Loading...
Permit CITY OF TIGARD BUILDING PERMIT ° Permit ft: BUP2021-00180 COMMUNITY DEVELOPMENT Date Issued: 8/10/2021 T(t;ARE) 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 1 S135AB01002 Jurisdiction: Tigard Site address: 10220 SW GREENBURG RD 125 Project: Fitness Center Subdivision: METZGER,TOWN OF Lot: 9 Project Description: Upgrades to include interior demolition,new walls,doors,relites,casework and finishes. Contractor: RUSSELL CONSTRUCTION INC Owner: LINCOLN CENTER LLC 20915 SW 105TH AVE BY SHORENSTEIN PROPERTIES LLC TUALATIN, OR 97062 235 MONTGOMERY ST, 16TH FLOOR SAN FRANCISCO, CA 94104 PHONE: 503-692-9002 PHONE: FAX: 503-692-9008 FEES Specifics: Description Date Amount Type of Use: COM Permit Fee-Additions,Alterations, 08/09/2021 $1,619.35 Class of Work: ALT Type of Const: VB Demolition Occupancy Grp: A-3 Occupancy Load: 43 12%State Surcharge-Building 08/09/2021 $194.32 Dwelling Units: 0 Plan Review 07/27/2021 $1,052.58 Stories: 0 Height: 0 ft Plan Review-Fire Life Safety 08/09/2021 $647.74 Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Lg$2.00(over 08/09/2021 $14.00 Value: $184,500 11x17) Metro CET 08/09/2021 $221.40 Tigard CET-Non-Residential-Admin 08/09/2021 $73.80 Floor Areas: Tigard CET-Non-Residential-AH 08/09/2021 $1,771.20 Total Area: 0 DC Provision Review,COM TI-Ping 08/09/2021 $434.00 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $6,028.39 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: ft° V De/wee Permittee Signature: OvvAhp �rt Call 503.639.4175 by 7:00 a.m.for the next available inspection date. f This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application-- 7 15 Commercial JULOFFICE USE ONLY U_.(4 1 5 2021 Received City of Tigard 7�2 3 'lIII Permit N¢3 u P Z.v 2f�Cb r�'v . (� Date/By: 13125 SW Hall Blvd.,Tigazd,OR 9722;`,I��LJY Ti��l4F{Q Plan Revie Q 4.41• Phone: 503.718.2439 Fax: 503.598 DING DIVISION Date/By: ' u " ��i Other Permit: Inspection Line: 503.639.4175 e ReadyBy: Jur'•� H See Page 2 for TIGARD ifiedMeth Supplemental Information Internet: www.tigard-or.gov f TYPE OF WORK REQUIRED DATA:l-AND 2-FAMILY DWELLING 0 New construction 0 Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ®Addition'alteration'replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. Valuation: $ 0 1-and 2-family dwelling ®Commercial/industrial El Accessory building Multi-family Number of bedrooms: ❑ ❑Master builder ❑Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address:3 Lincoln-10220 SW Greenburg Road New dwelling area: square feet City/State/ZIP:Tigard,OR 97223 Garage/carport area: square feet Suite/bldg./apt.no.:125 Project name:Fitness Center Upgrades Covered porch area: square feet Cross street/directions to job site:Project located north of SW Oak Street, Deck area: square feet south of SW Locust Street and east of Greenburg Road Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Tax map/parcel no.: equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Work to include demolition,new walls,doors,relites,casework,and finishes. Valuation: $$184,500.00 Existing building area: 4377 square feet New building area: 4377 square feet ® PROPERTY OWNER 0 TENANT Number of stories: 1 Name:Shorenstein Type of construction: I-B Address:5335 Meadows Rd.,Suite 275 Occupancy groups: City/State/ZIP:Lake Oswego,OR 97035 Existing: B Phone:(503)412-4844 Fax:( ) New: B/A-3 ❑ APPLICANT ® CONTACT PERSON BUILDING PERMIT FEES* (Please refer to fee schedule Business name:Mackenzie Structural plan review fee(or deposit): /05 p - ,5 Contact name:Samantha Ruddy FLS plan review fee(if applicable): Address:1515 SE Water Ave Suite 100 Total fees due upon application: City/State/ZIP:Portland,OR 97214 Amount received: Phone:(503)224-9560 Fax::(503)228-1285 PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* E-mail:sruddy@mcknze.com Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System. Business name:Russell Construction Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address:20915 SW 105`h Avenue Solar Installation Specialty Code checklist. City/State/ZIP:Tualatin,OR 97062 Permit fee(includes plan review $180.00 and administrative fees): Phone:(503)692-9002 Fax:( ) State surcharge(12%of permit fee): $21.60 CCB lie.:58918 Total fee due upon application: $201.60 Authorized signature: Samantha Rude'sk ", �se- s'e"i'am,ome . This permit application expires if a permit is not obtained ,400,4 2021 071416.237-0r within 180 days after it has been accepted as complete. Print name:Samantha Ruddy Date:07/14/2021 * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) Building Division Accessibility: Barrier Removal Improvement Plan TIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per-cent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ 184,500 MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ 46,125 ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2] of Valuation Computation): $ Is! i I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011 i City of Tigard 111111 q COMMUNITY DEVELOPMENT DEPARTMENT 1 Building Permit Review — Commercial - No Land Use TIGARD 43, Building Permit #: (3iit/J 2v Z I — 0 018'a Site Address: L1ncou•1 - /b220 SvJ & Suite/Bldg#: 12 S---- Project Name: f l` 1 5 Ctr UeaPsPeS (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: 'r'Ant t nflpeo‘renercnrc Existing Business Activity: Proposed Business Activity: Vsite address/suite# exists and active in permit syste r Terrace Neighborhood: ElYes No ning: M I C- �/ P mitted Use:pi 1/J Yes ❑ No ❑ Spec Space Confirm no land use required. ❑ Business License: Exists: ❑ Yes ❑ No,applicant was provided a business license application Notes: GOnFgmE0 No MIND►2 MOD A tD Approved by Planning: s Date: 7/ /2) Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: 7/00, /,:2.-/ Site Plans: # 3 Building Plans: # 3 Building Permit#: ErEnter building permit#above. Workflow Routing: Ig''Planning ❑ Permit CoordinatorSuilding Workflow Sign-off: EL--Sign-off for Planning(include notes from planning review) Route Application Documents: . ilding: original permit application,site plans,building plans, engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: C/ 1.ir_43.--_ Date: -0—V2.-f I:\Building\Fonns\BldgPermitRvw_COM NoLandUse 111819.docx Permit Coordinator Review 0 Conditions "Met"prior to issuance of building permit ❑ Approved, NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Ap;:cant: Revision Notice 2: Date Sent to ' .plicant: Revision Notice 3: Date Sent . Applicant: ❑ SDC Fees Entered: Wash 'o Trans Dev Tax: ❑ Yes ❑ N/A T.:. d Trans SDC: ❑ Yes ❑ N/A arks SDC: ❑ Yes ❑ N/A ❑ OK to Issue Permit Approved by Perm}x`Coordinator: Date: I:\Building\Forms\BldgPermitRvw_COM_NoLandUse_111819.docx