Specifications FOR OFFICE USE ONLY-SITE ADDRESS:
This form is recognized by most building departments in the Tri-County area for transmitting information.
Please complete this form when submitting information for plan review responses and revisions.
This form and the information it provides helps the review process and response to your project.
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
i III _ " Transmittal Letter
T I G A R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
TO: ire S pri v^kler ?loan re)) t'PIAN r DATE RECEIVED:
DEPT: BUILDING DIVISION Rtu .x V 0--L;
FROM: MO 64 0 LAS C i it AUG 2 3 2021
COMPANY: eXQt/PsS f ire cy S \S CITY OF IIUAHU
U BUILDING DIVISIOB _Y -
PHONE: 36o - lob3 g4 32
EMAIL: dame p c t I'f
RE: 129S0 SvJ Gf-cwt ave FPS - 2 —Doc S
(Site Address) (Permit Number)
13'1o4 t,.1 tcc -- ,re
(Project name or subdi on name and lot number)
ATTACHED ARE THE FOLLOWING ITEMS:
Copies: Description: Copies: Description: ,i,1:ii
Additional set(s) of plans. 3 Revisions: -ire cFri ftidey- playtiN,
Cross section(s) and details. Wall bracing and/or lateral analysis.
Floor/roof framing. Basement and retaining walls.
Beam calculations. nn Engineer's calculations.
3 Other (explain): Icy kcw\iC C Clntir-K6 re v i S1 or
REMARKS: I'\Oci ; `r7h5 t o I..) r3 or\c \\ave IDPP r oAc to
c work . re_ rr seN or re\oc hew a,.4).vVr-
CAtC, itnS aC\r\el
FOR OFFICE USE ONLY r
Routed to Permit Technician: Date: $- ..' J Initials:-_fr
Fees Dui Yes No Fee Description: Amount Due:
os 1-JI PJ rtvze - $ yS-
$
Special
Instructions:
Reprint Permit(per PE : ❑ Yes No // ❑ Done
Applicant Notified: z— Date: R /) A ( Initials:
I:1Building\Forms1Transmittal Letier-Rev i s ions_073120.doc
FFICF COPY
OFFICE COPY
root sY0
WWINEXPOOOVIOSONSOWLACOO
RECEIVED
EXPRESS FIRE SYSTEMS AUG 2 31021
670 S. 28TH STREET CITY OF TIGARD
BUILDING DIVISION
WASHOUGAL, WA 98671
PHONE: (360) 953-8432
W W W.ExpressFireSystems.com
FIRE SPRINKLER CALCULATION R1
FOR
Broadway Rose Theater
P R GFFSS/
�G1NE�,S? 0y
e //0'
412O12-'
OREGON ryo
/1/41RCH )0:10 (c,
,AMEO
XPIRES: ( I23
Mohamed Hussein
From: Mohamed Hussein
Sent: Friday, April 30, 2021 3:17 PM
To: Aaron Beattie
Subject: RE: Broadway Rose Fire Flow Test
Thanks Aaron,
The test you attached is dated 2015. I will use these numbers for my calculations given that there were no changes per
your email.
Thank you,
/l64,7 4474.uao�,a,; PE
Design/ Project Manager
Express Fire Systems, Inc.
mohamed@expressfiresystems.com
Office: 360-953-8432
Fax: 360-953-8394
CCB# 193272/WA. License: EXPREFS895N5
F 1 E S Y 6 T C M 1
wL
www.ExpressFireSystems.com
From:Aaron Beattie<abeattie@tigard-or.gov>
Sent: Friday, April 30, 2021 2:20 PM
To: Mohamed Hussein<mohamed@expressfiresystems.com>
Subject: Broadway Rose Fire Flow Test
Mohamed
Attached is the last fire flow test we performed for the theater. It was back in 2005 and the test shows an abundance of
available flow. Hopefully the Fire Marshal will accept this. There have been no changes to the water system in that
area. All the other test I have near that area are form the same year as this one.
Let me know if you need to have a test performed.
Aaron Beattie
Water Operations Supervisor
CITY OF TIGARD
Public Works 13125 SW Hall Blvd. I Tigard,Oregon 197223
Main: 503.639.4171 I Direct: 503.718.2690 I Cell: 503.702.0780 I Fax: 503.684.8840
Email: abeattie@tigard-or.gov
1
HYDRANT FLOW REQUEST FORM
PROJECT: SW PACIFIC HWY & SW SCHOOL ST.
ADDRESS:
CROSS STREET:
FLOW
HYDRANT LOCATION: SW SCHOOL ST. & SW GRANT ST.
