Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Plans
M EC2021 -00241 .`x. RECEIVED APR 0 7 ?02 CITY OF TIGARD BUILDING DIVISION GENERAL NOTES: ABBREVIATIONS OREGON 1. MATERIALS,METHODS,AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE LATEST EDITION OF 28. ALL PENETRATIONS THRU FIRE RATED WALLS, FLOORS,AND CEILINGS SHALL BE SEALED WITH A UL APPROVED A AIR,AMP IDE DIAMETER, INDIRECT DRAIN THE FOLLOWING CODES AS ADOPTED BY LOCAL JURISDICTION. FIRESTOP MATERIAL SUITABLE FOR CONSTRUCTION MATERIAL TO MAINTAIN FIRE, SMOKE AND DRAFT ACU AIR CONDITIONING UNIT IE INVERT ELEVATION OREGON STRUCTURAL SPECIALTY CODE(OSSC) INTEGRITY OF STRUCTURE. FIRE RESISTANT SEALER SHALL BE TESTED IN ACCORDANCE WITH ASTM E84. AFF ABOVE FINISHED FLOOR IH INTAKE HOOD PERS OREGON MECHANICAL SPECIALTY CODE(OMSC) INSTALL SEALANT, INCLUDING FOAMING, PACKING AND OTHER ACCESSORY MATERIALS TO FILL OPENINGS AHU AIR HANDLING UNIT IN INCH OREGON PLUMBING SPECIALTY CODE(OPSC) WHERE FIRE RATED PENETRATIONS OCCUR. COMPLY WITH INSTALLATION REQUIREMENTS ESTABLISHED BY AL ALUMINUM,ACOUSTICAL LINING INIT INITIAL OREGON FIRE CODE(OFC) TESTERS AND INSPECTION AGENCY. ARRGT ARRANGEMENT INT INTERIOR PUBLIC EMPLOYEES RETIREMENT SYSTEM OREGON ENERGY EFFICIENCY SPECIALTY CODE(OEESC) ATM ATMOSPHERE IPLV INTEGRATED PART LOAD VALUE 29. FURNISH AND INSTALL PIPE SLEEVES PASSING THROUGH EXTERIOR WALLS.SLEEVES SHALL BE STEEL PIPE: IIII 2. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE AND ADOPTED REGULATIONS ASTM A53,TYPE E, GRADE A,SCHEDULE 40,GALVANIZED PLAIN ENDS,2"LONGER THAN WALL WIDTH. BC BLOWER COIL KW KILOWATT INCLUDING BUT NOT LIMITED TO NATIONAL,CITY,STATE,LOCAL CODES AND ORDINANCES WHICH MAY BE IN BDD BACKDRAFT DAMPER KWH KILOWATT HOURS EFFECT.ALL MECHANICAL MATERIALS,INSTALLATION PROCEDURES AND SYSTEM LAYOUTS SHALL BE 30. MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER HANDLING,DISPOSAL AND ASSOCIATED BFF BELOW FINISHED FLOOR APPROVED BY ALL APPLICABLE CODE ENFORCEMENT AUTHORITIES HAVING JURISDICTION.THE MECHANICAL COSTS OF ALL REFRIGERANT MATERIAL DURING THIS CONTRACT IN ACCORDANCE WITH ALL FEDERAL,STATE BFP BACKFLOW PREVENTER L LENGTH CONTRACTOR SHALL OBTAIN AND PAY FOR ALL NECESSARY PERMITS AND APPROVALS FOR THIS AND LOCAL CODES AND/OR REGULATIONS. BHP BRAKE HORSEPOWER LAT LEAVING AIR TEMPERATURE INSTALLATION. PAY ALL ROYALTIES OR FEES REQUIRED IN CONNECTION WITH THE USE OF PATENTED BLDG BUILDING LB POUND, LINEAR BAR DEVICES AND SYSTEMS. 31. THERMOSTATS SHALL BE MOUNTED AT 48"AFF TO MEET ADA REQUIREMENTS.PROVIDE TAMPER PROOF BOB BOTTOM OF BEAM LBS POUNDS COVERS IN PUBLIC AREAS AND WIRE GUARDS IN GYMNASIUMS. BOD BOTTOM OF DUCT LD LINEAR DIFFUSER 3. UPON CONTRACT AWARD,CONTRACTOR SHALL CONTACT LOCAL UTILITY COMPANY TO SCHEDULE UTILITY BOS BOTTOM OF STEEL LWT LEAVING WATER TEMPERATURE CONNECTIONS. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE ALL UTILITY WORK, SECURE ALL 32. ALL DUCTWORK SHALL BE CONNECTED TO MOTORIZED EQUIPMENT WITH FLEXIBLE DUCT CONNECTORS. BTUH BRITISH THERMAL UNITS PER HOUR PERMITS AND INSPECTIONS. MAX MAXIMUM 33. ALL DUCTWORK SIZES SHOWN ON DRAWINGS ARE CLEAR INTERNAL DIMENSIONS. CAP CAPACITY MBH THOUSAND BTU PER HOUR 4. ALL CONNECTIONS TO BUILDING SERVICES SHALL BE CAREFULLY COORDINATED WITH THE UTILITY CO AND CC COOLING COIL MCA MINIMUM CIRCUIT AMPACITY THE CONSTRUCTION MANAGER. SERVICE WORK OF THIS NATURE TO OCCUR DURING UNOCCUPIED BUILDING 34. INSTRUCT OWNER IN PROPER OPERATION OF SYSTEMS. CD CEILING DIFFUSER MD MANUAL DAMPER HOURS.THE CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE THAT ALL EXISTING EQUIPMENT IS CFM CUBIC FEET PER MINUTE MECH MECHANICAL OPERATIONAL AFTER ANY SHUTDOWN OCCURS. 35. DRAWINGS ARE DIAGRAMMATIC IN NATURE AND MAY HAVE TO BE ADAPTED TO COMPLY WITH BUILDING CHR CHILLED WATER RETURN MFR MANUFACTURER CONDITIONS.CONTRACTOR SHALL SUBMIT HVAC SHOP DRAWINGS,INDICATING LOCATIONS,AND ROUTING OF CHS CHILLED WATER SUPPLY MIN MINIMUM 5. ALL CONTRACT WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL REQUIREMENTS OF THE WRITTEN ALL DUCTS, PIPING,WIRING AND ASSOCIATED ACCESSORIES, MAKE OFFSETS WITH FITTINGS WITH AS SMALL Cl CAST IRON MOCP MAXIMUM OVER CURRENT PROTECTION SPECIFICATIONS FOR THIS PROJECT WHICH ARE CONSIDERED TO BE AN INTEGRAL PART OF THE CONTRACT ANGLE OF OFFSET AS POSSIBLE.DUCTWORK&PIPING SHALL BE ROUTED TO AVOID ALL STRUCTURAL CLG CEILING,COOLING MOD MOTOR OPERATED DAMPER DOCUMENTS.ALL CONTRACTORS AND SUBCONTRACTORS SHALL MAINTAIN(AT THE JOBSITE)AND REFER TO SUPPORTS,AND COORDINATE ALL WORK WITH WORK OF OTHER TRADES. CNTFGL CENTRIFUGAL MTR MOTOR COPIES OF THE WRITTEN SPECIFICATIONS AS PART OF THESE DRAWINGS.REFER TO THE WRITTEN CO CLEANOUT SPECIFICATIONS IN CONJUNCTION WITH THE PLANS FOR FULL PROJECT SCOPE. IN ALL CASES OF 36. ALL MECHANICAL EQUIPMENT AND APPLIANCES SHALL BEAR THE LABEL OF AN APPROVING AGENCY. LISTING CONC CONCRETE NC NORMALLY CLOSED A 7 A DISCREPANCY BETWEEN PLANS AND SPECIFICATIONS,THE MORE STRINGENT REQUIREMENTS SHALL GOVERN AND LABELING AGENCY QUALIFICATIONS:A"NATIONALLY RECOGNIZED TESTING LABORATORY"AS DEFINED IN COND CONDENSATE NEG NEGATIVE AND WHERE IT IS UNCLEAR,SUCH CASES SHALL BE REFEREED TO THE ENGINEER FOR ADJUDICATION. THE INTERNATIONAL MECHANICAL CODE. CONT CONTINUE,CONTROL NIC NOT IN CONTRACT COMP COMPRESSOR NO NUMBER,NORMALLY OPEN GROUP 6. ANY DISCREPANCIES OR INADEQUACIES WITHIN THESE BID DOCUMENTS OR BETWEEN THESE BID DOCUMENTS 37. THE MECHANICAL CONTRACTOR SHALL PROVIDE A COMPLETE SET OF"AS-BUILT"DRAWINGS INDICATING THE COP COEFFICIENT OF PERFORMANCE NTS NOT TO SCALE AND RELATED PLUMBING,ELECTRICAL, FIRE PROTECTION,ARCHITECTURAL,INTERIOR DECOR AND FIELD PRECISE LOCATION OF ALL SYSTEMS, EQUIPMENT,DUCTWORK, PIPING AND ACCESS DOORS,THESE PLANS CP CIRCULATING PUMP 111 SW Fifth Ave, Ste 2120 CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND/OR ENGINEER PRIOR TO BID SHALL ALSO INCLUDE ALL CHANGES AND DEVIATIONS FROM BID DOCUMENTS. CRU CONDENSATE RETURN UNIT OA OUTDOOR AIR SUBMISSION.DURING THE COURSE OF CONSTRUCTION COORDINATION AND ACTUAL CONSTRUCTION,THE CU CONDENSING UNIT OC ON CENTER Portland, Oregon 97204 MECHANICAL CONTRACTOR SHALL COOPERATE WITH ALL OTHER CONTRACTORS AND TRADES ON THIS 38. REFER TO SPECIFICATIONS,G0.00 AND G.01 FOR ALTERNATE SCOPE DISCRIPTION, ONLY FURNISH AND INSTALL CU FT CUBIC FEET OD OUTSIDE DIAMETER PROJECT TO ENSURE A SMOOTH RUNNING AND CAREFULLY COORDINATED INSTALLATION. EQUIPMENT IN ACCORDANCE WITH CONTRACT. CV CONSTANT VOLUME OPNG OPENING 1) Tel 503.416.2400 CVTR CONVERTER ORD OVERFLOW ROOF DRAIN Fax 2063.267.1701 7. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTING HIS BID FOR THE PROPOSED WORK. HE SHALL CW COLD WATER ORL OVERFLOW RAIN LEADER BE RESPONSIBLE TO VERIFY FIELD CONDITIONS.ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION CWR CONDENSER WATER RETURN OF THE ENGINEER PRIOR TO SUBMISSION OF BIDS IN WRITING. CWS CONDENSER WATER SUPPLY P PUMP,PLUMBING § SAZAN#790-20002 PD PRESSURE DROP 8. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR GENERAL CONSTRUCTION INCLUDING LOUVERS, dB DECIBELS PH PHASE W CONCRETE EQUIPMENT PADS, FLASHING DETAILS, ETC. REFER TO ARCHITECTURAL DRAWINGS FOR ROOM DB DRY BULB POC POINT OF CONNECTION T ELEVATIONS, LOCATE MECHANICAL DEVICES SUCH AS TEMPERATURE SENSORS, HUMIDISTATS,PANELS,ETC. DCVA DOUBLE CHECK VALVE ASSEMBLY POS POSITIVE SO THAT THEY DO NOT CONFLICT WITH GENERAL CONSTRUCTION(WAINSCOT,DOOR HARDWARE,ETC.)NOR SH EETMETAL NOTES: DEG DEGREE PR PUMPED RETURN LL WITH ELECTRICAL SYSTEM(LIGHT SWITCHES,SPEAKERS,OUTLETS,ETC.). DF DRINKING FOUNTAIN PIT PRESSUREJTEMPERATURE 0 1. PERFORM ALL SHEETMETAL WORK IN ACCORDANCE WITH CURRENT SMACNA STANDARDS.ALL DUCTWORK DI DE-IONIZED PVC POLYVINYL CHLORIDE 9. COORDINATE WITH OTHER TRADES: A)REFER TO ELECTRICAL DRAWINGS FOR ELECTRICAL CHARACTERISTICS SHALL BE CONSTRUCTED IN ACCORDANCE WITH SMACNA HVAC CONSTRUCTION STANDARDS. DIA DIAMETER OF MECHANICAL EQUIPMENT(VOLTAGE, PHASE,HZ, ETC.B)PROVIDE ADEQUATE CLEARANCE OF MECHANICAL DMPR DAMPER QTY QUANTITY WORK FROM ELECTRICAL ITEMS. MAINTAIN MINIMUM ACCESS OF 6-INCHES ABOVE ELECTRICAL CABLE TRAYS 2. DUCT SEALING SHALL MEET REQUIREMENT LISTED IN SMACNA HVAC DUCT CONSTRUCTION STANDARD AND ON DOWN AND 18-INCHES TO THE SIDE OF CABLE TRAYS. SMACNA HVAC AIR DUCT LEAKAGE TEST STANDARDS. DS DOWNSPOUT RA RETURN AIR RD ROOF DRAIN 10, DUCTING AND PIPING SHOWN ON DRAWINGS SHOW THE GENERAL RUN AND CONNECTIONS AND MAY OR MAY 3. CONSTRUCT DUCTS WITH G-60 OR BETTER GALVANIZED STEEL(ASTM 527)LFQ,CHEM TREAT IN GENERAL E EXISTING REF REFERENCE NOT IN ALL PARTS BE SHOWN IN ITS EXACT POSITION.CONTRACTOR SHALL BE RESPONSIBLE FOR ERECTING EA EXHAUST AIR REQD REQUIRED THE DUCTING AND PIPING SUITABLE IN EVERY RESPECT FOR THE WORK PERFORMED.DUCTWORK AND PIPING 4. CONSTRUCT RECTANGULAR DUCTWORK TO MEET ALL FUNCTIONAL CRITERIA DEFINED IN CHAPTER 11,OF THE EAT ENTERING AIR TEMPERATURE RF RETURN FAN SHALL BE INSTALLED SO THAT ACCESS,CLEARANCE,HEADROOM,AND PITCH ARE MAINTAINED.CONTRACTORS SMACNA HVAC DUCT CONSTRUCTION STANDARDS. PROVIDE DIAGONAL CREASING OR BEADING ON ALL EER ENERGY EFFICIENCY RATING RG RETURN GRILLE OF THE VARIOUS TRADES SHALL COORDINATE THE INSTALLATION. MECHANICAL CONTRACTOR SHALL REVIEW PANELS WIDER THAN 18-INCHES,AND PANELS LESS THAN 18 GAGE. CONSTRUCT ROUND AND FLAT OVAL EF EXHAUST FAN RH RELIEF HOOD, RELATIVE HUMIDITY ARCHITECTURAL DRAWINGS FOR CHASE AND SOFFIT LOCATIONS TO COORDINATE ALL EXPOSED DUCTWORK DUCTWORK IN ACCORDANCE WITH CHAPTER 3 OF SMACNA HDCS, EFF EFFICIENCY RL RAIN LEADER AND PIPE ROUTING. EG EXHAUST GRILLE RPBFP REDUCED PRESSURE BACKFLOW 5. DUCTMATE,METZ,OR W.D.C.I.DUCT CONNECTION SYSTEMS ARE ACCEPTABLE. DUCTS CONSTRUCTED USING EL ELEVATION PREVENTER 11. THE COMMISSIONING SPECIFICATION,INCLUDING ALL FUNCTIONAL TEST PROCEDURES,SHALL BE PROVIDED THESE SYSTEMS WILL REFER TO THE MANUFACTURER'S GUIDELINES FOR SHEET GAGE,INTERMEDIATE EQUIP EQUIPMENT RPM REVOLUTIONS PER MINUTE AND ENFORCED BY THE CONTRACTOR. REINFORCEMENT SIZE AND SPACING,AND JOINT REINFORCEMENTS. ESP EXTERNAL STATIC PRESSURE EWT ENTERING WATER TEMPERATURE S SOIL 12. PROVIDE SEISMIC RESTRAINT IN ACCORDANCE WITH IBC AND ASCE STANDARD 7. SUBMIT CALCULATIONS BY 6. PROVIDE COLLARS WHEREVER AN EXPOSED DUCT PASSES THROUGH A WALL,SLAB,OR CEILING-I-INCH WIDE, EXH EXHAUST SA SUPPLY AIR LICENSED STRUCTURAL ENGINEER. PRODUCTS MAY CONFORM TO SMACNA SEISMIC RESTRAINT GUIDELINES. 