Loading...
Plans (20) MEC2O21 -00291 RECEIVED MAY 0 3 2021 DESIGN & CONSTRUCTION CITY 0FTIGARD MANAGEMENT: Outside Air/Ventilation Calculation - Mechanical Code [WILDING DIVISION INDOOR AIR HANDLER - CHILLED WATER SYSTEM, oRE ELECTRIC HEAT BASED ONTRANE NEx I MIN SUPPLY FAN DATA COOLING DATA HEATING COIL DATA ELECTRICAL Vbz = Rp*Pz + Ra*Az I allial TAG MODEL TONS O.A. SUPPLY AIR ESP BLOWER EAT COOLING COIL OPERATING EWT/ WATER FLUID PD TOTAL SENSIBLE CAPACITY STAGES VOLTAGE PHASE AMPS MOCP NOTES PPL Zone Vent Air Vent Air Vent Air Exhaust •4000 Lusotfica Race,Mason,OH 45040 •41(513)765-6000 •6 Creamery Brook,East Granby.CT 06026 •.108601 413-9700 (CFM) (CFM) (WC) (HP) DB/WB ROWS PRESSURE LWT FLOW (GPM) FT MBH MBH (KW) Area Area per 3opulatior4'er Person Per Area Required Rate AHU-1 BCHD036 3 225 1400 0.6 1 80/67 1 4.55 PSIG 47/61 6.95 4.55 PSIG 48.81 36.9 5 1 208 3 23.12 25 1-3 STORE #t3757 Classification Az 1000 SF Pz Rp Ra Vbz per SF Comments Washington Square NOTES: Retail Sales 850 15 13 7.5 0.12 199.5 9463 SW Washington Square 1. EQUIPMENT IS SUPPLIED BY TENANT AND INSTALLED BY THE MECHANICAL CONTRACTOR. Dressing Rooms 0 0 0 0 0 0.25 Tigard, OR 97223 2. ROUTE PRIMARY CONDENSATE PIPING TO MAIN LANDLORD CONDENSATE DRAIN SYSTEM WHERE AVAILABLE. WHERE UNAVAILABLE, CONNECT TO TAIL PIECE OF NEAREST LAVATORY. Shipping/Receiving 0 0 0 0.12 0 Space: W14A 3. MANUFACTURER TO PROVIDE DOOR INTERLOCK SWITCH FOR ALL UNITS WITH ELECTRIC HEAT. Storage Rooms 105 0 0 0 0.12 12.6 Construction for: Toilet Room 60 0 0 0 0 0 1 Corridors 0 0 0 0.06 0 Reception 30 0 5 0.06 0 mi ,4 Office Spaces 5 0 5 0.06 0 CEILING EXHAUST FAN SCHEDULE Work Room/prep area 10 0 5 0.18 0 ITAG STYLE CFM MANUFACTURER MODEL STATIC VOLTAGE POWER NOTES 0 IEE-1 CEILING 100 LOREN-COOK GC-144 0.375 120 108W 1 0 CD t- l7 O NOTES: 3 O CCE- °: 1. CONTROL FAN WITH ROOM SWITCH 1015 13 212.1 Comments: 1. 50 cfm per toilet fixture for continuous exhaust; 70cfm otherwise Can -,,i L."(1) GENERAL NOTES - APPLIES TO ALL SHEETS cL L-, 3 U Co m O A. THE CONTRACT DOCUMENTS REFLECT A SYSTEM DESIGNED AROUND SPECIFIC REFERENCE PRODUCTS, THE 0 SELECTION OF WHICH HAS IMPACTED THE DESIGNS OF OTHER TRADES. IF ALTERNATE MANUFACTURERS ARE D J SUBMITTED OR BID, IT IS THE RESPONSIBILITY OF THIS G.C. TO COORDINATE ALL DIFFERENCES AND IMPACTS Cr n o WITH ALL TRADES PRIOR TO BID, INCLUDING COSTS ASSOCIATED WITH REQUIRED CHANGES TO OTHER TRADES. Q o NO EXTRAS WILL BE ALLOWED FOR CHANGES REQUIRED TO OTHER TRADES IF ALTERNATE EQUIPMENT IS BID OR INSTALLED AT THE G.0 'S OPTION. Air System Sizing Summary for Tenant Space Project Name:2020-0971 SGH-Washington Square 01/29/2021 B. EXISTING MECHANICAL INFORMATION IS BASED ON LIMITED EXISTING BUILDING DRAWINGS AND FIELD WORK. Prepared by:THORSON,BAKER,&ASSOCIATES 01:09PM THE G.C. SHALL FIELD VERIFY THE EXISTING CONDITIONS FOR ACCURACY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED FOR REVISIONS TO THE DESIGN TO CORRECT FOR EXISTING CONDITIONS NOT AS Air System Information INDICATED ON THE PLANS. Air System Name..........................................Tenant Space Number of zones_ 1 Equipment Class ___....CW AHU Floor Area _ 993.0 ft2 C. G.C. SHALL NOTIFY TENANT, ARCHITECT AND ENGINEER OF ANY SITUATIONS THAT MODIFY OR INCREASE THE Air System Type SZCAV Location- Portland,Oregon SCOPE OF WORK FROM WHAT IS DESCRIBED IN THE DOCUMENTS. Sizing Calculation Information D. G.C. SHALL BE RESPONSIBLE FOR ALL CUTTING/PATCHING RELATED TO THEIR WORK. Calculation Months Jan to Dec Zone CFM Sizing Sum of space airflow rates Revisions: Sizing Data .. ......Calculated Space CFM Sizing individual peak space loads Mark Date By E. IF SPACE ABOVE CEILING IS INDICATED TO BE A RETURN AIR PLENUM, CONSTRUCTION MATERIALS ABOVE CEILING SHALL BE NONCOMBUSTIBLE, OR HAVE A MAXIMUM 25 FLAME SPREAD AND 50 SMOKE DEVELOPMENT 1/29/21 STAFF FINISH RATING. WIRING SHALL BE LABELED PLENUM RATED TYPE PER NEPA 70. Central Cooling Coil Sizing Data 90%DESIGN REVIEW SET Total coil load............................................................... -_ 2.9 Tons Load occurs at Jun 1400 Total coil load 35.1 MBH OA DB/WB 88.41 66.8 °F � F. COORDINATE LOCATION AND ELEVATION OF MECHANICAL WORK WITH ALL DUCTWORK, LIGHT FIXTURES, AND Sensible coil load 26.4 MBH Entering 08/WB _____81.3 166.8 °F /z\ 2/12/21 STAFF OTHER CEILING BUILT-IN FIXTURES_ CONTACT ENGINEER OR ARCHITECT IMMEDIATELY SHOULD ANY CONFLICT Coil CFM at Jun 1400 974 CFM Leaving DB/WB 56.1 /54.8 °F 100%RID/L.L.REVIEW SET ARISE. Max block CFM 974 CFM Coil ADP - 53.3 'F Sum of peak zone CFM 974 CFM Bypass Factor_-_______. 0.100 Sensible heat ratio 0.754 Resulting RH. 52 % G. MOUNTING OF ALL EQUIPMENT, DUCTWORK AND PIPING MUST BE DONE PER BUILDING GUIDELINES AND LOCAL CFM/Ton 332.9 Design supply temp. _________55.0 °F 3 Q CODES AND INDUSTRY STANDARDS. COORDINATE INSTALLATION OF EQUIPMENT SUPPORT WITH BUILDING ft2/Ton 339.6 Zone T-stat Check ______._____..0 of 1 OK MANAGER AND NEXTORE REPRESENTATIVE. BTU/(hrft2) _ - 35.3 Max zone temperature deviation 0.0 °F Water flow @ 14.0"F rise 5.02 gpr H. NO PVC PIPING ALLOWED IN PLENUM AREAS. A Central Heating Coil Sizing Data I. DUCT SIZES INDICATED REPRESENT CLEAR INTERIOR SHEET METAL DIMENSIONS. Max coil load 11.7 MBH Load occurs at.. .... Des Htg Coil CFM at Des Htg__--_- _..........--_974 CFM BTUI(hrft2). -- . 11.8 Q J. ALL DUCTWORK CONCEALED ABOVE CEILINGS, AND ALL OUTSIDE AIR DUCTS, SHALL BE EXTERNALLY INSULATED, Max coil CFM 974 CFM Ent. DB 1 Lvg DB 59.9/71.1 °F IF DUCTWORK IS RUN IN A NON-CONDITIONED SPACE ALL DUCTWORK MUST BE INSULATED WITH 2" FIBERGLASS Water flow @ 20.0"F drop N/A INSULATION AND VAPOR BARRIER. Humidifier Sizing Data K_ BRANCH DUCTS SERVING DIFFUSERS SHALL BE SIZED TO MATCH DIFFUSER NECK SIZE INDICATED. Max steam flow at Des Htg.. ....6.34 lb/hr Air mass flow_ ---_ 4374.85 lb/hr Engineer of Record Airflow Rate __ 974 CFM Moisture gain .00145 lb/lb 9 L. ALL ROUND DUCT ELBOWS SHALL BE LONG SWEEP, 1-1/2 TIMES THE CENTERLINE RADIUS. M. G C MUST REPLACE ALL AIR FILTERS IN HVAC UNITS WITH NEW CLEAN FILTERS BEFORE AIR BALANCING AND Supply Fan Sizing Data • Actual max CFM _______...974 CFM Fan motor BHP 0.27 BHP PRIOR TO FINAL TURNOVER TO TENANT. Standard CFM _ 972 CFM Fan motor kW _ ._0.21 kW Actual max CFM/ft2 0.98 CFM/ft2 Fan static ...... .._. .......................--_-____-__..1.00 in wg N. IT IS THE G.C.'S RESPONSIBILITY TO ENSURE THAT THE MECHANICAL COMPONENTS ARE INSTALLED AT Thorson Baker LOCATIONS AND ELEVATIONS WHICH MAKE THEM READILY AND SAFELY ACCESSIBLE FOR ROUTINE Associates MAINTENANCE WITHOUT REQUIRING ANY EXTRAORDINARY MEASURES. Outdoor Ventilation Air Data Design airflowCFM 195 CFM CFM/person.. 14.94 CFM/person CONSULTING CFM/ft2 --- 0.20 CFM/ft2 ENGINEERS O. THE TENANT RESERVES THE RIGHT TO CHECK CONSTRUCTION COMPLIANCE WITH PLANS AND SPECIFICATIONS. 