Loading...
Plans *``^ '-‘. ..-- ems --"' --, :-;;. ':�--,".,. ...-,,,,,,... v Markup Legend SPRINKLER SYMBOL DEFINITION , / COLOR/LINETYPE LEGEND BLUE LINES=FEED TO FIXTURES(BATH,SHOWER,ETC.). %NB ` o Delete Line \ J \ 7....... BEEN LINES=INTERLEVEL CONNECTIONS E LY. MAXIMUM SPACING(TYP) BLACK LINES 1/2"PIPE E SIZE HEAD TO SPRINKLER HEAD. > o Add Line —— — I SPRINKLER MODEL(TYP) RECEIVED :a 6tiag HEAD SYMBOL(TYP) —••• =3/4"PIPE SIZE C �,�,u T JUL6 d[ — — = 1"PIPE SIZE N N u S' Add Tee I I I ;3G k, 6E: CO > = 1-1/4"PIPE SIZE W 3 LL w o Add Elbow CITY OF TIGARD j ` d "° "Z ;ITY OF TIGARD CIza Add Coupling H Approved [ Al = m= w 3 [ � 3UILDING DIVISION ����3 1 1 1 Contitionally ApprovedH I E`" Add Head 1-- 0,5,,.. ; ,, ,,- For only the work as described in: 1 ' i 1"AQUAPEX INTERLEVEL � a '2"' � � fy�//tf �1 ) //�/ 1 AQUAPEX INTERLEV L � Delete Head J PERMIT NO.//i it �r e 7 — t o /J`•� CONNECTIONS FROMA f a` -((JC()) (F- 'I SECOND FLOOR TO THIRD I CONNECTIONS FROM FIRST o Z Y°�z °'x i /I FLOOR FLOOR TO SECOND FLOOR ' ,;y E coo g- 3 �� See Letter to: ollow z-oot Move Head -O- -0- // \\\ / I \\ --.- z m z i5}z oiao" s. I.40,7,,]F'm — 1 1 Attach [ \ I :5164 o 121,o 3 m o 4 Note:All revisions must be reviewed by Uponor / " I u d z Table F002-1 Job Address: /7b2. ,SW GNiodvpi. 1\ /l__ p \ a�=y�� �>vN_ 0101 Multipurpose Fire SafetySystems / " I I •\ \ \ �Ea�m�N �mF` z R zzza oQooa o The Uponor Residential Fire Safety System is a residential fire protections By• 4.�� Date: - t / �� I I\ \ I // I� \ s o<o<F o o; <z system installed in combination with the cold side of the domestic potable / ; \, - I' W o m.c S y a a 'a 3 o.. water system. Only licensed contractors trained by Uponor can install this - " j \ ,, \ PROPERLY PROTECT AND f ¢i r,,;y m 'z p system. \ I 1;NSULATE PIPE 70 MAINTAIN ¢� p o o z o o m¢..„.Z.; ,; z • ••i z-oz°.-z m F E a-3y /. ® I / I 11 \. .- III \ DECIFABOVE MINIMUM TEMPERATURE U u h•a j N w F F�1 What to do if Changes are Required L1 V / r ' 1 l •R !' -1 t 7 F 40°F PER NFPA-13D,TYP. ¢ w o u If an features or obstructions require the addition or deletion of sprinkler '_ ROOF BELOW / 7 _I �® Vl v'c�'� o 'm-u }- '1 - •g BaVE w iaaz Uzz a.,C heads,or significant relocation of sprinkler heads,contact the Uponor Design 7-04-XOX �- I �f�C�IO £ H-2 a F - r I Ci m i'"o z a 8 d — Department to . _ \ I m-- a; ❑any �ljy (888.594.7726).determine if observed changes require a redesign p 3 _r FL BELOWI .J. 1' r B-0 7-0 SOHD e z"�S 3 y.`�C�'p u c MOST HYDRAULICALLY REMOTE HEADS I \ 78 Typ. .e /e ' ``//� V► I I '® I 3 o� �<d z �o a I HEAD# GPM PRESSURE REQ'D AT STREET I / — -� I I, I fft�/ I I ...z.-..