Permit CITY OF TIGARD MASTER PERMIT
illill ■ COMMUNITY DEVELOPMENT Permit#: MST2021-00219
T[G A R D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 06/17/2021
Parcel: 2S108DB01700
Jurisdiction: Tigard
Site address: 15328 SW HUDSON AVE
Subdivision: POLYGON AT BULL MOUNTAIN Lot: 15
Project: Thorpe
Project Description: Rooftop Solar PV
BUILDING
Floor Areas Required Setbacks Required
Stories: 0 Bedrooms: 0 First: 0 sf Basement: 0 sf Left: 0 Parking Spaces: 0
Height: 0 Bathrooms: 0 Second: 0 sf Garage: 0 sf Front: 0 Smoke
Dwelling Units: 0 Third: 0 sf Right: 0 Detectors:
Total: 0 sf Value: $6,398.40 Rear: 0
PLUMBING
Sinks: 0 Water Closets: 0 Washing Mach: 0 Laundry Trays: 0 Rain Drain: 0 Urinals: 0
Lavatories: 0 Dishwashers: 0 Floor Drains: 0 Sewer Lines: 0 SF Rain Storm Sewer: 0
Drains: 0
Tubs/Showers: 0 Garbage Disp: 0 Water Heaters: 0 Water Lines: 0 Catch Basins: 0
Bckflw Prevntr: 0
Footing Drain: 0 Ice Maker: 0 Hose Bib: 0 Backwater Value: 0
Other Fixtures: 0
Drywell-Trench Drain: 0
Other Fixture Units:
MECHANICAL
Fuel Types Air Conditioning: N Vent Fans: 0 Clothes Dryers: 0
Heat Pump: N Hoods: 0 Other Units: 0
Furn<100K: 0 Vents: 0 Woodstoves: 0 Gas Outlets: 0
Furn>=100K: 0
ELECTRICAL
Residential Unit Service Feeder Temp SrvclFeeders Branch Circuits
1000 sf or less: 0 0-200 amp: 1 0-200 amp: 0 W/Svc or Fdr: 0
Ea add9 500 sf: 0 201-400 amp: 0 201-400 amp: 0 W/O Svc/Fdr: 0
Mfd Home/Feeder/Svc: 0 401-600 amp: 0 401-600 amp: 0
601-1000 amp: 0 601+amp-1000v: 0
1000+amp/volt: 0
ELECTRICAL-RESTRICTED ENERGY
SF Residential
Audio&Stereo: N HVAC: N Security Alarm: N Vaccuum System: N Garage Opener: N All
Other: Y Other Description: Roof Top Solar PV System 7.44 kW Ecompasing: N
BUILDING INFO
Class of Work: Type of Use: Type of Constr: Occupancy Group: Square Feet:
ALT SF VB R-3 0
Owner: Contractor: _
THORPE,BRIAN DAVID CONDUIT ELECTRIC Required Items and Reports(Conditions)
LITTEN,SHANNON LEE 19461 SW 89TH AVE
15328 SW HUDSON AVE TUALATIN,OR 97062
TIGARD,OR 97224
PHONE: PHONE: 503-692-1428
FAX: 503-692-3652
Total Fees: $469.47
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Ore..n law requires�ou to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through a' 952-001-0090. • may obtain opy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issued By: �' ^ `� ,, Permittee Signature: s--' ,..____- A?2G17