3030 West Streetsboro Road SHOULD THE TENANT FIND CORRECTIVE WORK NECESSARY, HE WILL NOTIFY G.C. OF SUCH WORK IN WRITING Richfield,Ohio 44286 AND EXPECT COMPLIANCE PERFORMED WITH DUE DILIGENCE. IF ANY CORRECTIVE WORK IS DEEMED TO BE (330)659-6688 Phone NECESSARY,THE COST OF REINSPECTIONS WILL BE BORNE BY THE G.C. IF WORK IS REQUIRED BY TENANT IN (330)659-6675 Fax ORDER TO IMPROVE, CHANGE OR CORRECT AIR CONDITIONING OPERATIONAL CONDITIONS DUE TO: PART MALFUNCTION, WARRANTY OR OTHER INABILITY TO PROVIDE THE COMFORT CONDITIONS REQUIRED BY THE OFFICE COPY Seal STORE, G.C. SHALL BE DIRECTED BY TENANT TO ADDRESS THIS WORK IN A TIMELY MANNER. IF IT BECOMES EVIDENT THAT THE G.C. CAN NOT ACCOMPLISH THE TASK, THEN AFTER 72 HOURS OF WRITTEN NOTICE, THE TENANT MAY AT HIS DISCRETION TAKE OVER SUCH WORK AND BACK CHARGE THE G.C. FOR ANY CORRECTIVE WORK THAT WAS REQUIRED DUE TO LACK OF PERFORMANCE, WORKMANSHIP AND/OR ADHERENCE TO PLANS - AND SPECIFICATIONS. OFFICECOPY P. DUCTWORK SHALL NOT BE ROUTED OVER ELECTRIC PANELS AND TRANSFORMER. 'd CITY OF 17GARD, FOR CODE COMPLIANCE Approved: ] , OTC: I 1 • _ 4 Permit #: ae-c,..la ,j _ arl 1 o Address: Architect/Engineer Job No.: Suite#: 21-005 N . N B t Data: Nextore Store Design Revision No.: N . 07 9 Neat-tore project RESPONSIBILITY SCHEDULE (HVAC) Number 82260 ti Brand Design Type: co �A cr Off3k �e GC= GENERAL CONTRACTOR SGH 4.5 G+ F, *- LL= LANDLORD cNiLu 4 q`,- \c'�PkyQPOcrQk)P� N A= NOT APOPLIICABLE w ISSUED FOR: El Construction m DIVISION 15000 - MECHANICAL SUPL RCV. :NSR DCG P&R RELO REMARKS Q ACCESS PANELS GC GC GC COORDINATE WITH TRADES FOR SIZE AND LOCATION. to l- ROOF WORK GC GC GC GC TO COORD.W/LANDLORD WHEN REQUIRED HVAC DISTRIBUTION,DUCTWORK, DIFFUSERS GC GC GC .5 HVAC UNIT(S) &CURBS-RTU,VAV, HAV, ETC. T GC GC Title CC CONTROLS FOR HVAC UNIT(S) GC GC GC WHERE LANDLORD CONTROLS ARE REQUIRED, UTILIZE LANDLORD CONTROLS CONTRACTOR AT GC'S EXPENSE MECHANICAL co ZONE CONTROL DAMPERS W/THERMOSTAT N/A U w STRUCTURAL SUPPORTS FOR AIR HANDLERS GC GC GC GENERAL NOTES c5 N/A CV GAS METER N/A & DETAILS c`l TOILET ROOM EXHAUST FAN T GC GC Date Sheet N ENERGY MANAGEMENT SYSTEM T T T GC TO PROVIDE FIELD WIRING WHEN NEEDED AND IF APPLICABLE 1(29/21 N Drawn By ic) o SMOKE DETECTORS GC GC GC MECHANICAL CONTRACTOR TO FURNISH AND INSTALL ELECTRICAL CONTRACTOR TO MAKE FINAL CONNECTIONScn TBA M-001 7.5 I Checked By a) 0 Q MEP RESPI TBA SCHEDULE-REV01 • DESIGN & CONSTRUCTION MANAGEMENT: iNsoios: ORE I simu •1000 Luxottica Place,Mason,OH 45040 0+1(5131765 6000 0 Creamery Brook,East Granby,CT 06026 •+I(600)413.9700 s + L(3 SUPPLY AIR DUCT,INSULATE • PER SPEC. STORE #3757 HIGH EFFICIENCY FITTING Washington Square ECCENTRIC REDUCER 9463 SW Washington Square INSULATED RIGID ROUND DUCTWORK. INSULATION TO Tigard, OR 97223 1r,' HAVE FOILFACING(TYP.) Space: W14A RECTANGULAR ROU le.. DUCTWORK DUCTWORND K , INSULATED FLEX.DUCT(5 FEET r MAX.) Construction for: VARIES r /� SHALL BE 1.5 x R, INSULATED 90 2"MINIMUM41. DEGREE SHEET METAL ELBOW BALANCING -- COLLAR DAMPER BALANCING DAMPER VOLUME DAMPER TO BE mill / ' WITHIN 12'OF MAIN DUCT / � DRAW BAND(TYP_) RECTANGULAR TO ROUND 45°LATERAL FITTING W 'BUCKLEY FITTING" ACOUSTICAL \ CEILING ��� � O RECTANGULAR �-7 DC CD DUCTWORK + ROUND DUCTWORKd HVAC DETAIL NOTES: CEILING DIFFUSER Cl') o O 1. SEE HVAC DRAWINGS FOR DUCT J • SIZES � ,u0 0 r " BRANCH DUCT HEIGHT X o DIMENSION 2°LESS THAN ` DUCT CONNECTION DETAIL JMAIN DUCT HEIGHT DIMENSION M01 2ii,, C BALANCING BALANCING u DAMPER DAMPER `� RECTANGULAR TO RECTANGULAR CONICAL FITTING = ga 2 M 00 DUCT BRANCH TAKE-OFF DETAIL 94311 � J APPLIES TO RECTANGULAR DUCT ONLY - ROUND/OVAL DUCT SHALL USE LONG RADIUS BENDS TABLE - 2 TABLE - 1 / 2/3k it I/2W I/314 ALLOWABLE HANGER LOAD, MAX. STRAP HANGERS (PAIR)SPACED If314 I h,_ I/6W r " Revisions: w+ D 10'-0" 8-0 5'-0" STRAPS LBS. RODS LBS. MAX. MAX. MAX. MAX. Mark Date By R R R SHALL EQUAL 2 1"x 22 GA. 520 A 1/29/21 STAFF RSHALLEQUAL { ) (2) 114"0 540 72" 1"x 22 GA. 1"x 22 GA. 1"x 22 GA. VANE OR BE GREATER OR BE GREATER 90%DESIGN REVIEW SET •' W THAN 1/3W. W /- VANE THAN 1/6W. (2) 1"x 20 GA. 640 (2)31810 1360 96" 1"x 20 GA. 1"x 22 GA. — (2) 1"x 18 GA. 840 (2) 112"0 2500 120" 1"x 18 GA. 1"x 22 GA. A 2/12/21 STAFF SHORT-RADIUS ELBOW WITH ONE VANE100%SID/L.L.REVIEW SET SHORT RADII/5 ELBOW WITH Ti110 VANES (2) 1"x 16 GA. 1400 (2)518"0 4000 168" 1"x 18 GA. (2)314"0 6000 192" 1"x 16 GA. /' RODS STRAP HANGERS w (TABLE 2) -------i- , i— (TABLE n 1) 4 I L W /� 6" MAX. —, — / ', R R SHALL EQUAL12"MAXIMUM Th..,OR BE GREATER ANGLE SPACING --H 0 THAN W. (TABLE-3) NUT7r— __,1.___. Engineer of Record STANDARD RADIUS ELBOW 14 1" MIN. M 01 0 RADIUS ELBOW DETAIL M020 RECTANGULAR DUCT SUPPORT DETAIL - NON SEISMIC -i3 �J Thorson Baker Associates CONSULTING ENGINEERS 3030 West Streetsboro Road Richfield,Ohio 44286 (330)659-6688 Phone (330)659-6675 Fax VCLEANOUT Seal INDOOR A.C.UNIT DRAIN LINE IS ONE SIZE LARGER THAN EQUIPMENT DRAIN POINT SIZE WATER RETURN EQUIPMENT DRAIN THERMOMETER(TYP.) <"> INVERT COMBINATION BALANCING! CHILLED WATER SUPPLY SHUT-OFF VALVE 3'MIN. il 3-WAY CONTROL VALVE EQUIPMENT DRAIN POINT / L — Q SHUT OFF VALVE(TYP.) — o REDUCER(TYP.) �.�— MANUAL AIR VENT P. INDOOR A.C.UNITLii (TYP.) SCHEDULE 40 PVC PIPE OR — I III C N01 I HE— I Architect/Engineer Job No.: TYPE"C"COPPER IN PLENUMS TRAP SEAL I_ NC 21-005 cNo (SEE NOTES 1&2) "11_0 N ,j Nextore Store Design Revision No.: t -- 3 GAUGE COCK(TYP.) O7 c3 UNION TYPICAL — _ C3 (TYPICAL) 1 I~ Nextore Number project 82260 CLEAN OUT COMBINATION BALANCING/ AHU-1 Brand Design Type: T---- SHUT-OFF VALVE q yP 9SEE NOTE 3 AIR GAP=2 x PIPE DIA. o FIN.FL.ORR00F _ SGH 4.5 G+ hi I I I III— o — cJ 6"MIN.(TYP.) ISSUED FOR: ut NOTES: __________„,,,X 0 Construction m 1. FOR DRAINS ON SUCTION SIDE OF FAN USE VAIN.TRAP SEAL OR MAX.FAN 3/4"HOSE END DRAIN I— SUCTION PRESSURE PLUS 1'WHICHEVER IS GREATER. VALVE(TYP.) 5 aa) 2. FOR DRAINS ON DISCHARGE SIDE OF FAN USE 6'MIN.TRAP SEAL OR MAX. Title -6 FAN DISCHARGE PRESSURE PLUS 1"WHICHEVER IS GREATER. cts HVAC U 3. SEE MECHANICAL PLANS FOR ROUTING. ti DETAILS 9 " M 0l O MECHANICAL CONDENSATE DETAIL M020 CHILLED WATER AHU PIPING DETAIL � o Date Sheet Nl(29/21 Drawn O ua TBA M-002 CD Checked By 0 Q TBA 07 JD Z - ' DESIGN & CONSTRUCTION MANAGEMENT: i 1 MECHANICAL SPECIFICATIONS NEX i ORE II. INSULATION IV. PIPING C. PERFORMANCE TEST I WW1 I. GENERAL PROVISIONS A. GENERAL A. GENERAL •4000Luxottica Place,Mason,OH 45040 •t1(513)765-6000 1. AFTER ALL HVAC EQUIPMENT IS INSTALLED,TESTED AND BALANCED AS SPECIFIED HEREIN •6 Creamery Brook,East Granby,CT 06026 •+1(860)413-9700 A. GENERAL CONDITIONS,CODES&STANDARDS 1. INSTALLATION SHALL CONFORM TO THE MANUFACTURER'S RECOMMENDATIONS,AND IN 1. THE ENTIRE PIPING INSTALLATION,MATERIALS,EQUIPMENT,ETC.SHALL CONFORM TO THEY SHALL BE OPERATED AND PLACED UNDER SURVEILLANCE FOR A PERIOD OF AT ACCORDANCE WITH RECOGNIZED INDUSTRY PRACTICES. THE REQUIREMENTS OF THE LOCALLY ENFORCED BUILDING CODE,THE MECHANICAL LEAST ONE(1)DAY,THIS MAY INCLUDE THE DAY OF STARTUP,TO VERIFY THAT ALL STORE #3 5 7 1.GENERAL CONDITIONS OF THE CONTRACT FOUND IN THE ARCHITECTURAL DRAWINGS, 2. CLEAN AND DRY SURFACES PRIOR TO INSULATING. CODE. EQUIPMENT IS PRODUCING THE REQUIRED CAPACITY. THE HVAC CONTRACTOR SHALL BE GENERAL AND SPECIAL CONDITIONS OF THE AMERICAN INSTITUTE OF ARCHITECTS(AIA)(NSPE)(NEC) 3. EXTEND INSULATION WITHOUT INTERRUPTION THROUGH WALLS,FLOORS,HANGERS AND 2. TEST ALL PIPING IN ACCORDANCE WITH LOCAL CODES AND ORDINANCES. RESPONSIBLE FOR THE OPERATION OF THE EQUIPMENT DURING THE ENTIRE PERIOD. Washington Square AND ANY OF THE TENANTS GENERAL REQUIREMENTS SHALL APPLY UNLESS NOTED OTHERWISE. SIMILAR PENETRATIONS. 3. FURNISH ACCESS DOORS FOR VALVES. 