18-GAGE ANGLE WITH MITERED CORNERS&SEAL WITH FIBERGLASS AND MASTIC. EWC ELECTRIC WATER COOLER SD STORM DRAIN,SMOKE DAMPER EXIST EXISTING SENS SENSIBLE 13. PROVIDE A SINGLE SUBMITTAL OF ALL MECHANICAL EQUIPMENT AS SPECIFIED. AS A MINIMUM,SUBMIT 7. SPIN-IN FITTINGS SHALL BE CONICAL TYPE WITH VOLUME DAMPER,AND QUADRANT;FLEX MASTER ELGEN OR EXP EXPANSION SEER SEASONAL ENERGY EFFICIENCY RATING , PRODUCT DATA FOR ALL EQUIPMENT AND FIXTURES LISTED IN ACCOMPANYING SCHEDULES FOR APPROVAL. EQUIVALENT. EXT EXTERIOR,EXTERNAL SF SUPPLY FAN,SQUARE FEET SG SUPPLY GRILLE 14. USE EXPERIENCED INSTALLERS. DELIVER, HANDLE,AND STORE MATERIALS IN ACCORDANCE WITH B. ELBOWS IN RECTANGULAR OR SQUARE DUCTWORK SHALL HAVE AN INSIDE RADIUS EQUAL TO DIMENSION OF F FAHRENHEIT, FIRE LINE SL SOUNDLINING MANUFACTURER'S INSTRUCTIONS. ELBOW IN THE PLANE OF THE TURN;OTHERWISE USE SQUARE ELBOWS WITH TURNING VANES. FD FIRE DAMPER, FLOOR DRAIN SP STATIC PRESSURE FDC FIRE DEPARTMENT CONNECTION SPR SPRINKLER 15. ARRANGEMENT OF SYSTEMS INDICATED ON THE DRAWINGS IS DIAGRAMMATIC,AND INDICATES THE MINIMUM 9. ELBOWS IN ROUND DUCTWORK SHALL HAVE THE INSIDE RADIUS EQUAL TO DIMENSION OF ELBOW IN THE FLA FULL LOAD AMPS SS STAINLESS STEEL,SANITARY SEWER REQUIREMENTS FOR PLUMBING AND MECHANICAL WORK. ADJUST BOX LOCATIONS,BASED ON FIELD PLANE OF THE TURN. USE SEGMENTED, STANDING SEAM,PLEATED,OR STAMPED ELBOWS. ADJUSTABLE FLR FLOOR STP STANDPIPE MEASUREMENTS,TO AVOID INSTALLATION ABOVE DESKS. SITE CONDITIONS SHALL DETERMINE THE ACTUAL ELBOWS ARE ALLOWED IF RADIUS CONFORMS TO ABOVE. FLTR FILTER ARRANGEMENT OF THE WORK. TAKE FIELD MEASUREMENTS BEFORE PREPARING SHOP DRAWINGS,OBTAIN FM FLOW METER T THERMOSTAT APPROVAL OF SHOP DRAWINGS BEFORE BEGINNING FABRICATION. BE RESPONSIBLE FOR ACCURACY OF 10. SQUARE CORNER INSERTS(TURNING VANES)SHALL BE SMACNA FIG.4.3 SINGLE THICKNESS,RUNNER TYPE 2 FOB FLAT ON BOTTOM TEMP TEMPERATURE DIMENSIONS AND LAYOUT. OVERHEAD PIPING AND DUCTWORK SHALL BE ARRANGED TO OBTAIN MAXIMUM WITH 2-1/8-INCH SPACING. FO FLAT OVAL TG TRANSFER GRILLE HEAD ROOM. SHOP DRAWING SHALL BE SUBMITTED TO AND REVIEWED BY THE ENGINEER OF RECORD. FOT FLAT ON TOP TOD TOP OF DUCT 11. VOLUME DAMPERS ARE NOT SHOWN GENERALLY,INCLUDE A DAMPER IN THE DUCT TO EACH SUPPLY, FPM FEET PER MINUTE TOT TOTAL 16. CLEAN AND PROTECT WORK FROM DAMAGE. RESTORE DAMAGED FINISHES. COVER ENDS OF PIPING AND EXHAUST,OR RETURN OPENING;ALSO IN EACH BRANCH DUCT WHERE THREE OR MORE OPENINGS ARE FPS FEET PER SECOND TP TRAP PRIMER,TOTAL PRESSURE DUCTWORK NOT ACTIVELY BEING WORKED ON. DO NOT USE ANY PART OF THE OWNER'S BUILDING AS A SHOP, ASSOCIATED WITH THE BRANCH. FSD FIRE SMOKE DAMPER TSP TOTAL STATIC PRESSURE EXCEPT PARTS DESIGNATED FOR SUCH PURPOSES BY THE OWNER. FT FEET,FAN TERMINAL TU TERMINAL UNIT 12. THOROUGHLY CLEAN ALL DEBRIS FROM THE INSIDE OF ALL DUCTWORK AND PLENUMS. BLOW FREE ALL SMALL FV FACE VELOCITY TYP TYPICAL 17. CHANGES OR SUBSTITUTIONS OF EQUIPMENT WILL NOT BE ALLOWED WITHOUT SPECIFIC WRITTEN APPROVAL PARTICLES OF RUBBISH AND DUST. FROM THE ARCHITECT OR ENGINEER.ALL COSTS RESULTING FROM THE SELECTION OF OTHER THAN GA GAGE UH UNIT HEATER SPECIFIED EQUIPMENT SHALL BE BORNE BY THE CONTRACTOR, INCLUDING,BUT NOT LIMITED TO WORK 13. MECHANICAL DRAWINGS SHOW APPROXIMATE LOCATIONS FOR GRILLES AND DIFFUSERS. AFTER SHOP GAL GALLONS UON UNLESS OTHERWISE NOTED AFFECTING OTHER CONTRACTORS,THE OWNER,OR RE-DESIGN ISSUES. DRAWINGS ARE COMPLETED VERIFY EXACT LOCATION OF GRILLES AND DIFFUSERS IN THE FIELD. GALV GALVANIZED GPM GALLONS PER MINUTE V VENT,VOLT 18. ALL INDICATED WORK SHALL BE PERFORMED BY THE MECHANICAL CONTRACTOR UNLESS OTHERWISE NOTED. 14. CONNECT FLEXIBLE DUCTS TO METAL DUCTS WITH A SLIP JOINT MADE USING FIRE RESISTANT MASTIC AND VA VALVE CONTRACTOR SHALL COORDINATE HIS SCHEDULING WITH THE OWNER AND GENERAL CONTRACTOR TO CLAMP, IDEAL"SNAP-LOCK"OR VENTLOCK"SURETIGHT NO.670"AT EACH END. SUPPORT IN ACCORDANCE H HUMIDIFIER,HEIGHT VAV VARIABLE AIR VOLUME COMPLY WITH THE OWNERS USAGE OF THE BUILDING. WITH SMACNA HVAC DUCT CONSTRUCTION STANDARDS. DO NOT INSTALL WITH ABRUPT BENDS OR OFFSETS. HB HOSE BIBB VEL VELOCITY MAXIMUM LENGTH 5-FEET. LOW PRESSURE INSULATED FLEXIBLE DUCT SHALL BE THERMAFLEX MK-E. HIGH HC HEATING COIL VFD VARIABLE FREQUENCY DRIVE 19. ALL CONTRACTORS SHALL PROVIDE CUTTING AND PATCHING FOR THEIR RESPECTIVE TRADES.ALL PRESSURE INSULATED FLEXIBLE DUCT SHALL BE THERAMFLEX MK-C. HD HEAD VTR VENT THROUGH ROOF CONTRACTORS REMOVING OR RELOCATING ANY EQUIPMENT,PIPES,DUCTS,CONDUITS, ETC SHALL PATCH ALL HEX HEAT EXCHANGE SURFACES DISTURBED BY THIS WORK TO MATCH ADJACENT SURFACES. HOA HAND-OFF-AUTOMATIC W WASTE,WATER,WATT,WIDTH HP HORSEPOWER,HEAT PUMP WB WET BULB 20. CONTRACTOR IS RESPONSIBLE FOR THE PROPER CARE OF ALL OWNER'S EQUIPMENT AND/OR FURNISHINGS PIPING NOTES. HPS HIGH PRESSURE STEAM WG WATER GAGE WHICH ARE REQUIRED TO BE TEMPORARILY REMOVED,STORED, OR RELOCATED.CONTRACTOR SHALL HTG HEATING WH WATER HEATER,WALL HYDRANT 1 ASI 1 02/09/2021 REPLACE,REPAIR, OR REIMBURSE OWNER FOR ALL DAMAGES TO SUCH PROPERTIES AT FULL REPLACEMENT 1. PROVIDE ALL REQUIRED ACCESORIES INLCUDING SHUT-OFFS AND CLEANOUTS.PROVIDE COMPONENTS WHICH HW HOT WATER WTR WATER VALUE AND EQUIVALENCY.CONTRACTOR SHALL ADVISE OWNER FOR DISPOSITION OF REMOVED EQUIPMENT PREVENT BACK-SIPHONAGE OR CROSS-CONNECTIONS. PROVIDE ISOLATION DEVISED TO REDUCE SOUND HWC HOT WATER CIRCULATING # DESCRIPTION DATE AND/OR MATERIALS. TRANSMISSION. HWP HOT WATER PUMP HWR HEATING WATER RETURN Oregon PERS 21, CONTRACTOR'S WORK MAY BE REQUIRED OUTSIDE OF THE DESIGNATED SPACE.ALL SYSTEMS BEING HWS HEATING WATER SUPPLY DEMOLISHED AND REMOVED,MODIFIED,AND/OR TERMINATED SHALL BE FIELD VERIFIED TO INSURE NO WORK HZ HERTZ PERFORMED, INSIDE OR OUTSIDE,OF THE DESIGNATED SPACE SHALL DISRUPT ANY SERVICE OR SYSTEMS OF H VAC Full Design ANY OTHER AREAS. IF ANY CONDITIONS ARISE THAT ARE NOT IDENTIFIED ON THE DRAWINGS,IMMEDIATE NOTIFICATION SHALL BE PROVIDED TO THE ENGINEER OR OWNER.NO WORK SHALL PROCEED WITHOUT APPROVALS FROM ENGINEER OR OWNER. 22. DO NOT CUT STRUCTURAL ELEMENTS WITHOUT PRIOR WRITTEN APPROVAL. ENERGY CODE MECHANICAL NOTES: Oregon Public 23. THE MECHANICAL CONTRACTOR SHALL MOUNT THE DUCT SMOKE DETECTOR.THE ELECTRICAL CONTRACTOR 1. HEAT PUMPS HAVING SUPPLEMENTARY ELECTRIC RESISTANCE HEAT HAVE CONTROLS THAT,EXCEPT DURING TO PROVIDE AND WIRE DUCT MOUNTED SMOKE ue i et.i R.ELECTRICAL CONTRACTOR SHALL ALSO PROVIDE DEFROST, PREVENT SUPPLEMENTARY HEAT OPERATION WHEN THE HEAT PUMP CAN MEET THE HEATING LOAD. OFFICE COPY Employees Retirement AND WIRE A REMOTE MONITORING KEY OPERATED TEST AND ALARM STATION FOR EACH DUCT SMOKE DETECTOR.THE REMOTE TEST ALARM STATION SHALL BE MOUNTED AS DIRECTED IN THE AREA OF THE SMOKE 2. WHERE USED TO CONTROL BOTH HEATING AND COOLING,ZONE THERMOSTATIC CONTROLS PROVIDE A - CITY OF TIGARD, System DETECTOR. TEMPERATURE RANGE OR DEADBAND OF AT LEAST 5°F WITHIN WHICH THE SUPPLY OF HEATING AND COOLING REVIEWED FOR CODE COMPLIANCE 24. THE MECHANICAL CONTRACTOR TO PROVIDE ALL ROOF CURBS, EQUIPMENT RAILS, SUPPORTS, ROOF ENERGY TO THE ZONE IS CAPABLE OF BEING SHUT OFF OR REDUCED TO A MINIMUM. ArrgvetlJj PORTALS AND ASSOCIATED EQUIPMENT TO ENSURE A COMPLETE INSTALLATION FOR NEW HVAC EQUIPMENT. 3. EACH HVAC SYSTEM HAS CONTROLS THAT VARY THE START-UP TIME OF THE SYSTEM TO JUST MEET THE OTC: ( 1 MECHANICAL CONTRACTOR RESPONSIBLE TO PROVIDE EXACT LOCATIONS AND REVIEWED AND RELEASED TEMPERATURE SET POINT AT TIME OF OCCUPANCY. • EQUIPMENT SUBMITTALS OF ROOF CURBS, EQUIPMENT SUPPORTS,ROOF PORTALS,AND ASSOCIATED Permit #: )=.0 .<- .aC�4 - r g)..Q,a.� EQUIPMENT TO THE ARCHITECT.ALL ROOF PENETRATIONS,EQUIPMENT SUPPORTS,ROOF PORTALS AND 4. EACH ZONE IS PROVIDED WITH THERMOSTATIC SETBACK CONTROLS THAT ARE CONTROLLED BY EITHER AN ASSOCIATED EQUIPMENT SHALL BE INSTALLED BY ROOFING SUB-CONTRACTOR.ROOFING CONTRACTOR SHALL AUTOMATIC TIME CLOCK OR PROGRAMMABLE CONTROL SYSTEM. Address: i ) L) Jen r BE BONDED AND ALL WORK SHALL BE DONE SO AS NOT TO VOID ROOF WARRANTY.ROOFING CONTRACTOR Suite #" SHALL PROVIDE BASE FLASHING,AND PROVIDE TEMPORARY WEATHER-PROOF COVERS UNTIL MECHANICAL 5. BOTH OUTDOOR AIR SUPPLY AND EXHAUST ARE EQUIPPED WITH NOT LESS THAN CLASS I MOTORIZED CONTRACTOR INSTALLS NEW HVAC UNITS.MECHANICAL CONTRACTOR TO PROVIDE COUNTER FLASHING. DAMPERS. Date: ����- , 25. FURNISH TO ELECTRICAL CONTRACTOR ALL MOTOR STARTERS AND CONTROL DEVICES FOR MECHANICAL 6. WHERE A HUMIDITY CONTROL DEVICE EXISTS IT IS SET TO MAINTAIN A DEADBAND OF AT LEAST 10% RELATIVE EQUIPMENT.ELECTRICAL CONTRACTOR SHALL INSTALL AND WIRE STARTER AND CONTROL EQUIPMENT FOR HUMIDITY WHERE NO ACTIVE HUMIDIFICATION OR DEHUMIDIFICATION TAKES PLACE. ALL MOTORS. a 26. ALL HVAC EQUIPMENT CONTAINING COOLING(EVAPORATOR)COILS INCLUDING DOWN FLOW ROOF TOP UNITS 7. DEMAND CONTROLLED VENTILATION(DCV)IS INCLUDED FOR SPACES LARGER THAN 500 FT2 FOR SIMPLE O SHALL HAVE CONDENSATE MONITORING FOR OVERFLOW PROTECTION FOR PRIMARY OR SECONDARY DRAIN SYSTEMS AND SPACES LARGER THAN 150 FT2 FOR MULTIPLE ZONE SYSTEMS, W PANS AS APPLICABLE. SUCH DEVICES SHALL BE LABELED TO COMPLY WITH UL#508 AND SHALL SHUT DOWN 8. ALL LONGITUDINAL AND TRANSVERSE JOINTS,SEAMS AND CONNECTIONS OF LOW-PRESSURE SUPPLY AND () •E COOLING SYSTEM AND SIGNAL BMS SYSTEM IF APPLICABLE. RETURN DUCTS ARE SECURELY FASTENED AND SEALED WITH WELDS,GASKETS,MASTICS(ADHESIVES), LL 27. ALL EXPOSED HORIZONTAL AND VERTICAL PIPING SHALL BE INSTALLED IN A NEAT ARRANGEMENT IN MASTIC-PLUS-EMBEDDED-FABRIC SYSTEMS OR TAPES INSTALLED IN ACCORDANCE WITH THE LJ. ._ LOCATIONS WHICH ARE THE MOST INCONSPICUOUS.VERTICAL DROPS SHALL BE KEPT TO AN ABSOLUTE MANUFACTURER'S INSTALLATION INSTRUCTIONS. ISSUE FOR B I D a MINIMUM AND THEIR FINAL LOCATIONS SHALL BE COORDINATED AND RUN WITHIN CHASES,WALLS,OR SOFFITS EXCEPTION(S): VALIDITY OF PERMIT WITH OTHER PLUMBING AND ELECTRICAL FEEDS. MECHANICAL CONTRACTOR SHALL REVIEW ARCHITECTURAL A. CONTINUOUSLY WELDED AND LOCKING TYPE LONGITUDINAL JOINTS AND SEAMS ON DUCTS OPERATING DRAWINGS FOR CHASE AND SOFFIT LOCATIONS TO COORDINATE ALL EXPOSED PIPING ROUTING.ALL SUCH THE ISSUANCE OF A PERMIT Project: AT STATIC PRESSURES LESS THAN 2 INCHES W.G.PRESSURE CLASSIFICATION, LOCATIONS SHALL BE REVIEWED WITH ARCHITECT/ENGINEER PRIOR TO INSTALLATION. 9. AN OPERATING AND MAINTENANCE MANUAL WILL BE PROVIDED TO THE BUILDING OWNER BY THE MECHANICAL BASED SHALLON TS ANDCONSTRUCTIONOTHER Contents: GENERAL NOTES, DOCUMENTS AND OI U CONTRACTOR. DATA NOT PREVENT THE CODE OFFICIAL FROM ABBREVIATIONS AND w REQUIRING THE CORRECTION 7 OF ERRORS. OSSC 105.4 SHEET INDEX g 0 ill Drawn: CM MECHANICAL SHEET INDEX Checked: GMJ M0.00 GENERAL NOTES,ABBREVIATIONS AND SHEET INDEX Date: 11/30/2020 M0.01 MECHANICAL LEGEND a M0.02 MECHANICAL CALCULATIONS -v M0.03 MECHANICAL SCHEDULES c x M0.04 MECHANICAL SCHEDULES MD1.01 MECHANICAL DEMOLITION-FIRST FLOOR PLAN Sheet Number e (w,) MD1.02 MECHANICAL DEMOLITION-SECOND FLOOR PLAN MD1.03 MECHANICAL DEMOLITION-THIRD FLOOR PLAN U MD1.04 MECHANICAL DEMOLITION-ROOF PLAN M2.00 OVERALL PLANS i M2.01 MECHANICAL HVAC-FIRST FLOOR PLAN 2 M2.02 MECHANICAL HVAC-SECOND FLOOR PLAN a o M2.03 MECHANICAL HVAC-THIRD FLOOR PLAN M2.04 MECHANICAL-ROOF PLAN fto. M0000 co M6.00 MECHANICAL DETAILS Q M7.00 MECHANICAL CONTROLS DIAGRAMS M7.01 MECHANICAL CONTROLS DIAGRAMS ,179.OF TIGARD i .s.r,*-tul4 by Planning initials: __ _1 ._ OREGON PERS SYMBOLS LEGEND - GENERAL SYMBOLS LEGEND - AIR HANDLING SYMBOLS LEGEND - PIPING SYMBOLS LEGEND - PIPING & AIRFLOW DIAGRAMS PUBLIC EMPLOYEES RETIREMENT SYSTEM SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION 1111 SOIL OR WASTE PIPING OR DUCTED AIRFLOW DRAWING CONSTRUCTION("FLAG')NOTE ," POSITIVE PRESSURE DUCT-TURNING TOWARD - - - -V - - - VENT MINI POSITIVE PRESSURE DUCT-TURNING AWAY CL RAIN LEADER —————— NON-DUCTED AIRFLOW ORL OVERFLOW RAIN LEADER X-XX EQUIPMENT IDENTIFIER + I I /1 NEGATIVE PRESSURE DUCT-TURNING TOWARD IC INDIRECT DRAIN - - +� ICOLD WATER ELECTRICAL CONNECTION ***■. .•. ei*g MATCHLINE k 1 e ' 1 NEGATIVE PRESSURE DUCT-TURNING AWAY -- HOT WATER --- HOT WATER CIRCULATING FLOW CONTINUATION ARROW P0 ROUND DUCT-TURNING TOWARD 140°NN— 140°POTABLE HOT WATER COMPLEX INTERLOCK(ELEC.,PNEUMATIC, ETC.) (::::) REVISION CLOUD(ENCIRCLES DRAWING CHANGES MADE SINCE THE g 0ROUND DUCT TURNING AWAY 120°HW— 120°POTABLE HOT WATER PREVIOUS RELEASE) F FIRE --—----— CONNECTION TO CENTRAL MONITORING AND CONTROL SYSTEM(CHCS) ID�Pn SPRINKLER l , . FLAT OVAL DUCT TURNING TOWARD OWSTANDPIPE PUMP A ?`REVISION REFERENCE � , I IPG HIGH PRESSURE STEAM n FLAT-OVAL DUCT-TURNING AWAY I IWC HEATING WATER SUPPLY I iWRT CENTRIFUGAL FAN EXISTING TO BE REMOVED(HATCH) HEATING WATER RETURN \ / /\.. 1 \ CHC CHILLED WATER SUPPLY A I i RR-0.