„2.,,, \ as y(y II \ I �omm�acz`= o O 1 HEAD H.2 17 54.86 / m, 2 HEAD H.8&H.7 26.116 62.09 I Mister i�Ing _ h2 0';E tA6z6 b U m H.6- . I / \ iu,, >,g Ig .wzz� B room / '''P. 1 Car Storage _ a d w H „ I N��EFL OR OVER g nE o ao N e �\ RC- H.31 4 I / _ 1 D,yZ� e \Garage Area �a��a�Fo a a N' •TE \\ M 10 N/s RES:• :' I I / R.M Nn0 •• \ I WAL.FINISH N G .B. Or m t� CEILING FI H§'TVP 'X'G.W.B. SENJU Model RC-RES Residential Flat Concealed Pendent SS8464 =ENT s ' .i o E T STAA NNH�SS Workshop1 0 1 3'-3 'n 2•_8 .� \�• ,-rt• I I FIRETIPPE ALL:W.B. 0 - - - 6 K=4.9, 162E ,7/16"Orifice,Maximum Spacing 16'x16' h 5'-P 2 / I ® i 2 5' t \ 3'6' I WRAP BEAMS99EL• CEILING LEVEL Sprinkler head demand: 13gpm @ 7.04 I p �` , NSULAT FLr+R ABOVE 4 1 I here by certify that this plan,specification, RC RES 16 f t o Ij� \_ / , O- if , if 24 or report was prepared by me or under my (' 12 ff�71-.,� -New •. 7T PI ., \ I I I \ I direct supervision and that I am NICET SENJU Model RC RES Residential Flat Concealed Pendent SS8464 —" L� r\ , 8'-Zy' 3'-7)4' 3'-6" Certified. ® - - - 3 K=4.9,162E ,7/16"Orifice,Maximum Spacing 18'x18' I ® ) If1RC-RES-18 S rinkler head demand: 17 m @ 12 Q NI,� Sy(1 AT`s'• I' 1 _ I` \ I 1 I e ,�t )% h P 9P 6 I Idi WOOD 'EAD M TM. Bath _y` / - _Olio _ \�r \o a I / RI "8"(ADD CA - Tim W McDonald Date: 3 FT '^\ I - I� R OVE STEPS ASt __ SENJU Model RC-RES205 Residential Flat Concealed Pendent SS8464 _ -- i%uIRED PER SITE NICET Certification No.150393 1 K=4.9,205E ,7/16"Orifice,Maximum Spacing 14'x14' ' Water-Based Systems Layout-Level III 0 - - - o P g ( TP Li 48" i� I ' r<,I I , J I CONDITION)\ I f z y RC-RES-14-205 Sprinkler head demand: 13 gpm @ 7.04 �' I W i�I I ��I'I SE I J 7 ' Ii MAX.27READS I - -- Certification Expires:June 1,2022 Q • (— SYSTEM 2 15t flour I I` ��'. I DE 1 H. .-;® -, . ,, D t7:a� F.5 .■. �` 3 2nd Floor i 3'-3' • I I - 4 3t / I,.�-.U EtES if CE3 1s I rffmr"lm .... 5 3rd Floor 10'r DRYER Laun•,JI `° j / ' � T • �.-z �r2�I : w I; I,..yr.,-�i1Wii:��fi�..` , LLJ - - \ I S. MAIN SHUTOFF / ` 30 TOTAL t8 i5 22x30'. I ,Kite �1z♦J : th i a.' \ >♦ U z I NA I ATTIC CS I <i > 3 �^' VALVE LOCATION C/1 w 3 % 8 Hr1 I a-�„:� � ~ i 325R` 18�T - _ T I 1111 I \ .,f r'r'i JIIJ P 5t a O o 0 1 6-0B PASS �i- IAO= .1 a C'1 No.+ 4`2 a' 4`�8` M = AIM \ -i- .. i , 36 Wli:i�3'� t � 1.. f H e'w �' ��r< j III ti_ . u 1, . _ 1-1/4"AQUAPEX P.i i ( I \ THICK S _ , -� o .. z0 erEv"rne' TO SYSTEM �© r—� , e ® RC-RES 1•6 T 3' / .9 ctrenElt ,. N rti ,, 6 a Z o g ECURRENT STATIC 1 1/4"AQUAPEX RISER z T i i ,<C I z u a aWATER PRESSURE r � 5' "� W r a a ru Bedroom 2 ' .�• � _ 29 RC-R.i.-16 • '; e LLI STATIC: 95 si PRESSURE GAUGE I \ I A / II e, 8 O o.ec 1 o p TO HOT WATER o I m I a m 1 1/4"PRV CASH ACME I HEATER Ts' ath ^I �J I ...d t ( ) T.