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Buiki> g Permit Application
Rbsidential RECEIVED FOR OFFICE I SF om.1
Received .. , rsT2O ... ici
. City of Tigard �� Date/By:cive �4 t5 0.2l PermitNo.: ��'�(�
13125 SW Hall Blvd.,Tigard,OR 97223 JuN 0 202 Plan Review / _ At?
Phone: 503.718.2439 Fax: 503.598.1960 Date/By: ff /`jfJ Other Permit:
1IGARD Inspection Line: 503.639.4175 CITY OFTIGARD DateReady/By: / / , Juris: ® See Page 2for
Internet: www.tigard-or.gov ied/Method' l/ Supplemental Information
BUILDING DIVISION
TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING
❑New construction ❑Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
El Addition/alteration/replacement ®Other:Solar equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
dwellin Valuation: $
® I-and 2-familyg ❑Commercial/industrial ��.3�� �(/
` ❑Accessory building El Multi-family Number of bedrooms:
4 0 Master builder 0 Other: Number of bathrooms:
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address:15328 Southwest Hudson Avenue New dwelling area: square feet
City/State/ZIP:Tigard Oregon 97224 Garage/carport area: square feet
Suite/bldg./apt.no.: Project name:Thorpe Solar Covered porch area: square feet
Cross street/directions to job site: p�� 1 Deck area: square feet
,'ij r'� /,f �� L�d �)t, _ �> Other structure area: square feet
/ REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: Lot no.: Permit fees*are based on the value of the work performed.
fax ma �arccl no.: Indicate the value(rounded to the nearest dollar)of all
P I equipment,materials,labor,overhead,and the profit for the
DESCRIPTION OF WORK work indicated on this application.
7.44kW PV Solar Roof Mount Install Valuation: $
Existing building area: square feet
New building area: square feet
® PROPERTY OWNER ❑ TENANT Number of stories:
Name:Brian Thorpe Type of construction:
Address:15328 Southwest Hudson Avenue Occupancy groups:
City/State/ZIP:Tigard Oregon 97224 Existing:
Phone:(949 )322-6540 Fax:( ) New..
® APPLICANT 0 CONTACT PERSON BUILDING PERMIT FEES*
(Please refer to fee schedule)
Business name:Solgen Power, LLC Structural plan review fee(or deposit):
Contact name:Mariela Gonzalez
FLS plan review fee(if applicable):
Address:5715 Bedford St
City/State/ZIP:Pasco, WA, 99301 Total fees due upon application:
Amount received:
Phone:(509)408-1165 Fax: :( )
PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
E-mail:mariela.gonzalez@solgenpower.com
Commercial and residential prescriptive installation of
CONTRACTOR roof-top mounted Photo Voltaic Solar Panel System.
Business name:Conduit Electric Submit two(2)sets of roof plan with connection details
and fire department access,along with the 2010 Oregon
Address:19461 SW 89th Ave Solar Installation Specialty Code checklist.
City/State/ZIP: Tualti, OR 97062 Permit Fee(includes plan review $180.00
and administrative fees):
Phone:(509 )408-1165 Fax:( ) State surcharge(12%of permit fee): $21.60
CCB lie.: Total fee due upon application: $201.60
Authorized signature: J„r_ This permit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
*Fee methodology set by Tri-County Building Industry
Print name: Mariela Gonzalez Date:06/02/2021 Service Board.
1:\Building\Permits\BUP-RESPermitApp.doc 02/24/2011 440-4613T(I 1/02/COM/WEB)
Building Permit Application Checklist x.
One- and Two-Family Dwelling FOR OFFICE USE ONl.l
Received
City of Tigard Date/By:
No.:
ilq13125 SW Hall Blvd.,Tigard,OR 97223 Associated permits:
I Phone: 503.718.2439 Fax: 503.598.1960
TIGARD
24-Hour Inspection Line: 503.639.4175 ❑ Electrical ❑ Plumbing El Mechanical
Internet: www.tigard-or.gov 0 Other:
THE FOLLOWING ITEMS ARE REQUIRED FOR PLAN REVIEW 1 es No `/.k
1 Land use actions completed. See jurisdiction criteria for concurrent reviews. ❑ ❑ Cl
2 Zoning. Flood plain,solar balance points,seismic soils designation,historic district,etc. ❑ ❑ ❑
3 Verification of approved plat/lot. ❑ ❑ ❑
4 Fire district approval required. Name of district: • ❑ ❑ ❑
5 Septic system permit or authorization for remodel. Existing system capacity ❑ ❑ ❑
6 Sewer permit. ❑ ❑ ❑
7 Water district approval. ❑ ❑ ❑
8 Soils report. Must carry original applicable stamp and signature on file or with application. ❑ ❑ ❑
9 Erosion control ❑plan 0 permit required. Include drainage-way protection,silt fence design and location of catch- ❑ ❑ ❑
basin protection,etc.