2. TEST SHALL BE PERFORMED WITH ALL CONTROLS IN THE AUTOMATIC POSITION AND 2.REFER TO THE GENERAL CONDITIONS ON THE ARCHITECTURAL DOCUMENTS AND THE 4. INSULATION JACKET AND FITTING COVER MUST BE PLENUM RATED. 4. THIS GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SERVICES BUILDING LIGHTS,DAMPERS,ETC.POSITIONED TO SIMULATE NORMAL OPERATION OF 9463 SW Washington Square GENERAL AND SPECIAL CONDITIONS OF THE AIA FOR ADDITIONAL REQUIREMENTS REGARDING; 5. IT IS ESSENTIAL THAT THE INTEGRITY OF THE VAPOR-BARRIER BE MAINTAINED. SEAL ALL FOR ALL EQUIPMENT WHETHER PROVIDED BY THIS GENERAL CONTRACTOR OR OTHERS. THE HVAC SYSTEM. SAFETY,COORDINATION& COOPERATION,WORKMANSHIP,PROTECTION,CUTTING AND PATCHING, PENETRATIONS OF THE VAPOR BARRIER BY STAPLES,HANGERS OR WHERE OTHERWISE GENERAL CONTRACTOR SHALL COORDINATE HIS INSTALLATION WITH THE APPROPRIATE EQUIPMENT 3. DURING THE TEST,CONTROL SETTINGS MAY REQUIRE ADDITIONAL ADJUSTMENTS TO Tigard, OR 97223 DAMAGE TO OTHER WORK,PRELIMINARY OPERATIONS,STORAGE,ADJUSTMENTS,CLEANING,ETC. DAMAGED. SUPPLIER AND SHALL REVISE THE DESIGN AS REQUIRED TO MATCH THE EQUIPMENT BEING PRODUCE THE BEST BALANCED SYSTEM OPERATION. THEIR FINAL SETTING OF EACH Space: W14A 3.ALL WORK SHALL BE IN CONFORMANCE WITH ALL LOCALLY ENFORCED, 6. MAINTAIN ACCESS TO BALANCING DAMPERS AND VALVES. SUPPLIED.THIS GENERAL CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIALS REQUIRED TO OPERATING AND SAFETY CONTROL SHALL BE RECORDED,THEY SHALL INCLUDE,BUT NOT FEDERAL,STATE AND LOCAL CODES AND ORDINANCES INCLUDING ANY SPECIAL THE TENANT 7. INSULATION SHALL BE BY OWENS-CORNING,KNAUF,OR MANVILLE. CONNECT ALL EQUIPMENT TO THE PIPING LIMITED TO,THERMOSTATS,LIMIT CONTROLS,AND OTHER SIMILAR ITEMS. REQUIREMENTS IN ADDITION TO THOSE SPECIFIED. 8. ALL DUCTWORK AND PIPING SHALL BE INSULATED PER REQUIREMENTS OF ASHRAE 90.1, SYSTEMS INCLUDING BUT NOT LIMITED TO;CONDENSATE,REFRIGERANT,CHILLED WATER,HEATING 4. SHOULD COMPLETION OF THE INSTALLATION OCCUR AT SUCH TIME THAT THE REQUIRED Construction for: 4.GENERAL CONTRACTOR SHALL PAY FOR AND OBTAIN ALL NECESSARY LICENSES, CHICAGO ENERGY CONSERVATION CODE,NFPA,AND LOCAL CODES.THE FIRST 10 FEET HOT WATER,CONDENSER WATER,STEAM,ETC. PERFORMANCE TEST MUST BE CONDUCTED DURING A SEASON WHEN THE FULL PERMITS AND INSPECTIONS REQUIRED TO PROCEED WITH THE WORK.THIS SHALL INCLUDE ALL OF RETURN DUCTS SHALL BE INTERNALLY LINED FOR ACOUSTICAL ATTENUATION. 5. FIRE STOPPING-REFER TO ARCHITECTURAL DRAWINGS FOR WALL TYPE AND UL OPERATION OF EITHER THE HEATING OR COOLING SYSTEM CAN NOT BE CHECKED,THE REQUIRED COORDINATION WITH THE LOCAL UTILITY COMPANIES AND THEIR ASSOCIATED FEES OR OUTSIDE AIR DUCTWORK AND DUCTWORK IN UNCONDITIONED SPACES SHALL ALWAYS CONSTRUCTION DESIGN NUMBER.FOR RATED MASONRY WALL AND FLOOR ASSEMBLIES, MECHANICAL CONTRACTOR SHALL PERFORM THE TEST AND RECORD ALL SUCH DATA AS COSTS. BE INSULATED WITH EXTERNAL INSULATION.PIPING SYSTEMS ALWAYS REQUIRING PROVIDE A UL APPROVED THROUGH-PENETRATION FIRE STOP SYSTEM NUMBER IS AVAILABLE WITH SYSTEM OPERATING AUTOMATICALLY UNDER THE PREVAILING INSULATION INCLUDES,BUT IS NOT LIMITED TO,CONDENSATE,REFRIGERANT,CHILLED C-AJ-1175. FOR RATED GYPSUM BOARD ASSEMBLIES,PROVIDE A UL APPROVED WEATHER CONDITIONS. THAT PART OF THE SYSTEM WHICH CAN NOT BE TESTED SHALL B. SCOPE OF WORK WATER,HEATING HOT WATER,CONDENSER WATER,AND STEAM.INTERNALLY INSULATED THROUGH-PENETRATION FIRE STOP SYSTEM NUMBER W-L-1003. BE DELAYED UNTIL THE WEATHER IS APPROPRIATE,AT WHICH TIME THE REMAINING PART 4111.111) DUCTS SHALL HAVE 1 INCH THICK,1-1/2 LB DENSITY ACOUSTICAL INSULATION(AIR SIDE OF THE REQUIRED TESTS SHALL BE CONDUCTED AND DATA RECORDED ACCORDINGLY. 1.THIS CONTRACT SHALL INCLUDE THE FURNISHING,INSTALLING, CONNECTING,AND BLACK COATED TO MEET NFPA).INSULATION SHALL BE INSTALLED PER THE B. CONDENSATE DRAINS,CONDENSER WATER UP TO 2'ABOVE GRADE AND UNDER 125 OPERATION OF ALL EQUIPMENT WHICH IS A PART OF THE MECHANICAL SYSTEMS AS SHOWN ON THE REQUIREMENTS OF THE SMACNA GUIDE AND THE MANUFACTURER'S PSIG D. ACCEPTANCE AND CHECK-OUT GENERAL CONTRACTOR SHALL PROVIDE QUALIFIED DRAWINGS AND AS REQUIRED BY SIMILAR INSTALLATIONS. ANY MATERIAL OR LABOR WHICH IS RECOMMENDATIONS.DUCT SIZES NOTED ON DRAWING ARE INSIDE CLEAR DIMENSIONS. PERSONNEL,AT NO ADDITIONAL COST TO THE TENANT,AS MAY BE REQUIRED BY THE ENGINEER FOR NEITHER SHOWN ON THE DRAWINGS NOR CALLED FOR IN THE SPECIFICATIONS,BUT WHICH IS INSULATION WRAP SHALL BE FIBERGLASS,FOIL BACKED WRAPPING.WHERE DUCTS OR 1. ASTM B88,TYPE 1,HARD DRAWN COPPER PIPE;AND ASME 816.18,CAST BRASS,OR ASME THE PURPOSE OF VERIFYING PROPER OPERATION AND INSTALLATION OF THEIR WORK AT THE TIME OBVIOUSLY NECESSARY TO COMPLETE THE WORK AND WHICH IS USUALLY INCLUDED IN WORK OF A PIPING IS EXPOSED,AND REQUIRES INSULATION,PROVIDE FIBERBOARD RIGID INSULATION B16.22,SOLDER WROUGHT COPPER FITTINGS. OF REQUEST FOR ACCEPTANCE. =RC C) SIMILAR CHARACTER SHALL BE FURNISHED AND INSTALLED UNDER THIS CONTRACT AT NO AND PAINT.PAINT COLOR SHALL BE COORDINATED WITH THE ARCHITECTURAL o zt ADDITIONAL COST TO THE TENANT.GENERAL CONTRACTOR SHALL PROVIDE ALL LABOR AND DRAWINGS,LANDLORD,AND TENANT.WHERE DUCTS OR PIPES ARE OUTSIDE THE V. HVAC EQUIPMENT D o MATERIALS REQUIRED TO PROVIDE THE TENANT A COMPLETE,CODE APPROVED AND OPERATIONAL BUILDING,AN ALUMINUM JACKET SHALL BE PROVIDED AND INSTALLED OVER THE CHILLED WATER AIR-HANDLING UNITS C ) 2 d' MECHANICAL SYSTEMS. INSULATION,AND SEALED WEATHERTIGHT. A. INSTALLATION OF ALL EQUIPMENT SHALL COMPLY WITH THE MANUFACTURER'S 0 O 2.CAREFULLY READ SPECIFICATION FOR ALL PARTS OF THE WORK SO AS TO BECOME FAMILIAR INSTALLATION INFORMATION AND INSTRUCTIONS,REQUIREMENTS AND ANY ADDITIONAL ' WITH ALL TRADES'WORK SCOPE. CONSULT WITH OTHER TRADES TO INSURE PROPER LOCATIONS B. HVAC GUIDELINES. GENERAL CONTRACTOR SHALL PROVIDE ALL ADDITIONAL REQUIRED ACCESSORIESu 0 AND AVOID INTERFERENCES. ANY CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF THE REQUIRED TO COMPLETE THE INSTALLATIONS. I. CHILLED WATER AIR-HANDLING UNITS c TENANT BEFORE WORK IS COMMENCED. 1. INTERNALLY INSULATE WITH 1 INCH THICK 1-1/2#DENSITY ACOUSTICAL INSULATION(AIR (713 Ox 0 3.ALL CONTRACTORS SHALL BE HELD TO HAVE EXAMINED THE PREMISES AND SITE SO AS TO SIDE BLACK COATED TO MEET NFPA)ALL DUCTWORK NOTED AS REQUIRING SUCH. B. HVAC EQUIPMENT SHALL BE'STARTED UP"BY A FACTORY TRAINED AND AUTHORIZED SERVICE A. FAN:AHU-1 FAN SHALL RUN CONTINUOUSLY AND OUTDOOR AIR SHALL BE OPEN COMPARE THEM WITH THE DRAWINGS AND SPECIFICATIONS,NOTE THE EXISTING CONDITIONS AND INTERNAL INSULATION SHALL BE INSTALLED PER THE REQUIREMENTS OF THE SMACNA TECHNICIAN. ALL FACTORY STARTUP FORMS SHALL BE COMPLETED AND TURNED OVER TO THEmiiiiimm OTHER WORK THAT WILL BE REQUIRED,AND THE NATURE OF THE CONDITIONS UNDER WHICH THE GUIDE AND THE MANUFACTURER'S RECOMMENDATIONS.DUCT SIZES NOTED ON TENANT WITH ALL COMPLETED WARRANTY CARDS PRIOR TO FINAL APPROVAL. TO AT LEAST MINIMUM POSITION DURING STORE OPERATING HOURS.AHU-1 FAN SHALL RUN ON CALL('AUTO"MODE)AND OUTDOOR AIR SHALL REMAIN CLOSED DURING STORE ��M }, " WORK IS TO BE PERFORMED. NO ALLOWANCE SHALL BE MADE TO ALL CONTRACTORS BY REASON OF DRAWING ARE SHEET METAL DIMENSIONS. OFF IF SMOKE DETECTOR DETECTS SMOKE,FAN SHALL BE DOWN AND A .,_cl) n3 THIS FAILURE TO HAVE MADE SUCH EXAMINATION OR OF ANY ERROR ON HIS PART. 2. ALL SUPPLY AND OUTSIDE AIR DUCTWORK SHALL BE WRAPPED WITH 2 INCH OF 0.75 VI. AIR DISTRIBUTION OFF HOURS. TO THE BUILDINGETECTLIFE SAFETY SYSTEM COORDINATE SHUTUDOELECTRICALNANO a 4.ALL EXISTING UTILITY AND MECHANICAL SERVICES SHALL BE FIELD VERIFIED. CORRECTIONS LB/CU.FT.FIBERGLASS,FOIL BACKED DUCT WRAPPING. TO THE DESIGN AND INSTALLATION SHALL BE MADE WITHOUT ADDITIONAL COST TO THE TENANT. A. AIR DISTRIBUTION WORK. a, v S.THIS GENERAL CONTRACTOR IS RESPONSIBLE TO COORDINATE THE OPENINGS WITH THE C. PIPING r>3 GENERAL TRADES CONTRACTOR. THE FINAL LOCATIONS AND SIZES OF ALL DUCT AND LOUVER :3-(7) O OPENINGS SHALL BE PROVIDED BY THIS CONTRACTOR. 