Loading...
Permit FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT 111 Transmittal Letter TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: Tom Hochstatter DATE RECEIVED: DEPT: BUILDING DIVISION RECEIVED FROM: Gavin Russell OCT 13 2021 COMPANY: CIDA CITY OF TIGARL PHONE: 503-226-1285 BUILDING DIVISIO EMAIL: gavinr@cidainc.com RE: l fc I4.6 SA/OPER P OONt;s rzsRRy pp BUP2021-00074 (Site Address) (Permit Number) Kiddie Academy-Tigard (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: Additional set(s) of plans. Revisions: 3 Cross section(s) and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. 3 Engineer's calculations. is Other(explain): REMARKS' Revised foundation detail for on site light poles. The concrete strength specification on S0.1 (3000 psi). FOR OFFICE USE ONLY Routed to Permit Technician: Date: 1 o— ) g .24 Initials: Fees Duj Yes ❑No Fee Description: Amount Due: j-'r 6D J w rev'., $ Special Instructions: Reprint Permit (per PE): ❑ Yes NNo ❑ Done Applicant Notified: ( o,, Date: /o/7(/j-i Initials: T # CITY OF TIGARD BUILDING PERMIT ' •. . COMMUNITY DEVELOPMENT Permit#: BU P2021-00074 T l C;ARL) 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 6/16/2021 Parcel: 2S113AB00701 Jurisdiction: Tigard Site address: 16145 SW UPPER BOONES FERRY RD Project: Kiddie Academy Subdivision: CIRCUIT PARTITION Lot: 2 Project Description: New 10,864 sq.ft.daycare facility with parking lot and play areas. Contractor: ROBERTSON &OLSON CONSTRUCTION Owner: 16821 SE MCGILLVRAY BLVD#210 VANCOUVER,WA 98683-3404 PHONE: 360-699-4724 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: NEW Type of Const: VB Permit Fee-COM-New Construction 06/16/2021 $6,466.82 Occupancy Grp: E Occupancy Load: 206 12%State Surcharge-Building 06/16/2021 $776.02 Plan Review 06/02/2021 $4,203.43 Dwelling Units: Plan Review-Fire Life Safety 06/02/2021 $2,586.73 Stories: 1 Height: 23 ft Parks SDC Improvement 06/16/2021 $3,982.95 Bedrooms: Bathrooms: Parks SDC Reimbursement 06/16/2021 $726.45 Value: $1,360,000 Info Process/Archiving-Lg$2.00(over 06/16/2021 $68.00 11x17) DC Provision Review,COM New-Bldg 06/16/2021 $205.00 Floor Areas: DC Provision Review,COM New-Ping 06/16/2021 $205.00 Total Area: 10861 Metro CET 06/16/2021 $1,632.00 Accessory Struct: Basement: Carport: Covered Porch: Deck: Garage: Mezzanine: Total $20.852.40 Required: Required Items and Reports(Conditions) Fire Sprinkler: Yes Parapet: Fire Alarm: Yes Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: Holly Va,,-t.t we Permittee Signature: pf l gpplica-,,an Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application _ .Al / Commercial FOR OFFICE USE ONLY 1 Cl of Tigard ECEIVE, Received Permit Ill " 13125,SW Hall Blvd.,Ti ard,OR 9722, Date/By: 3 01���) ,O /'(Ll,� g Plan Review i Phone: 503-718-2439 Fax: 503-598-1960 a A qn Date/By: —15—�) Related Permit:Jd 11?,—(1 fU Inspection Line: 503-639-4175 MAR 1 4 `u21 Date Ready/By: Juris: • TIGARD P Y Y 1j / / Seepage 2 for , Internet: www.tigard-or.gov Notified/Method: 1.0 D�11ej) , Supplemental Information OF TIGARD lid Ce. kiev " ` TY�a� of WQ AC ING DWlSI REQUIRED DATA:1-AND 2-FAMILY DWELLING ,...X1 New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all I, 141 ❑Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the ) ` ` CATEGORY!,OF CONSTRUCTION ! work indicated on this application. ElI-and 2-family dwelling RI Commercial/industrial Valuation: $ ❑Accessory building 0 Multi-family Number of bedrooms: ❑Master builder El Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: `1 Job site address: 16145 SW Upper Boones Ferry Rd New dwelling area: square feet kf City/State/ZIP: Tigard/OR/97224 Garage/carport area: square feet Suite/bldg./apt.#: Project name: Kiddie Academy-Tigard Covered porch area: square feet Cross street/directions to job site: SW Upper Boones Ferry Rd Deck area: square feet �.�� Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST a Subdivision: Lot#: 00701 Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all If, Tax map/parcel#: 2S113AB00701 equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. "'4 New 10,861 SF daycare facility with parking lot and play areas. Valuation: $ 1,360,000 �,(''7 Existing building area: n/a square feet �+ New building area: 10,861 square feet PROPERTY OWNER Number of stories: 1 is.Name: Kalvi LLC Type of construction: VB Address: 8821 NW Savoy Ln. Occupancy groups: E " Cityistate/zIP: Portland/OR/97229 Existing: n/a ri\ N Phone:(503 )577-3822 Fax ( ) New: n/a ❑ APPLICANT CONTACT PERSON ` BUILDING PERMIT FEES* Z'' (Please refer to fee schedule) Business name: CIDA Inc. Structural plan review fee(or deposit): Contact name: Gavin Russell t} FLS plan review fee(if applicable): c,,�„ :� Address: 15895 SW 72nd Ave., Suite 200 `: Total fees due upon application: City/State/ZIP: Portland/OR/97224 Phone:(503)226-1285 Fax::( ) Amount received: "E-mail:gavinr�cidainc cOm PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System. Business name: Tee vW\x r�Sdr 8, 0\Sp I►\ Submit two(2)sets of roof plan with connection details N. 'za• and fire department access,along with the 2010 Oregon 1 4 Address:`to C3Z\ St 1.('1c t.-\\v(a1 7\0 Solar Installation Specialty Code checklist. 1 st w Q Permit fee includes plan review `!1* City/State/ZIP:\)cir\cCjV V LAIN,. u�3 ( r $180.00 e ,� and administrative fees): p' Phone:(`��G'e et— �1Z Fax:( ) o p, h State surcharge(12/o of permit fee): $21.60 k tY CCB Lie.: Total fee due upon application: $201.60 Authorized signature: "Z:l...—,_ This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name: Gavin Russell Date: 12/22/2020 * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Pemuts\BUP_COM_PermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB) r, City of Tigard li COMMUNITY DEVELOPMENT DEPARTMENT I TIGAKD Building Permit Review — Commercial - With Land Use 41, Building Permit #: e,,,, ?1-,.-)a37i, Site Address: /4;/hi oi,LI (.4 / 5 72& ,,4, Suite/Bldg#: (ice Project Name: X rdi1,� 4 cad e (Name of commercial business occupfing the space. If vacant,enter Spec Space.) 1 IA Planning Review Proposal: hAlu vloj 1 Oty ie "I .;.k:, , ,,,L Verify site address/suite# exists and active in permit system. ,� River Terrace Neighborhood: ElYes ® No [$: Land Use Case#: St)Q.Z020- Occ O2 10 Plans Match Approved Land Use: 4CJ�Site Plan t 'Landscape Plan ❑ Other: •' "N Urban Forestry Plan K. Elevation Plan Al vt. Building Height: Maximum Height 4S Actual Height 24 gConditions Met: X Prior to Submittal ®Prior to Permit Issuance 3 'EA Business License: Exists: ❑ Yes Ig( No,applicant was provided a business license application -F Public Facilities Improvement(PFI) Permit: Pr 12.p20-C)4S(o .1 Required: Yes,applicant was notified ❑ No Applied For: tif Yes El No, stop intake --,*.i Notes: Approved byPlanning: ksl, � -`. Date: 3(301202.1 ZRevisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved III Not Approved Revision�: ❑ Approved El Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: 3/PiA�f 822-- Site Plans: # 3 Building Plans: # 3 Building Permit#: nter building— permit#above. �� Workflow Routing: g eering P Vernut Coordinator g Workflow Sign-off: ign-off for Planning(include notes from planning review) Route Application Documents: g: original permit application, site plans,building plans, engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: Date: „3:4'/3/ 1::\Building\Fonns\BldgPermitRvw_COM_WithLandUse 111819.docx Engineering Review 3 ❑ Slope at building pad: ❑ PFI Permit#: ❑ Conditions "Met"prior to issuance of building permit ❑ Easements (encroachments)per engineering conditions of approval and plat(not typical on SDR/CUP) ❑ Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes ❑ No Assess Water Quantity Fee in-lieu: ❑ Yes ❑ No LIDA Facility on lot: ❑ Yes ❑ No NOT Approved by Engineering: Date g s z/ Notes: / 4'//' frt- P G40/-474.4` • Approved by Engineering: ,See- GtiktrAuci tputh.) SlL.p Date: Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review iConditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: gSDC Fees Entered: Wash Co Trans Dev Tax: Yes ❑ N/A 113T l IS ( Ues-L- Tigard Trans SDC: Yes ❑ N/ Parks SDC:( NitI ix pa.) /Yes ❑ N/A rP/Cet, • / L�OK to Issue Permit Approved by Permit Coordinator: �., Date: **CM 4 1:\Building\Forms\B1dgPermitRvw_COM_W ithLandU se_111819.docx ,,,„ City of Tigard 11,1 ■ COMMUNITY DEVELOPMENT DEPARTMENT TIGARD Building Permit Review — Commercial - With ; nd Use (4 Building Permit #: Nit0-02,1-ao Site Address: 16145 SW Upper Boones Ferry Rd Sui /Bldg#: , . Project Name: Kiddie Academy (Name of commercial business occupying the space. If vacant,ente ,pee Space.) V Piaui-link_Review q Proposal: New daycare t N Verify site address/suite# exists and active in permit system. N River Terrace Neighborhood: El Yes N No N Land Use Case #: SDR2020-00002 IZ Plans Match Approved Land Use: ' N Site Plan Cta Landscape Plan ❑ Other: NZCal Urban Forestry Plan Kl Elevation Plan 0 liaBuilding Height: Maximum Heigh 45 Actual Height 24 KI Ir, Conditions Met: ® Prior to Subttal Prior to Permit Issuance • NI Business License: Exists: ❑ Yes ii No,applicant as provided a business license application k VE Public Facilities Improvement (PFI) Pe ',t: PFI2020-00486 ,.k Required: ® Yes,applicant was no ''ed ❑ No Applied For: $] Yes ❑ No, stop intake Notes: Meet conditions prior to ,,ermit issuance. Approved by Planning: ArA OetiKetrb Date: 01/05/2021 Revisions (after Building Sub - ittal only) Reviewer Date Revision 1: ❑ Approve. E Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Appr. ed ❑ Not Approved $trildiri Permit Submittal / , Original Submittal I te: /A/2e/-9Q20 Site Plans: # C.3 Building Plans: # & Building Perm' #: [17—Enter building permit# above. Workflow R. ting: [Planning C'Engineering [Permit Coordinator [Building Workflow 'ign-off: l- Sign-off for Planning(include notes from planning review) Route A..lication Documents: Building: original permit application,site plans,building plans, engineer and beam calculations and t..st details,if applicable,etc. Not s: / By/ ermit Technician: y/,i///J7/ Date: //,?) .Za, I:\Building\Forms\BldgPermitRvw_COM_WithLandUse_111819.docx th 'neerir _Review [J Slope at building pad: ..3 [k P I Permit#: f P/2 Y'0D 12I V onditions "Met"prior to issuance of building permit tyEasements (encroachments)per engineering conditions of approval and plat (not typical on SDR/CUP) Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: E Yes 'No Assess Water Quantity Fee in-lieu: ❑ Yes [ "No LIDA Facility on lot ❑ Yes Imo'No ❑ NOT Approved by Engineering: Date Notes: T_ ' Approved by Engineering: Date: __2 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator-Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: x Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: ❑ SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes ❑ N/A Tigard Trans SDC: ❑ Yes ❑ N/A Parks SDC: ❑ Yes ❑ N/A ❑ OK to Issue Permit Approved by Permit Coordinator: Date: 1:\Building\Forms\BldgPern»tRvw_COM_W ithLandUse_111819.docx DocuSign Envelope ID:A84AE08C-EE86-484F-90CB-CBEB4F9192F3 City of Tigard Transportation Development Tax (TDT) TIGARD Notification of Fee and Pa ment Options Please sign and return prior to building permit issuance. This advises you that the TDT for this project is as shown below and outlines the payment options that may be available to you. This form is to be signed and submitted prior to issuance of a building permit. City of Tigard Date: 4/8/2021 Site Address: 16145 SW Upper Boones Ferry Rd Project Kiddie