10 3 Complete sets of legible plans. Must be drawn to scale,showing conformance to applicable local and state ❑ ❑ ❑
building codes. Lateral design details and connections must be incorporated into the plans or on a separate full-size
sheet attached to the plans with cross references between plan location and details. Plan review cannot be completed if
copyright violations exist.
11 Site/plot plan drawn to scale. The plan must show lot and building setback dimensions;property corner elevations(if ❑ ❑ ❑
there is more than a 4-ft.elevation differential,plan must show contour lines at 2-ft.intervals);location of easements
and driveway;footprint of structure(including decks);location of wells/septic systems;utility locations;direction
indicator;lot area;building coverage area;percentage of coverage;impervious area;existing structures on site;and
surface drainage.
12 Foundation plan. Show dimensions,anchor bolts,any hold-downs and reinforcing pads,connection details,vent size ❑ ❑ ❑
and location.
13 Floor plans. Show all dimensions,room identification,window size,location of smoke detectors,water heater, ❑ ❑ ❑
furnace,ventilation fans,plumbing fixtures,balconies and decks 30 inches above grade,etc.
14 Cross section(s)and details. Show all framing-member sizes and spacing such as floor beams,headers,joists,sub- ❑ ❑ ❑
floor,wall construction,roof construction. More than one cross section may be required to clearly portray
construction. Show details of all wall and roof sheathing,roofing,roof slope,ceiling height,siding material,footings
and foundation,stairs,fireplace construction,thermal insulation,etc.
15 Elevation views. Provide elevations for new construction;minimum of two elevations for additions and remodels. ❑ ❑ ❑
Exterior elevations must reflect the actual grade if the change in grade is greater than four foot at building envelope.
Full-size sheet addendums showing foundation elevations with cross references are acceptable.
16 Wall bracing(prescriptive path)and/or lateral analysis plans. Must indicate details and locations;for non- ❑ ❑ ❑
prescriptive path analysis provide specifications and calculations to engineering standards.
17 Floor/roof framing. Provide plans for all floors/roof assemblies,indicating member sizing,spacing,and bearing ❑ ❑ ❑
locations. Show attic ventilation.
18 Basement and retaining walls. Provide cross sections and details showing placement of rebar. For engineered ❑ ❑ ❑
systems,see item 22,"Engineer's calculations."
19 Beam calculations. Provide two sets of calculations using current code design values for all beams and multiple joists ❑ ❑ ❑
over 10 feet long and/or any beam/joist carrying a non-uniform load.
20 Manufactured floor/roof truss design details. ❑ ❑ ❑
21 Energy Code compliance. Identify the prescriptive path or provide calculations. A gas-piping schematic is required ❑ ❑ ❑
for four or more appliances.
22 Engineer's calculations. When required or provided,(i.e.,shear wall,roof truss)shall be stamped by an engineer or ❑ ❑ ❑
architect licensed in Ore.on and shall be shown to be applicable to the .ro'ect under review.
JURISDICTIONAL SPECIFICS
23 Three(3)site plans are required for Item II above. Site plans must be 8-1/2"x 11"or 11"x 17". ❑ ❑ 0
24 Two(2)sets each are required for Items 16,19,20 and 22 above. ❑ ❑ ❑
25 Building plans shall not contain red lines or tape-ons. "Mirrored"building plans will not be accepted. ❑ ❑ ❑
26 "Reversed"building plans must meet criteria outlined in the Permit&System Development Fees document. ❑ ❑ ❑
27 "Drawn to scale"indicates standard architect or engineer scale. ❑ ❑ ❑
28 Site plan to include tree size,type and location per approved project street tree plan(if applicable),and City of Tigard 0 ❑ ❑
Street Tree List.
29 Site plan to include trees and tree protection measures as required by conditions of approval. Tree locations,driplines, ❑ ❑ ❑
and protection measures must be drawn to scale and must include the project arborist's signature of approval.
30 A Clean Water Services'Sensitive Area Pre-Screening Site Assessment form is required for all building additions, ❑ ❑ ❑
including decks,patio covers(over non-impervious surface)and accessory structures to existing residential dwellings
on a lot of record approved prior to September 9, 1995.
