Loading...
Report (2) GEOPPCIFIC Real World Geotechnical Solutions Investigation•Design•Construction Support April 3, 2021 GeoPacific Project No. 21-5769 Westwood Homes, LLC 12700 NW Cornell Road Portland, Oregon 97229 Phone: 503-715-2383 Via email to: Darrin Krause at darrin@westwoodhomesllc.com Subject: GEOTECHNICAL OBSERVATION OF FOUNDATION SUBGRADE BURTS LANDING—LOT 2 11873 SW PENNY LAME TIGARD,OREGON GeoPacific visited the site today to observe the foundation preparation at Lot 2 of the development. It is our understanding that the planned structure will consist of a single-family residence utilizing conventional spread footings. At the time of our arrival,the excavation was complete and extended approximately 1 2 to 18 inches below the surrounding grade. The foundation bearing material appeared to consist of native silt soils, which were evaluated with a hand probe. Probing efforts yielded 3 to 4 inches of penetration, indicating generally stiff consistency of the foundation bearing soils. The footing layout of Lot 2 and the surrounding properties is relatively flat. Footing-to-wall and footing-to- slope setbacks do not appear to be an issue. Based on observed conditions, foundation subgrade soils as prepared are considered suitable to support the anticipated allowable bearing pressure of 1,500 psf. Estimated settlement under the allowable bearing pressure is 1 inch total, and inch differential, measured over a horizontal distance of 20 feet. Care should be taken to avoid saturation or disturbance of footing subgrade soils during and after excavation. If footing bearing soils become saturated or disturbed, any softened soil or slough should be removed and replaced with crushed aggregate or additional concrete. In general, footing excavations should be cleaned such that no more than approximately '-int of loose soils are present prior to pouring concrete. Construction should include typical measures for controlling subsurface water beneath the homes, including positive crawlspace drainage to an adequate low-point drain exiting the foundation, visqueen covering the exposed ground in the crawlspace, and crawlspace ventilation (foundation vents). The homebuyers should be informed and educated that some slow flowing water in the crawlspaces is considered normal and not necessarily detrimental to the home given these other design elements are incorporated into its construction. Appropriate 14835 SW 72nd Avenue Tel (503) 598-8445 Portland, Oregon 97224 Fax(503) 941-9281 Burts Landing,Westwood Homes—Lot 2 GeoPacific Project No. 21-5766 design professionals should be consulted regarding crawlspace ventilation, building material selection and mold prevention issues, which are outside GeoPacific's area of expertise. We have prepared this report for Westwood Homes, LLC, and it should not be relied upon by third parties without consulting GeoPacific. Within the limitations of scope, schedule and budget, GeoPacific attempted to execute these services in accordance with generally accepted professional principles and practices in the fields of geotechnical engineering and engineering geology at the time the report was prepared. The conclusions and interpretations presented in this report should not be construed as a warranty of the subsurface conditions. No warranty, expressed or implied, is made. The scope of our work did not include flood hazard evaluations, environmental assessments, the presence or absence of wetlands; or potential hazardous substances in the soil, surface water, or groundwater at this site We appreciate this opportunity to be of service. Sincerely, GEOPACIFIC ENGINEERING, INC. 14 �..- , OREGO EXPIRES:06/30/2 2.1 James D. Imbrie, P.E. Principal Geotechnical Engineer 2 GEOPACIFIC ENGINEERING, INC.