STATIC: 82
RESIDUAL: PITOT- 69
GPM: 1394 AT 20 PSI - 12,947 GPM
DATED: 04.09.15 8:00 AM
MONITOR
HYDRANT LOCATION: SW PACIFIC HWY & SW SCHOOL ST.
STATIC: 82
RESIDUAL: 82
GPM:
DATED: 04.09.15 8:00 AM
WITNESS
WITNESSED BY:
TITLE:
ORGANIZATION: CITY OF TIGARD WATER DEPT.
SIGNATURE:
41
Atihr
r-ie
F 1 R 5� S_�TENIS 1I
R ESIOENTIAL • COMMERCIAL • INDUSTRIAL
EXCEEc)ING YOUR
EXPECTATIONS 244/'7 !
EXPRESS FIRE SYSTEMS
670 S. 28TH ST.
WASHOUGAL, OR 98671
360-953-8432
Job Name : BROADWAY ROSE THEATRE
Drawing : S21-029L
Location
Remote Area : 1
Contract : S21-029
Data File : S21-029L Area 1.WXF
Date/Time : 08/20/2021 -03:47 PM
Computer Programs by Hydratec Inc. Revision: 50.54.4
•
EXPRESS FIRE SYSTEMS Page 1
BROADWAY ROSE THEATRE Date
HYDRAULIC CALCULATIONS
for
Project name: BROADWAY ROSE THEATRE
Location:
Drawing no: S21-029L
Contract number: S21-029
Date: 5/3/2021
Design
Remote area number: 1
Remote area location: COSTUME SHOP
Occupancy classification: M
Density: 0.2 - Gpm/SqFt
Area of application: 1611 -SqFt
Coverage per sprinkler: 130- SqFt
Type of sprinklers calculated: SSU 8.0
No. of sprinklers calculated: 15
In-rack demand: -GPM
Hose streams: 250- GPM
Total water required(including hose streams): 668.2-GPM @ 59.6 - Psi
Type of system: WET
Volume of dry or preaction system: - Gal
Water supply information
Date: 4/9/2015
Location: NEAR CITY CONNECTION
Source: TIGARD WATER
Name of contractor: EXPRESS FIRE SYSTEMS
Address: 670 S. 28TH ST. / /WASHOUGAL, OR 98671
Phone number: 360-953-8432
Name of designer: MH
Authority having jurisdiction:
Notes: (Include peaking information or gridded systems here.)
Computer Programs by Hydratec Inc. Revision: 50.54.4
Water Supply Curve
EXPRESS FIRE SYSTEMS Page 2
BROADWAY ROSE THEATRE Date
City Water Supply: Demand:
C1 - Static Pressure : 82 D1 - Elevation : 11.494
C2 - Residual Pressure: 82 D2 - System Flow : 418.238
C2 - Residual Flow : 1394 D2 - System Pressure : 59.616
Hose ( Demand ) : 250
D3 - System Demand : 668.238
Safety Margin : 22.384
150
140
130
p 120
R 110
E 100
S 90 - Cl C2
S 80 o 0
U 70
D2
•
R 60 e
E 50 DS
40 i
30
20
10 i u7
200 400 600 800 1000 1200 1400 1600 1800
FLOW ( NA1.85 )
Computer Programs by Hydratec Inc. Revision: 50.54.4
- Fittings Used Summary
EXPRESS FIRE SYSTEMS Page 3
BROADWAY ROSE THEATRE Date
Fitting Legend
Abbrev. Name % % 1 1% 1% 2 2'Y 3 3'% 4 5 6 8 10 12 14 16 18 20 24
B NFPA 13 Butterfly Valve 0 0 0 0 0 6 7 10 0 12 9 10 12 19 21 0 0 0 0 0
E NFPA 13 90'Standard Elbow 1 2 2 3 4 5 6 7 8 10 12 14 18 22 27 35 40 45 50 61
F NFPA 13 45'Elbow 1 1 1 1 2 2 3 3 3 4 5 7 9 11 13 17 19 21 24 28
T NFPA 13 90'Flow thru Tee 3 4 5 6 8 10 12 15 17 20 25 30 35 50 60 71 81 91 101 121
V 90'Ell Firelock#001 0 0 0 0 0 3.5 4.3 5 0 6.8 8.5 10 13 4.5 5.1 0 0 0 0 0
X 90'Tee-BranchFirelock002 0 0 0 0 0 8.5 10.8 13 0 16 21 25 33 9.3 11 0 0 0 0 0
Zcd Colt C300 Horz Butt Fitting generates a Fixed Loss Based on Flow
Units Summary
Diameter Units Inches
Length Units Feet
Flow Units US Gallons per Minute
Pressure Units Pounds per Square Inch
Note: Fitting Legend provides equivalent pipe lengths for fittings types of various diameters.