I:\Building\Permits\BUP-RESPermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB)
Electrical Permit Applicatlo�- ��� � I OR 01I I( I.. I til'.OyI 1
City of Tigard JUN 11 2OZ1 Received ,
13125 SW Hall Blvd.,Tigard,OR 97223f‘c Plaan Review �• /
C"'"`—
: I Phone: 503.718.2439 Fax: 503.598.UN u TI Date/B : Related Permit#:
Inspection Line: 503.639.4175 BUILDING DIVISION Ready Date/By: Juris: VI See Page 2 for
I I tr 11:D Internet: www.tigard-or.gov Notified/Method: Supplemental Information
. TYPE OF WORK ay e vt1 x t .' a q.
❑New construction ❑Addition/alteration/replacement Please check all that apply(submit 2 sets of plans w/items checked):
E Demolition ®otner: Solar Install 0 Service or feeder 400 amps or more El Building over three stories.
where the available fault current El Marinas and boatyards.
CATEGORY OF CONSTRUCTION exceeds 10,000 amps at 150 volts or ❑Floating buildings.
® 1-and 2-family dwelling ❑Commercial/industrial 0 Accessory building
less to ground,or exceeds 14,000 0 Commercial-use agricultural
amps for all other installations. buildings.
0 Multi-family 0 Master builder 0 Other:
0 Fire pump. 0 Installation of 150 KVA or
vt s ;n T6.. >) ❑Emergency system. larger separately derived
15328 Southwest Hudson ❑ oo ofoew motor load of system.
Job#: Job site address: 100HP or more. ❑"A","E","l-2",°`t-3",
City/State/ZIP:Tigard Oregon 97224 ID Six or more residential units. occupancy.
g g 0 Health-care facilities. 0 Recreational vehicle parks.
Suite/bldg./apt.#: I Project name:Thorpe Solar 0 Hazardous locations. ❑Supply voltage for more than
0 Service or feeder 600 amps or more. 600 volts nominal.
Cross street/directions to job site: FEE SCHEDULE
Description I Qty. I Each ] Total I *
New residential single-or multi-family dwelling unit.
Subdivision: I Lot#: Includes attached garage.
Tax map/parcel#: 1,000 sq ft.or less 168.54 4
1 Ea.add'I 500 sq.ft.or portion 33.92 1
g'i ',r . ,, ., t. . �'„� ... "f.. /.,5,g- Limited energy,residential
7.44kW PV Solar Roof Mount Install (with above sq.ft.) 75.00 2
Limited energy,multi-family 75.00 2
residential(with above sq.ft.)
t Qd )a ,, Renewable Energy 0 See Page 2
� * , ,�;`,c •„t: t > ••_ , -; '. Services or feeders installation,alteration,and/or relocation
Name:Brian Thorpe 200 amps or less x 100.70 2
Address:15328 Southwest Hudson Avenue 201 amps to 400 amps 133.56 2
401 amps to 600 amps 200.34 2
City/State/ZIP:Tigard Oregon 97224 601 amps to 1,000 amps 301.04 2
Phone:( 949)322-6540 I Fax:( ) Over 1,000 amps or volts 552.26 2
Temporary services or feeders installation,alteration,and/or
Email:thorpebri@gmail.com relocation
Owner installation: This installation is being made on property that I own which is not 200 amps or less 59.36 1
intended for sale,lease,rent,or exchange,according to ORS 447,449,670,and 701. 201 amps to 400 amps 125.08 2
Owner signature: Date: 401 amps to 599 amps 168.54 2
,t r Branch circuits—new,alteration,or extension,per panel
A
Fee for branch circuits with
Business name:Solgen Power, LLC above service or feeder fee, 7.42 2
each branch circuit
Contact name:Mariela Gonzalez B.Fee for branch circuits without
service or feeder fee,first Address:5715 Bedford St branch circuit 56.18 2
City/State/ZIP:Pasco, WA, 99301 Each add'l branch circuit 7.42 2
Miscellaneous(service or feeder not included)
Phone:
(509)408-1 165 Fax::( ) Each manufactured or modular
dwelling,service and/or feeder 67.84 2
Email: mariela.gonzalez@solgenpower.com Reconnect only 67.84 2
CONTRACTOR Pump or irrigation circle 67.84 2
Business name:Conduit Electric Sign or outline lighting 67.84 2
Signal circuit(s)or limited-energy 0 See Page 2 2
Address:19461 SW 89th Ave panel,alteration,or extension. g
City/State/ZIP:Tualti, OR 97062 Each additional inspection over allowable in any of the above
Additional inspection(1 hr min) 66.25/hr
Phone:(509)408-1165 Fax:( ) Investigation(1 hr min) 90.00/hr
Industrial plant(1 hr min) 78.18/hr
Email:mariela.gonzalez@solgenpower.com Inspections for which no fee is
specifically listed /,hr min) 90.00/hr
CCB Lic.:109669 Electrical Lic.:26-905C Suprv.Lie.: p ('
ELECTRICAL PERMIT FEES
Suprv.Electrician signature,required: Subtotal:
Print name: Charles Parker Date:06/02/21 ❑Plan Review Required(25%of permit fee):
State surcharge(12%of permit fee):
Authorized signature:?,] / )"__) TOTAL PERMIT FEE:
�- `—'J This permit application expires if a permit is not obtained within 180
Print name:Mariela Gonzalez Date:06/02/21 days after it has been accepted as complete.