Academy Land Use Case BUP2021-00074 Name: or Permit #: Tax 2S113AB00701 TDT Amount: $191,486 Lot#: This constitutes my request to use the TDT payment option or combination of options I have selected below. [This selection can be changed up to the time a building permit is issued.] I realize that TDT charges are due and payable at the time a building permit is issued unless those charges are deferred or are financed through installment payments. ❑ Cash, Check, or Credit Card,payment due at building permit issuance. Deferral until Occupancy,payment due before issuance of an occupancy permit. Payment of the TDT may be deferred until issuance of the occupancy permit if the TDT is greater than the amount for a single family residence. In requesting this option I understand that any deferred 1'DT must be paid prior to issuance of a Certificate of Occupancy. I further understand that the amount of 1'DT due on deferred obligations shall be the amount in effect at the time of issuance of the building permit. For a deferral request to be accepted both the Property Owner and the Developer must sign this request. ❑ Credit Voucher (for developer-built required public improvements, subject to approval, completion, and acceptance of creditable improvements.) PLEASE NOTE: TDT Credits must be redeemed at the time TDT Payment is due,either at the time the building permit is issued or,if payment is deferred,prior to issuance of an occupancy permit. If you expect to claim TDT Credits be sure the improvements, any creditable payments, and your Request for Credits is complete either before your building permit is to be issued or,if payment is deferred,before you request an occupancy permit. No refund of TDT Payments will be made if Credits are submitted more than 30 days after issuance of the relevant building or occupancy permit. ❑ "Bancroft" or Installment Payments (separate application required.) c—DocuSigned by: DocuSigned by: er'aleaMar kurtyrinuA, ‘—F2114P7130E8114.P3, 136148708E23116... PROPERTY OWNER DEVELOPER 4/13/2021 4/13/2021 DATE: DATE: DocuSign Envelope ID:A84AEO8C-EE86-4B4F-90CB-CBEB4F9192F3 City of Tigard Transportation System Development Charge (TSDC) TIGARD Notification of Fee and Payment Options This advises you that the total TSDC for this project is as shown below and outlines the payment options that may be available to you. This total includes charges for TSDC-Improvement,TSDC-Reimbursement, and TSDC-River Terrace,if relevant. This form is to be signed and submitted no later than the time of building permit application or, if no building permit is required, then upon land use application (TMC 3.24.080, as amended by Ordinance No. 20-02). City of Tigard Date: 4/8/2021 Site Address: 16145 SW Upper Boones Ferry Rd Project Kiddie Academy Land Use Case or BUP2021-00074 Name: Permit #: Tax 2S113AB00701 Total TSDC $153,188.80 Lot#: Amount*: *Total TSDC amount is the sum of$144,823.60 for TSDC-Improvement and$8,365.20 for TSDC-Reimbursement. This constitutes my request to use the TSDC payment option or combination of options I have selected below. [This selection can be changed up to the time a building permit is issued.] I realize that TSDC charges are due and payable at the lime a building permit is issued unless those charges are Deferred or are financed through Installment Payments. [Please address questions about TSDC Payment Options to Permit Coordinator, 503-718-2426.] ❑ Cash, Check, or Credit Card,payment due at building permit issuance. EE Deferral until Occupancy,payment due before issuance of an occupancy permit. Payment of the TSDC may be deferred until issuance of the occupancy permit. In requesting this option,I understand that any deferred TSDC must be paid prior to issuance of a Certificate of Occupancy or final inspection. For a deferral request to be accepted both the