•I � + INCLINE RISE(RJ OR DROP(D)IN DIRECTION OF ARROW f HEAVY LINEWEIGHT INDICATES NEW WORK CHIT CHILLED WATER RETURN OM ELECTRIC MOTOR/STARTER ASSEMBLY REDUCER,CONCENTRIC G R C U - LIGHT LINEWEIGHT INDICATES EXISTING INFORMATION 1 . I FLEXIBLE CONNECTION WYE STRAINER WITH CAPPED HOSE END BLOWDOWN VALVE1T1 ELECTRIC MOTOR OPERATOR(VALVES AND DAMPERS) ' y 111 SW Fifth Ave, Ste 2120 POINT OF CONNECTION 4-, 0ACCESS DOOR(AD)OR ACCESS PANEL(AP) FLOOR DRAIN Portland, Oregon 97204 AP ANGLE VALVE • A © FUNNEL DRAIN 0Tel 503.416.2400 1)T=1AUTOMATIC CONTROL VALVE-TWO WAY(PNEUMATIC OPERATOR FaX 206.267. 701 SHOWN) ` i ) FLOOR SINK(SQUARE AND ROUND) Aft - + -1 + VQLUME DAMPER M SAZAN#790-20002 AUTOMATIC CONTROL VALVE-THREE WAY(ELECTRIC OPERATOR FLOW DIRECTION VW DETAIL REFERENCE FD SHOWN) DETAIL IDENTIFICATION NUMBER s FIRE DAMPER 110/1� 'I BUTTERFLY VALVE SHEET WHERE DETAIL IS DRAWN SDFLEXIBLE CONNECTION IN PIPING 4 sL___T SMOKE DAMPER Nigf ELEVATION REFERENCE 7 ELEVATION IDENTIFICATION FSD MAV MV MANUAL AIR VENT(MAV),AUTOMATIC AIR VENT(AAV) NUMBER SHEET WHERE ELEVATION IS DRAWN 1 T s iii, FIRE SMOKE DAMPER (�) �' PRESSURE GAUGE Allk SECTION REFERENCE SECTION C in 1) VP IDENTIFICATION NUMBER I I -lie- MOTOR OPERATED DAMPER THERMOMETER N - SHEET WHERE SECTION IS DRAWN BOD _, ,[i] Er) BM THERMOMETER WELL NORTH REFERENCE 1 ! S + + BACKDRAFT DAMPER ®Li SIGHT GLASS \ \V//n\\ FLEXIBLE DUCT / HOSE BIB SYMBOLS LEGEND - AIR HANDLING SYMBOLS LEGEND - AIR HANDLING SYMBOLS LEGEND - PIPING SYMBOLS LEGEND - FIRE PROTECTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION ES STEAM TRAP ASSEMBLY r FIRE a FT FIT = FLOAT AND THERMOSTATIC ROUND,90°ELBOW,RIW OR RID=1.5 X-XX �--5 EQUIPMENT WITH EQUIPMENT IDENTIFICATION F = FLOAT WET PIPE ALARM VALVE T = THERMOSTATIC B = BUCKET TO THERMOSTAT IB = INVERTED BUCKET j - I = IMPULSE I FDC FIRE DEPARTMENT CONNECTION RECTANGULAR,90°ELBOW,FON OR R/D-1.5 - DIFFUSER IDENTIFIER 0 = ORIFICE J O10100 X10-....____CONNECTION SIZE >IC PRESSURE REGULATING VALVE WITH SUPERVISORY SWITCH —AIR FLOW(CFM) )( 0 r A PIPE ANCHOR RECTANGULAR OR ROUND,90°ELBOW, DIFFUSER TYPE MARK 0 WET SPRINKLER HEAD RIW OR RID=1.5 PIPE ALIGNMENT GUIDE DRY SPRINKLER HEAD CEILING SUPPLY DIFFUSER -J ® ®�I ® 6"Q —I-') I C-I ---- CONTROL VALVE STATION elMil SQUARE CORNER ELBOW WITH TURNING VANES i CEILING RETURN DIFFUSER IPS PIPE SUPPORT ill I SYMBOLS LEGEND - MEDICAL GASSES .4DESS >"/ ® ® CEILING EXHAUST DIFFUSER flit 31PRESSUREITEMPERATURE TEST PORT CAP SYMBOL DESCRIPTION 02 MA MV OXYGEN MEDICAL MEDICAL COMPRESSEDVACUUM AIR CRIPTION CONNECTION S SIDEWALL GRILL DIFFUSER 4 PLUG WAG WASTE ANESTHETIC GAS 1 ASI 1 02/09/2021 RECTANGULAR BRANCH TO RECTANGULAR DUCT I UNION • MA MEDICAL AIR OUTLET # DESCRIPTION DATE s s CONNECTION WITH 45°TAPER WAGD�--�--WA� WASTE ANESTHETIC GAS DEVICE I yf WYE STRAINER 1102 NITROUS OXIDE(NITROUS) AIRFLOW,SUPPLY GATE VALVE N2 NITROGEN Oregon PERS J. ROUND OR RECTANGULAR BRANCH TO ROUND OR RECTANGULAR DUCT CO2 CARBON DIOXIDE 9 CONNECTION D I GLOBE VALVE ETC ETHYLENE OXIDE HVAC Full Design AIRFLOW, RETURN BALL VALVE MEDICAL GAS VALVE(SERVICE VALVE) .5..L_EL* ROUND BRANCH TO RECTANGULAR DUCT CONNECTIONDal ZVB ZONE VALVE BOX MAB BALANCING OR PLUG VALVE MEDICAL GAS ALARM BOX Oregon Public NEEDLE VALVE MA MEDICAL AIR PRESSURE SENSOR Employees Retirement 71 rl PRESSURE REDUCING VALVE 9 ROUND BRANCH TO ROUND DUCT CONNECTION * --fl HOSE REEL(RETRACTABLE) System l 8 BALANCING/MEASURING VALVE TRANSITION OR REDUCER-NOTED FOT(FLAT ON TOP)OR FOB(FLAT ON V RELIEFENE OX.,er:_ 2' BOTTOM)IF REQUIRED CHECK VALVE SYMBOLS LEGEND - LABORATORY +-7:::1= 1)" RECTANGULAR TO ROUND TRANSITION C PIPE TURNING DOWN I AWAY SYMBOL DESCRIPTION 0 PIPE TURNING UP/TOWARDS + NON POTABLE COLD WATER • cii PIPE DOWN TEE • ++, NON POTABLE HOT WATER •+++• NON POTABLE HOT WATER RECIRCULATE PIPE DOWN TEE I AWAY LA LABORATORY AIR C PIPE UP TEE I TOWARDS LV LABORATORY VACUUM csic ISSUE FOR BID c. I Project: I- Contents: z w MECHANICAL U w LEGEND m N S 0 :4 Drawn: CM Checked: GMJ Date: 11130/2020 g c C 0 Shod Number: n a 0_ N A: M01101 M N N AC-1 SYSTEM REQUIRED OUTSIDE AIR FLOW RATE AC-2 SYSTEM REQUIRED OUTSIDE AIR FLOW RATE OREGON MINIMUM VENTILATION RATES FROM TABLE 403.3.1.1,2019 OREGON MECHANICAL SPECIALTY CODE MINIMUM VENTILATION RATES FROM TABLE 403.3.1.1,2019 OREGON MECHANICAL SPECIALTY CODE PERS PEOPLE DEFAULT OUTDOOR PEOPLE AREA BREATHIN ZONE PEOPLE PEOPLE AREA BREATHIN ZONE AREA ZONE AIR DEFAULT OUTDOOR AREA ZONE AIR ZONE DEFAULT OUTDOOR OUTDOOR G ZONE OUTDOOR ZONE DEFAULT OUTDOOR OUTDOOR G ZONE OUTDOOR NO. ZONE AIRFLOW OUTDOOR DISTRIBUTI PROVIDED NO.OF ZONE AIRFLOW OUTDOOR DISTRIBUTI PROVIDED FLOOR OCCUPAN AIRFLOW AIRFLOW OUTDOOR AIRFLOW FLOOR OCCUPAN AIRFLOW AIRFLOW OUTDOOR AIRFLOW AREA T DENSITY PEOPLE POPULATI RATE IN REQUIRED AIRFLOW REQUIRED AIRFLOW ON REQUIRED OUTDOOR AREA T DENSITY PEOPLE POPULATI RATE IN REQUIRED AIRFLOW REQUIRED AIRFLOW ON REQUIRED OUTDOOR PUBLIC EMPLOYEES RETIREMENT SYSTEM PER CODE ON(c) BREATHIN RATE EFFECTIVE AIR PER CODE ON(c) BREATHIN RATE EFFECTIVE AIR (a) PER CODE (b) G ZONE BY CODE (f) BY CODE REQUIRED NESS(I) BY CODE (a) PER CODE (b) G ZONE BY CODE BY CODE REQUIRED BY CODE ROOM NAME ZONE NAME OCCUPANCY CLASSIFICATION ( } (e) (g) (h) 0) ROOM NAME ZONE NAME OCCUPANCY CLASSIFICATION (d) (e) (f) (g) (h) NESS{i) 0) El [SQFO-0�0 [CFM PER [CFM PER [CFM] [CFM] [CFM] (CFM] [SQA PM 11.00 [CFM PER [CFM] [ QPER [CFM] [CFM] [CFM] [CFMj [SOFT] PERSON] [CFM] SQFT.] Az Pz Rp Ra Vbz Ez Voz Az Pz Rp Ra Vbz Ez Voz 102 LIBRARY W1-2 STORAGE-WAREHOUSES 315 - - 0 - - 0.06 19 19 0.8 24 25 101 LUNCH ROOM FP1-3 ASHRAE 62-1 -BREAK ROOMS 1097 25 27 64 5.0 320 0.06 66 386 0.8 482 485 103 WORK AREA W1-1 STORAGE-WAREHOUSES 154 - - 0 - - 0.06 9 9 0.8 12 15 119 COMPUTERS FC-1 OFFICES-OFFICE SPACES 413 5 2 4 5.0 20 0.06 25 45 0.8 56 60 104 OFFICE FP1 X1 OFFICES-OFFICE SPACES 137 5 1 1 5.0 5 0.06 8 13 0.8 17 20 121 OPEN OFFICE I FP3 X2 OFFICES-OFFICE SPACES 671 5 3 10 5.0 50 0.06 40 90 0.8 113 115 105 DARK RM W1-1 STORAGE-WAREHOUSES 23 - - 0 - - 0.06 1 1 0.8 2 5 122A OPEN OFFICE FC-1 OFFICES-OFFICE SPACES 390 5 2 3 5.0 15 0.06 23 38 0.8 48 50 106A OPEN OFFICE FP1-1 OFFICES-OFFICE SPACES 1050 5 5 15 5.0 75 0.06 63 138 0.8 173 175 122B OPEN OFFICE W1-5 OFFICES-OFFICE SPACES 547 5 3 8 5.0 40 0.06 33 73 0.8 91 95 106E OPEN OFFICE W1-1 OFFICES-OFFICE SPACES 1040 5 5 11 5.0 55 0.06 62 117 0.8 147 150 122C OPEN OFFICE FC-1 OFFICES-OFFICE SPACES 814 5 4 5 5.0 25 0.06 49 74 0.8 92 95 107 SHELVES W1-1 STORAGE-WAREHOUSES 326 - - 0 - - 0.06 20 20 0.8 24 25 124 OPEN OFFICE FPI-7 OFFICES-OFFICE SPACES 350 5 2 4 5.0 20 0.06 21 41 0.8 51 55 108 CORRIDOR W1-3 PUBLIC SPACES-CORRIDORS 266 - - 0 - - 0.06 16 16 0.8 20 20 124A FIRE SPRINKLER FP1-7 STORAGE-WAREHOUSES 31 - - 0 - - 0.06 2 2 0.8 2 5 112 CORRIDOR W1-1 PUBLIC SPACES-CORRIDORS 92 - - 0 - - 0.06 6 6 0.8 7 10 125 OFFICE FP1-6 OFFICES-OFFICE SPACES 128 5 1 1 5,0 5 0.06 8 13 0.8 16 20 113 MAIL RM FP1-2 STORAGE-WAREHOUSES 596 - - 0 - - 0.06 36 36 0.8 45 45 126 OFFICE FP1-6 OFFICES-OFFICE SPACES 139 5 1 1 5.0 5 0.06 8 13 0.8 17 20 114 OFFICE W1-3 OFFICES-OFFICE SPACES 146 5 1 2 5.0 10 0.06 9 19 0.8 23 25 127A OPEN OFFICE FP1-6 OFFICES-OFFICE SPACES 439 5 2 8 5.0 40 0.06 26 66 0.8 83 85 A115 INSERT MACH W1-3 STORAGE-WAREHOUSES 624 - - 0 - - 0.06 37 37 0.8 47 50 1278 OPEN OFFICE W1-7 OFFICES-OFFICE SPACES 493 5 2 6 5.0 30 0.06 30 60 0.8 74 75 A 7 116 OPEN OFFICE W1-3 OFFICES-OFFICE SPACES 413 5 2 1 5.0 5 0.06 25 30 0.8 37 40 127C OPEN OFFICE W1-7 OFFICES-OFFICE SPACES 886 5 4 16 5.0 80 0.06 53 133 0.8 166 170 117 OPEN OFFICE FP1-2 OFFICES-OFFICE SPACES 1183 5 6 3 5.0 15 0.06 71 86 0.8 107 110 127D OPEN OFFICE W1-7 OFFICES-OFFICE SPACES 862 5 4 12 5.0 60 0.06 52 112 0.8 140 140 GROUP 118 OPEN OFFICE/CORRIDOR W1-4 OFFICES-OFFICE SPACES 1004 5 5 7 5.0 35 0.06 60 95 0.8 119 120 127E OPEN OFFICE FP1-5 OFFICES-OFFICE SPACES 135 5 1 1 5.0 5 0.06 8 13 0.8 16 20 SW Fifth Ave, 2120 134 W SHOWER W1-2 PUBLIC SPACES-TOILET ROOMS-PUBLIC 174 - - 0 - - - - - 0.8 0 0 128 CORRIDOR W1-6 PUBLIC SPACES-CORRIDORS 403 - - 0 - - 0.06 24 24 0.8 30 35 Portland, Oregon Ste204 135 M SHOWER W1-2 PUBLIC SPACES-TOILET ROOMS-PUBLIC 179 - - 0 - - - - - 0.8 0 0 129 OFFICE FP1-5 OFFICES-OFFICE SPACES 139 5 1 1 5.0 5 0.06 8 13 0.8 17 20 136 CORRIDOR W1-2 PUBLIC SPACES-CORRIDORS 301 - - 0 - - 0.06 18 18 0.8 23 25 130 WORK AREA W1-8 STORAGE-WAREHOUSES 175 - - 0 - - 0.06 11 11 0.8 13 15 CAD Tel 503.416.2400 136A STORAGE W1-2 STORAGE-WAREHOUSES 39 - - 0 - - 0.06 2 2 0.8 3 5 131 CONFERENCE FP1-4 OFFICES-CONFERENCE ROOMS 388 50 19 10 5.0 50 0.06 23 73 0.8 92 95 Fax 206.267. 701 137 MEN W1-2 PUBLIC SPACES-TOILET ROOMS-PUBLIC 223 - - 0 - - - - - 0.8 0 0 132 PLANNING W1-6 OFFICES-CONFERENCE ROOMS I 181 50 9 8 5.0 40 0.06 11 51 0.8 64 65 ' 138 DATA W1-4 GENERAL-IDE ROOM 165 0 0 0 0.0 0 0.00 0 0 0.8 0 0 133 PLANNING FP1-5 OFFICES-CONFERENCE ROOMS 181 50 9 8 5.0 40 0.06 11 51 0.8 64 65 SAZAN#790-20002 139 ELEV MACH W1-4 GENERAL-ELEC/MECH 98 0 0 0 0.0 0 0.00 0 0 0.8 0 0 204 CORRIDOR W2-7 PUBLIC SPACES-CORRIDORS 150 - - 0 - - 0.06 9 9 0.8 11 15 140 ELECT W1-4 GENERAL-ELEC/MECH 125 0 0 0 0.0 0 0.00 0 0 0.8 0 0 205 COUNSELING FP2-10 OFFICES-CONFERENCE ROOMS 112 50 6 2 5.0 10 0.06 7 17 0.8 21 25 141 JANITOR W1-2 ASHRAE 62-1 -JANITOR CLOSETS,TRASH ROOMS,... 77 0 0 0 0.0 0 0.00 0 0 0.8 0 0 206 COUNSELING W2-7 OFFICES-CONFERENCE ROOMS 111 50 6 2 5.0 10 0.06 7 17 0.8 21 25 142 WOMEN W1-2 PUBLIC SPACES-TOILET ROOMS-PUBLIC 239 - - 0 - - - - - 0.8 0 0 207 COUNSELING W2-7 OFFICES-CONFERENCE ROOMS 108 50 5 2 5.0 10 0.06 6 16 0.8 21 25 143 E LOBBY W1-2 PUBLIC SPACES-CORRIDORS 183 - - 0 - - 0.06 11 11 0.8 14 15 208 MEDIA CENTER W2-7 OFFICES-OFFICE SPACES ( 98 5 0 2 5.0 10 0.06 6 16 0.8 20 20 203 RECEPTION W2-3 OFFICES-MAIN ENTRY LOBBIES 459 10 5 4 5.0 20 0.06 28 48 0.8 59 60 209 COFFEE I W2-7 STORAGE-WAREHOUSES 83 - - 0 - - 0.06 5 5 0.8 6 10 230A BOARD RM FP2-4 OFFICES-CONFERENCE ROOMS 1037 50 52 14 5.0 70 0.06 62 132 0.8 165 170 210 SICK RM W2-7 OFFICES-OFFICE SPACES I 98 5 0 1 5.0 5 0.06 8 11 0.8 14 15 230B BOARD RM W2-5 OFFICES-CONFERENCE ROOMS 432 50 22 31 5.0 155 0.06 26 181 0.8 226 230 211 TRAINING FP2-10 EDUCATION-COMPUTER LAB 638 25 16 14 10.0 140 0.12 77 217 0.8 271 275 230C BOARD RM W2-4 OFFICES-CONFERENCE ROOMS 424 50 21 31 5.0 155 0.06 25 180 0.8 226 230 212 FILE RM W2-8 STORAGE-WAREHOUSES 134 - - 0 - - 0.06 8 8 0.8 10 15 231 CORRIDOR W2-3 PUBLIC SPACES-CORRIDORS 397 - - 0 - - 0.06 24 24 0.8 30 30 213A OPEN OFFICE FP2-9 OFFICES-OFFICE SPACES 465 5 2 6 5.0 30 0.06 28 58 0.8 72 75 232 CORRIDOR W2-2 PUBLIC SPACES-CORRIDORS 303 - - 0 - - 0.06 18 18 0.8 23 25 2138 OPEN OFFICE W2-8 OFFICES-OFFICE SPACES 471 5 2 4 5.0 20 0.06 28 48 0.8 60 65 233A OPEN OFFICE FP2-1 OFFICES-OFFICE SPACES 641 5 3 8 5.0 40 0.06 38 78 0.8 98 100 214 OFFICE FP2-8 OFFICES-OFFICE SPACES 145 5 1 1 5.0 5 0.06 9 14 0.8 17 20 233B OPEN OFFICE FP2-1 OFFICES-OFFICE SPACES 643 5 3 6 5.0 30 0.06 39 69 0.8 86 90 215 OFFICE FP2-8 OFFICES-OFFICE SPACES 145 5 1 1 5.0 5 0.06 9 14 0.8 17 20 233C OPEN OFFICE W2-1 OFFICES-OFFICE SPACES 932 5 5 10 5.0 50 0.06 56 106 0.8 132 135 216 CORRIDOR W2-8 PUBLIC SPACES-CORRIDORS 248 - - 0 - - 0.06 15 15 0.8 19 20 233D OPEN OFFICE W2-1 OFFICES-OFFICE SPACES 773 5 4 2 5.0 10 0.06 46 56 0.8 70 75 217 STORAGE FP2-7 STORAGE-WAREHOUSES 59 - - 0 - - 0.06 4 4 0.8 4 5 234 COFFEE-STORAGE W2-2 ASHRAE 62-1 -BREAK ROOMS 361 25 9 6 5.0 30 0.06 22 52 0.8 65 65 218 DIR OFFICE FP2-7 OFFICES-OFFICE SPACES 269 5 1 2 5.0 10 0.06 16 26 0.8 33 35 235 DATA W2-3 GENERAL-IDF ROOM 129 0 0 0 0.0 0 0.00 0 0 0.8 0 0 219 OPEN OFFICE W2-8 OFFICES-OFFICE SPACES 591 5 3 2 5.0 10 0.06 35 45 0.8 57 60 236 ELECT W2-3 GENERAL-ELEC/MECH 84 0 0 0 0.0 0 0.00 0 0 0.8 0 0 220 DP DIR OFFICE FP2-6 OFFICES-OFFICE SPACES 195 5 1 2 5.0 10 0.06 12 22 0.8 27 30 237 WOMEN VV2-3 PUBLIC