-{ z W (OR EQUIVALENT? IIF— /. Q- / Qlrllflf'��� I�a. !I / 6PSI LOSS FLOWING 26 GPM i \\ / 11* 2A"re I Ir — : _ _ I� ,,I IVY kL.Suite/ N. 2''Sy8 }2'"27�a t M-'"I W N PRV Set P1si sure ((±±TTp�BB I I \ rCIMO 1 ''� ill ,'' POrCh 1"WATER METER fH(4PVER I O I 2 = F'— ',I N I O g NFPA 13D STANDARD LOSS I I I I I t� I ALL ABSVVE - s••• •• I FLOOR ABOVE I ../ O o.Z, 3PSI LOSS FLOWING 26GPM I CD EfE S J 1 2 04r0 SH '. i EGRESS L.L o Q y SHUT OFF VALVE Ilii Si501-o SL._ _ I 1 I If) 6-05 5L -- m i -� 6-04p.5L ri' ® 4• Q Q ,:!z I '}�'1n� _ M m CURB STOP S.1 ROOF'BELOW 0 ,--® I I L_ "}• I 0} 'I OLc) •••/ m 1PSI LOSS I I I I ROOF' LOW r-{ { cc Ce ,.-' STREET - I Fr ',at,J aa� �0 .. I 'r'~> E F 11=I111= 11=11=11 5'- 5'-6, r.9 ?y a CORPORATION - -n��g�liir I t Y r-r r_6• l�-1 �IJ z Y s a-a O '^ z STOP 1PSI LOSS in El ( , r o _ d O n 0 U g C1 u) Z WATER o .` --�� Ea_s 1DD'OF 3 THIRD FLOOR SECOND FLOOR 1 FIRST FLOOR SHEETDESCRIPTION alEV=55 1 1/4"AQUAPEX - -- ALL FLOORS 34 OF. F100 1/4" = 11-p11 F\.� 1/4" = 11-0n F100 1/4" = 11-0" 1"COPPER-K SHEET NUMBER 4 WATER SERVICE DETAIL O 5 15 -... - 1/4"=1'-0" F100 NTS © UPONOR - CONFIDENTIAL F100 AquaSAFE TM GENERAL NOTES: Senju RC-RES:Open Web Truss/TJI Construction Insulation Recommendations N In areas subject to freezing,care should be taken in unheated attic spaces See General Notes 8.2.5.8 for Architectural .. ProPEX LF Brass Fire to cover Uponor AquaPEX tubing completely with insulation. Insulation Feature Requirements ; Sprinkler Adapter Tee should follow the guidelines of the insulation manufacturer. See Uponor 1. THIS SYSTEM IS DESIGNED AS PER NFPA 13D 2019 EDITION AS A RESIDENTIAL MULTIPURPOSE SYSTEM Fire Sprinkler Adapter Document"Uponor 7.- sUcsereTwheHo2leTsop Blocking Maybe /� po or AquaSAFE Attic Insulation Guidli s pa for attic y SECTION 3.3.12.3. �C - - - - / Pttsn-on Nut installationguidelines(Provided in Contractors Documents package or online Required.If I D 9 0 ▪ z I. , at www.Uponorpro.com). 0 Blocking is Used, 1 I/4"Min. ) r a•+z2. UPONOR COMPANY RESERVES THE EXCLUSIVE RIGHTS TO ALL DETAILS AND DRAWINGS AS SHOWN ON sTHiS SHEET.THESE DETAILS AND DRAWINGS ARE PROPRIETARY INFORMATION OF UPONOR COMPANY AND . 1 1[11 I /1. I 1 y2,,Max. p Planter Box Window,Bay Window or Similar Feature. '^,E p UNAUTHORIZED USE MAY BE SUBJECT TO PROSECUTION TO THE FULL EXTENT OF THE LAW. Bottom of mounting Extreme Temperature Installations If no additinal Floor area is created No Additional Sprinkler is Required. • �+L! !racket to Face of Truss AquaSAFE Residential Fire Safety systems are often installed in attics or "t m w a 3. THE DESIGN OF THIS SYSTEM IS DICTATED BY SPECIFIC CEILING HEIGHTS AND ROOM SIZES. IT IS THE Fire Sprinkler Adaitter -4-- other areas exposed to temperature extremes of heat and/or cold. Follow 8'-0"or less I, O RESPONSIBILITY OF THE INSTALLING CONTRACTOR TO ENSURE THAT THE CONDIITONS SHOWN ON THESE Mounting Bracket -1.;/ the recommended extreme weather installation instructions to isolate and 1 y °'>ec PLANS ARE EXACTLY AS THEY EXIST IN THE FIELD. DEVIATIONS FROM THE DESIGN MAY CAUSE THE /( 'SI protect system components from extreme temperatures. Because this �IIfL RC -i6 w°'N z SYSTEM TO BE UNABLE TO CONTROL A FIRE.IF THE BUILDING CONSTRUCTION DIFFERS FROM THE FIRE ® - system also delivers domestic cold water directly to plumbing fixtures, I ® Q v D z Y 9'-0"or less > r SPRINKLER PLAN,CONTACT THE SYSTEM DESIGNER IMMEDIATELY. 