1. ALL ABOVE GROUND PIPING SHALL BE INSULATED WITH FIBERGLASS PIPING 1. DUCTWORK(ROUND OR RECTANGULAR OR SPIRAL)SHALL BE OF GALVANIZED STEEL B. COOLING:ON A CALL FOR COOLING,COOLING THERMOSTAT MODULATES CHILLED 6.THIS CONTRACT SHALL ALSO INCLUDE ALL LABOR,MATERIALS AND MISCELLANEOUS EXPENSES INSULATION WITH AN ALL SERVICE JACKET AND SELF SEALING LAP (ASJ/SSL). CONSTRUCTION AND SHALL BE INSTALLED IN ACCORDANCE WITH THE LATEST EDITION WATER CONTROL VALVES AS NEEDED TO MEET DEMAND. J REQUIRED FOR ALL REQUIRED MECHANICAL DEMOLITION OF THE EXISTING AREAS BEING RENOVATED. 2. FITTINGS AND VALVES SHALL BE INSULATED WITH PRE-MOLDED OF THE SMACNA MANUAL AND THE FOLLOWING PRESSURE/SEAL SCHEDULE: Cl') in p a. THE DEMOLITION SHALL CONSIST OF THE COMPLETE REMOVAL (PROPERLY DISPOSED OFF FIBERGLASS FITTINGS AND COVERED WITH A PRE-FORMED PVC FITTING COVER. a. DUCTWORK BETWEEN AHU(ROOFTOP UNIT)AND VAV BOXES-3' W.G.POSITIVE C. HEATING:ON A CALL FOR HEATING THERMOSTAT SHALL ACTIVATE ELECTRIC HEATER Q o SITE UNLESS OTHERWISE NOTED) OF ALL HVAC EQUIPMENT,PIPING,DUCTWORK,MATERIALS,ETC. PRESSURE,EAL CLASS A. AS NEEDED.HEATING CONTROL SHALL USE P+I LOGIC. '4' NOT REQUIRED IN THE FINAL DESIGN AND INSTALLATION OF THE HVAC SYSTEMS FOR THE NEW III.SPRINKLER b. OTHER SUPPLY AIR DUCTWORK-2'W.G.POSITIVE PRESSURE,SEAL CLASS B. ..., RENOVATED AREAS. c. RETURN&EXHAUST DUCTWORK-2'W.G.NEGATIVE PRESSURE,SEAL CLASS B. bc. ALL AUNDERGROUND SERVICES NOT BEING REUSED SHALL BE CTO THEIR ESPBELOW THE MAINFLOANDR. A. GENERAL 2. ROUND DUCT ELBOWS SHALL BE LONG SWEEP,1-1/2 TIMES THE CENTERLINE RADIUS D. CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL CONTROLS,CONTROL WIRING c. ALL THE MAIN GROUND SERVICES SHALLBEREMOVED BACK OED IN 'S ENTIRETEY. UNLESS CLEARANCE IS NOT AVAILABLE AT WHICH TIME MITERED ELBOWS WITH TURNING AND TO MAKE OPERATIONAL. CAPPED OR IF THE IS NOT REQUIRED,THE MAIN SHALL BE REMOVED IN IT'S ENTIRETY. 1. THE ENTIRE INSTALLATION SHALL CONFORM TO THE REQUIREMENTS OF NFPA 13, THE UTILIZED.BE UTIL . d. COORDINATE ALL DEMOLITION WITH THE ARCHITECTURAL DOCUMENTS AND THE BUILDING TENANT'S INSURANCE COMPANY,THE LOCALLY ENFORCED BUILDING CODE,LOCAL VANES SHALL = � ARCHITECT AND THE TENANTS GENERAL REQUIREMENTS. BUILDING AND FIRE OFFICIALS AND ALL OTHER LOCAL AUTHORITIES HAVING JURISDICTION. 3. RECTANGULAR ELBOWS SHALL BE FURNISHED WITH DOUBLE THICKNESS TURNING E. UNITS SHALL BE TRANE AS FURNISHED BY OWNER NATIONAL ACCOUNTS 7. ALL WORK INCLUDING,BUT NOT LIMITED TO PARTS,MATERIAL,EQUIPMENT AND LABOR SHALL 2. ALL WORK SHALL BE PERFORMED BY A LANDLORD APPROVED,STATE LICENSED SPRINKLER VANES.TURNING VANES SHALL BE FASTENED WITH A DOUBLE ROW OF SCREWS. REPRESENTATIVE,AND INSTALLED BY CONTRACTOR.UPON DELIVERY OF UNITS, BE GUARANTEED FOR ONE YEAR AFTER ACCEPTANCE BY THE ENGINEER AND TENANT. WHERE AN CONTRACTOR. 4. FLEXIBLE CONNECTIONS AT THE INLET AND OUTLET OF THE RTU. INSTALL CONTRACTOR SHALL VERIFY ALL EQUIPMENT IS AS SPECIFIED ON DRAWINGS EQUIPMENT MANUFACTURER HAS A WARRANTY THAT EXCEEDS ONE YEAR,THAT WARRANTY PERIOD 3. THIS WORK SHALL INCLUDE ALL PIPING,FITTINGS,HANGERS, EQUIPMENT,ETC.,REQUIRED FLEXIBLE CONNECTIONS WITH 3'WIDE DOUBLE NEOPRENE COATED FLAME RETARDANT, INCLUDING ALL ELECTRICAL REQUIREMENTS,ACCESSORIES AND OTHER SHALL APPLY TO THIS PROJECT. TO COMPLETE THE WORK. NFPA 90A APPROVED,FIBERGLASS FLEXIBLE CONNECTION. FLEXIBLE CONNECTION TO REQUIREMENTS.ANY DISCREPANCIES MUST BE REPORTED TO TENANT 4. SPRINKLER HEADS ARE TO BE CENTERED IN LAY-IN CEILING TILES. HEADS ARE TO BE SPACED HAVE A MINIMUM OF 24 GAGE, 3'WIDE SHEET METAL COLLARS PERMANENTLY CONSTRUCTION MANAGER WITHIN THE FIRST TWENTY-FOUR(24)HOURS AFTER C.DOCUMENTS SYMMETRICALLY WITH LIGHTING AND OTHER CEILING FIXTURES WHEN INSTALLED IN DRYWALL ATTACHED TO EACH SIDE. DELIVERY. CEILINGS. 5. MITERED OFFSETS GREATER THAN 30 DEGREES IN EITHER DIRECTION SHALL NOT BE Revisions: 1. THE DRAWINGS ARE DIAGRAMMATIC,ALL WORK SHALL BE PERFORMED AS INDICATED ON 5. DETERMINE VOLUME AND PRESSURE OF INCOMING WATER SUPPLY FROM WATER FLOW TEST PERMITTED. Mark Date By THE DRAWINGS UNLESS EXISTING CONDITIONS OR COORDINATION ISSUES REQUIRE DATA.REVISE DESIGN WHEN TEST DATA BECOMES AVAILABLE PRIOR TO SUBMITTALS. 6. CHANGES IN DUCT SIZES SHALL BE MADE BY UNIFORM TAPER SECTION WITH A CHANGES.THESE CHANGES SHALL BE MADE WITH NO ADDITIONAL COST TO THE 6. SUBMITTALS MAXIMUM INCLUDE ANGLE OF DIVERGENCE OF 15DEGREES. 1/29/21 STAFF TENANT. a. SHOP DRAWINGS: 7. RECTANGULAR BALANCING DAMPERS-RUSKIN MD25 SHALL BE SINGLE BLADE UP TO 6"IN 2. ANY INCIDENTAL ITEMS OR LABOR,ETC.NOT INCLUDED IN THE SPECIFICATIONS OR THE (1) PREPARE AND SUBMIT SHOP DRAWINGS IN ACCORDANCE WITH THE 90%DESIGN REVIEW SET DRAWINGS BUT REASONABLY IMPLIED AS NECESSARY FOR THE COMPLETE INSTALLATION MECHANICAL GENERAL PROVISIONS. HEIGHT AND 36'IN WIDTH,AND RUSKIN MD35 MULTI BLADE FOR LARGER SIZES. ALL OF ALL APPARATUS SHALL BE INCLUDING IN BID. (2) SHOW PLANS,CROSS SECTION,ELEVATIONS,DETAILS AND JOB ROUND BALANCING DAMPERS SHALL BE COMMERCIAL GRADE SINGLE BLADE UP TO 16' 3. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO SUPPLEMENT EACH OTHER AND CONDITIONS,RELATIONSHIP TO OTHER WORK.PIPE SIZES, ELEVATIONS ABOVE FLOOR,HEAD IN DIAMETER SHALL INCORPORATE LOCKING TYPE INDICATING ADJUSTMENT. /2 2/12/21 STAFF ANY MATERIAL OR LABOR CALLED FOR IN ONE SHALL BE FURNISHED EVEN THOUGH NOT LOCATIONS,INSPECTORS TEST CONNECTION,SPRINKLER ENTRANCE,VALVES,ALARMS,BACKFLOW BALANCING DAMPERS SHALL BE INSTALLED IN ALL BRANCH DUCTS OFF MAIN AND ON MENTIONED IN BOTH. PREVENTER,FLOW SWITCH AND SUPERVISORY DEVICES. ALL TAPS OFF DUCTS TO DIFFUSERS UNLESS OTHERWISE NOTED ON DRAWINGS. Too%BIDiI.I.REVIEW SET 4. IF ERRORS ARE FOUND IN THE DRAWINGS OR SPECIFICATIONS OR DISCREPANCIES OCCUR (3) SUBMIT DATA ON THE FOLLOWING ITEMS: 8. FINAL CONNECTIONS TO DIFFUSERS MAY BE MADE WITH FLEXIBLE DUCTWORK BUT IT'S BETWEEN THE SAME,OR BETWEEN THE FIGURES ON THE DRAWINGS,AND THE SCALE OF (a) PIPING AND COUPLINGS. USE IS LIMITED TO STRAIGHT HORIZONTAL OR VERTICAL RUNS. ALL CHANGES OF J� SAME OR BETWEEN THE LARGER AND SMALLER DRAWINGS,OR IN THE DESCRIPTIVE (b) WET ALARM VALVE. DIRECTION IN AN DUCT SYSTEM(GALVANIZED OR FLEXIBLE)SHALL BE MADE WITH AN !3 MATTER ON THE DRAWINGS SHALL BE REFERRED TO THE TENANT FOR REVIEW AND FINAL (c) BACKFLOW PREVENTER. APPROPRIATE GALVANIZED ELBOW. MAXIMUM LENGTH OF ANY FLEXIBLE DUCT IS 5'-0". DECISION PRIOR TO THE BID DUE DATE. (d) VALVES AND SUPERVISORY DEVICES. 