplemental Information CITY OF TIGARC. TYPE,Q RK REQUIRED DATA:1-AND 2-FAMILY DWELLING ❑New construction ltVISIOI� Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ❑Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ®1-and 2-family dwelling 0 Commercial/industrial Valuation: $ 10 r OQ� Qc. ❑Accessory building 0 Multi-family Ntunberofbedrooms: 2 bedrooms ❑Master builder ❑Other: Number of bathrooms: 1 bathroom floor SITE INFORMATION AND LOCATION Total number of floors: 1 wl bsmnt. Joh site address: 11900 SW 95th Avenue New dwelling area: square feet - City/State/ZIP: Tigard, OR 97223 Garage/carport area: square feet Suite/bldg./apt.no.: Project name: Weston Oaks Covered porch area: square feet Cross street/directions to job site: 95th and Greenburq Road Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: 1 S 1 3 5 DC 1 01 OO Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Demo of existing home and barn Valuation: $ C17'1 Q�_-e— - V. — ffe 1 'Ogg?* I T. Existing building area: square feet New building area: square feet 51 PROPERTY OWNER ❑ TENANT Number of stories: Name: Bozma, LLC Type of construction: Address: 14787 SW Millikan Way Oceupancygroups: City/State/ZIP: Beaverton. OR 97003 Existing: Phone:( ) Fax:( ) New: Ul APPLICANT 0 CONTACT PERSON BUILDING PERMIT FEES* (Please refer to fee schedule) Business name: Bozma, LLC Matt We I n e r — Structural plan review fee(or deposit): Contact name:Address: 14787 SW Millikan Way FLSplanreviewfee(ifapplic¢ble): City/State/ZIP. Beaverton, OR 97003 Total fees due upon application: Phone:(5031 970-5699 Fax::( ) Amount received: E-mail: matt(a�crandallgroup.com PHO'1'OVOL'TAICSOLAR PANEL SYSTEM FEES. CONTRACTOR Commercial and residential prescriptive installation of roof-top mounted PhotoVoltaic Solar Panel System. Business name: D&T Excavation (Murray D iq na m) submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address; P.O. Box 3767 Solar Installation Specially Code checklist. City/State/ZIP: Wilsonville, OR 97070 Permit Fee(includes plan review $180.00 Phone:(503 612-9284 Fax:(503)612-9287 age(12%of fees): State surcharge(12% permit fee): $21.60 CCB lie.: 151668 Total fee due upon application: $201.60 Authorized signature: This permit application expires If a permit Is not obtained /� within 180 days after it has been accepted as complete. Print name:. 4 ,Z.,e r Date: 9127/21 "Pee methodology set by Tri-County Building Industry Service Board. 1:\Building\Permits\BUP-RESPermi4App.doc 02/24/2011 440-4613T(11/02/COM/WEB) 1 City of Tigard COMMUNITY DEVELOPMENT DEPARTMENT ■ T 1 G R D Building Permit Review — Residential Building Permit #: 51,,f0` I— S— i Site Address: 11900 SW 95th Ave Project Name: Weston Oaks Lot #: Planning Review Proposal: demo house and accessory structures KI Verify address/suite#active in Accela. ® In River Terrace: E No ❑ Yes, River Terrace Review Addendum Site Plan Elements: ®Erosion Control n3 copies of site plan on 8-1/2"x 11"or 11 x 17"paper Retained trees with drip line and tree protection measures ®Drawn to scale(standard architect or engineer scale) ❑ rint of new structure(including decks)and FFE ®North arrow ❑Utility to • ns&easements(required for ne additions) K]Site address,project or subdivision name and lot number ❑Sidewalk/dri oes not apply. ®Applicant information(name and phone number) ❑Location of vj - inLot dimensions and building setback dimensions ❑Street tree size,type and o ®Square footage of buildings to be demolished ❑Street names OExisting structures on site ❑Corner ele ' ns(2'contours if more than ' erential) laisLot area,building coverage area,percentage of coverage and >1,00 of impervious area created or replaced? ❑ e No impervious area(applicable if R-7,R-12,R-25&R-40) es,is a storm water quality facility shown? ❑Yes ❑ I1 Clean Water Services—Service Provider Letter(lot platted prior to 9/10/1995): Required: ❑ Yes,applicant was notified