Loading...
Report (2) M�►�'?,oI • brXt 3 170i7 Sw hsp% May, ASHERMAN ENGINEERING - 3151 NE SANDY BLvn.,SurrE 100 PORTLAND,OR 97232 vINC r 1 (—L, PHONE(503) 230-8876 �J-' �1 SHERMANENGINEERS.COM MEMORANDUM To: Darrin Krause , PAOfes.1 Westwood Homes 12118 NW Blackhawk Dr. ''� t�� . ' . Portland, OR 97229 6 Date: January 5, 2021 `10 O From: James Meese A,P SNS-f- Design Engineer EXPIRES. 6/301 RE: Sherman Engineering Project#19-MSOC-02-642 Viewcrest—Lot 4 Tigard, OR We are writing to inform you of our recommendations for changes to the engineering design on this project. As requested, we have reviewed the diagonal hole drilled at the top of the floor beam labeled FBS. After our review of the hole location and required design loads, we have determined that the hole is not acceptable where drilled for long term loading conditions. We recommend removing the wire and sistering on an LSL 1-3/4x14 approximately 4'- 0" long at each side of the beam, then drilling a new hole horizontally into the center of all three beams. Locate the 5/8"-dia. Hole at 24"from the beams end at the center of the depth. Connect the LSL using(3) 'SDWS22400DB'screws at ends and center of the LSL,see the attached for a few related sketches for installation. CC: Don Sherman File—Westwood-VC4 memo_01-05-21 1 -ckal;41 I?, 9 1 w/r'ptin k►1,-1. 11,0-1,6 , kilipve 1/) 4PItY4/-24-eopt; A(43vs + fry' tato , mi ii;11, N ifil /IT 1 lk INN 1!' � D(�i UG 060 1 a (,., ef 11),, pr )(11-,.,.361 ‘21-&e'l fiLgini 012 / P),P1 Li °1- 192/4Jc14- 6 1,5eiorz,e-t ' 11-/I- 14' 11- 3c1911146 444 r4 , '''.... = 1 ' °Uri L ii.,.3 fv. 1 ,,,,,ne,.-. 1 , , H E14 S76M `'it ei-i''A- IP-ol.- Ar ,