3-#10 x 1 1/2 -t --� \. Uponor highly recommends that you protect the tubing with adequate x IA N ? Full Course 'LII ^�I insulation in warm weather areas to minimize heating of the cold water N m o w>+ 4. THIS SYSTEM AND THE ACCOMPANYING HYDRAULIC CALCULATIONS ARE DESIGNED IN COMPLIANCE WITH Thread Screws 11= ° = z v O 3 NFPA 13D 2019 EDITION. In Bottom Holes supplri o m o « �w 3 TV W g)Hm Qm Installation methods include,but are not limited to: \�`, •'(�1/ w rn m Y W 5. "STAND-ALONE"OR"MULTIPURPOSE,WET PIPE"SYSTEMS ARE PERMITTED TO ONLY USE ANTI-FREEZE - � �-�.-- � I °� i \ LISTED FOR USE IN NEW SPRINKLER SYSTEMS. = • Tenting over the fire sprinkler piping.• G"'~W 3 Lead-Fred Senju ' '3 • Additional layers of batt insulation. If additional floor area is created.Cannot exceed 18 ft,be more than 2'-0" 6. MODIFICATIONS ARE PROHIBITED.SPRINKLERS THAT HAVE BEEN PAINTED,CAULKED,MODIFIED OR Concealed Senju \ c. r" ' -.' Concealed Flat • Increased depth of blown-in insulation. deep,more than 9'-0"wide and be with in the coverage area of the via d E m :i DAMAGED MUST BE REPLACED. Sprinkler Head Cover Plate sprinkler.No Additional Sprinkler is Required. o i2 z i i ax Caution: If you will be installing spray foam insulation,make sure to v,h z E s iv czi o o C 7. A SINGLE CONTROL VALVE ARRANGED TO SHUT OFF BOTH THE DOMESTIC SYSTEM AND THE SPRINKLER protect all components during application.Consult with the spray foam < x❑Ia,x q o a m m SYSTEM SHALL BE INSTALLED. Senju RC-RES:Traditional Wood Framing Construction NFPA 13D Table 7.5.6.3 Distances From u g u z y o ❑ manufacturer to ensure compatibility with all products before application. x a > o 2}o z Heat Sources §•'oiF�2Fy4ma 8. OWNERS MANUAL MUST BE PROVIDED TO THE OWNER. Consultation with local building officials is encouraged to ensure compliance r ; s z= o 'U 9. AT THE MAIN SHUT OFF VALVE,A TAG OR A SIGN STATING THE FOLLOWING IS REQUIRED;"WARNING:THE ProPEX LF Brass Fire with local building codes. Ordinary Intermediate ?o y o °3 WATER SYSTEM FOR THIS HOME SUPPLIES FIRE SPRINKLERS THAT REQUIRE CERTAIN FLOWS AND Sprinkler Adapter Tee Fire Sprinkler Adapter Heat Source Temp. Temp. d m°z h o p o H-m I. , Push-on Nut o a c 6tU_ z PRESSURES TO FIGHT A FIRE.DEVICES THAT RESTRICT THE FLOW OR DECREASE THE PRESSURE OR 135°-170° 175°-225° z E o m a a❑ m 55 0 AUTOMATICALLY SHUT OFF THE WATER TO THE FIRE SPRINKLER SYSTEM,SUCH AS WATER SOFTENERS, BendingPEX Tubing z❑2° m❑ a-G Side of Fireplace 36" 12" ❑z o 0 FILTRATION SYSTEMS AND AUTOMATIC SHUT OFF VALVES,SHALL NOT BE ADDED TO THIS SYSTEM Di.l� r ❑ f,I- a a z WITHOUT REVIEW OF THE FIRE SPRINKLER SYSTEM BY A FIRE PROTECTION SPECIALIST.DO NOT REMOVE - 11/4"Min. The minimum bend radius of Uponor PEX tubing in any direction is six times Front of Fireplace 60" 36" W m o m y>,,q$,r - o z THIS SIGN". 