CAS No Received: ❑ Yes ❑ No ® Water Meter Fixture Unit Worksheet—Additions,Remodels and ADUs Required: ❑ Yes,applicant was notified ® No Received: ❑ Yes ❑ No e SDC Exemption for ADU applied for: ❑ Yes ❑ No Received: ❑ Yes ❑ No J Public Facilities Improvement (PFI) Permit Required: ❑ Yes,applicant was notified ❑ No Applied For: ❑ Yes ❑ No,stop intake ® Land Use Case#: PDR2020-00001 ® Zoning: R-7 ed Setbacks: Front: Rear: Side: Street Side: Garage: ❑ Building ' t: Max.Height: Actual Height: ❑ Landscape Area: % ❑ Lot Coverage Max: ° Entrance ❑ Set back no more t 'from street-facing wall ❑ Paralle reet or offset 45 degrees or less Windows ❑ Minimum 12%of area of all s cing facades Garage ❑ Garage door is behind widest street-fat Does not apply. t Yes ❑ No,one of the following is met: ❑ Door extends no more than 5'fry overed porch extending beyond garage. ❑ Door extends no more t from wall and there is a t.window above garage on 2nd floor. ❑ Garage door width i 12'or less ❑ 50%or less of facade ° or less and includes 7 of following: ❑ Coy orch ❑ Recessed entrance ❑ Wall offset ❑ 1'Roo e ❑ Roof offset ire shingles ❑ Lap Siding ❑ Roof pitch ❑ Gable,hip,or gambrel roo Dormer ❑ Accent siding ❑ Window trim ❑ Window recess ❑ Window projection n isual Clearance ER Urban Forestry Plan E Sensitive Lands: ❑ Yes iEl No Type: 0 Conditions met prior to issuance of building permit Notes: Meet conditions prior to issuance. L, '0 Approved By Planning: A�I�1.M C ti Date: 9/30/2021 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved Cl Not Approved Revision 2: ❑ Approved ❑ Not Approved 1:\Building\Fonns\BldgPermitRvw_RES_122419.docx Building Permit Submittal Original Submittal Date: 4Tj gi Site Plans: # Building Plans: # ( Building Permit#: ❑ Ent ilding permit#a ve. j Workflow Routing: lanning ngineering rmit Coordinator ❑ Building Workflow Sign-off: Ki.°S'ign-off for Planning(include notes from planning review) '..A., Route Application Documents: ngineering: (1) copy of permit application, (1) site plan, (1)building plan and N. opal plan review routing form. Ti'T:uilding: original permit application,site plans,building plans, engineer and beam calculations and trust details,if applicable,etc. Notes: iefv ) on By Permit Technician: Date: f/W4,31 Cr Engineering Review 1Z 0--S-lope at building pad: 2%' Rt.-Conditions "Met"prior to issuance of building permit O'Easements (encroachments)per engineering conditions of approval and plat E''Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes [No " ['No Assess Water Quantity Fee in-lieu: ❑ Yes IDA Facility on lot: ❑ Yes i•-"No Final Plat Recorded: ❑ NOT Approved by Engineering: Date: Notes: v p Approved by Engineering: x , rl +1-keit, Date: /0--4-2e921(. Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Permit Coordinator Review OConditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: -Ica2 pet,,.., to(gI2i2A -Psi- Date: Notes: 1l �Y 2Ut.�-co� h 5 I?,b?/� Revisions (after Building Submittal only) ® Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: SDC Exemption: ❑ Received ,,Zr. Does not apply zErSDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes X N/A Tigard Trans SDC: ❑ Yes /1 N/A Parks SDC: ❑ Yes /el. N/A LIDA ❑ Yes /N/A OK to Issue Permit Approved by Permit Coordinator: Aar-. \- Date: PI S I ill I;; I:\Building\Forms\BldgPen iitRvw_RES_122419.docx Agnes Lindor From: Agnes Lindor Sent: Monday, October 4, 2021 9:22 AM To: matt@crandallgroup.com Cc: Monica Bilodeau; #Building Permit Technicians Subject: 11900 SW 95th Ave Demo Hi Matt- Planning needs a report from the arborist stating that the tree protection fencing is installed as per approved Land Use plans. Please send over this letter so we can release the permit.Thanks, Agnes Lindor l Associate Planner City of Tigard I Community Development 13125 SW Hall Boulevard Tigard, Oregon 97223 Phone: 503.718.2429 Email:AgnesL@tgard-or.gov 1