SPACES-TOILET ROOMS-PUBLIC 244 - - 0 - - - - - 4.8 0 0 221 WORK AREA VV2-8 STORAGE-WAREHOUSES 323 - - 0 - - 0.06 19 19 0.8 24 25 238 MEN W2-3 PUBLIC SPACES-TOILET ROOMS-PUBLIC 226 - - 0 - - - - - 0.8 0 0 222 OFFICE FP2-6 OFFICES-OFFICE SPACES 205 5 1 1 5.0 5 0.06 12 17 0.8 22 25 239 E LOBBY W2-3 PUBLIC SPACES-CORRIDORS 205 - - 0 - - 0.06 12 12 0.8 15 20 223 OFFICE FP2-6 OFFICES-OFFICE SPACES 191 5 1 1 5.0 5 0.06 11 16 0.8 21 25 240 COATS W2-4 STORAGE-WAREHOUSES 70 - - 0 - - 0.06 4 4 0.8 5 10 224 OFFICE FP2-6 OFFICES-OFFICE SPACES 190 5 1 1 5.0 5 0.06 11 16 0.8 21 25 240A STORAGE W2-4 STORAGE-WAREHOUSES 34 - - 0 - - 0.06 2 2 0.8 3 5 225 OPEN OFFICE W2-7 OFFICES-OFFICE SPACES 983 5 5 8 5.0 40 0.06 59 99 0.8 124 125 241 OFFICE FP2-2 OFFICES-OFFICE SPACES 150 5 1 1 5.0 5 0.06 9 14 0.8 18 20 226 OFFICE FP2-5 OFFICES-OFFICE SPACES 189 5 1 1 5.0 5 0.06 11 16 0.8 20 25 242 MEETING RM FP2-2 OFFICES-CONFERENCE ROOMS 280 50 14 10 5.0 50 0.06 17 67 0.8 84 85 227 CONFERENCE W2-6 OFFICES-CONFERENCE ROOMS 243 50 12 10 5.0 50 0.06 15 65 0.8 81 85 243 OFFICE FP2-2 OFFICES-OFFICE SPACES 157 5 1 1 5.0 5 0.06 9 14 0.8 18 20 228 OPEN OFFICE FP2-5 OFFICES-OFFICE SPACES 816 5 4 4 5.0 20 0.06 49 69 0.8 86 90 244 CORRIDOR FP2-2 PUBLIC SPACES-CORRIDORS 71 - - 0 - - 0.06 4 4 0,8 5 10 229 STORAGE W2-7 STORAGE-WAREHOUSES 155 - - 0 - - 0.06 9 9 0.8 12 15 245A OPEN OFFICE FP2-3 OFFICES-OFFICE SPACES 544 5 3 4 5.0 20 0.06 33 53 0.8 66 70 302 STORAGE W3-8 STORAGE-WAREHOUSES 76 - - 0 - - 0.06 5 5 0.8 6 10 245B OPEN OFFICE W2-2 OFFICES-OFFICE SPACES 708 5 4 7 5.0 35 0.06 42 77 0.8 97 100 303 COFFEE W3-8 STORAGE-WAREHOUSES 82 - - 0 - - 0.06 5 5 0.8 6 10 246 OFFICE W2-2 OFFICES-OFFICE SPACES 110 5 1 1 5.0 5 0.06 7 12 0.8 15 15 304 PRINTERS W3-8 STORAGE-WAREHOUSES 240 - - 0 - - 0.06 14 14 0.8 18 20 247 OFFICE W2-2 OFFICES-OFFICE SPACES 67 5 0 1 5.0 5 0.06 4 9 0.8 11 15 304A STORAGE W3-8 STORAGE-WAREHOUSES 22 - - 0 - - 0.06 1 1 0.8 2 5 301 UPPER LOBBY FP3-6 OFFICES-MAIN ENTRY LOBBIES 417 10 4 4 5.0 20 0.06 25 45 0.8 56 60 305A OPEN OFFICE FP3-13 OFFICES-OFFICE SPACES 716 5 4 3 5.0 15 0.06 43 58 0.8 72 75 301A CORRIDOR W3-3 PUBLIC SPACES-CORRIDORS 304 - - 0 - - 0.06 18 18 0.8 23 25 305B OPEN OFFICE W3-8 OFFICES-OFFICE SPACES 885 5 4 9 5.0 45 0.06 53 98 0.8 123 125 313A OPEN OFFICE FP3-7 OFFICES-OFFICE SPACES 795 5 4 6 5.0 30 0.06 48 78 0.8 97 100 305C OPEN OFFICE W3-8 OFFICES-OFFICE SPACES 881 5 4 8 5.0 40 0.06 53 93 0.8 116 120 313B OPEN OFFICE W3-6 OFFICES-OFFICE SPACES 1269 5 6 14 5.0 70 0.06 76 146 0.8 183 185 305D OFFICE FP3-13 OFFICES-OFFICE SPACES 131 5 1 1 5.0 5 0.06 8 13 0.8 16 20 315 OFFICE FP3-1 OFFICES-OFFICE SPACES 125 5 1 1 5.0 5 0.06 8 13 0.8 16 20 306 OFFICE FP3-12 OFFICES-OFFICE SPACES 127 5 1 1 5.0 5 0.06 8 13 0.8 16 20 317 OPEN OFFICE W3-5 OFFICES-OFFICE SPACES 1209 5 6 13 5.0 65 0.06 73 138 0.8 172 175 307 OFFICE FP3-12 OFFICES-OFFICE SPACES 143 5 1 1 5.0 5 0.06 9 14 0.8 17 20 318A OPEN OFFICE FP3-1 OFFICES-OFFICE SPACES 1223 5 6 8 5.0 40 0.06 73 113 0.8 142 145 308 CONFERENCE FP3-11 OFFICES-CONFERENCE ROOMS 188 50 9 8 5.0 40 0.06 11 51 0.8 64 65 318B OPEN OFFICE W3-5 OFFICES-OFFICE SPACES 651 5 3 7 5.0 35 0.06 39 74 0.8 93 95 309 OFFICE FP3-10 OFFICES-OFFICE SPACES 128 5 1 1 5.0 5 0.06 8 13 0.8 16 20 319 CONFERENCE W3-1 OFFICES-CONFERENCE ROOMS 205 50 10 8 5.0 40 0.06 12 52 0.8 65 70 310 OFFICE FP3-9 OFFICES-OFFICE SPACES 130 5 1 1 5.0 5 0.06 8 13 0.8 16 20 322 OFFICE FP3-2 OFFICES-OFFICE SPACES 126 5 1 1 5.0 5 0.06 8 13 0.8 16 20 311 WORK AREA W3-7 STORAGE-WAREHOUSES 434 - - 0 - - 0.06 26 26 0.8 33 35 323 CONFERENCE FP3-3 OFFICES-CONFERENCE ROOMS 371 50 19 10 5.0 50 0.06 22 72 0.8 90 95 312A OPEN OFFICE FP3-8 OFFICES-OFFICE SPACES 674 5 3 7 5.0 35 0.06 40 75 0.8 94 95 324 OFFICE FP3-4 OFFICES-OFFICE SPACES 128 5 1 1 5.0 5 0.06 8 13 0.8 16 20 312B OPEN OFFICE W3-7 OFFICES-OFFICE SPACES 1198 5 6 14 5.0 70 0.06 72 142 0.8 177 180 325A OPEN OFFICE FP3-5 OFFICES-OFFICE SPACES 600 5 3 5 5.0 25 0.06 36 61 0.8 76 80 312C OPEN OFFICE W3-7 OFFICES-OFFICE SPACES 951 5 5 9 5.0 45 0.06 57 102 0.8 128 130 1 ASI 1 02/09/2021 3258 OPEN OFFICE W3-2 OFFICES-OFFICE SPACES 1050 5 5 8 5.0 40 0.06 63 103 0.8 129 130 312D OPEN OFFICE FP3-9 OFFICES-OFFICE SPACES 465 5 2 5 5.0 25 0.06 28 53 0.8 66 70 # DESCRIPTION DATE 326 PRINTERS W3-2 STORAGE-WAREHOUSES 200 - - 0 - - 0.06 12 12 0.8 15 15 313C OPEN OFFICE W3-7 OFFICES-OFFICE SPACES 709 5 4 4 5.0 20 0.06 43 63 0.8 78 80 326A STORAGE W3-2 STORAGE-WAREHOUSES 22 - - 0 - - 0.06 1 1 0.8 2 5 314 OFFICE FP3-8 OFFICES-OFFICE SPACES 139 5 1 1 5.0 5 0.06 8 13 0.8 17 20 Oregon PERS 327 COFFEE W3-2 STORAGE-WAREHOUSES 47 - - 0 - - 0.06 3 3 0.8 4 5 TOTAL 24,596 213 310 1,620 1,514 3,134 3,918 4,120 328 DATA W3-3 GENERAL-IDE ROOM 130 0 0 0 0.0 0 0.00 0 0 0.8 0 0 FOOTNOTES: HVAC Full De s i g n 329 STORAGE W3-3 STORAGE-WAREHOUSES 71 - - 0 - - 0.06 4 4 0.8 5 10 (a)Az=NET OCCUPIABLE FLOOR AREA OF SPACE OR SPACES IN THE ZONE IN SOFT 330 ELECT W3-3 GENERAL-ELEC/MECH 133 0 0 0 0.0 0 0.00 0 0 0.8 0 0 (b)DEFAULT NO.OF PEOPLE PER CODE=Az'DEFAULT OCC.DENSITY/1000 331 WOMEN W3-3 PUBLIC SPACES-TOILET ROOMS-PUBLIC 242 - - 0 - - - - - 0.8 0 0 (c)Pz=NO.OF PEOPLE IN THE SPACE OR SPACES IN THE ZONE PER SEAT COUNT OR EXIT PLANS AND CODE SUMMARY SHEET 332 MEN W3-3 PUBLIC SPACES-TOILET ROOMS-PUBLIC 229 - - 0 - - - - - 0.8 0 0 (d)Rp=PEOPLE OUTDOOR AIRFLOW RATE IN BREATHING ZONE IN CFM PER PERSON Oregon Public 333 E LOBBY W3-3 PUBLIC SPACES-CORRIDORS 276 - - 0 - - 0.06 17 17 0.8 21 25 (e)PEOPLE OUTDOOR AIRFLOW REQUIRED BY CODE IN CFM=Rp*Pz 334 STAIR FP3-6 PUBLIC SPACES-CORRIDORS 260 - - 0 - - 0.06 16 16 0.8 20 20 (f)Ra=AREA OUTDOOR AIRFLOW RATE IN CFM PER SOFT Employees Retirement TOTAL 28,736 240 263 1,315 1,562 2,877 3,597 3,760 (g)AREA OUTDOOR AIRFLOW REQUIRED BY CODE IN CFM=Ra*Rz System FOOTNOTES: (h)Vbz=BREATHING ZONE OUTDOOR AIRFLOW REQUIRED IN CFM PER EQUATION 4-1=Rp*Pz+Ra*Rz (a)Az=NET OCCUPIABLE FLOOR AREA OF SPACE OR SPACES IN THE ZONE IN SQFT (i)Ez=ZONE AIR DISTRIBUTION EFFECTIVENESS PER AIR DISTRIBUTION CONFIGURATION PER TABLE 403.3.1.1.1.2 (b)DEFAULT NO.OF PEOPLE PER CODE=Az*DEFAULT OCC.DENSITY/1000 0)Voz=ZONE OUTDOOR AIRFLOW REQUIRED BY CODE IN CFM AS PER EQUATION 4-2=Vbz/Ez (C)Pz=NO.OF PEOPLE IN THE SPACE OR SPACES IN THE ZONE PER SEAT COUNT OR EXIT PLANS AND CODE SUMMARY SHEET (d)Rp=PEOPLE OUTDOOR AIRFLOW RATE IN BREATHING ZONE IN CFM PER PERSON (e)PEOPLE OUTDOOR AIRFLOW REQUIRED BY CODE IN CFM=Rp*Pz (f)Ra=AREA OUTDOOR AIRFLOW RATE IN CFM PER SOFT (g)AREA OUTDOOR AIRFLOW REQUIRED BY CODE IN CFM=Ra*Rz ii (h)Vbz=BREATHING ZONE OUTDOOR AIRFLOW REQUIRED IN CFM PER EQUATION 4-1=Rp*Pz+Ra*Rz (i)Ez=ZONE AIR DISTRIBUTION EFFECTIVENESS PER AIR DISTRIBUTION CONFIGURATION PER TABLE 403.3.1.1.1.2 (j)Voz=ZONE OUTDOOR AIRFLOW REQUIRED BY CODE IN CFM AS PER EQUATION 4-2=Vbz/Ez c N ISSUE FOR BID of Project IR Contents: w MECHANICAL U a w CALCULATIONS Drawn: CM ti Checked: GMJ N I Date: 11/30/2020 I c c a _ _Sheet Sheet Number. e m N U m a v . . M 0 MO . 02 0 2 ri 0 z...._.N rn a OREGON GENERAL NOTES PERS 1.REFER TO SPECIFICATIONS,G0.00 AND G.01 FOR ALTERNATE SCOPE DISCRIPTION.ONLY FURNISH AND INSTALL OR DEMOLISH I REMOVE EQUIPMENT IN ACCORDANCE WITH CONTRACT. PUBLIC EMPLOYEES RETIREMENT SYSTEM FAN POWER VARIABLE AIR VOLUME UNIT SCHEDULE (EXISTING) PRIMARY AIR ELECTRIC HEATING COIL FAN ELECTRICAL MAX STATIC PRESSURE LOSSOPERATING WEIGHT EQUIP.NO LOCATION SERVICE MANUFACTURER MODEL SERIES INLET SIZE MAX AIRFLOW MIN AIRFLOW (WC.) MAXINC*AT ASP=10 KW STAGES EAT DB LAT DB MCA V/PH/HZ CFM HP HEATING CFM V PHASE (LBS) REMARKS (IN) (CFM) (CFM) (DEG F) (DEG F) FP1-1 - OFFICE 106 PERIM - - - 1,860 500 0.40 35 7 3 - - - - 600 1/3 1100 480 3 - - FP1-2 - AUX SERVICE 103 - - - 1,060 320 0.40 35 5.5 2 - - - - 525 1/3 845 480 3 - - FP1-3 - LUNCH ROOM 101 - - - 2,250 480 0.40 35 7.5 3 - - - - 525 1/3 1005 480 3 - - FP1-4 - CONF ROOM 131 - - - 420 90 0.40 30 2 1 - - - - 220 1/15 310 277 1 - - FP1-5 - PLANNING RM 133 - - - 870 260 0.40 30 4 2 - - - - 320 1/15 610 480 3 - - FP1-6 - OFFICE 125-126 - - - 1,280 380 0.40 30 5 2 - - - - 320 1/15 730 480 3 - - FP1-7 WORKROOM 124 - - - 260 60 0.40 30 2 1 - - - - 200 1/15 260 277 1 - - FP1-8 - OFFICE 104 - - - 480 160 0.40 30 2 1 - - - 250 1/15 410 277 1 - n � /�.\FPI-9 - OFFICE 111 - - - 430 160 0.40 30 2 1 - - - - 210 1/15 370 277 1 - \ /C\ FP2-1 - LEASE N PERIM - - - 1,100 330 0.40 35 6 2 - - - - 350 1/15 680 480 3 - - FP2-2 - LEASE E PERIM - - - 980 290 0.40 35 5 2 - - - - 275 1/15 565 480 3 - - R 0 U P FP2-3 - LEASES PERIM - - - 400 120 0.40 35 2 1 - - - - 275 1/15 395 277 1 - 111 SW Fifth Aye, Ste 2120 FP2-4 - BOARD ROOM 220 - - - 800 240 0.40 30 4 2 - - - - 350 1/15 590 480 3 - - Portland, Oregon 97204 FP2-5 - OFFICE 228 PERIM - - - 1,200 360 0.40 35 5 2 - - - - 350 1/15 710 480 3 - - FP2-6 - OFFICE 222-226 - - - 1,200 360 0.40 35 5 2 - - - - 350 1/15 710 480 3 - (- Tel 503.416.2400 FP2-7 - OFFICE 218 - - - 625 190 0.40 30 Z5 1 - • - - 275 1/15 455 277 1 - - r Fax 206.267.1701 FP2-8 - OFFICE 217-215 - - - 470 140 0.40 30 2 1 - - - - 220 1/15 360 277 1 - - FP2-9 - CONTRACTORS 213 - - - 1,060 315 0.40 35 3.5 2 - - - - 220 1/15 590 480 3 - - SAZAN#790-20002 FP2-10 - TRAINING 211 - - - 1,230 300 0.40 30 3 2 - - - - 350 1/15 650 277 1 - - FP3-1 - OFFICE 318 PERIM - - - 1,260 370 0.40 35 7 3 - - - 350 1/15 720 480 3 - - FP3-2 - OFFICE 322 - - - 210 60 0.40 30 1 1 - - - - 175 1/15 235 277 1 - - FP3-3 CONF ROOM 323 - - - 470 120 0.40 30 2 1 - - - - 220 1/15 340 277 1 - - FP3-4 - OFFICE 324 - - - 250 60 0.40 30 1 1 - - - - 175 1/15 235 277 1 - - FP3-5 - OFFICE 325 PERIM - - - 310 90 0.40 35 2 1 - - - - 175 1/15 365 277 1 - - FP3-6 - LOBBY 202 - - - 1,920 570 0.40 35 11 3 - - - - 675 1/3 1245 480 3 - - FP3-7 - WORK AREA 315 - - - 660 200 0.40 35 3 2 - - - - 275 1/15 475 277 1 - - FP3-8 - OFFICE 313 PERIM - - - 1,215 360 0.40 35 5 2 - - - - 350 1/15 710 480 3 - - FP3-9 - OFFICE 312 PERIM - - - 1,180 350 0.40 35 5 2 - - - - 350 1/15 700 480 3 - - FP3-10 - OFFICE 309 - - - 270 60 0.40 30 1 1 - - - - 220 1/15 280 277 1 - - FP3-11 - CONF ROOM 308 - - - 330 90 0.40 30 1 1 - - - - 220 1/15 310 277 1 - - FP3-12 - OFFICE 306-307 - - - 450 130 0.40 30 2 1 - - - - 220 1/15 350 277 1 - - FP3-13 - OFFICE 305 PERIM - - - 705 210 0.40 35 3.5 2 - - - - 275 1/15 485 480 3 - - REMARKS: PACKAGED ROOFTOP AIR CONDITIONING UNIT SCHEDULE (GAS HEAT) (EXISTING) COOLING COIL SUPPLY FAN RETURN FAN GAS HEATER ELECTRICAL COOLING LOAD EAT LAT NOMINAL CAPACITY MIN OUTSIDE AIR OPERATING WEIGHT EQUIP.NO LOCATION SERVICE MANUFACTURER SERIES (T ) EER IEER AIRFLOW ESP HP AIRFLOW ESP HP ( ECONOMIZER INPUT CAPACITY OUTPUT CAPACITY TYPE MCA V/PH/HZ (LBS) REMARKS TOTAL LOAD(MBH) SENSIBLE LOAD(MBH) EDB/EWB LDB/LWB (CFM) (IN-WC) (CFM) (IN-WC) (MBH) (MBH) AC-1 ROOF NORTH WING TRANE INTELLIPAK SFH 56 663 621 77/64 55/- 8.5 - 23,200 1.5 30 18,560 1.0 7.5 4,300 YES 500 410 NG 240 460/3/60 11,200 AC-2 ROOF SOUTH WING TRANE INTELLIPAK SFH 56 664.2 602.5 77.0/61.0 55/- 8.5 - 23,000 1.5 30 18,400 1.0 7.5 4,800 YES 500 410 NG 240 460/3/60 11,200 REMARKS: SINGLE DUCT VARIABLE AIR VOLUME UNIT SCHEDULE (EXISTING) PRIMARY AIR ELECTRIC HEATING COIL ELECTRICAL EQUIP.NO LOCATION SERVICE MANUFACTURER MODEL SERIES MAX STATIC PRESSURE LOSS MAXNC'AT ASP=10' OPERATING WEIGHT INLET SIZE MAX AIRFLOW MIN AIRFLOW EAT DB LAT DB DISCHARGE NC RADIATED NC REMARKS (IN) (CFM) (CFM) (W.C.