1 Max. the outside diameter 6 x OD). ❑ .E•o a Bottom Mounting ( Wood Burning Stove 42" 12" f z-'m.,.y o-J' Fire Sprin der Adapter __ ,- Bend supports are available for 3/8",1/2",3/4"and 1"Uponor AquaPEX F"r P O z a„z`�F_a-- , I Bracket to=ace of Truss Kitchen Range 18" 9" i-F o z zo o c s 2 e zo 10. ALL INTERIOR PIPING TO BE UPONOR"AquaPEX®"UNLESS NOTED. Mounting Bracket _ � tubing to facilitate 90-degree rigid bends. 9 g,�? �,4 d i- Wall Oven 18" 9" U a_ a oA 55 5•4 �,,,y a 11. UPONOR"AquaPEX"TUBING TO BE SUPPORTED PER NFPA 13D AND MANUFACTURER'S RECOMMENDATIONS. 2-#10 x j 1/2" O' w Recommended Tubing Length Between Fittings 18" 9" y o s y tz z°u z Y= 9 9 _Hot Air Flues •'wai`a0- aou-N"` Full Course ->:_E I --------\- Fitting Size Minimum Tubing Length Uninsulated Heat Ducts 18" 9" 0 m y o ,ca,s 3 z°'i 12.MINIMUM SPACING BETWEEN SPRINKLERS IS B'-0" REFER TO SPACING CHARTS FOR MAXIMUM SPACING Thread Sf rews a°' u5 ❑d o �., �7 tf Uninsulated Hot Water Pipes 12" 6" xf �S oay�❑ BETWEEN SPRINKLERS AND FROM WALLS.SPRINKLER HEAD MANUFACTURERS MAY HAVE MORE In Top Holes 1-J � CJ 3/8"ProPEX Fitting 2^ �ilZ4 3m°�J,z u c uSide of Hot Air Diffuser 24" 12" za � L.,=g��izRESTRICTIVE SPACING LIMITATIONS. - 1/2"ProPEX Fitting 2" ❑ a\ o \ Front of Hot Air Diffuser 36" 18" 3w o> u a isa_°.fis o13.SPRINKLERS ARE NOT NECESSARILY CENTERED IN ROOMS DUE TO LIGHT FIXTURES OR OTHER CEILING •,✓'� 3/4"ProPEX Fitting 3" Hot Water Heater 6" 3" ,#z t1Xoohofm F-oMOUNTED OBSTRUCTIONS. Lead-Free Fla[I.. `�`� 1"ProPEX Fitting3 1 2" Furnace 6" 3" om N u a>e Concealer Senlu \ r" r'" y Concealed Flat / ;❑o CG,a 6 u-i u z z 14.THE PLUMBING TIE IN CONNECTIONS ARE SCHEMATIC IN NATURE AND CAN BE INSTALLED OFF THE Sprinkler Head 50W-250W Light Fixture 6" 3' >t� u §,�p z m SPRINKLER LOOP ANYWHERE BETWEEN SPRINKLER TO SPRINKLER CONNECTION. Cover Plate 1 1/4"ProPEX Fitting 4 1/2" 12" 6" 2 4m x o'' u m z u 250W-499W Light Fixture y u 3 E m_ u 15. THIS SUGGESTED LAYOUT IS BASED UPON INFORMATION PROVIDED BY OTHERS. CHANGES IN '^ .m z Z o u'am g t. w CONSTRUCTION OR FIELD CONDITIONS MAY OCCUR WHICH MAY REQUIRE CHANGES TO THE LAYOUT. IT IS z Q Exposed Installation Requirements. \ \ `m uu'a u ci_i#,-❑ce< w THE RESPONSIBILITY OF THE INSTALLER TO NOTIFY UPONOR TECHNICAL SERVICES OF SUCH CHANGES. Uponor AquaPEX'"'tubing(white)and ProPEX'"'EP Fittings and ProPEX'"' Brass Fittings are approved for exposed installation where the following 16. NFPA 13D 8.2.5*OBSTRUCTIONS TO RESIDENTIAL SPRINKLERS • 8.2.5,7* SHADOW AREAS SHALL BE PERMITTED IN THE PROTECTION AREA OF A SPRINKLER AS LONG AS conditions are met.