Equivalent lengths shown are standard for actual diameters of Sched 40 pipe and CFactors
of 120 except as noted with '. The fittings marked with a * show equivalent lengths values
supplied by manufacturers based on specific pipe diameters and CFactors and they require no
adjustment. All values for fittings not marked with a *will be adjusted in the calculation
for CFactors of other than 120 and diameters other than Sched 40 per NFPA.
Computer Programs by Hydratec Inc. Revision: 50.54.4
' Flow Summary - NFPA
EXPRESS FIRE SYSTEMS Page 4
BROADWAY ROSE THEATRE Date
SUPPLY ANALYSIS
Node at Static Residual Available
Source Pressure Pressure Flow Pressure Total Demand Required Pressure
TEST 82.0 82 1394.0 82.0 668.24 59.616
NODE ANALYSIS
Pressure Discharge
Node Tag Elevation Node Type at Node at Node Notes
101 26.54 8 12.52 28.31 0.2 130
102 26.54 8 12.73 28.54 0.2 106
103 26.54 8 13.6 29.51 0.2 121
105 26.54 8 12.32 28.08 0.2 121
106 26.54 8 12.59 28.39 0.2 121
107 26.54 8 13.58 29.48 0.2 121
104 26.54 16.6
108 25.58 18.39
109 25.58 19.73
110 20.0 30.47
TOR 20.0 32.48
BUG -3.5 44.0
VO -3.5 51.78
CW -3.5 60.58
TEST 0.0 59.62
112 26.54 8 9.81 25.06 0.2 88
113 26.54 8 10.08 25.4 0.2 127
115 26.54 8 10.12 25.45 0.2 82
116 26.54 8 10.3 25.68 0.2 127
114 26.54 11.42
117 25.58 14.7
118 25.58 17.14
119 26.54 8 11.54 27.17 0.2 127
120 26.54 8 11.85 27.54 0.2 127
122 26.54 8 11.8 27.48 0.2 127
123 26.54 8 12.12 27.85 0.2 127
121 26.54 13.4
124 26.54 8 18.39 34.31 0.2 121
125 26.54 18.93
HOSE -3.5 60.46 250.0
Computer Programs by Hydratec Inc. Revision: 50.54.4
•
Final Calculations : Hazen-Williams
EXPRESS FIRE SYSTEMS Page 5
BROADWAY ROSE THEATRE Date
Node1 Elev1 K Qa Nom Fitting Pipe CFact Pt
to or Ftngs Pe """" Notes **"""
Node2 Elev2 Fact Qt Act Egiv Len Total Pf/Ft Pf
101 26.540 8.00 28.31 1.5 8.570 120 12.518
to 0.0
102 26.540 28.31 1.682 8.570 0.0249 0.213 Vel = 4.09
102 26.540 8.00 28.54 1.5 9.670 120 12.731
to 0.0
103 26.540 56.85 1.682 9.670 0.0902 0.872 Vel = 8.21
103 26.540 8.00 29.51 1.5 T 9.9 5.430 120 13.603
to 9.900 0.0
104 26.540 86.36 1.682 15.330 0.1955 2.997 Vel = 12.47
0.0
104 86.36 16.600 K Factor= 21.20
105 26.540 8.00 28.08 1.5 11.110 120 12.320
to 0.0
106 26.540 28.08 1.682 11.110 0.0245 0.272 Vel = 4.05
106 26.540 8.00 28.39 1.5 11.110 120 12.592
to 0.0
107 26.540 56.47 1.682 11.110 0.0890 0.989 Vel = 8.15
107 26.540 8.00 29.48 1.5 T 9.9 5.680 120 13.581
to 9.900 0.0
104 26.540 85.95 1.682 15.580 0.1938 3.019 Vel = 12.41
104 26.540 86.35 2.5 T 16.474 0.960 120 16.600
to 16.474 0.416
108 25.580 172.3 2.635 17.434 0.0788 1.373 Vel = 10.14
108 25.580 211.63 3 10.920 120 18.389
to 0.0
109 25.580 383.93 3.26 10.920 0.1231 1.344 Vel = 14.76
109 25.580 34.31 3 2X 34.943 22.750 120 19.733
to 34.943 2.417