} KW STAGES (DEG F) (DEG F) MCA V/PH/HZ V PHASE (LBS} W1-1 - OPEN OFFICE 106 - • - 1,590 470 0.40 35 - - - - - - 24 1 - - - - W1-2 - INTERIOR 136-143 - - - 720 300 0.40 35 - - - - - - 24 1 - - - - W1-3 - INSERT MACH 115 - - - 1,210 520 0.40 35 - - - - - - 24 1 - - - - W1-4 - STORAGE 118 - - - 400 100 0.40 35 - - - - - - 24 1 - - - - 1 ASI 1 02/09/2021 W1-5 - COMPUTER RM 122 - - - 975 290 0.40 35 - - - - - - 24 1 - •- - • WI-6 - OPEN OFFICE 127 - - - 1,120 330 0.40 35 - - - - - - 24 1 - - - - # DESCRIPTION DATE W1-7 • OPEN OFFICE 127 - - - 1,530 460 0.40 35 - - - - - - 24 1 - - - - W2-1 - LEASE INTERIOR - - - 1,020 300 0.40 35 - - - - - - 24 1 - - - - Oregon PERS W2-2 - LEASE INTERIOR - - - 800 240 0.40 35 - - - - - - 24 1 - - - - HVAC W2-3 - ELEV LOBBY 237 - - - 780 230 0.40 35 - - - - - - 24 1 - - - - HVAC Full Design W2-4 - BOARD ROOM 230 - - - 410 160 0.40 35 - - - - - - 24 1 - - - - W2-5 - BOARD ROOM 230 - - - 410 160 0.40 35 - - - - - - 24 1 - - - - VV2-6 - CONF RM 227 - - - 180 0 0.40 35 - - - - - - 24 1 - - - W2-7 - OPEN OFFICE 225 - - - 1,300 390 0.40 35 - - - - - - Y4 1 - - - • Oregon Public W2-8 - OPEN OFFICE 219 - - - 1,275 380 0.40 35 - - - - - - 24 1 - - - - Employees Retirement W3-1 - CONF RM 319 - - - 140 0 0.40 35 - - - - - - 24 1 - - - - System W3-2 W3-2 - OPEN OFFICE 325 - - - 1,550 690 0.40 35 - - - - - - 24 1 - - - - W3-3 - ELEV LOBBY 333 - - - 720 290 0.40 35 - - - - - - 24 1 - - - W3-4 - CONF ROOM 316 - - - 150 0 0.40 35 - - - - - - 24 1 - - - - W3-5 - OPEN OFFICE 317 - - - 1,140 450 0.40 35 - - - - - - 24 1 - - - - W3-6 - WORK AREA 315 - - - 1,620 650 0.40 35 - - - - - - 24 1 - - - - VV3-7 - OPEN OFFICE 312 - - - 1,980 800 0.40 35 - - - - - - 24 1 - - - - W3-8 - OPEN OFFICE 305 - - - 1,820 720 0.40 35 - - - - - - 24 1 - - - - I REMARKS: 1 aic ISSUE FOR BID •i Project: 01- Contents: Z W MECHANICAL U W 2 SCHEDULES N aDrawn: CM tg Checked: GMJ Date: 11/30/2020 g c "o c x Sheet Number: N U m a r rz- _ �; ■ 0 3,,N 0 a OREGON GENERAL NOTES PERS 1. REFER TO SPECIFICATIONS,G0.00 AND G.01 FOR ALTERNATE PACKAGED ROOFTOP AIR CONDITIONING UNIT SCHEDULE (GAS H EAT) SCOPE DISCRIPTION. ONLY FURNISH AND INSTALL EQUIPMENT IN ACCORDANCE WITH CONTRACT. COOLING COIL SUPPLY FAN RETURN FAN GAS HEATER ELECTRICAL PUBLIC EMPLOYEES RETIREMENT SYSTEM BASIS OF NOMINAL COOLING LOAD EAT LAT MIN OPERATING111 BASIS OF DESIGN OUTSIDE EQUIP.NO LOCATION SERVICE DESIGN CAPACITY EER !EERAIRFLOW ESP AIRFLOW ESP AIR ECONOMIZER INPUT OUTPUT WEIGHT REMARKS MANUFACTURER SERIES (TONS) TOTAL SENSIBLE CFM IN WC HP HP CAPACITY CAPACITY TYPE FLA MCA MOP V/PH/HZ (LBS) LOAD LOAD(MBH) EDBIEWB LDBILWB (CFM) ( ) (CFM) (IN-WC) (CFM) (MBH) (MBH) (MBH) AC-1 ROOF NORTH WING PETRA PPH 75 75 759 675.1 76.8161.3 53.4/50.9 12,0 13.5 26,000 1.5 (4)7.6 20,800 1.0 (2)6 3,800 YES 650 506 NG 169.6 176.8 200.0 460/3/60 10,800 1-10 AC-2 ROOF SOUTH WING PETRA PPH 65 65 664.2 602.5 77.0161.0 53.4/50.7 12.0 13.5 23,200 1.5 (4)7.6 18,560 1,0 (2)5.38 4,200 YES 550 413.3 NG 158.6 164.4 175.0 46013/60 10,500 1-10 REMARKS: 1.UNIT BASE TO MATCH EXISTING ROOF CURB.CURB TO BE SEISMICALLY BRACED. Unclear, Unit swap on original bid, now more work tearing up roof 2.VARIABLE AIR VOLUME WITH VARIABLE FREQUENCY DRIVE SUPPLY AND RETURN MOTORS 3.100%ECONOMIZER. 4.FIELD INSTALLED CONTROLS. 5.PROVIDE EC MOTORS ON SUPPY AND RETURN FANS. A 6 LD •0-' k 'TE RB E P" •R To •RD = G • QUIPMENT. 0-V 8 PPV1 ' MONONIP ..ALL •N -. PO'' • B' ON -*LS • •. OR. A 9 •-0V ' SI E -• kTE TRI . P. ,I R • NE ON040;011011:ti. . 10.P•OVIDSt•EED OMP- SSO• FOR OOLI GROUP 111 SW Fifth Aye, Ste 2120 FAN POWER VARIABLE AIR VOLUME UNIT SCHEDULE Portland, Oregon 97204 1 Tel 503.416.2400 PRIMARY AIR ELECTRIC HEATING COIL FAN ELECTRICAL ' Fax Fax 206.267.1701 MAX STATIC PRESSURE LOSSOPERATING WEIGHT EQUIP.NO LOCATION SERVICE MANUFACTURER MODEL SERIES INLET SIZE INLET SP(IN W.C.) OUTLET SP(IN W.C.) MAX AIRFLOW MIN AIRFLOW C) MAX NC AT ASP=10" KW STAGES EAT DB LAT DB MCA VIPHIHZ CFM HP HEATING CFM V PHASE (LBS) REMARKS SAZAN#790-20002 (IN) (CFM) (CFM) (DEG F) (DEG F) FP1-1 - OFFICE 106 PERIM PRICE FDV5 12 0.75 0.25 1,110 500 0.40 35 7 SCR 65.91 86.02 10.10 480/3 600 1/2 1100 480 3 109 1-10 FP1-2 - AUX SERVICE 103 PRICE FDV5 10 0,75 0.25 1,060 320 0.40 35 5,5 SCR 67.43 87.99 10.90 480/3 525 1/3 845 480 3 101 1-10 FP1-3 - LUNCH ROOM 101 PRICE FDV5 14 0.75 0.25 2,250 480 0.40 35 7.5 SCR 69.63 89.58 15.70 480/3 525 V2 1005 480 3 134 1-10 FPI-4 - CONF ROOM 131 PRICE FDV5 6 0.75 0.25 420 90 0.40 30 2 SCR 69.19 89.58 11.70 277/1 220 1/3 310 277 1 101 1-10 FP1-5 - PLANNING RM 133 PRICE FDV5 10 0.75 0.25 870 260 0.40 30 4 SCR 66.48 87.21 8.60 480/3 320 1/3 610 480 3 101 1-10 FPI-6 - OFFICE 125-126 PRICE FDV5 10 0.75 0.25 1,280 380 0.40 30 5 SCR 64.59 86.23 10.10 480/3 320 113 730 480 3 101 1-10 FP1-7 - WORKROOM 124 PRICE FDV5 6 0.75 0.25 260 60 0.40 30 2 SCR 68.08 92.38 11.70 277/1 200 1/3 260 277 1 101 1-10 FPI-8 OFFICE 104 PRICE FDV5 8 0.75 0.25 480 160 0.40 35 2 SCR 64.14 79.56 11.70 277/1 250 1/3 410 277 1 101 1-10 FPI-9 OFFICE 111 PRICE FDV5 8 0.75 0.25 430 160 0.40 30 2 SCR 63.51 80.59 11.70 277/1 210 1/3 370 277 1 101 1-10 FP2-1 - LEASE N PERIM PRICE FDV5 10 0.75 0.25 1,100 330 0.40 35 6 SCR 65.29 93.18 11.70 480/3 350 1/3 680 480 3 101 1-10 FP2-2 - LEASE E PERIM PRICE FDV5 10 0.75 0.25 980 290 0.40 35 5 SCR 60.32 100.32 10.10 480/3 275 1/3 565 480 3 101 1-10 FP2-3 - LEASES PERIM PRICE FDV5 6 0.75 0.25 400 120 0.40 35 2 SCR 65.44 81.44 11.70 277/1 275 1/3 395 277 1 101 1-10 FP2-4 - BOARD ROOM 220 PRICE FDV5 8 0.75 0.25 800 240 0.40 30 4 SCR 68.24 86.04 8.60 480/3 350 113 590 480 3 101 1-10 FP2-5 - OFFICE 228 PERIM PRICE FDV5 10 0.75 0.25 1,200 360 0.40 35 5 SCR 64.86 87.11 10.10 480/3 350 1/3 710 480 3 101 1-10 FP2-6 - OFFICE 222-226 PRICE FDV5 10 0.75 0.25 1,200 360 0.40 35 5 SCR 62.39 84.64 10.10 480/3 350 1/3 710 480 3 101 1-10 FP2-7 - OFFICE 218 PRICE FDV5 8 0.75 0.25 625 190 0.40 30 2.5 SCR 64.44 86.39 13.90 277/1 275 113 455 277 1 101 1-10 FP2-8 - OFFICE 217-215 PRICE FDV5 8 0.75 0.25 470 140 0.40 30 2 SCR 64.16 81.72 11.70 277/1 220 1/3 360 277 1 101 1-10 FP2-9 - CONTRACTORS 213 PRICE FDV5 10 0.75 0.25 1,060 315 0.40 35 3.5 SCR 61.16 81.84 7.90 480/3 220 1/3 590 480 3 101 1-10 FP2-10 - TRAINING 211 PRICE FDV5 10 0.75 0.25 1,230 300 0.40 30 3 SCR 64.38 81.16 7.10 277/1 350 113 650 277 1 101 1-10 FP3-1 - OFFICE 318 PERIM PRICE FDV5 10 0.75 0.25 1,260 370 0.40 35 7 SCR 64.72 95.44 13.20 480/3 350 113 720 480 3 101 1-10 FP3-2 - OFFICE 322 PRICE FDV5 6 0.75 0.25 210 60 0.40 30 1 SCR 66.17 79.61 7,10 277/1 175 1/3 235 277 1 101 1-10 FP3-3 - CONE ROOM 323 PRICE FDV5 8 0.75 0.25 470 120 0.40 30 2 SCR 64.7 83.29 11.70 277/1 220 1/3 340 277 1 101 1-10 FP3-4 - OFFICE 324 PRICE FDV5 6 0.75 0.25 250 60 0.40 30 1 SCR 64.9 76.83 7.10 277/1 175 1/3 235 277 1 101 1-10 FP3-5 - OFFICE 325 PERIM PRICE FDV5 6 0.75 0.25 310 90 0.40 35 2 SCR 72.43 81.46 11.70 277/1 175 1/3 365 277 1 101 1-10 FP3-6 - LOBBY 202 PRICE FDV5 12 0.75 0.25 1,920 570 0.40 35 11 SCR 63.13 91.01 21.50 480/3 675 1/2 1245 480 3 109 1-10 FP3-7 - WORK AREA 315 PRICE FDV5 8 0.75 0.25 660 200 0.40 35 3 SCR 62.11 92.68 16.20 277/1 275 1/3 475 277 1 101 1-10 FP3-8 - OFFICE 313 PERIM PRICE FDV5 10 0.75 0.25 1,215 360 0.40 35 5 SCR 54.43 99.57 10.10 480/3 350 1/3 710 480 3 101 1-10 FP3-9 - OFFICE 312 PERIM PRICE FDV5 10 0.75 0.25 1,180 350 0.40 35 5 SCR 60.57 93.14 10.10 480/3 350 1/3 700 480 3 101 1-10 FP3-10 - OFFICE 309 PRICE FDV5 6 0.75 0.25 270 60 0,40 30 1 SCR 69.89 83.34 7.10 27711 220 1/3 280 277 1 101 1-10 FP3-11 - CONF ROOM 308 PRICE FDV5 6 0.75 0.25 330 90 0.40 30 1 SCR 69.71 79.01 7.10 277/1 220 1/3 310 277 1 101 1-10 FP3-12 - OFFICE 306-307 PRICE FDV5 6 0.75 0.25 450 130 0.40 30 2 SCR 63.94 80.83 11.70 27711 220 1/3 350 277 1 101 1-10 FP3-13 - OFFICE 305 PERIM PRICE FDV5 8 0.75 0.25 705 210 0.40 35 3.5 SCR 63.49 96,79 7,90 480/3 275 1/3 485 480 3 101 1-10 REMARKS: 1.MULTIPOINT CROSSFLOW SENSOR 2.MOTOR VIBRATION ISOLATION 3.SPRING VIBRATION HANGERS 4.CONTROL ENCLOSURE 5.AIR FLOW PROVING SWITCH 6.FUSED DOOR INTERLOCK SWITCH ON ELECTRIC HEAT ENCLOSURE 7.314 FIBERGALSS INSULATION 8.DIGITAL CONTROLS SUPPLIED AND INSTALLED BY CONTROLS CONTRACTOR 9.EC MOTORS 1 ASI 1 02/0912021 10.SINGLEPOINT ELECTRICAL CONNECTION. # DESCRIPTION DATE SINGLE DUCT VARIABLE AIR VOLUME UNIT SCHEDULE Oregon PERS PRIMARY AIR ELECTRIC HEATING COIL ELECTRICAL H VAC Full Design MAX STATIC PRESSURE BASIS OF DESIGN BASIS OF DESIGN MODEL LOSS DISCHARGE NC RADIATED NC OPERATING WEIGHT REMARKS EQUIP.NO LOCATION SERVICE MANUFACTURER SERIES INLET SIZE INLET SP(IN WC) OUTLET SP(IN WC) MAX AIRFLOW MIN AIRFLOW IN W C KW STAGES EAT DB LAT DB MCA V1PHIHZ V PHASE {LBS) (IN) (CFM) (CFM) { ) (DEG F) (DEG F) W1-1 - OPEN OFFICE 106 PRICE SDVS 10 0.75 0.25 1,165 460 0.40 27 24 - - - - - - 24 1 19 1-4 Oregon Public W1-2 - INTERIOR 136-143 PRICE SDV5 8 0.75 0.25 860 750 0.40 27 - - - - - - - 24 1 15 1-4 Employees Retirement W1-3 - INSERT MACH 115 PRICE SDV5 6 0.75 0.25 430 150 0.40 20 - - .. - - - - 24 1 12 1-4 W1-4 - STORAGE 118 PRICE SDV5 12 0.75 0.25 2,440 735 0.40 27 - - - - - - - 24 1 23 1-4 System W1-5 - COMPUTER RM 122 PRICE SDV5 6 0.75 0.25 425 125 0.40 26 - - - - - - - 24 1 12 1-4 VV1-6 - OPEN OFFICE 127 PRICE SDV5 5 0.75 0.25 310 110 0.40 35 - - - - - - - 24 1 13 1-4 W1-7 - OPEN OFFICE 127 PRICE SDV5 12 0.75 0.25 1,810 545 0.40 - - - - - - - - 24 1 23 1-4 W2-1 - LEASE INTERIOR PRICE SDV5 8 0.75 0.25 800 240 0.40 25 - - - - - - - 24 1 15 1-4 W2-2 - LEASE INTERIOR PRICE SDV5 8 0.75 0.25 825 300 0.40 26 - - - - - - - 24 1 15 1-4 W2-3 - ELEV LOBBY 237 PRICE SDV5 12 0.75 0.25 1,800 840 0.40 - - - - - - - - 24 1 23 1-4 W2-4 - BOARD ROOM 230 PRICE SDV5 6 0.75 0.25 455 190 0.40 1 25 - - - - - - - 24 1 12 1-4 i W2-5 - BOARD ROOM 230 PRICE SDV5 6 0.75 0.25 435 180 0.40 25 - - - - - - - 24 1 12 1-4 W2-6 - CONF RM 227 PRICE SDV5 5 0.75 0.25 200 65 0.40 26 - - - - - - - 24 1 13 1-4 W2-7 - OPEN OFFICE 225 PRICE SDV5 10 0.75 0.25 1,440 440 0.40 - - - - - - - - 24 1 19 1-4 W2-8 - OPEN OFFICE 219 PRICE SDV5 8 0.75 0.25 800 340 0.40 28 - - - - - - - 24 1 15 1-4 VV3-1 - CONF RM 319 PRICE SDV5 4 0.75 0.25 160 60 0.40 27 - - - - - - - 24 1 13 1-4 W3-2 - OPEN OFFICE 325 PRICE SDV5 8 0.75 0.25 685 205 0.40 22 - - - - - - - 24 1 15 1-4 W3-3 - ELEV LOBBY 333 PRICE SDV5 10 0.75 0.25 1,650 800 0.40 22 - - - - - - - 24 1 19 1-4 "E W3-4 - CONE ROOM 316 PRICE SDV5 4 0.75 0.25 150 0 0.40 25 - - - - - - - 24 1 19 1-4 c W3-5 - OPEN OFFICE 317 PRICE SDV5 10 0.75 0.25 1,160 350 0.40 - - - - - - - - 24 1 19 1-4 cu W3-6 - WORK AREA 315 PRICE SDV5 8 0.75 0,25 800 240 0.40 25 - - - - - - 24 1 15 1 4 ISSUE F OR B I D wl W3-7 - OPEN OFFICE 312 PRICE SDV5 12 0.75 0.25 1,760 540 0,40 - - - - - - - - 24 1 23 1-4 W3-8 - OPEN OFFICE 305 PRICE SDV5 10 0.75 0.25 1,180 360 0.40 20 - - - - - - - 24 1 19 1-4 Project: al Contents: Z REMARKS: ILI 0 MECHANICAL 1.WITH HANGER BRACKETS U 2.WITH CONTROLS ENCLOUSURE a. SCHEDULES N 3.WITH 1/2"FIBERGLASS INSULATION 0 4.FIELD INSTALLED CONTROLS b Drawn: CM o� Checked: GMJ Date: 11/30/2020 r§ N G V C SC Sheet Number. C-) M a N Le? M 0 i 0 4 &, c N O ari GENERAL NOTES OREGON 1. 1.ALL EXISTING HVAC EQUIPMENT AND DISTRIBUTION DUCTWORK SHOWN ARE TAKEN FROM AVAILABLE RECORD DRAWINGS. RECORD DRAWINGS ARE FOR REFERENCE ONLY TO DEMONSTRATE GENERAL CONDITIONS.CONTRACTOR TO FIELD PERS VERIFY ACTUAL CONDITIONS. 2. UPGRADE ALL OF THE SPACE TEMPERATURE SENSOR IN PLACE, EXCEPT WHERE NOTED. PUBLIC EMPLOYEES RETIREMENT SYSTEM 3. LOW PRESSURE VOLUME CONTROL DAMPERS NOT SHOWN. ill 4. REFER TO SPECIFICATIONS, G0.00 AND G.01 FOR ALTERNATE SCOPE D!SCR1PTION.ONLY FURNISH AND INSTALL EQUIPMENT IN ACCORDANCE WITH CONTRACT. }A` B B.8 C C.5 2.9 E F G H J FLAG NOTES 1011110- DISCONNECT AND REMOVE VAV TERMINAL UNIT AND DUCTWORK AS NECESSARY TO ACCOMMODATE REPLACEMENT VAV TERMINAL UNIT. SEE M2.1 FOR NEW WORK. XA i4 _. OFF:. MAIL ROOM AUY 111 XB SERVICE E A / A \ 113G R O U P i 111 SW Fifth Ave, Ste 2120 Portland, Oregon 97204 --. ,--, 9 Tel 503.416.2400 Fax 206.267.1701 SAZAN#790-20002 - 1=k. 7 , // 1 1 I ,_, n , _ 1 X 1 f p 1. FP1-2 >i= X L. A FP1-9 1 1 � I i) I j! = r� INSERTING MACHINE VP- AIL ', rurKlEIPE -mil — ,� ) rLo ill ..0 1111P\ `' 4 « O FCEF-b e ,1-4 dimp I...