Plans (2) frog 2131•boov3 (61;3 U. Darwif► LOT
E"
"POLYGON AT ROSHAK RIDGE"
LOT 181
HUB AND TACK CERTIFICATION
NE 1/4 SEC. 7, T 2 S, R 1 W, W.M.
CITY OF TIGARD, WASHINGTON COUNTY, OREGON
SURVEYED JANUARY 27, 2021
PREPARED FOR:
TAYLOR MORRISON, INC.
703 BROADWAY ST., SUITE 710
0
VANCOUVER, WA. 98660 SW DARWIN LOOP di
N
N89'54'00"W 40.00'
-o_ _ }
0 N
N cD (D
6.00' PUBLIC _i_f
UTILITY EASEMENT ———
3.00' 3.00'
N 1 -
Op M
O) 6)
Q 00 CO
N
N
LOT w LOT w LOT
182 0 181 0 180
CO
o 0
°p z o z
I
E
W
1 \
I
a 8.00' PUBLIC— -,)
C UTILITY EASEMENT 0 a'
o ^ cn
o N
U
•
REGISTERED
o PROFESSIONAL
LAND SURVEYOR
N89'20'47"E 40.00'
�,'�
3
< OREGON
JULY 9, 2002
TRAVIS C. JANSEN SW BULL MOUNTAIN ROAD
57751 (COUNTY ROAD NO. 262)
N
o RENEWS: 6/30/2021
3 I, TRAVIS C. JANSEN, A REGISTERED PROFESSIONAL LAND SCALE
o SURVEYOR IN THE STATE OF OREGON, HEREBY CERTIFY THAT I 20 10 20
° HAVE ACCURATELY SURVEYED AND STAKED THE OFFSETS TO
o THE FOUNDATION ENVELOPE FOR LOT 181 OF THE PLAT OF 1 INCH = 20 FEET
0
"POLYGON AT ROSHAK RIDGE".
DRAWN BY: T2 DATE: 2/4/21
0 PACIFIC COMMUNITY DESIGN
REVIEWED BY: TCJ DATE: 2/4/21
Z 395-010 PLANNING - ENGINEERING - SURVEYING
PROJECT NO.: (503) 941-9484
EODESIGN FIELD REPORT
Page 1of1
GDI Project: Polygon-1 1 3-05 Prepared By: Dan Boileau
Project Name: Roshak Ridge 3/19/2021
Location: SW Bull Mountain Road and SW Roy Report#: 188
Rogers Road, Tigard
Arrival: 0800 Departure: 0845
Weather: Overcast 50's Permit#: TBA
Site Visit Requested By: Rob(Taylor Morrison) Met With (on site): Rob (phone)
Purpose: Observe lots 181 and 180 footing subgrade
Outstanding Issues: FR-186 1/14/21 Park Slope Failure
On arrival, I observed subgrade had been prepared to final elevations, as indicated on the attached site plan. A
skiff of rock had been placed over exposed subgrade. I used a %" diameter steel foundation probe to evaluate
the consistency of the subgrade based on side walls. Resistance to penetration indicates generally medium
stiff to stiff subgrade conditions. Subgrade appeared to consist of native brown clay and silt.
Based on observations and probing, footing subgrade observed today and indicated on attached site plan are
being prepared in general accordance with our geotechnical recommendations provided aforementioned
recommendations are enacted.
Distribution:
Attachments: Site Plan (1)
Reviewed by:
This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services. We rely on the contractor to comply with the plans and
specifications throughout the duration of the project irrespective of the presence of our representative. Our work does not include supervision or direction of the contractor,the contractor's employees
or agents. Our firm is not responsible for site safety. This field report is a DRAFT representation of our field observations,testing,and preliminary rec mendations.The report can only be
considered final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed By"section.
Signature:
9450 SW Commerce Circle,Suite 300 I Wilsonville,OR 97070 I S03.968.8787 I www.geodesigninc.com