* Number of inspections allowed per permit.
1'.\Building\Permits\ELC_PermitApp_ELR_ERE.doe Rev 06/17/2015 440-4615T(1 I/05/COM/WEB
Electrical Permit Application—City of Tigard
Page 2—Supplemental Information
Limited Energy Permit Fees: Renewable Energy Permit Fees:
y $75.00 ..h . w. s ;
Fee for all residential systems combined: Renewable
SQty. Each I Total tY
Renewable electrical energy systems:
Check Type of Work Involved: 5 kva or less 100.70 2
5.01 to 15 kva X 133.56 2
❑ Audio and Stereo Systems* 15.01 to 25 kva 200.34 2
Wind generation systems in excess of 25 kva:
❑ Burglar Alarm 25.01 to 50 kva 301.04 2
❑ Garage Door Opener* 50.01 to 100 kva 552.26 2
>100 kva(fee in accordance 552.26 2
with OAR 918-309-0040)
❑ Heating, Ventilation and Air Conditioning Solar generation systems in excess of 25 kva:
System* Each additional kva over 25 7.42 3
❑ V• acuum Systems* >100 kva-no additional charge 0.0 3
Each additional inspection over allowable in any of the above:
• Other: Solar Install Each additional inspection is 66.25/hr 1
charged at an hourly(1 hr min)
Inspections for which no fee is 90.00/hr
s.-cificall listed(%hr min)
MasFTx. 'iY. '5xihi ±i .... % ,�. p Y 'i` Y_
t�s .s,i`, r : � 47 any . on Page' ) .�* , . ,.w
Fee for each commercial system: $75.00 s irs
Subtotal(Enter 1 .
y " Number of inspections allowed per permit.
(SEE OAR 918-309-0000)
Check Type of Work Involved:
❑ Audio and Stereo Systems
❑ Boiler Controls
❑ Clock Systems
❑ Data Telecommunication Installation
❑ Fire Alarm Installation
❑ H• VAC
❑ Instrumentation
❑ Intercom and Paging Systems
❑ Landscape Irrigation Control*
❑ Medical
❑ N• urse Calls
❑ Outdoor Landscape Lighting*
❑ Protective Signaling
❑ O• ther:
Total number of commercial systems:
*No licenses are required. Licenses are required for all
other installations
i.\Building\Permits\ELC_PermitApp_ELR_ERE.doc Rev 06/17/2015
xY
S4
Elect!' al Permit A 1 ,licatio • ECEIVED FOR Orel( I. I SI:O�vI.I
Cl ofTigard and ''ii Received Permit#:
• 131252 SW al Blvd.,Tigard,OR 97223 �UN 2021Date B
Plan Review
Phone: 503.718.2439 Fax: 503.598.196Q�1.�OF TIGARD Date B Related Permit#:
Inspection Line: 503.639.4175 Ready Date/By: Juris: i0 See Page 2 for
I I C 1 ti 0 Internet: www.tigard-or.gov . , G DIVISION Notified/Method: Supplemental Information
x k ro. k �`"c ,r5
saw x7 4 � _ ;� , f ,,.,. : _
a..