__ il �� _ c. +fes • v Nr X W1-1 `, 4111Ii 4— W 1-2 .4 4110 ` I fg• , . vA . , CEF-6 /!9_ 0 - I f I., N, \/ • Al . O/ w4‘700/ i — \\ t 4..* XI I I IV4` FP1-1 _ III ~ r• • ♦� N/ ; I I 1 DATA CENTER �— I F� li W1-5- SERVER 21 .•. i / CEF 7 0 (.G>.). 127 CAPPED DUCT 4, ! "< 1111°1 ` � ? - 1 ASI1 0210912021 / - 1.—fl II _ au 1 # DESCRIPTION DATE / do/e: FC-1 I � � I N\ �p ;I�� ,.. , FP1 8 _.... n _ w / I I� » II �I I J'�J $� Oregon PERS LI [FPI-8 " AL � � �� HVACDesign o�E�I I / Full w / IF rrl .---,7' -4117 Am/ 1 II r-7I ! I I /`\ 9 �� V i NOre on Public �, Employees Retirement \a\ N4* System Adl \ 14+ r.,,-.. .,<--- NdsA /r Nk, 1 .`REA .407\ 111b.` FP1-3 �'�' z !/ rl -ii , l II`- I_ I1 1 �ja EMII r FP14 � ALJ I,, 0/� , OPEN OFFICE FP1-7 Li 124 �I _, h i ,... . cd `� I �1� ISSUE FOR BID d1 / FP1-5 �y2 FP1-6 Project: Contents: z .4-- U __ _ r MECHANICAL If _ II J11.1 , �I DEMOLITION - FIRST 0 - r FLOOR PLAN 1 - 8 Drawn: CM Tiy 'iY ';' Checked: GMJ E Date: 11/30/2020 a A in t) ra Cv E Sheet Number: Cu tilU M d .•a• MD1 N MECHANICAL DEMOLITION - FIRST FLOOR PLAN I 0 1 -C1'74 1/8" = 11-0" N O N CV I 3 1 I 1 GENERAL NOTES OREGON ti 1. ALL EXISTING HVAC EQUIPMENT AND DISTRIBUTION DUCTWORK SHOWN ARE TAKEN FROM AVAILABLE RECORD DRAWINGS. RECORD DRAWINGS ARE FOR REFERENCE ONLY TO DEMONSTRATE GENERAL CONDITIONS.CONTRACTOR TO FIELD PERS VERIFY ACTUAL CONDITIONS. I 2. UPGRADE ALL OF THE SPACE TEMPERATURE SENSOR IN PLACE, EXCEPT WHERE NOTED. PUBLIC EMPLOYEES RETIREMENT SYSTEM 3. LOW PRESSURE VOLUME CONTROL DAMPERS NOT SHOWN. all I 4. REFER TO SPECIFICATIONS,G0.00 AND 0.01 FOR ALTERNATE SCOPE DISCRIPTION. ONLY FURNISH AND INSTALL EQUIPMENT IN H J ACCORDANCE WITH CONTRACT. I I FLAG NOTES XA DISCONNECT AND REMOVE VAV TERMINAL UNIT AND DUCTWORK AS NECESSARY TO ACCOMMODATE REPLACEMENT VAV TERMINAL UNIT. SEE M2.1 FOR NEW WORK. 1 © RELOCATE THERMOSTAT. SEE M2.2 FOR NEW LOCATION. XB I OFFICE MEETING ROOM OFF!' 250 251 CONTRACTOR TO FIELD VERIFY LOW PRESSURE DUCT LOCATION. 111 SW Fifth Ave, Ste 2120 I XC - Portland, Oregon 97204 XD 0 I 1 FP2-2 Tel 503.416.2400 ��rT to Fax 206.267.1701 `���� SAZAN#790-20002 I XE - XF . XG STAIR 2 23 XH W2-2 lr IBJ ii ^ / ��j�FP2-3 W2-1 W-A a /Agit ) ) FP2-1 �� I I i\e. LOBBY - 2'12 I ) 1plirCEF-3 \IIIIP v® -. 111116-7411k/ i /\ COUNSELING ��/ ��;� �.,r"ECEPTION, ammo CORR. UI I® Fr r203204 -Q t ir 1-,---, t A / �� :20.15 I ii —I, , —� 4 \\ CEF 4 COUNSELING ill 41/' �. O 1 = COUNSELING `X FP2-9 � '.\ 1 ASI 1 02I0912021 207 x � _/ . # DESCRIPTION DATE i 1[ 2) \ W2-4 1/ 1 / FP2-10 \ _ Com- Oregon PERS Sr i = FP2 W2$�' F. HVAC Full Design X '''s< i il —0- li /+Ao, /FP2 `F I = - _ Oregon Public _ l i E"/ O 006. ' - - - Employees Retirement ♦ rr W2-8 Po- , System o /to �.. I - I I Ad, VrTiT17 � r lir` i 0,.._ ,....4., ♦ _10-- e W2-6 CONFERENCE 227 40 a MI I FP2-5 ( _ - - II I - - Irga -. PP-liZdj -1 / \ I I I t 1 / 7 , � ►i 1 FP2 G_ i IA I a cti Itv .= / — ISSUE FOR BID WI 1 Project: g `MECHANICAL w v _ 11 I — SII I 1 DEMOLITION - Iu SECOND FLOOR m g - - - - PLAN o 1 ,� I I 1 1 Drawn: CM iii Checked: GMJ c I= Date: 11/30/2020 g c iaP Y a) Sheet Number: g g U 7 a co el) M D 1 • 02 N MECHANICAL DEMOLITION - SECOND FLOOR PLAN Lf? mi. = 1..0"N O O1 GENERAL NOTES OREGON 1. ALL EXISTING HVAC EQUIPMENT AND DISTRIBUTION DUCTWORK SHOWN ARE TAKEN FROM AVAILABLE RECORD DRAWINGS. RECORD DRAWINGS ARE FOR REFERENCE ONLY TO DEMONSTRATE GENERAL CONDITIONS.CONTRACTOR TO FIELD VERIFY ACTUAL CONDITIONS. PERS 2. UPGRADE ALL OF THE SPACE TEMPERATURE SENSOR IN PLACE, EXCEPT WHERE NOTED. PUBLIC EMPLOYEES RETIREMENT SYSTEM 3. LOW PRESSURE VOLUME CONTROL DAMPERS NOT SHOWN. III 4. REFER TO SPECIFICATIONS,G0.00 AND G.01 FOR ALTERNATE SCOPE DISCRIPTION, ONLY FURNISH AND INSTALL EQUIPMENT IN �'N� � �Y� � �.� �.� E - ACCORDANCE WITH CONTRACT. FLAG NOTES DISCONNECT AND REMOVE VAV TERMINAL UNIT AND DUCTWORK AS NECESSARY TO ACCOMMODATE REPLACEMENT VAV TERMINAL UNIT. SEE M2.1 FOR NEW WORK. -T , t t t t kI7'FFICE O 1 _ A7A 322 OFFICE CONFERENCE 324 323 - 111 SW Fifth Aye, Ste 2120 XC Portland, Oregon 97204 XD Tel 503.416.2400 r Fax 206.267.1701 FP3-22 10FP3-3 FP3-4 SAZAN#790-20002 .4 _ . LSC 2 low riz(-zi opm.ruz ' >< 1-I ell IIL - ! N FP3-5 - OPEN OFFIrs =, \ 1 /I - 32E �1 I'J -4-- -----r_) '`.. ti _ /\ I' L - �� • f° 11/ NS" \<:( CONFERENCE FP3-6 .....\\ •319 OR- I) \ ,\ 4 .41-- I I OPEN OFFICE 1 MIIte "11 ,,i -r in ,._ •.~ h 318 1 W3-1 � \ = CEF-1 } O I , I Imo/ UPPER LOBBY \\ 7 / _ zi \ f .. 'NCB 301 FP3-1 b " �4 rs, ,_ '�� TVI INN r 1 4 .0 I A. . •// tWa-34 S / t t t 4 I ` si// I II 1 / 0 .\\\\\<\.\\ i 44,Jr4 -4-- lEl___ - 4......... _ 'K„ 4 ilL, CEF-2 N, VV3-5 11\464* di\4 141111114111' 0,.\ ,. ,,, 4 _, o `_,` L 1 ASI 1 02/0912021 .14` �j. FP3-13 �; WOME , 1 1 d �. �� - # DESCRIPTION DATE , �w COFFE ' FP3-12 i Oregon PERS �- , / 303 W3-8 - OPEN OFFICE �7 — ? f' V 113-6 II HVAC Full Design \ \ �t>4 I PRINTERS 304 r7 --� FP3-11 �,�_ � - \...`1--1 Oregon Public 17/ J ,, Employees Retirement v141,k System i 1 I y' FP3-7 t Y L--L [f, STAIR r CONFERChIC I —► 310 308 ''C< !1 1 --P., 9 if, 4r '� - _ W3z r 1 1 PP- \ FP3-8zi FP3 9 OPEN OFFICE r``,:i 1,>\< 1101"�� 313 FP3-10 Adoll \OIr \-7 - ISSUE FOR BID y OPEN OFFICE 1 312 Project: Contents: z037,1 1 ji_i „, .._,... MECHANICAL LUU w ► - i1 I � LII _f1 DEMOLITION - THIRD L FLOOR PLAN s ij ;' 1' Drawn: CM +/C Checked: GMJ Date: 11/30/2020 M La c co e Sheet Number D U M a N MECHANICAL DEMOLITION - THIRD FLOOR PLAN LF? EDI MD1 . 03 el 118" = 11-0" pN N GENERAL NOTES OREGON 1.ALL EXISTING HVAC EQUIPMENT AND DISTRIBUTION DUCTWORK SHOWN ARE TAKEN FROM AVAILABLE RECORD DRAWINGS. RECORD DRAWINGS ARE FOR REFERENCE ONLY TO DEMONSTRATE GENERAL CONDITIONS.CONTRACTOR TO FIELD VERIFY ACTUAL CONDITIONS. 2.LOW PRESSURE VOLUME CONTROL DAMPERS NOT SHOWN, PERS PUBLIC EMPLOYEES RETIREMENT SYSTEM FLAG NOTES 111 DISCONNECT SUPPLY AND RETURN DUCTWORK,AND REMOVE ROOFTOP AIR CONDITIONING UNIT AS NECESSARY TO ACCOMMODATE B B.8 C C.5 2.9 E F G H J NEW WORK.PROTECT4CEMENT EXISTING TO REMAIN ELECTRICAL AND M2.4 FOR CONTROL WIRING FOR REUSE.COORDINATE WITH OTHER TRADES AS REQUIRED. © SHUT-OFF GAS PIPING,DISCONNECT AND REMOVE PIPING FROM UNIT CONNECTION BACK TO ISOLATION VALVE AND CAP FOR RECONNECTION FOR REPLACEMENT UNIT.SAVE AND PROTECT GAS REGLATOR FOR REINSTALLATION.SEE M2.4 FOR NEW WORK. XA 11 XP A7A \ GROUP 111 SW Fifth Ave, Ste 2120 AL. Portland, Oregon 97204 XP Tel 10 Fax 206.267.170503.416.24001 SAZAN#790-20002 XE XF XG XH ,>=1 i i ♦ r ♦ ♦ f f , (E)CONDENSING UNIT 1' •> (E)EXHAUST FAN j // I% / 0 EF-2 i CU-1 AC-2Fj <r> (E)GRAVITY INTAKE / / EF-1 © //` 411.1 ASI 1 02/0912021 # DESCRIPTION DATE (E)EXHAUST FAN Oregon PERS HVAC Full Design Oregon Public Employees Retirement System rid ISSUE FOR BID Y aI Project: Contents: I- w MECHANICAL DEMOLITION - ROOF a uJ PLAN Drawn: CM rn Checked: GMJ Date: 11/30/2020 I 0) Sheet Numbec d N C) d N MECHANICAL DEMOLITION - ROOF PLAN M D1 . 04 it; �I O N • OREGON (-A- B B. : :2.90 0 0 0 0 0 0 0 0 0 PERS ( (B) B. : ;2.9 PUBLIC EMPLOYEES RETIREMENT SYSTEM I 1 III I I I i I I I I I I I I I I I I 1 1 XA XA 0 I I I 1 - _ _ __ L/ I � — I— I ! XB 0 - - - -,-'— I- ! �� — I I XB MAIL ROOM AUX OFFICE / 1 OFFICE MEET R M - OFFICE / SERVICE (114) (250) ® 252 �J / / XD , / XD U � � 10 L - J C OMEN OFFICE U OP N OFFICE STORAGE / / / C22 / / / / 116 ® / / C `6 _ _— IF / / 1._ _^ _ I I , I I f / I I I _-��-:1 1 B I / /9 XG 9 == =W i XG c � / / XH a p / XH A A \ . . J I / 1I I I 1 / { I / I , / I III / / /I _ OPEN OFIFICE o ! �`� .. ' /„7 _ / _ -� , , �, GROUP N 8 - - - - INSERTING CINE J/ / � - C `'C lj / / / �; / / 111 SW Fifth Aye, Ste 2120 r_______ � cHEc LO. / / � C - � / � / / �•• / Portl0and, Oregon 97204 p I I I ///// I I / I C I I �COfFEE QED l I / I ��/� 1 / 0 DATA / _ _ r // J / Tel 52:1-61.7:mc: / 138 / / G 0a�EN OFFICE ' (202' ) ' / ax SHELVES / 4 ./N / ( 2.) \ ( } / / 41$1k OPEN OFFICE (107) / ,► / SAZAN#790-20002 I i (106) I I 4/Iti‘L,COMPUTER I / I i I 10 ,'"'% // MEN / RM.\ / 111. <,,,,,/, / ' (Ely . ,--, ,--, ,---- - 6. 1 6 [--- \• / / LOBBY • CT. DATA CENTER \ / '' . / SERVER 0 /6 ilia 4 140 / E / 1 CD ./40/ . /, 239 \\I\ _ N4 0 - / 0 . ' • ! '� ` J.1 / - i ' ' CORK. ' / 11141F, TRAI I NG OPENOFFICEOFFICE �.LIB' ^\ ! OPEN OFFICE *\/ (214)OFFICE �C/\ \ /FI j To1FAxwo 142 / I I I ( 110 ) _ I 17/ lI /I I I / �i Uj AREA / / / � � co PUTEks / / LC1) - 1 �Ti djAiiii , / / / FILE ROOM OFFICE • , ED 1/ „ 1 % — — -4D 1 Roos U� ., — / I I I I I V 3.5 I / 1230 I / / I I i ...� I / >/ I I 7 ( 216 ) - - - LUNCH R M ��0 ' W.S •� � � I b � •� '`1 I��I - - - I ' �1Jr�ildi�44„„ 44 - / OPEN LFI E i4N41114 i Q ( 101 ) / GO •HOTOIF• WORK 2. / wilmilli - 2.8 / u Lu Lu Lu L_ OPEN OFFICE / GON ERENC! FILE ROOM Lu lu.1.111——4 I I �\ I 1344 I I I 4 u I I I l L i \ 9 (4110 ff) ® LECTOR'S OFFIQI / _ / OFTEN OFFIE u 1 \ / ( 218 ) / AI , ' PLANNING I T0 I I _ I- L A . EREPEE IC C i e q - I_ ` ` - N OFFICE I - I I . - —I ��- �� � � ` � (2) .� � �� a:PUTY DIRECTOR'S PLANNING 1/ OFFICE OFFICE )OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE ® ( 129 ) ( 126 ) ® (226 (224) ( 223 ) C222 ) (208 I I I I I ! I I 1 I I I 1 I I -I- - - - - r I T - I ' I I u L- (1) I I I I I LJ u • - - - LEVEL 01 OVERALLN ED LEVEL 02 OVERALL N ED 1116”= 1'-0" 1116"= 1'-0" A B. • .2.90 0 0 0 0 Ci^1) B B. ;3(2.900000 0 0 0 0 0 I I I I f i I I I I I I I I I I I I I I I I XA XA I II 1 ASI 1 02/09/2021 0 ____ I I )(I3� GIXB- - - - I I - I I OFFICE I OFFICE # DESCRIPTION DATE ® coNF RENCE ! (324) / T� / t .171 / XD / D Oregon PERS 10 ) - - - - I - - I 10� _ I _ _ f _ I _ I_ _ - / I HVAC Full Design D : . 1 1 o _ _ / / / / / lb —. - / CI) I ==43r= I i I I / 1 I I — I I I I/ / i / I �+ 9 - _____ / - _-- XG _ 2 / --� - , Employees Retirement C I , Room , I / / 320 XH / XH System I I ( I / � I 711 I , I / i I I I / I / :I/IN I , I / y -I, —L t ® — - - 8 / /1... CONFERENCE 1 I 1/ �. / / / \ir / / // / / (319) ' ' / / OPEN • FICE 1 n I — 1 —p \ �JPPER LOBBY I / I f I I / I I / I I / Ripal,;, 8 LU / DAT 301 - - / / �j / 0 _ IED V -ODM ,#1,1i / / / 0 / / / / / . / 1 326 7 © ^ / / / 1 / / i / / \ •• / V '> I / I I / I/ / I MEN /2% i f I i 61__ - / ( 332) , ' _ - / / ' - - - - - -1— — ^"i 16.1 6 — .1 / / / N+ 30 '� OFFICE / / ' / / / / , / ,, \ .L© `1 \,\ I / I (241) I I / I I / yl ' I / !r ORAS Pry / \0 _j___17/7 — 0 /— — 5.1 FICI \ 303 / V / ////I/ / ISSUE FOR BID f I4 I I� I OPEL OFFICE / 14 3°51 / / / i ..-!) ` / ' P P. S i - - / - / \ / Project: .. - - - - - `n 1 7OFFICE 4� — - 4 / Contents: \� � 1 p C3ar� _ � � ZIC3.5 / .5 � I � I � ! / I I � � I / I f / / I / � I I 3� - - - �� - J - - _ — ,�r�T�- - / - /74/ - - - - - - OVERALL PLANS i i r i i CONFERENC• �' , / /,/ ,..\ I� E308 ) - - 2.8 2.8 \ WO AREA/FILES !minim I I I I l i l l / Ek I I ` I f / / I 1 I® I I I I / I I I I DraNm: CM //1/ Checked: Checker �3 / •PEN OFFI T _ OFFICE / g U �� ® ti---11— I (309) / Date: 11/30/2020 ig ` 2 1 _ I__ ` 4 — / I f 1I I I - OPEN OFFICE - __,_ - - (2)1 - H L - 4 ' — I - - I - - - - - - EEO 4. / Y OFFICE SD Sheet Number 1 _ I_ — 1 — I — �I — I — I — I �� 1 c — — — — — `/�1 U �\ J M LEVEL 03 OVERALL 13- ED ROOF PLAN OVERALL NM2 I 0 0 M N 1116"= 1'-0"ED N 1116" = 1'-0" N GENERAL NOTES OREGON 1. ALL EXISTING HVAC EQUIPMENT AND DISTRIBUTION DUCTWORK SHOWN ARE TAKEN FROM AVAILABLE RECORD DRAWINGS. RECORD DRAWINGS ARE FOR REFERENCE ONLY TO DEMONSTRATE GENERAL CONDITIONS.CONTRACTOR TO FIELD PERS VERIFY ACTUAL CONDITIONS. 