(UL 1821 Approved) THE CUMULATIVE DRY AREAS DO NOT EXCEED 15 FT.PER SPRINKLER. • 8.2.5.8 SMALL AREAS CREATED BY ARCHITECTURAL FEATURES,SUCH AS PLANTER BOX WINDOWS,BAY Exposed Wood Joist Ceiling Assemblies. '^ �� �m I here by certify that this plan,specification, WINDOWS,AND SIMILAR FEATURES,SHALL BE EVALUATED AS FOLLOWS: 1. Joists are of dimensional lumber,engineered wood or wood I-joist. `.i m or report was prepared by me or under my (1)WHERE NO ADDITIONAL FLOOR AREA IS CREATED BY THE ARCHITECTURAL FEATURE,NO 2. Joist are of depths from 6-16 inches(152-204 mm). direct supervision and that I am NICET ADDITIONAL SPRINKLER PROTECTION IS REQUIRED. 3. Joist are of spacing from 12-24 inches(305-610 mm)on center. m Certified. (2)WHERE ADDITIONAL FLOOR AREA IS CREATED BY AN ARCHITECTURAL FEATURE,NO ADDITIONAL 4. Joists can be exposed after installation. o❑ SPRINKLER PROTECTION IS REQUIRED,PROVIDED ALL OF THE FOLLOWING CONDITIONS ARE MET; 5. Metal pipe hangers spaced at maximum 24 inches(610 mm)on center \ \ are used. 1.55" 'I 1.66" (a)THE FLOOR AREA SHALL NOT EXCEED 18 FT. M) Tim W McDonald Date: (b)THE FLOOR AREA SHALL NOT BE GREATER THAN 24 INCHES IN DEPTH AT THE DEEPEST POINT OF 6. Listed residential automatic sprinklers of maximum activation j„ 3„THE ARCHITECTURAL FEATURE TO THE PLANE OF THE PRIMARY WALL WHERE MEASURED temperature rating of 155°F(68°C). 2 -4 Hanger 1" Hanger NICET Certification No.150393 ALONG THE FINISHED FLOOR. Water-Based Systems Layout-Level III (c)THE FLOOR SHALL NOT BE GREATER THAN 9FT IN LENGTH WHERE MEASURED ALONG THE PLANE OF THE PRIMARY WALL. Metal Tubing Support. 2022 Tubing Support Spacing: Certification Expires:June 1, (d)MEASURED FROM THE DEEPEST POINT OF THE ARCHITECTURAL FEATURE TO THE SPRINKLER (Anchor AquaPEX Tubing Securely Enough to Support the Tubing,Yet Relaxed 1. Metal tubing supports designed for plastic tubing shall be used. Enough to Allow the Tubing to Expand and Contract) SHALL NOT EXCEED THE MAXIMUM LISTED SPACING OF THE SPRINKLER. 2. Do not use supports that will damage the tubing.Inspect metal (3)THE HYDRAULIC DESIGN SHALL NOT BE REQUIRED TO CONSIDER THE AREA CREATED BY THE supports for sharp edges. 1. Along Horizontal Runs,Install Supports Every 32",if Horizontal Runs are ARCHITECTURAL FEATURE. 3. Do not rigidly anchor Uponor AquaPEX''tubing with supports.Allow Continuously Supported,Place Tubing Supports at Six-Foot Intervals. LLJ 17. NFPA 13D 8.3 LOCATION OF SPRINKLERS. enough tubing for freedom of movement to expand and contract. 2. Along Vertical Runs,Install Supports Every Four to Five Feet,at Each• 8.3.1 SPRINKLERS SHALL BE INSTALLED IN ALL AREAS EXCEPT WHERE OMISSION IS PERMITTED BY 8.3.2 Floor and at a Mid-story Guide. ` ) z v z_ THROUGH 8.3.8. m • 8.3.2 SPRINKLERS SHALL NOT BE REQUIRED IN BATHROOMS OF 55 FTC(5.1 M.)AND LESS In-line Flow Test z w • 8.3.3 SPRINKLERS SHALL NOT BE REQUIRED IN CLOTHES CLOSETS,LINEN CLOSETS,AND PANTRIES THAT The In-line Flow Test can be constructed on site. It performs a flow test to rl gO"' .