9. FLEXIBLE DUCTS TO DIFFUSERS SHALL BE ATCO RUBBER PRODUCTS,INC.MODEL UPC 5. THE BIDDING OF THIS WORK WILL CONTEMPLATE THE USE OF EQUIPMENT AND MATERIALS (e) SPRINKLER HEADS AND ESCUTCHEON PLATES. #070,INSULATED(R=4.2),U.L.181 RATED AND CLASS 1 AIR CONNECTOR. MAXIMUM EXACTLY AS SPECIFIED HEREIN. WHERE MORE THAN ONE MANUFACTURER IS MENTIONED ANY (f) SUPPORTS,HANGERS AND ACCESSORIES. LENGTH OF FLEXIBLE DUCT TO DIFFUSER TO BE 5'-0'. A 4 ONE MAY BE UTILIZED.SUBSTITUTE MANUFACTURERS MAY BE OFFERED ONLY AS AN ALTERNATE TO (g) SEISMIC CALCULATIONS 10. FIRE DAMPERS SHALL BE RUSKIN AND SHALL BE INSTALLED PER MANUFACTURER'S - THE SPECIFIED EQUIPMENT AND MATERIAL. (4) SUBMIT AND RECEIVE APPROVAL FROM THE AUTHORITY HAVING INSTRUCTIONS AND SMACNA REQUIREMENTS FOR A U.L.APPROVED INSTALLATION. FIRE a. SUBSTITUTIONS JURISDICTION PRIOR TO SUBMITTAL. DAMPERS SHALL BE TYPE'8' (BLADES AND FRAME COMPLETELY OUT OF THE AIRSTREAM) (1) THE MANUFACTURERS AND MODEL NUMBERS INDICATED IN THE (5) ONCE THE AUTHORITY HAVING JURISDICTION HAS APPROVED SHOP FOR ALL WALL ASSEMBLIES AND SHALL BE INSTALLED WITH THE APPROPRIATE WALL 5 CONTRACT DOCUMENTS ARE FOR THE PURPOSE OF DESCRIPTION AND TO ESTABLISH A BASE DRAWINGS,THE SUBCONTRACTOR SHALL SEND EIGHT SETS OF APPROVED STAMPED PLANS AND SLEEVE AND ANGLES PER UL 555. FIRE DAMPERS SHALL BE INSTALLED IN ALL FIRE RATED LEVEL OF QUALITY. THE GENERAL CONTRACTOR'S BID WILL CONTEMPLATE THE USE OF THE EQUIPMENT CUTS TO THE ARCHITECT FOR APPROVAL. WALLS.VERIFY FIRE RATED WALL LOCATIONS AND RATINGS ON THE ARCHITECTURAL EQUIPMENT AND MATERIALS EXACTLY AS INDICATED. (6) PLANS SUBMITTED WITHOUT ALL HYDRAULIC CALCULATIONS WILL DOCUMENTS.FOR ALL FLOOR PENETRATIONS PROVIDE RUSKIN TYPE'LR'FIRE (2) THE GENERAL CONTRACTOR SHALL SUBMIT FOR APPROVAL,WITH HIS BE RETURNED'REJECTED'. PROVIDE INDEPENDENT HYDRAULIC CALCULATION DAMPERS. SEE DETAILS ON DRAWINGS FOR ADDITIONAL INSTALLATION REQUIREMENTS. BID QUOTATION,A LIST OF ANY PROPOSED SUBSTITUTIONS OF MATERIALS AND EQUIPMENT FOR SHEETS. 11. DOUBLE THICKNESS INSULATED ACCESS DOORS SHALL BE PROVIDED AT ALL FIRE THOSE ON WHICH THE ORIGINAL DESIGN WAS BASED. A FULL DESCRIPTION OF ALL PROPOSED (7) ALL SPRINKLER PLANS SHALL BEAR THE STAMP OF A REGISTERED DAMPERS FOR ACCESS TO FUSIBLE LINK. DOOR SHALL BE SIZED TO ALLOW FOR EASY SUBSTITUTED ITEMS,THE CHANGE TO THEIR BID PRICE OR OTHER REASONS FOR PROFESSIONAL FIRE PROTECTION ENGINEER LICENSED WITH THE STATE SERVICE AND ACCESSIBILITY. ACCESS DOORS SHALL BE A MINIMUM OF 24'IN THE Engineer of Record SUCH SUBSTITUTIONS SHALL ACCOMPANY THE BID. ALL ACCESSORIES,FEATURES,ETC.,SUPPLIED WHERE THE STORE IS LOCATED. LONGEST DIMENSION. WITH THE SUBSTITUTED MANUFACTURER'S PRODUCT SHALL ALSO BE INCLUDED IN THE BID. (8) AT THE COMPLETION OF THE PROJECT,PROVIDE TENANT WITH 12. PROVIDE 3N35(1/4"ANGLE FRAMING AROUND THE ROOF OPENINGS FOR THE SUPPLY (3) IF THE GENERAL CONTRACTOR DOES NOT SUBMIT PROPOSED SUBSTITUTIONS WITH OPERATION AND MAINTENANCE MANUALS INCLUDING'AS-BUILT' RECORD AND RETURN AIR DUCTWORK. THEIR BID THE TENANT SHALL CONSIDER THE BIDDER TO BE PROPOSING THE MANUFACTURERS AND DRAWINGS,SPECIFICATIONS AND APPROVED PLANS. 13k MODEL NUMBERS SPECIFIED HEREIN AND SHOWN ON THE CONTRACT DRAWINGS. B. CRITERIA 13. SUPPORT ALL SHEET METAL AND EQUIPMENT FROM ANGLE IRON CONNECTED TO (4) SUBSTITUTIONS AFTER CONTRACT AWARD SHALL NOT BE STRUCTURAL STEEL.DO NOT SUSPEND DUCT OR EQUIPMENT FROM METAL DECK OR PERMITTED. 1. GENERAL CONTRACTOR SHALL VERIFY WITH THE LANDLORD'S PROJECT MANAGER FOR JOIST BRIDGING. Thorson =Baker 6. MISCELLANEOUS ITEMS NECESSARY TO COMPLETE THE SYSTEMS CAN BE OF ANY ANY ADDITIONAL CRITERIA(PIPE SIZING; PIPE SCHEDULE OR HYDRAULIC). RECOGNIZED MANUFACTURE PROVIDED THESE ITEMS MEET MINIMUM STANDARDS AS SET IN THESE 2. DESIGN AND INSTALL THE SPRINKLER SYSTEM AND PIPING TO CONFORM WITH NFPA 13, VII. CONTROLS + Associates SPECIFICATIONS. REFER TO EACH SECTION FOR ANY SPECIFIC REQUIREMENTS. ORDINARY HAZARD DESIGN WITH A MAXIMUM SPACING OF 130 SQUARE FEET PER CONSULTING SPRINKLER HEAD IN SALES AREAS AND 100 SQUARE FEET PER HEAD IN STOCK AREAS. A. CONTROL WIRING SHALL BE PLENUM RATED CABLE WITH COLOR CODED 18 -- D.COORDINATION 3. THE PROJECT AREA CURRENTLY HAS AN EXISTING SPRINKLER SYSTEM INSTALLED WITH AWG WIRES(MINIMUM). ENGINEERS FLUSH SPRINKLER HEADS INSTALLED ON A STANDARD GRID PATTERN. GENERAL 3030 West Streetsboro Road 1. GENERAL CONTRACTOR SHALL INCLUDE A VISIT TO THE JOB SITE AND TAKE INTO CONTRACTOR SHALL DESIGN AND MODIFY THE EXISTING SPRINKLER SYSTEM PIPING AND Richfield,Ohio 44286 CONSIDERATION MECHANICAL,ELECTRICAL AND GENERAL TRADE WORK CURRENTLY HEADS. THIS WORK SHALL INCLUDE THE RAISING OF ANY EXISTING SPRINKLER PIPING B. CONTROLS CONTRACTOR SHALL PROVIDE ALL WIRING BETWEEN THERMOSTAT AND (330)659-6688 Phone EXISTING AND WORK WHICH MAY BE INSTALLED PRIOR TO CONTRACT AWARD. WHICH INTERFERES WITH DESIGNED CEILING ELEVATIONS. SEE ARCH.DRAWINGS FOR EQUIPMENT(AIR HANDLER,ROOFTOP UNIT, CONDENSING UNIT,ETC.). (330)659-6675 Fax RELOCATION OF DUCTWORK,PIPING AND EQUIPMENT,AS REQUIRED,TO AVOID THIS CEILING ELEVATIONS. PROVIDE ANY AUXILIARY DRAIN PIPING REQUIRED FOR ANY WORK SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE TENANT. TRAPPED SPRINKLER PIPING. C. CONTROLS CONTRACTOR SHALL FURNISH AND INSTALL A 120(24)VOLT SUPPLY AIR DUCT 2. GENERAL CONTRACTOR SHALL VERIFY ALL MEASUREMENTS AT THE BUILDING SITE BEFORE 4. SEE ARCH.DRAWINGS FOR CEILING ELEVATIONS. MOUNTED IONIZATION SMOKE DETECTOR. DETECTOR SHALL BE WIRED,BY THE ELECTRICAL Seal STARTING ANY FABRICATION OR DOING ANY WORK IN THE FIELD AND SHALL BE (CONTROLS)CONTRACTOR,TO SHUT DOWN UNIT UPON ACTIVATION. RESPONSIBLE FOR THE CORRECT AND PROPER MEASUREMENTS OF HIS WORK ALONG C. COMPONENTS WITH RESOLUTIONS FOR ANY CONFLICT OF SPACE WITH OTHER TRADES. D. THERMOSTATS 3. WHERE THE WORK OF TWO OR MORE TRADES INTERFERE WITH EACH OTHER AND A 1. PROVIDE A WATTS REGULATOR NO.(007-LF 3/4 TO 2.5'009 2'TO 10')DOUBLE CHECK DEVIATION FROM DESIGN IS NECESSARY,NEITHER WORK SHALL PROCEED UNTIL THE VALVE ASSEMBLY BACKFLOW PREVENTER IN THE PIPING TO THE SPRINKLER HEADS 1. FURNISH AND INSTALL A HONEYWELL 7 DAY PROGRAMMABLE HEATING/COOLINGTENANT HAS BEEN NOTIFIED OF THE CONFLICT AND THEY HAVE RENDERED A DECISION IMMEDIATELY FOLLOWING THE CONNECTION TO THE DOMESTIC WATER SYSTEM, AS TO WHAT CHANGES SHOULD BE MADE. 2. FIRE DEPARTMENT CONNECTION:POTTER-ROEMER OR EQUAL SERIES 5020,4 x 21/2 x 21/2, THERMOSTAT AND CLEAR LOCKABLE COVER WITH APPROPRIATE CONTROL WIRING - 4. GENERAL CONTRACTOR SHALL LOCATE,IDENTIFY AND PROTECT ANY EXISTING SERVICES WITH ALL STANDARD FEATURES,"AUTO.SPKR."LETTERING,AND THREAD TO MATCH BETWEEN THERMOSTAT,(FURNACE AND CONDENSING UNIT)(ROOFTOP)AS REQUIRED WHICH ARE REQUIRED TO BE MAINTAINED OPERATIONAL AND SHALL EXERCISE EXTRA LOCAL FIRE DEPARTMENT REQUIREMENTS.