110 20 418.24 3.26 57.693 0.1442 8.318 Vel = 16.08
110 20 0.0 4 2V 17.907 33.500 120 30.468
to 17.907 0.0
TOR 20 418.24 4.26 51.407 0.0392 2.014 Vel = 9.41
TOR 20 0.0 4 B 15.8 18.500 120 32.482
to 15.800 10.178
BUG -3.5 418.24 4.26 34.300 0.0392 1.344 Vel = 9.41
BUG -3.5 0.0 4 T 29.067 155.000 140 44.004
to 2E 29.067 63.947 0.0
VO -3.5 418.24 4.1 F 5.813 218.947 0.0355 7.772 Vel= 10.16
VO -3.5 0.0 4 T 29.067 15.250 140 51.776
to Zcd 0.0 29.067 7.228 * ' Fixed Loss = 7.228
CW -3.5 418.24 4.1 44.317 0.0355 1.572 Vel= 10.16
CW -3.5 250.00 6 47.720 140 60.576
to -1.516
TEST 0 668.24 6.16 47.720 0.0117 0.556 Vel = 7.19
0.0
TEST 668.24 59.616 K Factor= 86.55
112 26.540 8.00 25.06 1.5 13.680 120 9.810
to 0.0
113 26.540 25.06 1.682 13.680 0.0198 0.271 Vel = 3.62
Computer Programs by Hydratec Inc. Revision: 50.54.4
Final Calculations : Hazen-Williams
EXPRESS FIRE SYSTEMS Page 6
BROADWAY ROSE THEATRE Date
Node1 Elev1 K Qa Nom Fitting Pipe CFact Pt
to or Ftngs Pe ******* Notes ******
Node2 Elev2 Fact Qt Act Egiv Len Total Pf/Ft Pf
113 26.540 8.00 25.40 1.5 T 9.9 8.570 120 10.081
to 9.900 0.0
114 26.540 50.46 1.682 18.470 0.0723 1.335 Vel = 7.29
0.0
114 50.46 11.416 K Factor= 14.93
115 26.540 8.00 25.45 1.5 8.900 120 10.122
to 0.0
116 26.540 25.45 1.682 8.900 0.0204 0.182 Vel = 3.67
116 26.540 8.00 25.68 1.5 T 9.9 5.110 120 10.304
to 9.900 0.0
114 26.540 51.13 1.682 15.010 0.0741 1.112 Vel = 7.38
114 26.540 50.46 1.5 T 9.9 0.960 120 11.416
to 9.900 0.416
117 25.580 101.59 1.682 10.860 0.2640 2.867 Vel = 14.67
117 25.580 0.0 1.5 9.260 120 14.699
to 0.0
118 25.580 101.59 1.682 9.260 0.2639 2.444 Vel = 14.67
118 25.580 110.04 2.5 10.810 120 17.143
to 0.0
108 25.580 211.63 2.635 10.810 0.1153 1.246 Vel = 12.45
0.0
108 211.63 18.389 K Factor= 49.35
119 26.540 8.00 27.17 1.5 13.680 120 11.537
to 0.0
120 26.540 27.17 1.682 13.680 0.0230 0.315 Vel = 3.92
120 26.540 8.00 27.55 1.5 T 9.9 8.570 120 11.852
to 9.900 0.0
121 26.540 54.72 1.682 18.470 0.0840 1.552 Vel= 7.90
0.0
121 54.72 13.404 K Factor= 14.95
122 26.540 8.00 27.48 1.5 13.680 120 11.796
to 0.0
123 26.540 27.48 1.682 13.680 0.0235 0.321 Vel= 3.97
123 26.540 8.00 27.84 1.5 T 9.9 5.110 120 12.117
to 9.900 0.0
121 26.540 55.32 1.682 15.010 0.0857 1.287 Vel = 7.99
121 26.540 54.72 1.5 T 9.9 0.960 120 13.404
to 9.900 0.416
118 25.580 110.04 1.682 10.860 0.3060 3.323 Vel = 15.89
0.0
118 110.04 17.143 K Factor= 26.58
124 26.540 8.00 34.31 1.5 T 9.9 5.430 120 18.390
to 9.900 0.0
125 26.540 34.31 1.682 15.330 0.0354 0.543 Vel = 4.95
125 26.540 0.0 1.5 T 9.9 0.960 120 18.933
to 9.900 0.416
109 25.580 34.31 1.682 10.860 0.0354 0.384 Vel = 4.95
Computer Programs by Hydratec Inc. Revision: 50.54.4
Sogt
VI R E S Y S T E MS
RESIC/E NTIAL • COMMERCIAL • I NC.0 STRIAE
EXCEEDING YOUR
EXPECTATIONS 2 4- 7 !
