Loading...
PFI2021-00303 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT 1111 I COMMUNITY DEVELOPMENT Permit#: PF12021-00303 Date Issued: 08/24/2021 T t G A R D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 parcel: SEG3553 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: Ziply PFI 5501447 Project Description: Ziply PFI 5501447-repair existing HUB Class of Work: FEES Description Date Amount Type 1 -Utilities(gas, electric, data) PFI Permit Fee 08/24/2021 $300.00 Total $300.00 Owner: REQUIRED INSPECTIONS Call 503-639-4175 for the IVR inspection request line or visit the City of PHONE: Tigard website at www.tigard-or.gov to schedule inspections online. Contractor: PHONE: Applicant: MICHELLE ROSE 6074 N DISCOVERY WAY 125 BOISE, ID 83713 PHONE: Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. PermitteelApplicant Signature: See applicationt Issued By: 161111.66 " ' p- i Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PFI2021-00303 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02 -WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services Association [ATSSA], and Oregon Temporary Traffic Control Handbook [OTTCH]. PFI_Utilities 06 -TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire& Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345 (Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours (min.) before initiation of construction work. PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 10 -TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 12 -TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Utilities 14- UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. L. PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads,ditches, etc.)as may be necessary,as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector,<Trent Brickey>at <971-228-9269>,to establish a preconstruction meeting. Work hours on Walnut are from 9:00am-3:00 pm PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24) hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms,conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 22- DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector. PFI Utilities 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners,and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two (2)persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing,of any/all assignment changes. PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI_Utilities 28-AS-BUILT DRAWING Applied Notice 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements,including any revision made to the previously approved construction plans and,also,any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also, any improvement which may impact an existing public system or facility,shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI_Utilities 31 -OTHER Applied Notice Other City of Tigard PFI#: 2021-00303 111 . ENGINEERING DEPARTMENT TIGARD Public Facilities Improvement (PFI) Permit PROJECT INFORMATION TYPE OF WORK Project name: 5501447 ❑ TYPE 1—Franchise Utility Work Ziply is proposing to repair existing HUB performed by NWN,PGE, or utility Brief description of project: agency 0 TYPE 2—ROW Sidewalk/Driveway/Sewer Work performed for the purpose of: S E G 3 553 • Sidewalk installation or repair • Driveway approach installation and repair SITE INFORMATION • Sanitary sewer lateral installation and SW 132nd + SW walnut Ln main line tap Location (address if available): E TYPE 3—Full Scale Development Work Tigard,OR 97223 performed with land use approval which includes any of the following. • Subdivisions or Partitions APPLICANT INFORMATION • Street widening • Mainline installation for sanitary sewer, Name: Michlle Rose-Ziply Fiber storm sewer, Tigard water, and Tigard water service area Mailing address: 6074 N Discovery Way Ste.125 Boise,ID Zip: 83713 ❑ TYPE 4-Small Cell Technology City/State: ❑ TYPE 5—Tigard Triangle 208-576-4031 Phone: Email: permitting@mountainitd.cplThne: - NOTE: Type 1 and 2 applications may be entailed to rowoermits@tigard-or eov. Contact name: Phone: Email: CONTRACTOR INFORMATION 0 Same as applicant 00012725 Name: North Sky Communications CCB Number: Mailing address: 11818 SE Mill Plain Blvd Ste 418 City/State: Vancouver,WA Zip: 97005 Phone: 503-206-4550 Email: dmatton@northskycomm.com ENGINEER INFORMATION Name: Malache Stalberg 4155 SW Cedar Hills Blvd Beaverton,OR 97005 Mailing address: City/State: Zip: 503-626-0114 Email: malachi.stalberg@ziply.com Phone: ADDITIONAL INFORMATION Estimated value of work is required(if over$5,000):$ (within the public right-of-way) Is work related to a LAND USE DECISION? 