+- MEET ALL OF THE FOLLOWING CONDITIONS: High Upstream Pressure ensure proper system operation and flow(see Figure FOO1-8). Ce F'D • n (1)THE AREA OF THE SPACE DOES NOT EXCEED 24 FT.(2.2 M.). If the upstream pressure exceeds 80 psi a pressure reducing valve may a ,z,ram^ v n (2)THE WALLS AND CEILINGS ARE SURFACED WITH NONCOMBUSTIBLE OR LIMITED-COMBUSTIBLE need to be installed. Some jurisdictions may require a pressure reducing Ce u a umi,o 0 MATERIALS AS DEFINED IN NFPA 220,STANDARD ON TYPES OF BUILDING CONSTRUCTION. valve regardless of upstream pressure. Uponor AquaPE/X��r/%/////////��',, ¢t7 ry o�. • 8.3.4* SPRINKLERS SHALL NOT BE REQUIRED IN GARAGES,OPEN ATTACHED PORCHES,CARPORTS,AND G% Tubing / 'li/H SIMILAR STRUCTURES r/ LLJ • 8.3.5 SPRINKLERS SHALL NOT BE REQUIRED IN ATTICS WITH OR WITHOUT STORAGE,PENTHOUSE EQUIPMENT ROOMS,ELEVATOR MACHINE ROOMS,CONCEALED SPACES DEDICATED EXCLUSIVELY TO AND z w z CONTAINING ONLY DWELLING UNIT VENTILATION EQUIPMENT,FLOOR/CEILING SPACES,ELEVATOR SHAFTS, --- -- i o ---' CRAWL SPACES,AND OTHER CONCEALED SPACES THAT ARE NOT USED OR INTENDED FOR LIVING L `�///f/� �f "i�� �J / i . -- J w F U O • PURPOSES. Xi/f! _ �I �__d_ r/ +... CZ ,.�/ ¢¢ z o s • 8.3.5.1 SUCH SPACES THAT CONTAIN FUEL-FIRED EQUIPMENT SHALL ALSO COMPLY WITH 8.3.5.1.1 OR ` ff r/ 1 ' I L.L O a a a: EQUIPMENTMale Threaded �+ O O o,c O w o 8.3.5.1.2. 0=mw • 8.3.5.1.1 WHERE THE FUEL-FIRED IS ABOVE ALL OF THE OCCUPIED AREAS OF THE DWELLINGU V u¢n N z UNIT,NO SPRINKLER PROTECTION SHALL BE REQUIRED IN THE CONCEALED SPACE. Coupling ProPEX Fire v// O • 8.3.5.1.2 WHERE FUEL-FIRED EQUIPMENT IS BELOW OR ON THE SAME LEVEL AS OCCUPIED AREAS OF THE , Sprinkler Adapter > aI m DWELLING UNIT,AT LEAST ONE QUICKRESPONSE INTERMEDIATE TEMPERATURE SPRINKLER SHALL BE 1"Ball Valve f"'1 W INSTALLED ABOVE THE EQUIPMENT OR AT THE WALL SEPARATING THE SPACE WITH THE FUEL-FIRED 7r zt--To Hot Water Heater Male Threaded Coupling _ EQUIPMENT FROM THE OCCUPIED SPACE. w �1� Female Threaded LIYi • 8.3.6 SPRINKLERS SHALL NOT BE REQUIRED IN UNHEATED ENCLOSURES AT THE BUILDING AT m E etElTee with Water O o g ENTRANCES/EXITS AS LONG AS THE DWELLING UNIT HAS ANOTHER ENTRANCE/EXIT. ' Pressure Gauge i • 8.3.7 SPRINKLERS SHALL NOT BE REQUIRED FOR CEILING POCKETS THAT MEET THE FOLLOWING g r \H Pressure Gauge Sprinkler Orifice (Optional) 0 o O O CONDITIONS: T. u' °" 2 8 Y d (1)THE TOTAL VOLUME OF ALL UNPROTECTED CEILING POCKETS IN A COMPARTMENT DOES NOT EXCEED 1° _ < � Q .,f w ,u, 100 FT.