EXPRESS FIRE SYSTEMS
670 S. 28TH ST.
WASHOUGAL, OR 98671
360-953-8432
Job Name : BROADWAY ROSE THEATRE
Drawing : 521-029L
Location
Remote Area : 2
Contract : S21-029
Data File : S21-029L Area 2.WXF
Date/Time : 08/20/2021 -03:12 PM
Computer Programs by Hydratec Inc. Revision: 50.54.4
EXPRESS FIRE SYSTEMS Page 1
BROADWAY ROSE THEATRE Date
HYDRAULIC CALCULATIONS
for
Project name: BROADWAY ROSE THEATRE
Location:
Drawing no: S21-029L
Contract number: S21-029
Date: 5/3/2021
Design
Remote area number: 2
Remote area location: REHEARSAL STUDIO
Occupancy classification: A
Density: 0.1 -Gpm/SqFt
Area of application: 1208-SqFt
Coverage per sprinkler: 148-SqFt
Type of sprinklers calculated: SSU 5.6
No. of sprinklers calculated: 12
In-rack demand: - GPM
Hose streams: 100-GPM
Total water required(including hose streams): 287.6 -GPM @ 67.9- Psi
Type of system: WET
Volume of dry or preaction system: - Gal
Water supply information
Date: 4/9/2015
Location: NEAR CITY CONNECTION
Source: TIGARD WATER
Name of contractor: EXPRESS FIRE SYSTEMS
Address: 670 S. 28TH ST. / /WASHOUGAL, OR 98671
Phone number: 360-953-8432
Name of designer: MH
Authority having jurisdiction:
Notes: (Include peaking information or gridded systems here.)
Computer Programs by Hydratec Inc. Revision: 50.54.4
Water Supply Curve
EXPRESS FIRE SYSTEMS Page 2
BROADWAY ROSE THEATRE Date
City Water Supply: Demand:
Cl -Static Pressure : 82 D1 - Elevation : 7.995
C2- Residual Pressure: 82 D2 - System Flow : 187.597
C2- Residual Flow : 1394 D2 - System Pressure : 67.900
Hose ( Demand ) : 100
D3 -System Demand : 287.597
Safety Margin : 14.100
150
140
130
P 120
R 110
E 100
S 90 C1 C2
S 80
U 70 D:
R 60 ۥ 3
E 50
40
30
20
10 o D1
. , . . . , , . . .
200 400 600 800 1000 1200 1400 1600 1800
FLOW ( NA1.85 )
Computer Programs by Hydratec Inc. Revision: 50.54.4
-
Fittings Used Summary
_ EXPRESS FIRE SYSTEMS Page 3
BROADWAY ROSE THEATRE Date
Fitting Legend
Abbrev. Name 'A '/, 1 1'A 1'/z 2 2%s 3 3A 4 5 6 8 10 12 14 16 18 20 24
B NFPA 13 Butterfly Valve 0 0 0 0 0 6 7 10 0 12 9 10 12 19 21 0 0 0 0 0
E NFPA 13 90'Standard Elbow 1 2 2 3 4 5 6 7 8 10 12 14 18 22 27 35 40 45 50 61
F NFPA 13 45'Elbow 1 1 1 1 2 2 3 3 3 4 5 7 9 11 13 17 19 21 24 28
Mfx Metraflex Loop Fitting generates a Fixed Loss Based on Flow
T NFPA 13 90'Flow thru Tee 3 4 5 6 8 10 12 15 17 20 25 30 35 50 60 71 81 91 101 121
V 90'Ell Firelock#001 0 0 0 0 0 3.5 4.3 5 0 6.8 8.5 10 13 4.5 5.1 0 0 0 0 0
X 90'Tee-BranchFirelock002 0 0 0 0 0 8.5 10.8 13 0 16 21 25 33 9.3 11 0 0 0 0 0
Zcd Colt C300 Horz Butt Fitting generates a Fixed Loss Based on Flow
Units Summary
Diameter Units Inches
Length Units Feet
Flow Units US Gallons per Minute
Pressure Units Pounds per Square Inch
Note: Fitting Legend provides equivalent pipe lengths for fittings types of various diameters.
Equivalent lengths shown are standard for actual diameters of Sched 40 pipe and CFactors
of 120 except as noted with *. The fittings marked with a* show equivalent lengths values
supplied by manufacturers based on specific pipe diameters and CFactors and they require no
adjustment. All values for fittings not marked with a *will be adjusted in the calculation
for CFactors of other than 120 and diameters other than Sched 40 per NFPA.