2. UPGRADE ALL OF THE SPACE TEMPERATURE SENSOR IN PLACE, EXCEPT WHERE NOTED. PUBLIC EMPLOYEES RETIREMENT SYSTEM 3. REFER TO SPECIFICATIONS,G0.00 AND G.01 FOR ALTERNATE all SCOPE DISCRIPTION. ONLY FURNISH AND INSTALL EQUIPMENT IN ACCORDANCE WITH CONTRACT. G H J FLAG NOTES PROVIDE AND INSTAL FAN POWERED VAV TERMINAL UNIT AS SCHEDULED. PROVIDE DUCT TRANSITION,FLEX CONNECTION AND SUPPORT.SEE DETAILS 11M6.0 AND 2/M6.0. © PROVIDE AND INSTALL SINGLE DUCT VAV TERMINAL UNIT AS SCHEDULED.PROVIDE DUCT TRANSITION,FLEX CONNECTION AND XA SUPPORT. SEE DETAILS 11M6.0 AND 31M6.0. © REPLACE EXISTING TSTAT AND LOCATE AS SHOWN. I 1 MECHANICAL SYSTEMS SERVING DATA CENTER ARE NOT IN SCOPE. XB SYSTEM TO REMAIN OPERATIONAL WITHOUT INTERUPTION THROUGH XB CONSTRUCTION, A.. 7 A MAIL ROOM AUX. SERVICEZ1 © CONTRACTORS TO UTILIZE EXTREME DUST MITIGATION AND 113 i EXTRERME CAUTION IN IMAGING AREA, EQUIPMENT AND RECORDS GROUP " 1 PRESENT IS VUNERABLE TO DUST AND DEBRIS. 111 SW Fifth Ave, Ste 2120 XC Portland, Oregon 97204 © XD . Tel 503.416.2400 7 _. . Fax 206.267.1701 LSAZAN#790-20002 1 = \ f '--1- 1\ I = XF z\ 7,I II I I I ! I XE \' `-- \ I XG -� r I = I L 1 1- I I NI XII � I 1 1 � I FP1-9 1 IH FPI-2I 1 CORK (1 II _ r' INSERTING MACHINE 108 CHECKIENVELOPR �� I-- I -41-1- I I I- J I © jcwi3 • IA ' .. / EEO 47\ r . I 1 \ jaw, .4_1 1 1 \\ u 1 • v. Nal,i , I 1,or ....c.... FP1-11 �r W1-1 A- \/ 100. 7It ima W1-2 ♦:� , 1/ ,. ' 1 0 \ 2 1 1 04 NO 15 ' 7> CEF-6 IF ir IIMID 1 1 / A I IL]I 1 1 t ♦ /�_ I 0� I Ir,{ IVa` L _ \/ I I ! FP1 1 .• ���, �� I 4 L DATA CENTER i - I • . .■+ ` 44rCEF-7 O W1-5 I SERVER 1 I X27 I I I • I 1 • • . , / .l : I {II _ 1 # ASI 1 DESCRIPTION 0210912021 �, COR' a DATE .11_4 1\N - FP1-8 ar is> FC-1 I I 1 } � mol um 1 \I ,, ,,,� Oregon PERS ' \\� ' � HVAC Full Design �. . 4 � I I g A\ I / IF [--TK L , N Ir r-7114 I Oregon Public ,u r � Employees Retirement IR. a I' �.SHOWER O A System b� 13� ` fir\ it or 0 p .Sr sWE. © w1"7 � % 13� / / FPI-3 `11111." 11110. >< �` 411, v W1-6 - MI 11 -'11 If] FP1-4 FP1-7 /(% ' \ $ CONFERENCE rd 131 - / -- X 'i" FP1 FP1-6 ,i, ISSUE FOR BID 1.., / 1( DPP- Project: �-- 1 I J PLANNING Contents: ' 1 -1z "32 MECHANICAL HVAC - D_ IIII I _ II I \ I _ I - FIRST FLOOR PLAN Np p , .. , - , t —z d Drawn: CM 1. YiT TY TiT ik Vk 1T T; Checked: GMJ Date: 11/30/2020 A a, e Sheet Number: D U m 0. c.%! M2 . 01 N MECHANICAL HVAC - FIRST FLOOR PLAN ED i') 1!8" = 1'-0" N O N C) i I 1 i 1 f 1 M GENERAL NOTES OR E G O N 1. 1.ALL EXISTING HVAC EQUIPMENT AND DISTRIBUTION DUCTWORK i SHOWN ARE TAKEN FROM AVAILABLE RECORD DRAWINGS. RECORD DRAWINGS ARE FOR REFERENCE ONLY TO DEMONSTRATE GENERAL CONDITIONS.CONTRACTOR TO FIELD PERS 1 . VERIFY ACTUAL CONDITIONS. 2. UPGRADE ALL OF THE SPACE TEMPERATURE SENSOR IN PLACE, EXCEPT WHERE NOTED. PUBLIC EMPLOYEES RETIREMENT SYSTEM • I3. LOW PRESSURE VOLUME CONTROL DAMPERS NOT SHOWN. MI 1 4. REFER TO SPECIFICATIONS,G0.00 AND G,01 FOR ALTERNATE 4 SCOPE DISCRIPTION, ONLY FURNISH AND INSTALL EQUIPMENT IN J ACCORDANCE WITH CONTRACT. FLAG NOTES i PROVIDE AND INSTAL FAN POWERED TERMINAL UNIT AS SCHEDULED. PROVIDE DUCT TRANSITION,FLEX CONNECTION AND SUPPORT.SEE DETAILS 1/M6.0 AND 2/M6.0. PROVIDE AND INSTALL SINGLE DUCT VAV TERMINAL UNIT AS MSCHEDULED.PROVIDE DUCT TRANSITION, FLEX CONNECTION AND XB SUPPORT. SEE DETAILS 1/M6.0 AND 3/M6.0. i > LOCATE NEW THERMOSTAT AT LOCATION SHOWN CONTRACTOR TO FIELD VERIFY LOW PRESSURE A/ DUCT LOCATION. 111 SW Fifth Ave, Ste 2120 XC PortlanTd, Oregon 97204 XD Tel 503.416.2400 !j . Fax 206.267.1701 1 FP2-2 .. . SAZAN#790-20002 XE XF XG XH W22 . VEST. - . FP2-3 OPEN OFFIC' 11101" 215 W2-1 , , IE III • , ) ) ) ) FP2-1 LOBBY CE -3 AL M N O ® ■P j /L 0\ COUNSELING 1r -. 2C5 : 6. Or I 1 T t T IA1 da immi, CORR '_ �-,I I -j.i I 232 411/PV �' — , CEF� COUNSELING ` , A* G O \ 206 t ( 'i y; � � r � ��,� �� I Q I I — FP2 9 1 ASI 1 02/09/2021 ",'N'kj;' # DESCRIPTION DATE © � l �� _, 'I 1 -"--0- w2� s ___ I �El FP2-107 © Oregon PERS r i li g �. � _�� X � , . - FP2-8 © � �/ • w2 s r W2_5 li ,- HVAC Full Design 111100- S%FP24 ' t -- a � 1I a /.�_ c\ 11 1 '� _ ./ /" - _ I _ = _ Oregon Public �� — _ - Employees Retirement IL /or System PP- e• ��, f4STORAGI: W2-8 ►, X fi' i W2-6 \\/ ' 4\= x STAIR © DIRECTOR'S OFFIC � C 0 I I / ``1 FP2-7 }�I — �1 iI —► FP2-5 , I— _ 7 1 \,_ i _ I! I i ���� A FP2-6 -6.A.‘114. �►� -14) OPEN OFFICE oil 228 i - ISSUE FOR BID 4,1 Project: — OFF: Contents: MECHANICAL HVAC - aII I I J I W II SECOND FLOOR IL L.NQ PLAN CPN*-.1 IiI I; III IiI Drawn: CM Checked: GMJ C Date: 11/3012020 E g 16 c C a) E Sheet Number. a5i D U M a_ M ED . M2 . 02 N MECHANICAL HVAC - SECOND FLOOR PLAN 118"= 1'-0" N N O] GENERAL NOTES OREGON 1. ALL EXISTING HVAC EQUIPMENT AND DISTRIBUTION DUCTWORK SHOWN ARE TAKEN FROM AVAILABLE RECORD DRAWINGS. RECORD DRAWINGS ARE FOR REFERENCE ONLY TO PERS DEMONSTRATE GENERAL CONDITIONS.CONTRACTOR TO FIELD VERIFY ACTUAL CONDITIONS. 2. UPGRADE ALL OF THE SPACE TEMPERATURE SENSOR IN PLACE, EXCEPT WHERE NOTED. PUBLIC EMPLOYEES RETIREMENT SYSTEM 3. LOW PRESSURE VOLUME CONTROL DAMPERS NOT SHOWN. III 4. REFER TO SPECIFICATIONS, G0.00 AND G.01 FOR ALTERNATE SCOPE DISCRIPTION.ONLY FURNISH AND INSTALL EQUIPMENT IN ACCORDANCE WITH CONTRACT. B.8 C C.5 2.9 E F G H J FLAG NOTES PROVIDE AND INSTAL FAN POWERED TERMINAL UNIT AS SCHEDULED. PROVIDE DUCT TRANSITION, FLEX CONNECTION AND SUPPORT.SEE XA DETAILS 1/M6.0 AND 21M6.0. IA t 4 t © PROVIDE AND INSTALL SINGLE DUCT VAV TERMINAL UNIT AS SCHEDULED.PROVIDE DUCT TRANSITION,FLEX CONNECTION AND —3— — SUPPORT.SEE DETAILS 11M6.0 AND 3/M6.0. iF FII 11� A / A \ OFFICE OF k327 CONFERENCE R C u323 111 SW Fifth Aye, Ste 2120 XC Portland, Oregon 97204 XD Tel 503.416.2400 Fax 206.267.1701 FP3-2 FP3-3 • FP3-4 SAZAN#790-20002 1111111" It 1111 11111". 1 H----j --) )1( ----4Z FP3-5 r� i 11/ ., \ R! t k- \ / \\ . ." \\// (1\404/ 8 FP3$ X4 \�� �/ . W3-111111". S ♦ ,�\ / Llt \# © - \,, 1 OPEN OFFICE F • r 318 FP31 1 t W3-1 \ • 0 ,N CEF 1 ) ) ) UPPER LOBBY \\\ — �'' • 301 al I II 1 _7 I / 1JNTERS&LUNGH I I ROOM � ®LUNCH ---Ar � / -,p /\/4 % ieN\ • 14 W3-3 1 t t t #1\ / 40 .0 Fi ( 9ii„ A , H, ..A., ..., __ ,` W3-4 �'L /1.- 0j CEF-2 STORAGE ' O 302 • *40)W3-5 �� \411\4 ( ( ( ( ® � FP3-13� `�� �� L-, OPEN OFFICE 1 ASI 1 02/0912021 © ` , © 305 f' �. _ # DESCRIPTIONDATEur . iI I ' Q I OFFICE �� —�/ / �: I Wa-a r, ' _ 3GE Oregon PERS OFFICE v !7 FP3-12 C'� �---- f-_ 317 */ W3-6 \ l I I 1 I 1 . , ,' - I Q4 17 - HVAC Full Design , \ , U 771 /k /'• IN Oregon Public \► 7(. 111100.-11FP3-11 11111111112 Employees Retirement ' 41111°"I _4 _ System 7 FP3-7 S 4/ / • / II 1 —w- �, W3-7 rdw i —a \i, `fir _ _ i `1 7 FP3-9 \ 1 ri /ir FP3-$ 1111°- - I IFP30 1M \ A) 1111 1 —10.- oi \ . . / ♦ /a• /�\ ISSUE FOR BID (13Y 4)I Project: Contents: i I I I I f ---10' Lu _ MECHANICAL HVAC - U f _II i �� j 11 11 ', II I THIRD FLOOR PLAN __LL § , - .. . .L A-_ cg 1 Drawn: CM i "k l; I Checked: GMJ c E cp Date: 11130/2020 A 1-0c c Y Sheet Number. n U m d co N MECHANICAL HVAC - THIRD FLOOR PLAN ED M2 . 03 Ch 1'8" = 1%0" CV O N to GENERAL NOTES OREGON 1.ALL EXISTING HVAC EQUIPMENT AND DISTRIBUTION DUCTWORK SHOWN ARE TAKEN FROM AVAILABLE RECORD DRAWINGS. RECORD PERS DRAWINGS ARE FOR REFERENCE ONLY TO DEMONSTRATE GENERAL CONDITIONS.CONTRACTOR TO FIELD VERIFY ACTUAL CONDITIONS. PUBLIC EMPLOYEES RETIREMENT SYSTEM FLAG NOTES all PROVIDE AND INSTALL PACKAGED ROOFTOP UNIT AS SCHEDULED. PROVIDE CONNECTIONS TO EXISTING SUPPLY AND RETURN DUCTWORK. INSTALL FLEX CONNECTION AND TRANSITIONS AS J REQUIRED TO ACCOMMODATE NEW SUPPLY AND RETURN SIZES, © POC 1-1/4"MPG TO EXISTING. EXTEND 1-1/2"LOW PRESSURE GAS WITH GAS REGULATOR AND CONNECT TO RTU WITH 8'MINIMUM DIRT LEG,PC,FLEX CONNECTION AND UNION. 1101110- 10'-0"MINIMUM RADIUS CLEARANCE OUTSIDE AIR INTAKE FROM EXHAUST OUTLETS. 1-114"CONDENSATE PIPE, PROVIDE 4"MIN.DEEP TRAP AND SPILL TO ROOF WITH SPLASH BLOCK. GROUPA / A 111 SW Fifth Ave, Ste 2120 XC Portland, Oregon 97204 XD TeI 503.416.2400 Fax 206.267.1701 SAZAN#790-20002 XE XF XG XH 78x29 SUPPLY AIR OUTLET OUTSIDE AIR INTAKE • ti '> \ / 1114"MPG IDIOGAS REGULATOR A EXHAUST AIR © 1112" . ` \ 78x41 RETURN AIR INLET � • EXHAUST AIR /' i 5 1 114"MPG 78x41 RETRN AIR INLET GAS REGULATOR >1 1/2"G AC-2 < ,' OUTSIDE AIR INTAKE 1 ASI 1 02/09/2021 DESCRIPTION DATE to- Oregon PERS 78x29 SUPPLY AIR OUTLET HVAC Full Design Oregon Public Employees Retirement System ISSUE FOR BID Project: Contents: I- w MECHANICAL - ROOF PLAN NO o Drawn: CM 0) Checked: GMJ E Date: 11/30/2020 m Y Sheet Number: 6) co U, t3 N MECHANICAL - ROOF PLAN M2 . 04 118" = 1'-O" N N • TRANSITION TO EQUIPMENT OREGON AS REQUIRED - PERS .._ GROUND JOINT UNIO/ pIg GAS EQUIPMENT IP 111 MANUAL MAIN SHOT-OFF VALVE--may II I I 3/8'THREADED ROD PUBLIC EMPLOYEES RETIREMENT SYSTEM 10 .. ISOLATOR BUSHING STRUCTURE a uIuIIP [It J STRUCTURE--N. r 0-_i DROP FROM MAIN. DETAIL NOTES: SEE PLANS FOR 1. DETAIL SHALL ONLY APPLY TO TERMINAL UNITS SIZE AND ROUTING NOT REQUIRING SEISMIC BRACING. - 2. SEISMIC BRACING SHALL BE ADDED TO TERMINAL _ , -- � FLEXIBLE GAS CONNECTOR, UNITS AND FAN POWERED BOXES AS REQUIRED BY // 18"MAXIMUM ;� 6"VERTICAL CODE.ENGINEERING SEISMIC BRACING DETAILS - -' SHALL BE DESIGN-BUILD BY THE CONTRACTOR,AND �� SHALL BE SUPERCED THIS DETAIL. - 3" NOTE:PROVIDE ROOF COMPATIBLE PIPE ill SWAY BRACE 07 ROOF SUPPORT SYSTEM WHERE _ lillii WHERE REQUIRED. 18 GA GALV.SHEET METAL CUP DRIP LEG W/PUNCHED HOLE FOR WIRE g GAS CONNECTION DETAIL iii AIR TERMINAL UNIT BRACING • AfN NTS NrNTS 7 A GROUP 111 SW Fifth Ave, Ste 2120 Portland, Oregon 97204 MAIN SUPPLYTel 503.416.2400 DUCTWORK3 c Fax 206.267.1701 *S.,___ SAZAN#790-20002 MINIMUM 2X INLETN DUCT DIAMETER OF SEE PLANS FOR DUCTWORK SIZES STRAIGHT DUCT RUN AND CONTINUATION(TYP) POC. MEDIUM PRESSURE FLEX TRANSITION AS REQUIRED DUCT(MAXIMUM 7-0") ' z- OPEN TO CEILING SPACE(TVP) CONTROLS ENCLOSURE - (RIGHT OR LEFT) aim THROWAWAY FILTER(TVP) _� 3 // i i i( ATTACH TO BUILDING STRUCTURE / WITH SPRING ISOLATORS.SEE I I_ _ J I SPECIFICATIONS FOR MORE MINIMUM ACCESS -' -' INFORMATION • _ REQUIREMENTS L N....--ECM FAN A - - - - � ELECTRIC HEATING COILif Lc_ - - - -.0 '`'`A'`'`'''(RIGHT OR LEFT TO MATCH FABRIC FLEXIBLE CONTROL ENCLOSURE) DUCT CONNECTOR SEE PLANS FOR DUCTWORK POC SIZES AND CONTINUATION N cifiji FTU DETAIL V. NTS V. MAIN SUPPLY DUCTWORK3 -► MINIMUM 2X INLET `' DUCT DIAMETER OF • �- SEE PLANS FOR DUCTWORK SIZES STRAIGHT DUCT RUN \1/4. AND CONTINUATION(TVP) POC MEDIUM PRESSURE FLEX _......07---- --TRANSITION AS REQUIRED DUCT(MAXIMUM 2-0") CONTROLS ENCLOSURE (RIGHT OR LEFT) C (7 ATTACH TO BUILDING STRUCTURE �' WITH ROD ISOLATORS.SEE VIBRATION MINIMUM ACCESS ISOLATION SCEDULE IN REQUIREMENTS / SPECIFICATIONS FOR MORE INFORMATION 1 ASI 1 02/09/2021 # DESCRIPTION DATE c 0 \ I Oregon PERS Poc+ HVAC Full Design g SEE PLANS FOR DUCTWORK SIZES AND CONTINUATION Oregon Public 1A'' VAV REHEAT Employees Retirement N Ie� NTS System DRAIN UNE SHALL BEAT LEAST THE SAME SIZE I AS THE DRAIN CONNECTION.314'e MINIMUM I AI \ PITCH DOWN OPEN TOWARDS DRAIN VENT -_— CLEAN 1111c OUT -11 , A ISSUE FOR BID �I ._I ie 0-1 I i L DRAIN CONNECTION per{ . B Contents: I MECHANICAL a.LIJ '"1 ROOF/FLOOR DETAILS N Drawn: CM N� UNIT TYPE A B DRAW THRU 2"PLUS X X+1" Checked: GMJ C I BLOW THRU 1" 2X IDate: 11/30/2020 WHERE X=STATIC PRESSURE INSIDE OF DRAIN r' . CONNECTION m c �-� AIR HANDLING UNIT DRAIN TRAP DETAIL N \© NTS Sheet Number N �� (.) 