GDI Project: Polygon-129-03 Prepared By: Nicholas Petersen
Project Name: I River Terrace East Date: 06/30/20
Location: I SW Scholls Ferry& Roy Rogers, Bvrtn. Report#: 312
Arrival: I 1000 Departure: ! 1030
Weather: I Mostly Cloudy, 50s Permit#: } TBD
Site Visit Requested By: I Rob Howser(TM) Met With (on site): Rob Howser w/TM and
• Curtis Heintz crew
Purpose: Observe of 229 nd 230 Subgrade
Outstanding Issues: I FR 311 Soft spot for Lot 228 subgrade (4/22/20)
Upon arrival, I was informed by Rob (TM)that crew had prepared subgrade for footing grade within lot 229 and 230
(see photos) and is marked in attached site plans. I observed 230 and section of lot 229 Subgrade covered with a
thin layer of crushed rock with mixed in AC and concrete pieces. I observed CH crew excavate section of lot 229 to
footing base grade via Link-Belt 130a excavator. The subgrade generally consisted of light brown silt or clay. I used a
Y2"diameter steel foundation probe, to evaluate the consistency of the subgrade. Resistance to penetration indicated
stiff to very stiff conditions.
Based on our observations and probing, it is our opinion lot 229 and 230 subgrade observed today and which is
referred to in attached site plans, has been prepared in general accordance with project requirements and our
geotechnical recommendations.
Distribution:
Attachments: Site Plan (1); Photo (2)
Reviewed by:
This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rdy on the contractor to comply with the plans and
specifications throughout the duration of the project irrespective of the presence of our representative. Our work does not include supervision or direction of the contractor,the contractor's employees
or agents. Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be
considered final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed BV'section.
/ 1/
Signature: / ; : Cc
9450 SW Commerce Circle,Suite 300 I Wilsonville,OR 97070 1503.968.8787 I www.geodesigninc.com
mDESIGN1 FIELD REPORT
Page 2 of 2
Photo (1)
E E v E+' tL+ � '.
��x
a5
,° sa
Image of lot 230 (facing North East)
'Photo (2) „5 a g,'
a�tV�
�s,:: yea .,�
t a g," *y a ®i ��. ' iA x' F gl i' +a' h y,''`T �
Image of lot 229 (facing East). Section of excavation on south side.
9450 SW Commerce Circle,Suite 300 I Wilsonville,OR 97070 1503.968.8787 I www.geodesigninc.com
r 'RIVER TERRACE EAST NO. 2'
LOT 230
HUB AND TACK CERTIFICATION
SE 1/4 SEC. 6, T 2 5, R 1 W, W.M.
CITY OF TIGARD, wAsHINGTON COUNTY, OREGON
suRvEyED JANUARY 17, 2020
, • 1
- 1 I PREPARED FOR;
POLYGON NORTHWEST COMPANY
, .
703 BROADWAY ST•., SUITE 510
VANCOUVER, WA. 98660
,
d(--6.00' PUBLIC UTILITY o
o
EASEMENT ..tt
/5.2w S89`58143°E 1105.101
-..i.„. .
—
4.••••.1.olt•••••Ii....
2500
. I
1
g
cs '
Eli1...
-4. 25.78' -.8.,4 •
X.,,
- .7 3'
w LOT w
I. N. 230 it
tO
1--
R Lo o
:-.-
(0 9 .
P
1— 0
0
-90 Z
R .
c‘i
IB
x
v,
' 46•S 28.48,' \5
die
a , ,
S89.5843E T 1 05.1 2'
ti a
:t• REGISTERED
e PROFESSIONAL
o
e-. LAND SURVEYOR
x
el
OREGON LOT
JULY 9, 2002
...- TRAVIS C. JANSEN 229
i \ 57751
.43 RENEWS:613012021
0
.E. I, TRAVIS C. JANSEN, A REGISTERED PROFESSIONAL LAND SCALE
SURVEYOR IN THE STA IL OF OREGON, HEREBY CERTIFY THAT 2° 0 10 20
I HAVE ACCURATELY SURVEYED AND STAKED THE Pniiiirl.6ii
8 "RIVER FOUNDATION FOR LOT 230 OF I LRRACE EAST NO. 2".. 1 INCH = 20 FEET
.i.
.0
5)
;,*?
,fl '
DRAWN BY: FAA DATE: 1/20/20
PACIFIC COMMUNITY DESIGN
.9' REVIEWED BY; T2 DATE: 1/20120
z" PLANNING - ENGINEERING- SURVEYING
‘ PROJECT NO.: 395-06 4
N.... (503) 941-9484
1