Property Owner and the Developer must sign this request. ❑ Credit Voucher for developer-built required public improvements, subject to approval, completion,and acceptance of creditable improvements.) NOTE: TSDC Credits must be redeemed at the time TSDC Payment is due,either at the time the building permit is issued or,if payment is deferred,prior to issuance of an occupancy permit. If you expect to claim TSDC Credits be sure the improvements,any creditable payments,and your Request for Credits is complete either before your building permit is to be issued or,if payment is deferred,before you request an occupancy permit. No refund of TSDC Payments will be made if Credits are submitted more than 30 days after issuance of the relevant building or occupancy permit. is ❑ "Bancroft" or Installment Payments (separate application required.) —DocuSigned by: DocuSigned by: [72rediatar —F7R6FCFAQFAR4F7 1 354487D8F43 415... PROPERTY OWNER DEVELOPER 4,/16941 4/13/2021 DATE: DATE: 1:\Community Development\Permit Coordinator\SDC Forms\TSDC Combination Payment Option Form 112718 AMS Parks Estimate Kiddie Academy 3/22/2021 16145 SW Upper Boones Ferry Rd AML ALL PARKS RATES EFFECTIVE 7/1/18 Q Yes Project is in River Terrace ? ® No Note: All Neigh-Imp# Units entries=0 if project is in River Terrace; All Neigh-RT# Units entries=0 if project is elsewhere in the city. Former Use Rate Type Use# ITE Code # Units Rate Parks Amount Description Parks-Imp 1 0 $477 $0 Vacant Parks-Reim 1 0 $87 $0 0 Neigh-Imp 1 0 $0 $0 Neigh-RT 1 $0 0 2 $0 Total Parks Former Uses $0 Proposed Use Use# ITE Code # Units Rate Parks Amount Description Parks-Imp 1 565 8.35 $477 $3,982.95 Day Care Center Parks-Reim 1 565 8.35 $87 $726.45 10,861SF Neigh-Imp 1 565 8.35 $0 $0 Neigh-RT 1 $0 Parks-Imp 2 $0 Parks-Reim 2 $0 0 Neigh-Imp 2 $0 0 Neigh-RT 2 $0 0 Total Parks Outside RT Proposed Uses $4,709.40 Less: Total Parks Outside RT Former Uses $0.00 Total All Parks Outside RT Net Increase $4,709.40 Total Parks RT Proposed Uses $0 Less: Total Parks RT Former Uses $0 Total All Parks RT Net Increase $0 Total Parks-Imp $3,983 Total Parks-Reim $726 Total Neigh-Imp $0 No Neigh-Imp Total Neigh-RT $0 No Neigh-RT For Non-Residential Calculations: Prior Use: Vacant Proposed Use: Day Care Center=1300sf/EE;10861/1300=8.35EEs. Parks-Imp=Parks Improvement,Citywide including River Terrace Parks-Reim=Parks Reimbursement,Citywide including River Terrace Neigh-Imp=Neighborhood Parks Improvement Outside River Terrace Neigh-RT=Neighborhood Parks Improvement Inside River Terrace .r...m..aa...ax...+.m..w.r.mr.aarrxxmwwwwr:..wr.aawwrrw:.a.ru ...:aa.x wvzvvnrauxexsus+usx.0 zxwruxuraa alaceiau.- raaaxua.r t.tara>r vra aaavr alxtxanrr4aNaFaui.usrl xu.ay.+Haue}4ax,W}ata[tu iuraFitlN.rxai.et a. Branden Taggart From: Branden Taggart Sent: Tuesday, June 15, 2021 5:15 PM To: Gavin Russell Subject: Kiddie Academy Building Permit: BUP2021-00074 - 16145 SW Upper Boones Ferry Rd. Attachments: Invoice.pdf i i Hello Gavin, The Buildingpermit for Kiddie Academyis readyto issue now. The balance due is 14 062.24 and I have attached an $ a invoice above for you to reference. These fees can be paid online now at https://aca- prod.accela.com/TIGARD/Welcome.aspx by searching for the permit record number BUP2021-00074 under the Building tab. There is a 3%service fee for credit cards, but e-checks do not have a service fee. Once paid, please email the Permit Technicians at TigardBuildingPermits@tigard-or.gov so that we may issue this permit and make it available for pick up. Additionally, we will need to receive contractor license information prior to the issuance of this permit. Please let me know if you have questions. Thank you, Branden Taggart IlN , q City of Tigard i-' Senior Permit Technician Community Development 13125 SW Hall Blvd Tigard, OR 97223 (503)718-2449 brandent@tigard-or,gov 1