Computer Programs by Hydratec Inc. Revision: 50.54.4
' Flow Summary - NFPA
EXPRESS FIRE SYSTEMS Page 4
BROADWAY ROSE THEATRE Date
SUPPLY ANALYSIS
Node at Static Residual Available
Source Pressure Pressure Flow Pressure Total Demand Required Pressure
TEST 82.0 82 1394.0 82.0 287.6 67.9
NODE ANALYSIS
Pressure Discharge
Node Tag Elevation Node Type at Node at Node Notes
DP01 10.0 5.6 7.0 14.82 0.1 72
EQ01 18.46 4.12
200 18.46 5.6 7.0 14.82 0.2 73
201 18.46 5.6 7.06 14.88 0.1 148
202 18.46 5.6 7.32 15.15 0.1 148
203 18.46 8.04
204 18.46 8.31
205 18.46 8.62
206 13.0 21.71
207 13.0 23.38
208 13.0 27.26
1 209 13.0 28.77
210 13.0 31.24
211 13.0 31.58
212 13.0 34.71
213 13.0 35.01
214 13.0 36.92
215 13.0 36.95
216 13.0 37.0
217 13.0 37.93
218 13.0 39.06
219 13.0 39.3
220 13.0 41.46
111A 13.0 46.81
111 20.0 46.42
110 20.0 47.18
TOR 20.0 47.63
BUG -3.5 58.12
VO -3.5 59.88
CW -3.5 69.3
TEST 0.0 67.9
221 18.46 5.6 7.47 15.31 0.1 148
222 18.46 5.6 7.55 15.39 0.1 148
223 18.46 5.6 7.23 15.06 0.2 68
225 18.46 5.6 7.29 15.12 0.1 148
226 18.46 5.6 7.56 15.4 0.1 148
227 18.46 5.6 7.72 15.56 0.1 142
228 18.46 5.6 7.8 15.64 0.1 142
229 18.46 5.6 7.41 15.25 0.1 104
230 18.46 8.32
231 18.46 8.6
232 18.46 8.6
Computer Programs by Hydratec Inc. Revision: 50.54.4
Final Calculations : Hazen-Williams
EXPRESS FIRE SYSTEMS Page 6
BROADWAY ROSE THEATRE Date
Node1 Elev1 K Qa Nom Fitting Pipe CFact Pt
to or Ftngs Pe ******" Notes "**"""
Node2 Elev2 Fact Qt Act Egiv Len Total Pf/Ft Pf
DP01 10 5.60 14.82 1 E 2.0 8.460 120 7.000
to 2.000 -3.664
EQ01 18.46 14.82 1.049 10.460 0.0747 0.781 Vel = 5.50
0.0
EQ01 14.82 4.117 K Factor= 7.30
200 18.46 5.60 14.82 1.5 8.220 120 7.000
to 0.0
201 18.46 14.82 1.682 8.220 0.0075 0.062 Vel = 2.14
201 18.46 5.60 14.88 1.5 9.650 120 7.062
to 0.0
202 18.46 29.7 1.682 9.650 0.0270 0.261 Vel = 4.29
202 18.46 5.60 15.15 1.5 T 9.9 2.480 120 7.323
to 9.900 0.0
203 18.46 44.85 1.682 12.380 0.0582 0.721 Vel = 6.48
203 18.46 30.70 2.5 15.310 120 8.044
to 0.0
204 18.46 75.55 2.635 15.310 0.0171 0.262 Vel = 4.44
204 18.46 76.79 2.5 4.960 120 8.306
to 0.0
205 18.46 152.34 2.635 4.960 0.0627 0.311 Vel = 8.96
205 18.46 35.26 2.5 2X 29.654 41.200 120 8.617
to 2V 11.807 41.461 5.470 " * Fixed Loss = 3.105
206 13 187.6 2.635 Mfx 0.0 82.661 0.0922 7.625 Vel = 11.04
206 13 0.0 2.5 18.080 120 21.712
to 0.0
207 13 187.6 2.635 18.080 0.0922 1.667 Vel = 11.04
207 13 0.0 2 T 12.307 3.580 120 23.379
to 12.307 0.0
208 13 187.6 2.157 15.887 0.2445 3.885 Vel = 16.47
208 13 -46.44 2 10.400 120 27.264
to 0.0
209 13 141.16 2.157 10.400 0.1444 1.502 Vel= 12.39
209 13 -40.05 2 2E 12.307 19.460 120 28.766
to 12.307 0.0
210 13 101.11 2.157 31.767 0.0779 2.475 Vel = 8.88
210 13 -32.88 2 8.910 120 31.241
to 0.0
211 13 68.23 2.157 8.910 0.0377 0.336 Vel = 5.99
211 13 -28.73 1.25 2E 6.0 20.020 120 31.577
to 6.000 0.0
212 13 39.5 1.38 26.020 0.1205 3.136 Vel = 8.47