(2.83 Ma). E c Flow Test O r-m ti (2)THE ENTIRE FLOOR UNDER THE UNPROTECTED CEILING POCKET IS PROTECTED BY THE SPRINKLERS To ensure the system provides enough water for proper fire sprinkler 0 m•+ AT THE LOWER CEILING ELEVATION. performance,you should conduct a flow verification test. �Lf) -. a (3)*THE INTERIOR FINISH OF THE UNPROTECTED CEILING POCKET EXCLUDING DECORATIVE `e II ® Uponor Warning Signs '$ >�y z Lu 1 TREATMENTS IS NONCOMBUSTIBLE OR LIMITED-COMBUSTIBLE MATERIAL. (4)SKYLIGHTS NOT EXCEEDING 32 FT.(2.97 M=)SHALL BE PERMITTED TO HAVE A PLASTIC COVER. n p Note: The NFPA 13D Installation Standard does not require flow m 0 P a: verification. lei Z F O • 8.3.8 SPRINKLERS SHALL NOT BE REQUIRED IN CLOSETS IN GARAGES AND EXTERIOR CLOSETS 1° 3 w g n a El Pressure Reducing Before performinga flow verification test,confirm the waterpressures byr (REGARDLESS OF SIZE)LOCATED ON EXTERIOR BALCONIES,EXTERIOR BREEZEWAYS/CORRIDORS,OR �_ P,5a LI 13 1 d p Valve ACCESSED FROM OUTDOORS WHERE THE CLOSET DOES NOT HAVE DOORS OR UNPROTECTED z C° contacting the Water and Sewer Department of your local city. Ensure[he d p��ty u, z PENETRATIONS DIRECTLY INTO THE DWELLING UNIT. o c V available water pressure matches the pressure used in the system design. • 8.3.9.SPRINKLERS SHALL BE INSTALLED IN ANY CLOSET USED FOR HEATING AND/OR AIR-CONDITIONING to § Note: The sprinkler plan indicates the most hydraulically remote sprinkler SHEET DESCRIPTION EQUIPMENT,WASHERS AND/OR DRYERS,OR WATER HEATERS EXCEPT AS ALLOWED BY 8.3.8, ° Main Fire Sprinkler (or pair of sprinklers). For test requirements on other sprinklers,consult GENERAL NOTES&DETAILS 18. INSULATION GUIDE LINES PER NFPA 13D. Shut-off Valve your local code. • 9.1.1*WET PIPE SYSTEMS. A WET PIPE SYSTEM SHALL BE PERMITTED TO BE TO BE USED WHERE ALL PIPING IS INSTALLED IN AREAS NOT SUBJECT TO FREEZING,INCLUDING AREAS PROPERLY INSULATED TO Note: It is a good idea to notify the fire inspector at least 24 hours prior to MAINTAIN 40°F. • performing a flow verification test. This may speed up the inspection A.9.1.1 IN AREAS SUBJECT TO FREEZING,CARE SHOULD BE TAKEN IN UNHEATED ATTIC SPACES TO process and eliminate the need to repeat the test for the inspector. SHEET NUMBER COVER SPRINKLER PIPING COMPLETELY WITH INSULATION. INSTALLATION SHOULD FOLLOW THE •• Note: See"AquaSAFE Flow Test Instruction Sheet"(Provided in GUIDELINES OF THE INSULATION MANUFACTURER.FIGURE A.9.1.1(A)THROUGH FIGURE A.9.1.1(F) _ Contractors Documents package or online at www.Uponorpro.com)for SHOW SEVERAL METHODS THAT CAN BE CONSIDERED. THESE ARE FOR ILLUSTRATIVE PURPOSES ONLY. ----- -- CONSULTATION WITH THE GENERAL CONTRACTOR AND/OR OWNER IS RECOMMENDED TO ENSURE - _ more information on Flow Test Setup,Assembly,Performing the Test and PROPER METHODS AND MATERIALS ARE USED TO MAKE SURE 40°F WILL BE MAINTAINED. Troubleshooting. If there are any questions please contact Uponor. 80 psi © UPONOR - CONFIDENTIAL F001 PRV Set Pressure