0 New construction 0 Addition/alteration/replacement Please check all that apply(submit 2 sets of plans w/items checked):
❑Demolition ®Other:Solar Install ❑Service or feeder 400 amps or more ❑Building over three stories.
where the available fault current 0 Marinas and boatyards.
fay -i a.• ,� L .t,i d t' S ,, ,; n i , , exceeds 10,000 amps at 150 volts or 0 Floating buildings.
® 1-and 2-family dwellingless to ground,or exceeds 14,000 ❑Commercial-use agricultural
❑Commercial/industrial ❑Accessory building
amps for all other installations. buildings.
❑Multi-family 0 Master builder ❑Other:
❑Fire pump. El Installation of 150 KVA or
„, ,..._ - .carom;,„ `;, ,. 2� „s,� Km*x3^'j wya $" Er ' ,..
t , >+ g: t ( k f & ❑Emergency system. larger separately derived
# r ❑Addition of new motor load of system
Job#: Job site address:15328 Southwest Hudson 100HP or more. ❑"A","E","1-2", '1-3",
❑Six or more residential units. occupancy.
City/State/ZIP:Tigard Oregon 97224 0 Health-care facilities. 0 Recreational vehicle parks.
Suite/bldg./apt.#: 1 Project name:Thorpe Solar ❑Hazardous locations. 0 Supply voltage for more than
❑Service or feeder 600 amps or more. 600 volts nominal.
Cross street/directions to job site: Fv
tDescription Qty. Each Total
New residential single-or multi-family dwelling unit.
Subdivision: i Lot#: includes attached garage.
1,000 sq.ft.or less 168.54 4
Tax map/parcel#: Ea.add'l 500 sq.ft.or portion 33.92 1
•,. ^ ,, . ..4 m iti ti �".za''S+�",4 9`. % i '�i tf� r }'.3... m ff'.,. 1414 K 0' «tt ant�
' c �1x� Limited energy,residential
7.44kW PV Solar Roof Mount Install (with above sq.ft.) 75.00 2
Limited energy,multi-family 75.00 2
residential(with above sq.ft.)
_ Renewable Energy ❑ See Page 2
v, „ E. t a J � a '` ,- `'F`• ' ' AN�'` x, ' '�) ' ' Services or feeders installation,alteration,and/or relocation
Name:Brian Thorpe 200 amps or less x 100.70 2
Address:15328 Southwest Hudson Avenue 201 amps to400amps 133.56 2
401 amps to 600 amps 200.34 2
City/State/ZiP:Tigard Oregon 97224 601 amps to 1,000 amps 301.04 2
Phone:( 949)322-6540 Fax:( ) Over 1,000 amps or volts 552.26 2
Temporary services or feeders installation,alteration,and/or
Email:thorpebri@gmail.com relocation
Owner installation:This installation is being made on property that I own which is not 200 amps or less 59.36 1
intended for sale,lease,rent,or exchange,according to ORS 447,449,670,and 701. 201 amps to 400 amps 125.08 2
Owner signature: Date: 401 amps to 599 amps 168.54 2
, w 9eT l % Branch circuits—new,alteration,or extension,per panel
APPLICANT,.`;r:• ur .mot rid MSC :'
- •�• A.Fee for branch circuits roil/:
Business name:Solgen Power, LLC above service or feeder fee, 7.42 2
each branch circuit
Contact name:Mariela Gonzalez B.Fee for branch circuits without
service or feeder fee,first
Address: 56.18 2
5715 Bedford St branch circuit
City/State/ZIP:Pasco, WA, 99301 Each add'l branch circuit 7.42 2
Phone:(50g )408-1165 Fax: :( ) Miscellaneous(service or feeder not included)
Each manufactured or modular 67.84 2
dwelling,service and/or feeder
Email: mariela.gonzalez@solgenpower.com Reconnect only 67.84 2
CONTRACTOR Pump or irrigation circle 67.84 2
Business name:Conduit Electric Sign or outline lighting 67.84 2
Signal circuit(s)or limited-energy
Address:19461 SW 89th Ave 0 See Page 2 2
panel,alteration,or extension.