0 Yes 0 No Case number: City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 1 of 4 . ., 'de•...,"' ..7. ''S ,-slic174;:t REPLACEMENT'. : : i -a, .,; A*,,., .-.,,!.0',;.,. . _ -.... -40 t ..- OF DAMAGED ,0.1 ,4 •,, 14 ...q,n'-=' •0., _ . _ ... - HUB ) ..7 , ,,- . ....,,,.-- - .... •,, 1 caid ..-., •4.. ...*. . , . . gteiMOGz0 --• " ,-,1,,,,f . - '4::- z,'.,,.: 4 :,1 ' .- ; • .",:• : ' '1‘..r."1 -C 7* fi'" ...'In taig.4."'''`.1,..-It 7.::-.-- i • '',,i,„::t.„. .• '41"i•.e.9 4 4.'", 4,'-'4.".-,,, .-- 4 , IP., 4 s.;/,/ .. ...I.'4 it• + .ee'4w. rt*.1.1..."1. '' -.'4\„4 /'44 ,. .1. :\.-\-..... <Mt- RV% - . V;osvv,vvainut@i3 • • 1 '''. 4 ; '.4.‘,‘' ,1440, .-;'t , ;';',--'-'"'---- ‘ '',.., C$/ f:1 -ma,- - ,.....?....r. , .s. 'L., k.. . A , -.,. ...,,,' ,..• . .- _ 't a/ • .3. I‘, -- ' • - ', '- ,41E 4i, .;‘,7 _ . ... ..•-•:, ..k!.,-- -.,- - --..„ ,.. ii::".' 1.-.••• .. I...- " ....?:, .-,. \ • , . _ irit, ,i ,' •.,.:2,t-.;:i - , ' .-v"-• ' •'"r',. ,e .244A.!';' •..'04,,,,,,....- -i. . -,1.4-.4.-.,... ....r.i 0--• -b.:.., ..:4 At:':',,P7-7%1'. t .')1:::i-#. 'i- ''''" : a* 'P'. . ; •V.-.6i (-- - ......m...74.0 - • - Page 52 2011 Edition Bicycle and Pedestrian Accommodation Diagrams The following practices and details address the accommodation of bicycles and pedestrians within work zones. The following detail drawings should be incorporated, where appropriate, into the traffic control plan for any short term work. 1. See Section 1.6 —Bicycle and Pedestrian Considerations for additional guidance. 2. Stay alert for pedestrians and bicycle traffic and accommodate safe passage for them, as needed. 3. The work space should be protected from bicycle and pedestrian intrusion by using barricades or closely-spaced channelizing devices. 4. Maintain access to transit stops or clearly close a transit stop using barricades or channelizing devices. Bicycle Accommodation Diagram 5-6 Bicycle Accommodation Principles: 1. If a significant volume of bicycles can be expected and work closes a marked bicycle facility, or requires bicycles to share a travel lane, install a "(Bicycle) ON ROADWAY" sign (CW 11-1) or the Bicycle symbol (W11-1)sign with an "ON ROADWAY"(OBW1-5) rider, in advance of the work area. 2. Install temporary signing off the paved shoulder, within the planter (buffer)strip, or share the width needed between the shoulder and the sidewalk, as available. 3. Signs are to remain in place until the surface is restored and the width made available for bicycle use. See Diagram 5-6 for typical bicycle signing placement. Sign Spacing and Buffer Lengths(feet) Posted Spadng Between Signs "Buffer" Speed A 8 C Space 20 50 25 1D0 100 100 75 30 100 35 125 40 35D 350 350 150 45 180 50 500 500 500 210 55 250 60 285 65 700 700 700 325 70 365 Chapter 5 September 2016 2011 Edition Page 53 Bicycle Accommodation Diagram 5-6 I NOTES: . Bicycles on Roadway(CW11-1)sign should not interrupt standard sequences. For example: o BE PREPARED TO STOP/Flagger Symbol o LANE CLOSED AHEAD/Lane Ends Symbol . Bicycles on Roadway sign typically follows ROAD WORK AHEAD sign and used as general warning. 1 11 A 1 V A V I CO \ CO N It �' DN ROADWAY / 1 C \OAD\ WORK RHEA/ Chapter 5 September 2016 Page 106 2011 Edition Diversion into a Continuous Left Turn Lane Diagram 430 Diagram 430 shows work in the travel lane(s) next to a continuous two-way left turn lane with one direction of traffic diverted into the continuous two-way left turn lane. 1. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3—Lights and Lighted Signs for exceptions. 2. For added visibility, a truck-mounted arrow board or PCMS in caution mode may be used. 3. When two or more travel lanes are reduced to a single lane before the diversion, each lane shall be closed separately. Layout traffic control according to ODOT Standard Drawing TM 852 for 5-lane sections. 4. A shifting taper(L/2) may be added in the diverted traffic direction across the continuous two-way left turn lane (as shown). This option is recommended when the speed is 45 mph or greater. Sign Spacing and Buffer Lengths(feet) Posted Spacing Between Signs "Buffer' Speed A B C Space 20 50 25 100 100 100 75 30 100 35 350 350 350 125 40 150 45 180 50 500 500 500 210 55 250 60 285 65 700 700 700 325 70 365 Chapter 5 September 2016 2011 Edition Page 107 Diversion into a Continuous Left Turn Lane Diagram 430 ROAD WORK �. AHEAD 'y t CENTER LANE CLOSED AHEAD A II • L/2 I .1 • • Buffer Protection Vehicle wJTMA(both Optional) See Chapter 4 rut / I Buffer • • L/2 I . • • IL12 • I A• • � t B ROAD WORK AHEAD, Chapter 5 September 2016