-FLUSH MOUNTED FIRE DEPARTMENT INLET TO PROVIDE A COMPLETE OPERATING SYSTEM.WIRING SHALL BE MINIMUM 18 AWG. CAUTION IN THE PERFORMANCE OF ALL WORK TO AVOID DISTURBING SUCH FACILITIES. CONNECTION WITH WALL PLATE WITH'AUTOMATIC SPRINKLER'IDENTIFICATION,ALL 2. THERMOSTATS SHALL BE MOUNTED WHERE INDICATED ON THE DOCUMENTS. ALL COSTS FOR REPAIR OF DAMAGES TO SUCH SERVICES SHALL BE PAID BY THE GENERAL BRASS CONSTRUCTION AND POLISHED BRASS FINISH. CONTACT THE FIRE DEPARTMENT 3. MECHANICAL CONTRACTOR SHALL PROGRAM THERMOSTAT PER THE TENANT'S Q CONTRACTOR CAUSING THE DAMAGE. TO VERIFY FIRE DEPARTMENT CONNECTION TYPE AND TREAD PATTERN TO MATCH THAT REQUIREMENTS AND TRAIN TENANT'S PERSONNEL IN THE OPERATION AND S. IT IS ESSENTIAL THAT ALL WORK AT THE PROJECT BE DONE AS SUCH TIME AND IN SUCH OF THE FIRE DEPARTMENT EQUIPMENT.PROVIDE 4"U!LISTED CHECK VALVE WITH BALL PROGRAMMING OF THE THERMOSTAT AND SYSTEM. ~o MANNER AS NOT TO INTERFERE WITH THE NORMAL OPERATIONS OF THE FACILITY. A DRIP PIPED TO DRAIN. iii WORK SCHEDULE SHALL BE ARRANGED WITH THE TENANT TO FACILITATE WORK WITH A VIII. TESTING AND BALANCING o MINIMUM OF INTERFERENCE WITH THE TENANT'S OPERATIONS. D. SUPERVISION: 6. AREAS TO BE USED FOR STORAGE SHALL BE ONLY AS DIRECTED BY THE TENANT.ALL Architect/Engineer Job No.: STORED MATERIAL SHALL BE RELOCATED OR REMOVED FROM THE SITE AS DIRECTED BY 1. THE RISER CONTROL VALVE AND ALL ZONE VALVES SHALL HAVE ELECTRIC SUPER VISION A. TESTING AND BALANCING SHALL NOT BEGIN UNTIL THE SYSTEM HAS BEEN COMPLETED,IS IN p THE TENANT. TO SIGNAL THE BUILDING FIRE ALARM SYSTEM. TAMPER SWITCHES PROVIDED BY FULL WORKING ORDER AND ALL EQUIPMENT START-UP HAS BEEN COMPLETED. ALL HVAC SYSTEMS 21-005 N 7. DAILY,AND AT THE COMPLETION OF THE WORK,EACH GENERAL CONTRACTOR SHALL SPRINKLER SUBCONTRACTOR AND WIRED BY THE ELECTRICAL SUBCONTRACTOR. AND EQUIPMENT SHALL BE PUT INTO FULL OPERATION AND THE OPERATION OF SAME CONTINUED N REMOVE ALL EXCESS MATERIALS AND DEBRIS CAUSED BY HIS WORK.UPON COMPLETION 2. MECHANICAL:ALL OTHER VALVES SHALL BE PADLOCKED IN STANDARD OPERATING DURING EACH WORKING DAY OF THE TESTING AND BALANCING. Nextore Store Design Revision No.: N OF EACH GENERAL CONTRACTOR'S WORK,CONDITIONS OF THE SPACE(S)SHALL BE THE POSITION,WITH 2 KEYS PER PADLOCK AND ALL PADLOCKS SHALL BE KEYED THE SAME. cii SAME AS FOUND PRIOR TO COMMENCEMENT OF THE WORK. FAILURE TO DO SO MAY CHAIN AND PADLOCK ALL VALVES OVER 2'SIZE. B. AN INDEPENDENT"AABC OR'NEBB'CERTIFIED AIR AND WATER BALANCE CONTRACTOR 07 RESULT IN THE TENANTS EMPLOYMENT OF A SEPARATE SERVICE TO OBTAIN THIS SHALL TEST AND BALANCE THE SYSTEM AND REPORT RESULTS TO THE ENGINEER TENANT AND THE ch CONDITION AND REDUCING THE FACTOR'S CONTRACT AMOUNT BY THE COST OF SUCH E. PIPING LANDLORD. o A SERVICE. 9 8. EACH GENERAL CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ALL DAMAGE TO OTHER 1. PIPING SHALL BE BLACK STEEL PIPE PER NFPA 13. 1. ALL WORK SHALL BE DONE UNDER DIRECT SUPERVISION OF THE CERTIFIED BALANCING Nextore project WORK CAUSED BY HIS WORK OR THROUGH THE NEGLECT OF HIS,OR HIS SUB-TRADE'S 2. PIPE HANGERS FOR THE SPRINKLER SYSTEM SHALL BE ADJUSTABLE CLEVIS HANGERS WITH ENGINEER AND BY QUALIFIED BALANCING TECHNICIANS. Number 82260 PERSONNEL. ALL PATCHING,REPAIRING,REPLACEMENT AND PAINTING,ETC.SHALL BE APPROPRIATE CLAMP(DEPENDING ON STRUCTURE). ALL PIPING SHALL BE SUPPORTED- METHODS FORMS SHALL BE IN ACCORDANCE WITH THE CERTIFICATION rn 2. MES AND DONE AS DIRECTED BY THE TENANT BY THE CRAFTSMEN OF THE TRADES INVOLVED. THE ON A MAXIMUM OF 10'CENTERS. Brand Design Type: N COSTS OF SUCH WORK SHALL BE PAID BY THE CONTRACTOR CAUSING THE DAMAGE. AGENCIES RECOMMENDATIONS AND REQUIREMENTS. N F. SPRINKLER HEADS 3. COMPLY WITH ASHRAE RECOMMENDATIONS PERTAINING TO MEASUREMENTS, SGH 4.5 G+ N E.METHODS INSTRUMENTS,TESTING,ADJUSTING AND BALANCING. 1. SPRINKLER HEADS IN AREAS WITH CEILINGS SHALL BE CENTRAL SPRINKLER CORP,DIVISION 4. ALL QUANTITIES SHALL BE WITHIN 10%OF THE DESIGN VALUES. w 1. EXCAVATIONS SHALL BE MADE IN OPEN TRENCHES. FLOORS SHALL BE SAW CUT. PIPING OF TYCO.SERIES TY-L,'k'ORIFICE,RECESSED,POLISHED CHROME PENDANT AUTOMATIC 5. MECHANICAL CONTRACTOR SHALL PROVIDE ANY SHEAVE CHANGES REQUIRED ON THE ISSUED FOR: L SHALL BE LAID ON AN APPROPRIATELY GRADED 6"BED OF CLEAN AND DRY SAND. SPRINKLER HEAD WITH TWO PIECE FACTORY WHITE METAL ESCUTCHEON. HVAC UNIT. 0 Construction :=-C- ENGINEERED FILL SHALL BE USED TO BACKFILL TO 6'ABOVE THE PIPING. BACKFILL THE 2. SPRINKLER HEADS IN AREAS WITH DRYWALL CEILINGS SHALL BE CENTRAL SPRINKLER m REMAINDER OF THE TRENCH UTILIZING THE EXCAVATED MATERIAL IF APPROVED BY THE CORP,DIVISION OF TYCO.ROYAL FLUSH II SERIES RFII,165 F,WITH A WHITE CEILING PLATE. I- ARCHITECT OR THE TENANT.IF THE EXCAVATED MATERIALS ARE NOT ACCEPTABLE, 3. SPRINKLER HEADS IN AREAS WITH EXPOSED STRUCTURE SHALL BE BRASS UPRIGHT ' ENGINEERED FILL ACCEPTABLE TO THE ARCHITECT SHALL BE UTILIZED TO BACKFILL THE CENTRAL SPRINKLER CORP.DIVISION OF TYCO SERIES TY-L,'k'ORIFICE,165 F. REMAINDER OF THE TRENCH. BACKFILL SHALL BE ACCOMPLISHED IN 9"LIFTS WITH ALL 4. SPRINKLER SYSTEM TO BE DESIGN BUILD PER BUILDING CRITERIA,LOCAL CODES AND Ce LIFTS COMPACTED TO 95%PROCTOR. PATCH FLOOR TO MATCH EXISTING. LUXOTTICA STANDARDS. Title 2. EQUIPMENT,PIPING,DUCTWORK,ETC.SHALL NOT BE SUPPORTED FROM ANY CEILINGS, UOTHER PIPING,CONDUIT OR DUCTWORK,ROOF DECK,OR JOIST BRIDGING. ITEMS SHALL MECHANICAL BE SUPPORTED FROM ACCEPTABLE STRUCTURAL BUILDING COMPONENTS AS rn DETERMINED BY THE ARCHITECT AND STRUCTURAL ENGINEER. SPECIFICATIONS S'" 3. ALL ROOF PENETRATIONS,FLASHING AND COUNTER FLASHING SHALL BE PERFORMED BY - o THE LANDLORD'S ROOFING CONTRACTOR AT THE REQUESTING GENERAL CONTRACTORS N COST. O N o N Date Sheet O N iii Drawn 109/21 ye o TBA M-003 cu Checked By 'o L 4- TBA J1 .Q , # DESIGN & CONSTRUCTION MANAGEMENT: NI 11 \EXIORE ORE WW1 DEMOLITION NOTES: •4000 Luxottica Place,Masan,OH 45040 •+1(513)765-6000 0 6 Creamery Brook,East Granby,CT 06026 S+1(860)413-9700 A. CONTRACTOR SHALL VISIT THE SITE PRIOR TO BID AND SHALL APPLICABLE).ALL SYSTEM SHUT-DOWNS AND DISRUPTION OF " TORE #3757 BE FAMILIAR WITH THE LIMITS OF DEMOLITION REQUIRED FOR SCHEDULED AFTER NORMAL BUILDING HOURS OR AS ALL TRADES.COORDINATE DEMOLITION WITH REQUIREMENTS OTHERWISE APPROVED BY OWNER. Washington Square OF NEW CONSTRUCTION PRIOR TO INITIATING WORK. 9463 SW Washington Square L PRIOR TO DEMOLITION FIELD VERIFY AND IDENTIFY ANY B. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING EXISTING EQUIPMENT TO REMAIN IN SERVICE THAT IS SERVED Tigard, OR 97223 COMPLETE REMOVAL AND DISCARDING OF ALL DEMOLITION BY SYSTEMS TO BE DEMOLISHED.NOTIFY ENGINEER OF ANY Space: W14A WASTE INCLUDING ANY UNFORESEEN ITEMS WITHIN THE SCOPE SUCH CONDITIONS AND REMOVE AND/OR RELOCATE THE p OF THE PROJECT. SERVICES AS DIRECTED. Construction for. C. CONTRACTOR SHALL COORDINATE DEMOLITION OPERATIONS J. MEET WITH OWNER REPRESENTATIVE AND LANDLORD PRIOR WITH CONTINUING OWNER OCCUPATION OF ADJACENT TO DEMOLITION TO IDENTIFY WHETHER EXISTING MATERIALS SPACES.ALL DEMOLITION WORK TO BE COORDINATED WITH SYSTEMS, EQUIPMENT,ETC.ARE CONSIDERED SALVAGE OR OWNER AND CONDUCTED UNDER CONTROLLED CONDITIONS. DEBRIS.REMOVE DEBRIS FROM SITE AND DISPOSE OF IN AND APPROVED MANNER AS DIRECTED BY OWNER. Illimmd D. REPAIR/PATCH AS REQUIRED FOR DEMOLITION OF VARIOUS CONSTRUCTION ITEMS.VERIFY AND COORDINATE ANY K. TERMINATE DEMOLISHED SYSTEM SERVICES IN A CONCEALED REQUIRED OPENING WITH RESPECTIVE TRADES.FOR ANY WORK LOCATION IN AN APPROVED MANNER.COORDINATE WITH NEW THAT SHALL OCCUR OUTSIDE OF DEMOLITION AREA, AND EXISTING CONSTRUCTION. = c) CONTRACTOR SHALL RETURN SPACE TO ORIGINAL CONDITION. a_-1- L FIELD VERIFY EXISTING PIPING LOCATIONS PRIOR TO WORK Cl ) p dog E. PROPERLY CAP,PLUG AND CONCEAL ANY PIPING LEFT IN PLACE. �./ ) 4- CAP ABANDONED SEWER PIPING A MINIMUM OF 8-BELOW M. VERIFY EXTENT OF DEMOLITION OF SANITARY SEWER, LE FINISH FLOOR PATCH AND REPAIR SLAB. DOMESTIC WATER PIPING PRIOR TO WORK.ALL DEMOLITION ( 0 WORK SHALL BE IN COMPLIANCE WITH APPLICABLE CODES, o c F. CONTRACTOR SHALL BE RESPONSIBLE TO REMOVE ALL NOT STANDARDS AND THE AUTHORITY HAVING JURISDICTION. CIO J u) iiii USED WATER PIPING,WASTE AND VENT,DUCTWORK EQUIPMENT IN THE REMODEL AREA. N. WHERE REQUIRED,COORDINATE EQUIPMENT ELECTRICAL a) TERMINATION REQUIREMENTS WITH ELECTRICAL CONTRACTOR. On G. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE WITH p nom. OWNER REPRESENTATIVE FOR WHETHER TO DISPOSE HVAC6 c3- OUTLETS REMOVED OR RE-USE. Co o H. DEMOLISH EXISTING AS REQUIRED PER NEW CONSTRUCTION AS = 1 4 DIRECTED BY ARCHITECT AND/OR AS NOTED ON DRAWINGS. D -I AVOID DISRUPTION OF SERVICES DURING BUSINESS HOURS(IF Q GD CD'Ci- 0 KEY NOTES - DEMOLITION 1. REMOVE EXISTING DIFFUSERS AND ASSOCIATED RUN OUT DUCTWORK. MAIN DUCTWORK TO .. REMAIN. 2. REMOVE EXISTING CHILLED WATER AIR HANDLING UNIT. 3. REMOVE EXISTING DUCTWORK SHOWN DASHED,TYPICAL CAP AND SEAL CONNECTION AT BRANCH OR MAIN,AS APPLICABLE. 4. EXISTING LANDLORD DUCTWORK TO REMAIN. TYPICAL UNLESS NOTED OTHERWISE. 5. EXISTING LANDLORD PIPING TO REAMIN.TYPICAL UNLESS NOTED OTHERWISE. Revisions: Mark Date By A1/29/21 STAFF 90%DESIGN REVIEW SET A2/12/21 STAFF 100%BID/L.L.REVIEW SET A A A Engineer of Record Bk,„. I��rr-.1 r. 1 Thorson Baker + Associates CONSULTING �z ENGINEERS 1 ! �/2' I 3030 West Streetsboro Road -14- ( --t----uik--1; I I I r f Richfield,Ohio 44286 - _ . I i i (330)659-6688 Phone 1-1-1" 7- '.\ i tq (330)659-6675 Fax 1-Fr rt-! 1` 1,'`1 I tll— -1 1 �� I i I 1 ,- Seal I ��� I f 1� 'T r kr___LJ ._-r --1 r4-r �� f1 - Cr — I I I 1 LTJ I I ,. p I 11-1:1 y`� 1-, MR) I 1 1 00 �.�� l N —h r -D L � I~-L r- 7 l r _ a i I 1 i LT t ` i -Y_Y_i Iri=-- . %-- I ` i\ I I l .I to i'z/ I I I I .`ii \ . ,4� �- I { I Architect/Engineer Job No.: %// /�� I I i 1 I I i i i 21-005 C71 G' L/ I I r rr-- ,- ii---- -----6.- - �, N (�� I 1 I I ii 1 Nextore Store Design Revision No.: N 13 I 11 I TI rt 1 ; N. I I I �tJ S.I L-_ -P- -4 ----� 1)--4---4-1-4-�-- --- I 07 rn r- * --1 r--',. -1 r 1----i\ -le\r -r--F---1 `.` 1 .` I .` I `�.�� I I O I . / . / . / 1 Nextore project III I \J/ .y \y I I 1 1 J Number 82260 I -1 j 7, Brand Design Type: cr, II L tl J I L J - a it L Li_ I C, II II 0 I SGH 4.5 G+ - - - - - - - - - - - -1 h - - - - - - - - r _I- ISSUED Hr - �� ISSUED FOR: a. 0 Construction Im I- Title N cC -6 co - HVAC DEMOLITION MECHANICAL HVAC 0) SCALE: ,,4.=, DEMOLITION PLAN 0 a N - O lI Date Sheet 0 1/29/21 Drawn By cp cn TBA M-100 v Checked By N .Q. TBA U) .0 - , t DESIGN & CONSTRUCTION MANAGEMENT: NE THERMOSTAT PROCUREMENT INSTRUCTIONS GRILLEREGISTER AND DIFFUSER SCHEDULE GENERAL NOTES NE/. I ORE , HONEYWELL TH8321WF1001,A.K.A.THE HONEYWELL VISION PRO 8000 WI-Fl I ISPOIGI I THERMOSTAT WITH WIRELESS REMOTE SENSORS AS REQUIRED. A. THE CONTRACT DOCUMENTS REFLECT A SYSTEM DESIGNED AROUND SPECIFIC REFERENCE PRODUCTS,THE I. DUCT SIZES INDICATED REPRESENT CLEAR INTERIOR SHEET METAL DIMENSIONS. •4000LuxottiraPlace,Mason,OH45040 •+1(613)766-6000 PROCURE FROM HABEGGER CORP SELECTION OF WHICH HAS IMPACTED THE DESIGNS OF OTHER TRADES.IF ALTERNATE MANUFACTURERS ARE •6 Creamery&aok,East Granby,CT 06026 •+1(860)413-9700 CONTACT INFO. TAG SERVICE MOUNTING MFR MODEL No. MODULE SIZE FINISH NOTES SUBMITTED OR BID,IT IS THE RESPONSIBILITY OF THIS G.C.TO COORDINATE ALL DIFFERENCES AND IMPACTS WITH J. ALL DUCTWORK CONCEALED ABOVE CEILINGS,AND ALL OUTSIDE AIR DUCTS,SHALL BE EXTERNALLY HABEGGER CACORDI@HABEGGERCORP.COM ALL TRADES PRIOR TO BID, INCLUDING COSTS ASSOCIATED WITH REQUIRED CHANGES TO OTHER TRADES.NO INSULATED. IF DUCTWORK IS RUN IN A NON-CONDITIONED SPACE ALL DUCTWORK MUST BE INSULATED WITH 2" STORE #3757 ANDY CUNNINGHAM ANDREWCUNNINGHAM@HABEGGERCORP.COM; SUPPLY MATCHSTD.WHITE EXTRAS WILL BE ALLOWED FOR CHANGES REQUIRED TO OTHER TRADES IF ALTERNATE EQUIPMENT IS BID OR FIBERGLASS INSULATION AND VAPOR BARRIER. • 513-612-4776 51 TITUS OMNI 24"X24* 2,3 \Washington Square PETE DOYLE PETEDOYLE@HABEGGERCORP.COM; AIR CEILING FINISH INSTALLED AT THE G.C.'S OPTION. K. BRANCH DUCTS SERVING DIFFUSERS SHALL BE SIZED TO MATCH DIFFUSER NECK SIZE INDICATED. 9463 SW WashICI O Square 513-612 4712 S2 SUPPLY MATCH TITUS OMNI 12"X 12" PAINT TO 2,4 B. EXISTING MECHANICAL INFORMATION IS BASED ON LIMITED EXISTING BUILDING DRAWINGS AND FIELD WORK.THE AIR CEILING MATCH CLG G.C.SHALL FIELD VERIFY THE EXISTING CONDITIONS FOR ACCURACY. NO ADDITIONAL COMPENSATION SHALL BE L. ALL ROUND DUCT ELBOWS SHALL BE LONG SWEEP,1-1/2 TIMES THE CENTERLINE RADIUS. Tigard, O R 97223 THERMOSTAT INSTALLATION INSTRUCTIONS SDS-L SUPPLY MATCH TITUS FL1S-HT/ 1.5" SLOT PAINT TO 1,5 ALLOWED FOR REVISIONS TO THE DESIGN TO CORRECT FOR EXISTING CONDITIONS NOT AS INDICATED ON THE Space: W14A AIR CEILING L= LENGTH MATCH CLG PLANS. M. G.C.MUST REPLACE ALL AIR FILTERS IN HVAC UNITS WITH NEW CLEAN FILTERS BEFORE AIR BALANCING AND , p NOTIFY ENERGY SERVICES(ENERGY.SERVICES@LUXOTiICARETAILCOM)AND COPY THE PROJECT SUPPLY MATCH FLISJHTPAINT TO PRIOR TO FINAL TURNOVER TO TENANT. Construction for. MANAGER IF THE WI-Fl NETWORK IS NOT AVAILABLE AT THE TIME OF INSTALLATION. SDR-L TITUS 1.5"SLOT 1,5 AIR CEILING I = LENGTH MATCH CLG C. G.C.SHALL NOTIFY TENANT,ARCHITECT AND ENGINEER OF ANY SITUATIONS THAT MODIFY OR INCREASE THE HVAC CONTRACTOR: RETURN MATCHSTD.WHITE SCOPE OF WORK FROM WHAT IS DESCRIBED IN THE DOCUMENTS. N. IT IS THE G.C.'S RESPONSIBILITY TO ENSURE THAT THE MECHANICAL COMPONENTS ARE INSTALLED AT 1.TAKE A PHOTO OF THE BACK OF EVERY WI-Fl T-STAT THAT IS INSTALLED,SHOWING THE R1 AIR CEILING TITUS OMNI 24"X 24' FINISH 2 LOCATIONS AND ELEVATIONS WHICH MAKE THEM READILY AND SAFELY ACCESSIBLE FOR ROUTINE MAINTENANCE MAC ADDRESS,CRC ID,AND 4 DIGIT PASSCODE(DATE CODE),AND EMAIL(WITH PROJECT D. G.C.SHALL BE RESPONSIBLE FOR ALL CUTTING/PATCHING RELATED TO THEIR WORK. WITHOUT REQUIRING ANY EXTRAORDINARY MEASURES. MANAGER IN COPY)TO(EN BpYSERVICE ( UXOT ICARETAILCOM). NOTES/ACCESSORIES AREA WHEN INSTALLATION E COMPLETED,T-STATT, IS INSTALLED,A UST OF THE THERMOSTATS S SHOWING THE E. IF SPACE ABOVE CEILING IS INDICATED TO BE A RETURN AIR PLENUM,CONSTRUCTION MATERIALS ABOVE CEILING O. THE TENANT RESERVES THE RIGHT TO CHECK CONSTRUCTION COMPLIANCE WITH PLANS AND SPECIFICATIONS. OF THE STORE WHERE EACH IS AND EACH T-STAT'S MAC ADDRESS, 1. PROVIDE YOUNGS REGULATOR TO CONTROL BALANCING DAMPER. LOCATE CONTROLLER ABOVE CEILING AT CRC ID AND 4 DIGIT DATE CODE. ACCESS PANEL OR ABOVE ADJACENT ACT CEILINGS. SHALL BE NONCOMBUSTIBLE,OR HAVE A MAXIMUM 25 FLAME SPREAD AND 50 SMOKE DEVELOPMENT FINISH SHOULD THE TENANT FIND CORRECTIVE WORK NECESSARY,HE WILL NOTIFY G.C.OF SUCH WORK IN WRITING AND • 3.A STICKER WITH THE MAC ID AND CRC ID OF EACH T-STAT IS PACKED WITH THE T-STAT, 2. RAPID MOUNT FRAME (IF SURFACE MOUNTING) RATING.WIRING SHALL BE LABELED PLENUM RATED TYPE PER NEPA 70. EXPECT COMPLIANCE PERFORMED WITH DUE DILIGENCE. IF ANY CORRECTIVE WORK IS DEEMED TO BE NECESSARY, AND IS TO BE PLACED ON THE BACK OF THE T-STAT,NOT ON THE FACEPLATE. E-MAIL THE THE COST OF REINSPECTIONS WILL BE BORNE BY THE G.C.IF WORK IS REQUIRED BY TENANT IN ORDER TO IMPROVE, UST AND THE PHOTOS IN FOR EACH STORE IN ONE E-MAIL TO 3. FURNISH WITH SECTORIZING BAFFLES FOR DIRECTIONAL CONTROL AND NECK MOUNTED VOLUME DAMPER F. COORDINATE LOCATION AND ELEVATION OF MECHANICAL WORK WITH ALL DUCTWORK,LIGHT FIXTURES,AND CHANGE OR CORRECT AIR CONDITIONING OPERATIONAL CONDITIONS DUE TO:PART MALFUNCTION,WARRANTY OR CD (ENERGY.SERVICES@LUXOTTICARETAILCOM)WITH THE NEXTORE PROJECT MANAGER COPIED. CZ d' OTHER CEILING BUILT-IN FIXTURES.CONTACT ENGINEER OR ARCHITECT IMMEDIATELY SHOULD ANY CONFLICT OTHER INABILITY TO PROVIDE THE COMFORT CONDITIONS REQUIRED BY THE STORE,G.C.SHALL BE DIRECTED BY ONE PHOTO PER T-STAT IS REQUIRED,AND IT IS IMPORTANT TO PHOTOGRAPH THE BACK OF cr 0 THE T STAT,WITH THE MAC ID,CRC ID,AND DATE CODE SHOWING. 