City/State/ZIP:Tualti, OR 97062 Each additional inspection over allowable in any of the above
Additional inspection(1 hr min) 66.25/hr
Phone:(509)408-1165 Fax:( ) Investigation(1 hr min) 90.00/hr
Industrial plant(1 hr min) 78.18/hr
Email:mariela.gonzalez@solgenpower.com tf/ /2-2i Inspections •for which no fee is
specifically listed('/,hr mitt), 90.00/hr
CCB Lic.:109669 Electrical Lic.:26-905C Suprv.Lic.: y
p Ll S�>JELEC 1RR . kfiTi II ES
Suprv.Electrician signature,reg µ.— _- _ - Subtotal:
Print name:Mariela Gonzalez I Date:06/02/21 0 Plan Review Required(25%of permit fee):
State surcharge(12%of permit fee):
Authorized signatur J `�- TOTAL PERMIT FEE:
This permit application expires if a permit is not obtained within 180
Print name:Mariela Gonzalez Date:06/02/21 days after it has been accepted as complete.
• Number of inspections allowed per perm it.
l:\Building\Permits\ELC_PerntitApp_ELR_ERE.doe Rev 06/17/2015 440-4615T(I I/05/COM/WEB
Electrical Permit Application—City of Tigard
Page 2—Supplemental Information 'I
Limited Energy Permit Fees: Renewable Energy Permit Fees:
1LCL:il 1'il ll!'}.L I Qh'. I Each I Total I*
Renewable for all residential systems combined: $75.00 Description
3' Renwable electrical energy systems:
Check Type of Work Involved: 5 kva or less 100.70 2
5.01 to 15 kva x 133.56 2
❑ Audio and Stereo Systems* 15.01 to 25 kva 200.34 2
Wind generation systems in excess of 25 kva:
❑ Burglar Alarm 25.01 to 50 kva 301.04 2
50.01 to 100 kva 552.26 2
❑ Garage Door Opener*
>100 kva(fee in accordance 552.26 2
with OAR 918-309-0040)
❑ Heating, Ventilation and Air Conditioning Solar generation systems in excess of 25 kva:
System* Each additional kva over 25 7.42 3
❑ Vacuum Systems* >100 kva-no additional charge 0.0 3
Each additional inspection over allowable in any of the above:
✓ Other: Solar Install Each additional inspection is 66.25/hr 1
charged at an hourly(l hr min)
Inspections for which no fee is 90.00/hr
s ecificall listed('/z hr min
Fee for each commercial system: $75.00 Subtotal(Enter on Page t).
y • Number of inspections allowed per permit.
(SEE OAR 918-309-0000)
Check Type of Work Involved:
n Audio and Stereo Systems
❑ Boiler Controls
❑ Clock Systems
❑ Data Telecommunication Installation
❑ Fire Alarm Installation
❑ HVAC
❑ Instrumentation
❑ Intercom and Paging Systems
❑ Landscape Irrigation Control*
❑ Medical
❑ Nurse Calls
❑ Outdoor Landscape Lighting*
❑ Protective Signaling
❑ Other:
Total number of commercial systems:
*No licenses are required. Licenses are required for all
other installations
I\Building\Permits\ELC_PermsApp_ELR_ERE_doc Rev 06/17/2015
City of Tigard RECEIVED
111111
Building Division Jo o 2 2021
• 13125 SW Hall Blvd,Tigard, OR 97223
Phone: 503.718.2439 Fax: 503.598.1960 CITY OF TIGARD
T I G A R D Inspection Line: 503.639.4175 BUILDING DIVISION
www.tigard-or.gov
2010 Oregon Solar Installation Specialty Code
Check List for Prescriptive Installation of Roof-Mounted
PhotoVoltaic Solar Panel System
Property Information
Installation Address: 15328 Southwest Hudson Avenue
City: Tigard Zip: 97224
Owner's Name: Brian Thorpe Date: 06/02/2021
Contractor's Name: Conduit Electric CCB #: 109669
Design Parameters of the Property/Structure
If"Yes", does not
Flood Hazard Is the installation ❑ Yes qualify for the
Area Located in a flood prescriptive path, follow
plain/flood way? ig No OSSC or ORSC for
design requirements.
