Loading...
Plans (4) 4yzq sus &ele, COS* Tu«6t, Astr201. - voiri vo/ss 010 ( "POLYGON AT ROSHAK RIDGE" Jt4+1 LOTS 87, 88, 89, 90, AND 91 ODICC 41110 HUB AND TACK CERTIFICATION balsf 164.01( NE 1/4 SEC. 7, T 2 S, R 1 W, W.M. CITY OF TIGARD, WASHINGTON COUNTY, OREGON SURVEYED OCTOBER 30, 2020 PREPARED FOR: PRIVATE UTILITY EASEMENT- 3.00' PUBLIC I TAYLOR MORRISON, INC. LOT UTILITY EASEMENT 703 BROADWAY ST., SUITE 510 92 VANCOUVER, WA. 98660 700 10 I 0 0 I N89'54'00"W 69.46'� 13.94'-�- ��4 I �• ,1a-g5- S4' L I 0 0 LOT 0 in 4 91 4 Q N N W 0 I U rx r o (D 69.34' 1 Et E CC I- I w a) LLI o QSD 2 M LOT M ~ c - 90 - i in in >- i_ 3 69.26' I 3 a O I cYD o _ - I o o 0 ,':� LOT M io 0 N N �-- o - 89 - 0 0 z Z 69.19' I N0 LOT co in 88 L i 69.11' N 15.50' 3 18.50'-4- c ° o LOT 10 c N 87 N I REGISTERED PROFESSIONAL 13.51'�- - - - - - J = LAND SURVEYOR r�t�19 �9.4�--` } N89'54'00"W 68.98'f V o M oo ao 6.00' PUBLIC a b c) ° UTILITY EASEMENT < OREGON 0 tO tD JULY 9, 2002 N G L TRAVIS C. JANSEN TRACT W z 57751 o RENEWS: 6/30/2021 I, TRAVIS C. JANSEN, A REGISTERED PROFESSIONAL LAND SCALE o SURVEYOR IN THE STATE OF OREGON, HEREBY CERTIFY THAT 20 0 10 20 ' I HAVE ACCURATELY SURVEYED AND STAKED THE OFFSETS o TO THE FOUNDATION ENVELOPE FOR LOTS 87, 88, 89, 90, 1 INCH = 20 FEET ED o AND 91 OF THE PLAT OF "POLYGON AT ROSHAK RIDGE". o DRAWN BY: FAA DATE: 11/2/20 PACIFIC COMMUNITY DESIGN REVIEWED BY: T2 DATE: 11/2/20 Z PLANNING - ENGINEERING - SURVEYING PROJECT NO.: 395-010 (503) 941-9484 CDESIGNU FIELD REPORT Page 1 of 1 GDI Project: Polygon-1 13-05 Prepared By: Dan Boileau Project Name: Roshak Ridge 1/15/2021 Location: SW Bull Mountain Road and SW Roy Report#: 187 Rogers Road, Tigard Arrival: 1245 Departure: 1315 Weather: Overcast 50's Permit#: TBA ._......___..---...----- Site Visit Requested By: Adrian Adams (Taylor Morrison) Met With (on site): Adrian Purpose: Observe lots 87-91 footing subgrade Outstanding Issues: FR-186 1/14/21 Park Slope Failure *RCSOVLCD* On arrival, I observed subgrade had been prepared to final elevations within Building 1 (Lots 87-91), as indicated on the attached site plan. Adrian indicates water had been removed from footings and footing subgrade had been over-excavated resulting in up to 12" crushed rock section. 3/4"-0 crushed rock had been placed in footing base and compacted. I used a Y2" diameter steel foundation probe to evaluate the consistency of the subgrade base on side walls. Resistance to penetration indicates generally medium stiff to stiff subgrade conditions. Resistance to penetration in granular pads indicates dense to very-dense conditions. Rock was well keyed and firm under foot. I observed standing water (-8-12") within spread footing excavations as shown on the attached site plan. Probing through water indicates generally stiff subgrade conditions. We recommend water is removed and any potential remaining slough and/or muck is removed from footing base