212 13 -20.59 1.25 9.510 120 34.713
to 0.0
213 13 18.91 1.38 9.510 0.0308 0.293 Vel = 4.06
213 13 0.0 1.25 2T 12.0 49.890 120 35.006
to 12.000 0.0
214 13 18.91 1.38 61.890 0.0309 1.910 Vet= 4.06
214 13 0.0 2 9.510 120 36.916
to 0.0
215 13 18.91 2.157 9.510 0.0035 0.033 Vel = 1.66
Computer Programs by Hydratec Inc. Revision: 50.54.4
Final Calculations : Hazen-Williams
EXPRESS FIRE SYSTEMS Page 7
BROADWAY ROSE THEATRE Date
Node1 Elev1 K Qa Nom Fitting Pipe CFact Pt
to or Ftngs Pe ******* Notes ******
Node2 Elev2 Fact Qt Act Eqiv Len Total Pf/Ft Pf
215 13 20.59 2 3.580 120 36.949
to 0.0
216 13 39.5 2.157 3.580 0.0137 0.049 Vel= 3.47
216 13 0.0 1.25 2E 6.0 1.710 120 36.998
to 6.000 0.0
217 13 39.5 1.38 7.710 0.1205 0.929 Vel = 8.47
217 13 27.46 2 31.200 120 37.927
to 0.0
218 13 66.96 2.157 31.200 0.0364 1.135 Vel= 5.88
218 13 34.15 2 3.030 120 39.062
to 0.0
219 13 101.11 2.157 3.030 0.0779 0.236 Vel= 8.88
219 13 40.05 2 T 12.307 2.670 120 39.298
to 12.307 0.0
220 13 141.16 2.157 14.977 0.1444 2.163 Vel= 12.39
220 13 46.44 2.5 2T 32.948 25.000 120 41.461
to 32.948 0.0
111A 13 187.6 2.635 57.948 0.0922 5.345 Vel = 11.04
111A 13 0.0 3 3V 20.159 22.000 120 46.806
to Mfx 0.0 20.159 -1.769 * * Fixed Loss = 1.262
111 20 187.6 3.26 42.159 0.0327 1.379 Vel= 7.21
111 20 0.0 3 23.250 120 46.416
to 0.0
110 20 187.6 3.26 23.250 0.0327 0.761 Vel = 7.21
110 20 0.0 4 2V 17.907 33.500 120 47.177
to 17.907 0.0
TOR 20 187.6 4.26 51.407 0.0089 0.457 Vel = 4.22
TOR 20 0.0 4 B 15.8 18.500 120 47.634
to 15.800 10.178
BUG -3.5 187.6 4.26 34.300 0.0089 0.305 Vel = 4.22
BUG -3.5 0.0 4 T 29.067 155.000 140 58.117
to 2E 29.067 63.947 0.0
VO -3.5 187.6 4.1 F 5.813 218.947 0.0081 1.763 Vel = 4.56
VO -3.5 0.0 4 T 29.067 15.250 140 59.880
to Zcd 0.0 29.067 9.062 * * Fixed Loss = 9.062
CW -3.5 187.6 4.1 44.317 0.0081 0.357 Vel = 4.56
CW -3.5 100.00 6 47.720 140 69.299
to -1.516
TEST 0 287.6 6.16 47.720 0.0025 0.117 Vel = 3.10
0.0
TEST 287.60 67.900 K Factor= 34.90
221 18.46 5.60 15.31 1.5 9.650 120 7.474
to 0.0
222 18.46 15.31 1.682 9.650 0.0080 0.077 Vel = 2.21
222 18.46 5.60 15.39 1.5 T 9.9 7.170 120 7.551
to 9.900 0.0
203 18.46 30.7 1.682 17.070 0.0289 0.493 Vel = 4.43
0.0
Computer Programs by Hydratec Inc. Revision: 50.54.4
Final Calculations : Hazen-Williams
EXPRESS FIRE SYSTEMS Page 8
BROADWAY ROSE THEATRE Date
Pi
pe Elev1 K Qa Nom Fitting P pe C Fa ct Pt
to or Ftngs Pe ******* Notes ******
Node2 Elev2 Fact Qt Act Eqiv Len Total Pf/Ft Pf
203 30.70 8.044 K Factor= 10.82
223 18.46 5.60 15.06 1.5 8.340 120 7.230
to 0.0
225 18.46 15.06 1.682 8.340 0.0077 0.064 Vel = 2.17
225 18.46 5.60 15.12 1.5 9.650 120 7.294
to 0.0
226 18.46 30.18 1.682 9.650 0.0280 0.270 Vel = 4.36
226 18.46 5.60 15.40 1.5 T 9.9 2.480 120 7.564
to 9.900 0.0
204 18.46 45.58 1.682 12.380 0.0599 0.742 Vel = 6.58
0.0
204 45.58 8.306 K Factor= 15.82
227 18.46 5.60 15.56 1.5 9.250 120 7.723
to 0.0