121
Wind Exposure Is the wind exposure Yes If"Yes", qualifies for
"C" or less? ❑ No the prescriptive path.
Installations on detached Is the Ground Snow
single/two-family Load 70 psf or less?
dwelling/single/two- If"Yes", qualifies for
family townhomes IX Yes the prescriptive path.
and/or their accessory
Ground structures. ❑ No
Snow Load Is the Ground Snow
Installations on all Load 50 psf or less?
structures other than If"Yes", qualifies for
Yes the prescriptive path.
above
❑ No
1
I1Building/Fonns/PhotoVoltaic-Checklist02-01-11.docx
Is the construction
lg material wood and does Yes
Type of the construction qualify If"Yes", qualifies for
Construction as "conventional light No the prescriptive path.
frame"construction?
Is the spacing 24 inches
or less?
Pre-engineered trusses. X Yes If"Yes", qualifies for
the prescriptive path.
❑ No
Roof framing
members Is the spacing 24 inches
or less?
Nominal lumber. If"Yes", qualifies for
Yes the prescriptive path.
❑ No
Is the combined weight X Yes
of the PV modules and If"Yes", qualifies for
racking less than or ❑ No the prescriptive path.
Solar equal to 4.5 psf?
installation Is the solar installation
layout in accordance Yes
with Section 305.4(3) of If"Yes", qualifies for
the 2010 Oregon Solar n No the prescriptive path.
Code?
n Metal
Single layer If roofing material is
Roofing Check the type of ❑ of wood one of the three types
material roofing material shingle/shake checked, qualifies for
Max. two layers the prescriptive path.
X of composition
shingle.
Is the roof mounted 2C Yes
Connections of solar assembly
the solar assembly connected to roof If"Yes", qualifies for
n No the prescriptive path.
to the roof framing or blocking
directly?
2
L/Building/Forms/PhotoVoltaic-Checkl i st02-01-11.docx
•
Is the gauge 26 or less? Yes If"Yes", qualifies for
❑ No the prescriptive pat:.
115 lbs for 60 inch
spacing or less?
If"Yes", .ualifies for
21 Yes the prescriptive path.
❑ No
Minimu • Uplift rating
of C ps? 75 lbs for 48 inches
spacing or less?
If"Yes", qualifies for
Yes the prescriptive path.
❑ No
Attachment of
roof mounted \'nimu 24 inches If the spacing falls
solar systems Spacing of clamps? within 24 inches and 60
directly to inches Max' ' m 60 inches inches, qualifies for the
prescriptive path.
standing seam
metal panels Width of roofing If the width of the panel
panels? 18 inches or -ss
is less than 18 inches,
inches qualifies for the
prescriptive path.
Minimum#10 at 24
inches o/c?
Size and spac' g of \f"Yes", qualifies for
NI
fasten- ? Yes t prescriptive path.
❑ No
Is the oof decking of
WSP in. '/"thickness, X Yes
d-eking connected to If"Yes", qu lifies for
framing members ❑ No the prescript) e path.
w/min. 8d nails @
6"/12" o/c?
Is the height less than or
Maximum 18 inches equal to 18 inches?
Height of the from the top of the Yes If"Yes", qualifies for
solar modules module to the roof the prescriptive path.
surface. ❑ No
3
1:/Building/Fonns/PhotoVoltaic-Checklist02-01-11.docx
Submittal Documents required for Prescriptive Installations
Show the location of the PV system in relation to buildings, structures,
property lines, and, as applicable, flood hazard areas.
Site Plan Details must be clear and easy to read.
Minimum size of the plan is 8.5 x 11 inches.
Attach a simple structural plan showing the roof framing(rafter size, type, and
spacing) and PV module system racking attachment.
System must be shown in sufficient detail and clarity to assess whether it
Structural Plan meets the prescriptive construction requirements as listed earlier above in the
matrix.
Minimum size of the plan is 8.5 x 11 inches.
PV Modules
Manufacturer: ZNShineSolar
Model Number: ZXM6-60-31 0/M
Listing Agency:
4
1:/Building/Forms/PhotoVoltaic-Chccklist02-01-11.docx