prior to footing pour. Based on observations and probing, footing subgrade and granular pads observed today and indicated on attached site plan are being prepared in general accordance with our geotechnical recommendations provided aforementioned recommendations are enacted. Distribution: Attachments: Site Plan (1) Reviewed by: This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services. We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative. Our work does not include supervision or direction of contractor,the contractor's employees or agents. Our firm is not responsible for site safety. This field report is a DRAFT representation of our field observations,testing,and preliminary recomm ions. The report can only be considered final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed By"section. Signature: 9450 SW Commerce Circle,Suite 300 I Wilsonville,OR 97070 1503.968.8787 I www.geodesigninc.com Polygon-113-05 - FR187 - 01/15/2021 *Areas are approximate and not to scale* E 575LE LONE r THE _. w . �"'�TAKE .• �>' m ,..-.,ao: �.,. <. «« m GENERAL NOTES ,. .EEEII To SUER. ctw ,., .,,— .p., ,,, .,:. - ««ze ((QVe)L'R CP P9 POLYGON NW COMPANY MATCHLINE SITE PLAN SHEET 4.1 ■T■■ I „ ■■ rmerlel■ ■�■■ ■ ■■_■■_■■ ■ �■■�■■ ■ ■■emu �/ I qq I/ % / /' ' 1/ I t ro '.° '°' ' R Pacific I Community i i ' I�� ; 1 iL �/ i1�14 1 i i " :o i 1 4 :, ; i 1 n g.g: Design { / / ez 1/ - I 1 mil` MI ' IJ Ii---1 1 1 I nt, / , oonnx.we I t< v�v I /, yyam �4 IA \11 I7 5DATE DESCRIPTION% 3� �� ) i zz: I/•" 1 i Ns °, z°; im i°, } B }% i< 1 'CVC V I S ' j st a I I 1.1 r �� A ( ^.,as ,sr. ;%aas-x� :� u' Ali }] ;�% .r I t^�� 'I/9' I m I/ /� �/ w 1 5 • I SrREETL R, Y ! I ,i 1 i ij m ,1 , I I /MA T t ,w / 1 i % I 1 1 1 . 1 /71 %���% O n I 1 ,z I %' + ' * 0�—• ;/ 1 j .� 1Sx BOTANY BAT UNC 1 con.p , v, 2 5 3 • - % a �� � Standing water observed- ;f ;jj ,I TMP 1 >o,J �E D '�/ ; I t 1 za /�,:+_ ' s ,�. �.; �,� >, i:-� Polygon at recommend dewateringand - yg �T I� r e / „t ®I/ '" , t a; "' F Roshak Ridge li %� removal of any slough or muck � e , 8�'�,� AIL prior to pour >/ I/, U „,sa °' .1/. / s I 11% ' , Yt Construction Documents MIM I y1� /lam1 _ _ a % 1 IiI%le P.,cro SIDE t bd R.. Ili,....,w.m _.m. ,. 1! 1 i� y., ' PLAN — % R r � Standing water observed- ) g� _' I; _ 3 •" ':"r recommend dewatering and L 0'e'I - I � INN s l//r- �° removal of any slough or muck THY} ! 'l .P, ,,,,,, ,,,� * 2 tI / prior to pour e 1/ SMART. dndame WACO FP WW1. 3711/1011 .b , 1 1 '7. 0 111112111M av�+nwxfCrw05..v�a�tam A»�, �„9....�.7..� 133, x t w.cowwewnu n mse »n>ru.usu.rizYPvasiy -`i#crs;BP z'. 'ry' "�':a'"s`q ���.:�.: �- -I ... �. .�►V.,�� ,eWP 0 .YB) O. $ )9K4�� . • �' ewsuu•a,NTaN ROAD,..�o. ;t .... Rr - ,ii 'e...o-,,......«.....»«�a..�:...�.a ,:'^�'''-t.=• ,�. 1-. ,.;..,... /1/77170107.301 m.. _ '\ — �'v ..n stele 4. 2 f ` ELE A ION .�4:NGVD 29 s — Approximate location of subgrade and granular pads observed today