4. PROVIDE YOUNGS REGULATOR TO CONTROL BALANCING DAMPER. LOCATE CONTROLLER IN DIFFUSER ARISE. TENANT TO ADDRESS THIS WORK IN A TIMELY MANNER. IF IT BECOMES EVIDENT THAT THE G.C.CAN NOT ' HOUSING, OUT OF VIEW FROM THE PUBLIC. ACCOMPLISH THE TASK,THEN AFTER 72 HOURS OF WRITTEN NOTICE,THE TENANT MAY AT HIS DISCRETION TAKE 0 o THE THERMOSTAT MUST BE CONNECTED TO OUR WI-FI NETWORK DURING G. MOUNTING OF ALL EQUIPMENT,DUCTWORK AND PIPING MUST BE DONE PER BUILDING GUIDELINES AND LOCAL OVER SUCH WORK AND BACK CHARGE THE G.C.FOR ANY CORRECTIVE WORK THAT WAS REQUIRED DUE TO p INSTALLATION. TO PERFORM THIS STEP,YOU MUST USE THE FOLLOWING 5. UTILIZE BORDER 66 WITH H1 CLIP OR BORDER 77 AS FIELD CONDITIONS DEMAND. PROVIDE MANUFACTURER'S CODES AND INDUSTRY STANDARDS.COORDINATE INSTALLATION OF EQUIPMENT SUPPORT WITH BUILDING LACK OF PERFORMANCE,WORKMANSHIP AND/OR ADHERENCE TO PLANS AND SPECIFICATIONS. V INFORMATION: PLENUM BOX OR FIELD CONSTRUCT,AT CONTRACTOR'S OPTION AND GIVEN FIELD CONDITIONS. MANAGER AND NEXTORE REPRESENTATIVE. CV o O THE NETWORK NAME(A.K.A.AN SSID)=CNFLT • A PASSPHRASE(A.K.A.THE PASSWORD)FOR CONNECTING THE T-STAT TO P. DUCTWORK SHALL NOT BE ROUTED OVER ELECTRIC PANELS AND TRANSFORMER. OUR WI-Fl NETWORK. NOTE:MANUFACTURER LISTED IS TO GIVE DIRECTION ON STYLE AND QUALITY. IT IS NOT THE INTENT OF THE H. NO PVC PIPING ALLOWED IN PLENUM AREAS. ummimm 0 THE PASSPHRASE WILL BE SENT TO YOU IN SEPARATE E-MAIL. LISTING TO SINGLE LINE SPECIFY A PARTICULAR MANUFACTURER. IF SUBSTITUTING,PROVIDE SHOP DRAWINGS TO VI) 2.) Id O DO NOT GIVE THE PASSPHRASE TO ASSOCIATES-IT IS NEXTORE PM FOR APPROVAL 2-LCM-H200-REV 0.0 �+- o CONFIDENTIAL AND TO BE KEPT THAT WAY. d O DO NOT GIVE THE 4 DIGIT DATE CODE TO ASSOCIATES-IT IS ALSO Ca• u CONFIDENTIAL AND TO BE KEPT THAT WAY THERMOSTAT SET POINT INSTRUCTIONS 004 SGH 4.5 PLATINUM/GOLD DIFFUSER SCHEDULE C> NOTES - MECHANICAL PLAN HVAC SYMBOLS = I `n PROVIDE DAMPERS PER DETAIL. FOR ALL LOCATIONS: FAN TO RUN CONTINUOUSLY DURING OCCUPIED PERIOD. 1. C3 LENSCRAFTERS 2. PROVIDE DUCT TAKE OFFS PER DETAIL. HIGH EFFICIENCY FITTINGS SHALL BE USED. SEE DETAIL. < CD OCCUPIED 3. INSULATE ALL SUPPLY DUCTWORK PER APPLICABLE ENERGY/MECHANICAL CODE-MOST RESTRICTIVE TO GOVERN. "."'XX-x SUPPLY AIR DIFFUSER-ARROWS INDICATE COOLING SET-POINT ALL AREAS(EXCEPT LAB)=725F x CFM PATTERN.NO PATTERN SHOWN EQUALS 4-WAY. 4. REMOTE SENSOR. CONNECT TO MAIN THERMOSTAT. OR AS NOTED COOLING SET-POINT FOR LAB=705F 5. DAMPER IS INSTALLED ABOVE GYPSUM BOARD CEILING. PROVIDE YOUNGS REGULATOR AND BOWDEN CABLE. SEE HEATING SET-POINT ALL AREAS(EXCEPT LAB)=685F TURN OVER NOTES (CONTRACTOR TO PROVIDE TO THE PM THE FOLLOWING PRIOR TO INITIAL PUNCHLIST): DETAIL PROVIDE CABLE OPERATED DAMPERS WHERE DAMPERS ARE INSTALLED OVER GYPSUM BOARD CEILING. ( 12' ) ROUND DUCTWORK. DIAMETER IN INCHES. HEATING SET-POINT FOR LAB=665F 6. EXTEND 8"EXHAUST DUCT TO LANDLORD PROVIDED EXHAUST MAIN. VERIFY LOCATION IN FIELD. COORDINATE ) FOR LABS: TIME PERIOD BEGINS 2 HOURS BEFORE STORE OPENS 1. AIR BALANCE REPORT TO STATE EQUIPMENT INFORMATION INCLUDING MODEL NUMBER,SERIAL NUMBER, WORK WITH LANDLORD. FOR BUSINESS(DUE TO LAB OCCUPANCY) RATED AND TESTED AMP DRAW,RATED AND TESTED VOLTAGE AND ANY ALTERATIONS OF THE EQUIPMENT 7. EXTEND OUTSIDE AIR DUCTWORK TO LANDLORD SUPPLIED OUTSIDE AIR MAIN AND CONNECT. L 20X12 t, RECTANGULAR DUCTWORK.SIZE IN INCHES, OVERRIDE ADJUSTMENTS=+/--25F FROM PROGRAMMED SET-POINTS REQUIRED TO ACHIEVE DESIGN AIR FLOW. 8. PROVIDE NEW MOTORIZED DAMPER IN OUTSIDE AIR DUCTWORK TO CLOSE WHEN AIR HANDLER IS IN 1 1 FIRST NUMBER IS SIDE SHOWN. OVERRIDE ADJUSTMENTS OF PROGRAMMED SET-POINT=4 HRS. UNOCCUPIED MODE. 2. CHANGE FILTER MEDIA PRIOR TO TURN OVER. LENSCRAFTERS 3. CLEAN DRAIN PANS PRIOR TO TURN OVER. 9. PROVIDE 24"OF DUCTWORK FOR MIXING RETURN AND OUTSIDE AIR. OPPOINT OF CONNECTION -NEW TO EXISTING UNOCCUPIED 10. NEW CHILLED WATER AIR HANDLING UNIT ABOVE BOH CEILING.MAINTAIN ALL MANUFACTURER RECOMMENDED HEATING=60 DEGREES(LABS 60 DEGREES) 4. DEMONSTRATE EQUIPMENT HEATS AND COOLS. CLEARANCES. r-}-z Revisions: COOUNG=80 DEGREES(LABS 78 DEGREES) 11. LOCATION OF DAMPER ACTUATOR MOUNTING BOARD"DB-1". ROUTE REMOTE BALANCING CABLES TO THE THIS `-fir MANUAL VOLUME DAMPER TIME PERIOD BEGINS AT STORE CLOSING TIME LOCATION. Mark Date By OVERRIDE ADJUSTMENTS=+/-2*F FROM PROGRAMMED SET-POINTS NOTE 12. EXTEND 1"CHILLED WATER SUPPLY AND CHILLED WATER RETURN PIPING TO LANDLORD'S CHILLED WATER MAINS. 0 1/29/21 STAFF OVERRIDE ADJUSTMENTS OF PROGRAMMED SET-POINT=4 HRS. 13. 1"CONDENSATE LINE DOWN TO TAIL PIECE OF LAVATORY. O SHEET KEYNOTE REFERENCE 90%DESIGN REVIEW SET ALL OTHER BRANDS PROVIDE FIRE STOPPING FOR ALL PENETRATIONS OF FIRE WALLS. OCCUPIED PROVIDE THROUGH WALL FIRE STOPPING FOR ALL LOCATIONS � COOLING SET-POINT ALL AREAS(EXCEPT LAB)=725F WHERE JUNCTION BOXES ARE LOCATED IN A DEMISING WALL,OR O- MOTORIZED DAMPER I Z\ 2/1221 STAFF HEATING SET-POINT ALL AREAS(EXCEPT LAB)=68*F OTHER FIRE WALL. 100%RID/L.L.REVIEW SET TIME PERIOD BEGINS 1HOUR BEFORE STORE OPENS FOR BUSINESS OVERRIDE ADJUSTMENTS=+/-25F FROM PROGRAMMED SET-POINTS OVERRIDE ADJUSTMENTS OF PROGRAMMED SET-POINT=4 HRS. 3 _ ALL OTHER BRANDS UNOCCUPIED HEATING=60 DEGREES(LABS 60 DEGREES) TEST AND RECORD THE NEW CFM DISCHARGING FROM NEW I COOLING=80 DEGREES(LABS 78 DEGREES) AHU-1. REPORT CFM TO NEXTORE PROJECT MANAGER. TIME PERIOD BEGINS AT STORE CLOSING TIME OVERRIDE ADJUSTMENTS=+/-2*F FROM PROGRAMMED SET-POINTS � OVERRIDE ADJUSTMENTS OF PROGRAMMED SET-POINT=4 HRS. , 6\ MECHANICAL REQUIREMENTS FOR M001 1 CONT O U G WIRELESS TEMPERATURE Engineer of Record 1.13 Thorson ,Baker Associates CONSULTING ENGINEERS , • 3030 West Streetsboro Road I 1 Richfield,Ohio 44286 j (330)659-6688 Phone i (330)659-6675 Fax 0 I Seal 1.-- -"j ILA . aANI I i . , O ) 6'0 SDS-6 SDS-6 i SDS-6 t 350MAX 350MAX 350MAX ' N 50MAXo I o I (TYP)© © (TYP) .( DB1 4-11- 14x14 r a 12x12 ! �/ ) ` i, 10'0 DBI `Lii T-s I JITh 'L� Architect/Engineer Job No.: 0 w o DB1 -i ( D61 5�-.-� O (TYP) rw / 21-005 r 10 MH I N Nextore Store Design Revision No.: N 1 csi cv 300MAX L- IL 6 -1"CD- r 07 --- CWS- . , . . 3 0 , 12 o - ` --CWR-z - CV �'�DB1 .--)DB1 Nextore project i DB1 Number 82260 O B O 16x13- I 1 I 1 /� ' I TZ !14x14 �. 12x12 t ' 10x10 Brand Design Type: • ! ' �` .-10x10 �i___10x10 I I SGH 4.5 G+ q Q I C Cl 10x10 ► SDR-6 I SDR-6 SDR-6 PM R1 350MAX n 350MAX 350MAX 11 W 400MAX ❑Construction ._ ii co ,__ - ...)._ _f_TH Title a) ce -6 MECHANICAL U HVAC PLAN MECHANICAL - HVAC N Co n SCALE: 1/4"=1'-0' Date Sheet 0 11!;29/21 PoDrawny CD cn TBA M-200 v m Checked By o_ TBA