228 18.46 15.56 1.682 9.250 0.0082 0.076 Vel = 2.25
228 18.46 5.60 15.64 1.5 T 9.9 7.170 120 7.799
to 9.900 0.0
204 18.46 31.2 1.682 17.070 0.0297 0.507 Vel = 4.50
0.0
204 31.20 8.306 K Factor= 10.83
229 18.46 5.60 15.25 1 T 5.0 6.540 120 7.414
to 5.000 0.0
230 18.46 15.25 1.049 11.540 0.0788 0.909 Vel = 5.66
230 18.46 0.0 1.25 T 6.0 7.190 120 8.323
to 6.000 0.0
231 18.46 15.25 1.38 13.190 0.0207 0.273 Vel = 3.27
231 18.46 0.0 2.5 1.710 120 8.596
to 0.0
232 18.46 15.25 2.635 1.710 0.0006 0.001 Vel = 0.90
232 18.46 20.01 2.5 4.740 120 8.597
to 0.0
205 18.46 35.26 2.635 4.740 0.0042 0.020 Vel = 2.07
0.0
205 35.26 8.617 K Factor= 12.01
233 18.46 7.3 20.01 1 T 5.0 3.320 120 7.513 K= K @ EQ01
to 5.000 0.0
232 18.46 20.01 1.049 8.320 0.1303 1.084 Vel = 7.43
0.0
232 20.01 8.597 K Factor= 6.82
208 13 46.44 1.25 2T 12.0 67.310 120 27.264
to 2E 6.0 18.000 0.0
234 13 46.44 1.38 85.310 0.1626 13.872 Vel = 9.96
234 13 0.0 2 T 12.307 5.310 120 41.136
to 12.307 0.0
220 13 46.44 2.157 17.617 0.0184 0.325 Vel = 4.08
0.0
220 46.44 41.461 K Factor= 7.21
Computer Programs by Hydratec Inc. Revision: 50.54.4
Final Calculations : Hazen-Williams •
EXPRESS FIRE SYSTEMS Page 9
BROADWAY ROSE THEATRE Date
Node1 Elev1 K Qa Nom Fitting Pipe CFact Pt
to or Ftngs Pe ****"** Notes ******
Node2 Elev2 Fact Qt Act Egiv Len Total Pf/Ft Pf
209 13 40.05 1.25 2T 12.0 67.160 120 28.766
to 2E 6.0 18.000 0.0
219 13 40.05 1.38 85.160 0.1237 10.532 Vel = 8.59
0.0
219 40.05 39.298 K Factor= 6.39
210 13 32.88 1.25 2T 12.0 40.890 120 31.241
to 12.000 0.0
235 13 32.88 1.38 52.890 0.0859 4.541 Vel = 7.05
235 13 1.27 1.25 E 3.0 26.620 120 35.782
to T 6.0 9.000 0.0
218 13 34.15 1.38 35.620 0.0921 3.280 Vel = 7.33
0.0
218 34.15 39.062 K Factor= 5.46
211 13 28.73 1.25 2E 6.0 44.810 120 31.577
to 2T 12.0 18.000 0.0
236 13 28.73 1.38 62.810 0.0669 4.202 Vel = 6.16
236 13 -1.27 1.25 E 3.0 25.920 120 35.779
to T 6.0 9.000 0.0
217 13 27.46 1.38 34.920 0.0615 2.148 Vel = 5.89
0.0
217 27.46 37.927 K Factor= 4.46
236 13 1.27 1.25 12.840 120 35.779
to 0.0
235 13 1.27 1.38 12.840 0.0002 0.003 Vel = 0.27
0.0
235 1.27 35.782 K Factor= 0.21
212 13 20.59 1.25 2T 12.0 49.890 120 34.713
to 12.000 0.0
215 13 20.59 1.38 61.890 0.0361 2.236 Vel= 4.42
0.0
215 20.59 36.949 K Factor= 3.39
HOSE -3.5 H100 100.00 6 62.760 140 69.277
to 0.0
CW -3.5 100.0 6.16 62.760 0.0004 0.022 Vel= 1.08
0.0
CW 100.00 69.299 K Factor= 12.01
Computer Programs by Hydratec Inc. Revision: 50.54.4
Final Calculations : Hazen-Williams
EXPRESS FIRE SYSTEMS Page 7
BROADWAY ROSE THEATRE Date
Nadel Elev1 K Qa Nom Fitting Pipe CFact Pt
to or Ftngs Pe ******* Notes ******
Node2 Elev2 Fact Qt Act Egiv Len Total Pf/Ft Pf
0.0
109 34.31 19.733 K Factor= 7.72
HOSE -3.5 H250 250.00 6 62.760 140 60.458
to 0.0
CW -3.5 250.0 6.16 62.760 0.0019 0.118 Vel = 2.69
0.0
CW 250.00 60.576 K Factor= 32.12
Computer Programs by Hydratec Inc. Revision: 50.54.4