2 4 co cn M6000 ti 7.4- c> N a .. OREGON SF UENCE OF OPERATION FOR VARIABLE AIR VOLUME AIR HANDLING UNIT WITH MINIMUM OUTSIDE AIR PERS 1.GENERAL PUBLIC EMPLOYEES RETIREMENT SYSTEM 1.1 ALL CONTROLS SHALL BE BY THE DDC OR EMCS SYSTEM UNLESS INDICATED TO BE BY LOCAL El CONTROLS. PRESSURE SWITCH LOW 1.2 THE DDC/EMCS SYSTEM SHALL SCHEDULE EACH SYSTEM OR ZONE INDEPENDENTLY PER OWNER'S TO DISABLE RETURN FAN OPERATING SCHEDULE. ALL OPERATING SCHEDULES SHALL BE CONFIRMED WITH OWNER AND WHEN SMOKE DAMPER IN ADJUSTED AS NECESSARY. AIMRETURN DUCT CLOSES (2)RETURN FAN Mr SMOKE 1.3 MINIMUM OUTSIDE AIR VENTILATION RATE SHALL BE SET AS INDICATED ON EQUIPMENT SCHEDULE EXHAUST AIR DETECTOR DRAWINGS. . Mir CO2 SD ` 1.4 ALL SET POINTS, INCLUDING SOFTWARE TIMERS INDICATED SHALL BE ADJUSTABLE. / ( it 7 ‘1 \ -� 1.5 UNIT IS NORMALLY STARTED AND STOPPED REMOTELY AT THE ECC.H-O-A SWITCH SHALL BE KEPT / D-3 9 ¢ RETURN AIR 1 Ail IN THE"AUTO"POSITION."HAND"AND"OFF"POSITIONS SHALL BE USED ONLY FOR MAINTENANCE. Q CURRENT TRANSMITTER WHEN THE UNIT IS"OFF"D-1,D-3 AND D-4,SHALL BE FULLY CLOSED.WHEN THE UNIT IS"ON"D-1, IT FOR FAN STATUS,TYP. VP SHALL BE FULLY OPEN.D-2 AND D-3 SHALL MODULATE IN ACCORDANCE WITH THE ZC C, *LI* IN EQ NC • A 1.5 RETURN FAN SHALL MODULATE TO MAINTAIN BUILDING PRESSURIZATION AND PREVENT OVER -- PRESSURIZATION. VSMC 4111) 43) 2.TEMPERATURE CONTROL itilk 2.1 SUPPLY AIR TEMPERATURE,SENSED BY TT-1,SHALL BE MAINTAINED AT SETPOINT VIA DIGITAL NIP , A Z A \ CONTROL PANEL BY MODULATING CC-1,OR D-1,D-2,D-3,D-4,AND HC-1 IN SEQUENCE. Alla GROUP 2.2 COOLING MODE:SUPPLY AIR TEMPERATURE,SENSED BY TT-1,SHALL BE MAINTAINED AT SETPOINTMir 111 SW Fifth Ave, Ste 2120 VIA DIGITAL CONTROL PANEL BY MODULATING CC-1. D-2 - \/\ / Portland, Oregon 97204 2.3 HEATING MODE:SUPPLY AIR TEMPERATURE, SENSED BY TT-1,SHALL BE MAINTAINED AT SETPOINT PRESSURE SWITCH TO ALARM VIA DIGITAL CONTROL PANEL BY MODULATING HC-1. WHEN OA INTAKE PRESSURE IS WHEN Tel 503.416.2400 2.4 PROVIDE MIXED AIR PLENUM PRESSURE CONTROL. MODULATE D-3 WITH OPPOSITE CONTROL LOWER THAN SET POINT-0.4". �, ". Fax 206.267.1701 ACTION TO D-2. MODULATE D-2 TO MAINTAIN A CONSTANT MIXED AIR PLENUM PRESSURE AS • DETERMINED BY AIR BALANCER AT DESIGN CONDITIONS. MODULATE OUTSIDE AIR DAMPER DURING 790-20002 OCCUPIED HOURS TO MAINTAIN MINIMUM OUTDOOR AIR FLOW. CLOSE OUTDOOR AIR DAMPER PS C C DURING UNOCCUPIED PERIODS. Ii SUPPLY AIR TO - CC-1 HC-1 TERMINAL UNIT-- 2.5 WHEN THE TEMPERATURE OF THE OUTSIDE AIR,SENSED BY TT-2, IS ABOVE 75°F(ADJ)[23.8°C],THE © 0 (4)SUPPLY FAN DIGITAL CONTROL PANEL SHALL CLOSE D-1 TO ITS MINIMUM POSITION AND MODULATE DX COOLING TO OUTSIDEMr c4 p v SD MAINTAIN THE SUPPLY AIR TEMPERATURE,SENSED BY TT-1. AIR w LU L) 0 CI 2.6 WHEN THE TEMPERATURE OF THE OUTSIDE AIR,SENSED BY TT-2,IS BETWEEN 65°F[18.3°C]AND THE \) \ y u. u7.3 z ) SUPPLY AIR TEMPERATURE SENSED BY TT-1,D-1 SHALL BE FULLY OPEN(MAXIMUM OUTSIDE AIR \ LL¢ I w cC 0 Q POSITION).THE DIGITAL CONTROL PANEL SHALL MODULATE DX COOLING TO MAINTAIN THE SUPPLY AIR a Ai U " SPS TEMPERATURE,SENSED BY TT-1. - ,� 0 Ail 8 © i < 1 _ NIP lir 2.7 WHEN THE TEMPERATURE OF THE OUTSIDE AIR,SENSED BY TT-2,IS BELOW THE SUPPLY AIR _ TEMPERATURE,SENSED BY TT-1,DAMPER D1 SHALL MODULATE TO MAINTAIN THE SCHEDULED TD-1 ZC SUPPLY AIR TEMPERATURE.IF D-1 IS CLOSED,HC-1 SHALL MODULATE OPEN TO MAINTAIN THE w -- SST PRESSURE SWITCH HIGH SUPPLY AIR TEMPERATURE,SENSED BY TT-1.PROVIDE ECONOMIZER ENTHALPY CONTROL FOR VSMC 0 TO DISABLE FAN WHEN HIGH UNIT W/HUMIDIFIER. PRESSURE LIMIT SETPOINT IS 3.AIR FLOW CONTROL -` CIO- REACHED 3.1 THE SUPPLY AIR FLOW SHALL BE CONTROLLED BY THE DIGITAL CONTROL PANEL MODULATING THE SUPPLY FAN VARIABLE SPEED MOTOR CONTROLLER TO MAINTAIN 1.0"[25mm]OF DUCT STATIC LOCATE SENSOR VARIABLE SPEED PRESSURE(FIELD ADJUSTABLE),SENSED BY SPS-1.RESET STATIC PRESSURE BASED ON ACTUAL OUTSIDE UNDER MOTOR CONTROLLER, BUILDING LOAD BY POLLING ALL VAVs. SHIELD TYP. 3.2 AIRFLOW MEASURING STATIONS LOCATED UPSTREAM OF SUPPLY AND RETURN FANS SIGNAL - CONTROLLER WHICH MODULATES RETURN FAN AIRFLOW ACCORDING TO FOLLOWING EQUATION: RETURN FAN CFM=SUPPLY FAN CFM-(GENERAL EXHAUST CFM-BUILDING PRESSURIZATION) BALANCER SHALL VERIFY GENERAL EXHAUST FAN AIRFLOWS TO DETERMINE AIR HANDLER EXHAUST FAN SET POINTS. VARIABLE Al R VOLUME Al R HANDLING UNIT WITH - GENERAL EXHAUST FAN CFM IS BASED ON SUM OF EXHAUST AIRFLOWS IN THE AREA SERVED BY AHU. MINIMUM OUTSIDE AIR CONTROL D IAG RAM: AC-1 AND AC-2 3.3 USING HIGH PRESSURE SENSOR SPS-2 LOCATED AT THE SUPPLY FAN DISCHARGE,SHALL PREVENT 2 THE SUPPLY FAN FROM DEVELOPING OVER 3"[75mm]OF STATIC PRESSURE(FIELD ADJUSTABLE). IF NO SCALE STATIC PRESSURE AT SPS-2 DOES EXCEED 3"[75mm]THE SUPPLY AIR FAN SHALL STOP. SPS-2 SHALL BE HARDWIRED TO THE SUPPLY FAN VSMC AND UNIT SHALL BE SHUTDOWN IN HAND,AUTO OR BYPASS MODE.SPS-2 WILL REQUIRE MANUAL RESET AT THE DEVICE. 4.FREEZE PROTECTION 4.1 IF THE AIR TEMPERATURE AS SENSED BY TT-3 FALLS BELOW 45°F[7°C],AN ALARM SIGNAL SHALL INDICATE AT THE DCP AND ECC. IF THIS TEMPERATURE FALLS BELOW 40°F[4.4°C],AS SENSED BY THE TSL,THE SUPPLY AND RETURN FANS SHALL SHUT DOWN AND A CRITICAL ALARM SHALL INDICATE AT THE DIGITAL CONTROL PANEL AND ECC.TSL SHALL BE HARDWIRED TO THE SUPPLY FAN UFD AND UNIT SHALL BE SHUTDOWN IN HAND,AUTO OR BYPASS MODE.TSL WILL REQUIRE MANUAL RESET AT THE DEVICE. 4.2 -0.4F 4",FULE LY OPENDE AIR RA DAMPER,CLOSE RELIEF DAMPER AND SDING IS LOWER END ALARM TO OPERATOR STATION. N SET POINT(PROVIDED BY TAB) GENERAL NOTES: 5.AUTOMATIC SHUTDOWN/RESTART CONTROLS SCOPE OF WORK INCLUDES, BUT IT IS NOT LIMITED TO THE FOLLOWING. : 5.1 WHEN SMOKE IS DETECTED BY DUCT SMOKE DETECTOR,SD,THE SUPPLY AND RETURN FANS SHALL THE CONTROLS SYSTEM SHALL BE REPLACED TO ACCOMMODATE NEW EQUIPMENT INSTALLATION, SHUT"OFF"AND AN ALARM SIGNAL SHALL BE TRANSMITTED TO THE FIRE ALARM SYSTEM.ALL INCLUDING AC-1,AC-2,AND VAV TERMINAL UNITS AND INCORPORATION OF EXISTING TO REMAIN SMOKE DAMPERS IN THE SUPPLY AND RETURN DUCTS SHALL CLOSE. EQUIPMENT. 5.2 EXHAUST FANS SERVING AREA OF THE SUPPLY FAN SHALL CONTINUE TO RUN.SUPPLY AND RETURN CONTROL SYSTEM SHALL INCORPORATE ALL CONTROL POINT LISTED WITH CORRECT SYSTEM FANS SHALL RESTART AND SMOKE DAMPERS SHALL OPEN WHEN FIRE ALARM CIRCUIT IS RESET. OPERATION. CONTROL SYSTEM SHALL UTILIZE EXISTING WIRING AS MUCH AS POSSIBLE TO MINIMIZE 1 ASI 1 02/09/2021 6.EMERGENCY CONSTANT SPEED OPERATION INSTALLATION IMPACT. # DESCRIPTION DATE 6.1 UPON FAILURE OF THE VSMC,THE SUPPLY AND RETURN FANS SHALL BE STARTED/STOPPED SYSTEM SHALL BE EQUIPPED WITH REMOTE ACCESS THAT WILL ALLOW FACILITIES PERSONNEL TO MANUALLY AT THE DIGITAL CONTROL PANEL OR THE ECC THROUGH THE BY-PASS VSMC. ADJUST AND CONTROL EQUIPMENT FROM ANYWHERE IN THE BUILDING OR REMOTELY VIA CELLULAR Oregon PERS MOBILE DEVICE OR WIRELESS NETWORK. 7.UNOCCUPIED MODE ANY THERMOSTATS REPLACED IN CONFERENCE OR MEETING ROOMS, SHALL BE REPLACED BY A HVAC Full Design 7.1 IN UNOCCUPIED MODE,STOP SUPPLY AND RETURN FANS AND CLOSE OUTSIDE AIR AND RELIEF AIR COMBINATION THERMOSTAT/CARBON DIOXIDE,AND THE ASSOCIATED TERMINAL UNIT SHALL BE DAMPERS. REPROGRAMMED TO PROVIDE DEMAND CONTROL VENTILATION. CONTROLS SYSTEM INTERFACE SHALL UTILIZE GRAPHICS FOR ALL EQUIPMENT. {, 8. NIGHT LOW LIMIT REFER TO CONTROLS SPECIFICATIONS FOR ADDITIONAL INFORMATION. . Oregon PUbI{C 8.1 OPERATATE UNIT IN OCCUPIED MODE IF COOLEST ZONE FALLS BELOW 55F(ADJUSTABLE). REVERT Employees Retirement TO UNOCCUPIED MODE WHEN RETURN AIR TEMPERATURE RISES TO 60F. System 9.CONTROL POINTS, 9.1 CONTROL POINTS SHALL INCLUDE,BUT NOT LIMITED,TO THE FOLLOWING POINTS FOR MONITORING AND CONTROL TO INTERFACE WITH DDC OR EMCS SYSTEM. TYPICAL AC UNIT OUTSIDE AIR FLOW(CFM) SUPPLY FAN VSD START/STOP RETURN AIR FLOW(CFM) SUPPLY FAN VSD STATUS SUPPLY AIR FLOW(CFM) SUPPLY FAN VSD FAULT SUPPLY FAN STATUS AND SPEED SUPPLY FAN VSD SPEED CONTROL A 044040.0100440: U- Al- AN A A i SP • A PE- •TU' ENT TING •IR MP - •TU-E RA M- - • s-E OUTSIDE AIR TEMPERATURE SUPPLY DUCT STATIC PRESSURE LEAVING AIR TEMPERATURE SPACE STATIC PRESSURE . COMPRESSOR STATUS RETURN FAN VSD START/STOP E STATUS AND POSITION OF ANY AND ALL RETURN FAN VSD STATUS ISSUE FOR BID DAMPERS WITHIN OR PART OF THE AIR RETURN FAN VSD FAULTof aHANDLER ASSEMBLY,INCLUDING ECONOMIZER RETURN FAN VSD SPEED CONTROL PRESSURE DROP ACROSS FILTERS 0-1- CARBON DIOXIDE MONITORING ON THE RETURN FREEZE PROTECTION THERMOSTAT Protect. AIR INTAKE AS WELL AS ANY CONTROL POINTS SA/RA HIGH DUCT STATIC PRESSURE Contents: LISTED WITHIN THE SPECIFICATION OR HEREIN DUCT SMOKE DETECTORS MECHANICAL a FILTER STATUS CONTROLS tu gN DIAGRAMS O al I,. Drawn: CM Checked: GMJ C Date: 11/30/2020 4 VARIABLE AIR VOLUME AIR HANDLING UNIT WITH MINIMUM OUTSIDE AIR SOO: AC-1 AND AC-2 1 1 Sheet Number: NO SCALE 0M M M7 . 00 N C a OREGON wiD TYPICAL VARIABLE TYPICAL PARALLEL alis. WM'S S AIR VOLUME FAN POWERED PUBLIC EMPLOYEES RETIREMENT SYSTEM TERMINAL UNIT TERMINAL UNIT Aft x21 C,mall2J MOD MOD ird co > SA > I dal -;C ) SA > Aga IMF A //1A \ FLAG NOTES FLAG NOTES GROUP PROVIDE COMBINATION CO2 SENSOR AND 110►- PROVIDE COMBINATION CO2 SENSOR AND 111 SW Fifth Ave, Ste 2120 THERMOSTAT WHERE APPLICABLE. THERMOSTAT WHERE APPLICABLE. Portland, Oregon 97204 INCLUDING CONFERENCE AND MEETING INCLUDING CONFERENCE AND MEETING 9 ROOM,WHERE REQUIRED BY SPECIFICATION ROOM,WHERE REQUIRED BY SPECIFICATION ORAS DRAWINGS INDICATE. ORAS DRAWINGS INDICATE. 1'v' Tel 503.416.2400 Fax 206.267.1701 TYPICAL SINGLE DUCT VAV TERMINAL UNIT TYPICAL PARALLEL FAN POWER VAV TERMINAL UNIT sAZAN#79a20002 NO SCALE 2 NO SCALE VARIABLE AIR VOLUME TERMINAL UNIT (VAVI PARALLEL FAN TERMINAL UNIT(FTU1 1.1 SINGLE DUCT VARIABLE AIR VOLUME TERMINAL UNIT(COOLING ONLY) 1.1 PARALLEL FAN TERMINAL UNIT WITH ELECTRIC HEAT A. OCCUPIED MODE: A. OCCUPIED MODE: 1. IN OCCUPIED MODE THE UNIT SHALL MAINTAIN: 1. IN OCCUPIED MODE THE UNIT SHALL MAINTAIN: a. A 75°F(ADJ.)SETPOINT FOR COOLING. a A 75°F(ADJ.)SETPOINT FOR COOLING. b. A 5°F(ADJ)COOLING OFFSET SETPOINT. b. A 70°F(ADJ.)SETPOINT FOR HEATING. 2. THE TERMINAL UNIT CONTROLLER SHALL MODULATE THE PRIMARY AIR DAMPER TO MAINTAIN THE DESIRED PRIMARY AIRFLOW,USING A PRESSURE c. A 5°F(ADJ.)HEATING OFFSET SETPOINT. INDEPENDENT CONTROL ALGORITHM. THE TERMINAL UNIT SHALL RESET THE DESIRED PRIMARY AIRFLOW BETWEEN THE MAXIMUM AND MINIMUM d. A 5°F(ADJ)COOLING OFFSET SETPOINT. SCHEDULED VALUES TO MAINTAIN ROOM TEMPERATURE. 2. THE TERMINAL UNIT CONTROLLER SHALL MODULATE THE PRIMARY AIR DAMPER TO MAINTAIN THE DESIRED PRIMARY AIRFLOW,USING A PRESSURE 3. AS THE DEMAND FOR COOLING INCREASES THE PRIMARY AIR DAMPER WILL INCREASE FROM DESIGN MINIMUM TO 100%DESIGN MAXIMUM AS THE INDEPENDENT CONTROL ALGORITHM.-THE TERMINAL UNIT SHALL RESET THE DESIRED PRIMARY AIRFLOW BETWEEN THE MAXIMUM AND MINIMUM COOLING DEMAND RISES FROM 0%TO 100%. IN THE EVENT OF A POWER BUMP OR THERE IS A LOSS OF PRIMARY AIR FLOW DURING OCCUPIED MODE, SCHEDULED VALUES TO MAINTAIN ROOM TEMPERATURE. THE PARALLEL FAN SHALL RUN ON HEATING MODE ONLY AND BE SET DURING BALANCING THEN ALL OF THE PRIMARY AIR DAMPERS WILL GO TO A PREDETERMINED VALUE OF 15 PERCENT.THIS WILL PREVENT OVER PRESSURIZATION OF THE TO THE SCHEDULED AIRFLOW VALUE.THE CONTROLLER SHALL MODULATE THE FAN WITH THE PRIMARY AIRFLOW.IF THE DESIRED PRIMARY BUILDING. AIRFLOW IS 80%OF MAXIMUM. BALANCER WILL SET FAN VOLUME K FACTOR AT MINIMUM FAN SPEED AND MAXIMUM FAN SPEED. IF THE DESIRED B. ADDITIONAL INFORMATION FOR ALL CONFERENCE ROOMS WITH 12 OR MORE OCCUPANTS. PRIMARY AIRFLOW IS AT ITS MINIMUM SCHEDULED VALUE,AND THE ROOM TEMPERATURE IS BELOW ITS SETPOINT,THE CONTROLLER SHALL 1. THESE ROOMS SHALL HAVE A TEMPERATURE SENSOR WITH DIGITAL DISPLAY AND USER ADJUSTMENT. MODULATE THE ELECTRIC HEATING COIL AS DEMAND INCREASES THE SIGNAL WILL INCREASE HEATER OUTPUT AND INCREASE HEATING TO 2. USER ADJUSTABLE OFFSET SHALL BE 1°F UP AND 1°F DOWN(ADJ). THE OFFSET SHALL MOVE THE TEMPERATURE SET POINT UP OR DOWN WHILE MAINTAIN TEMPERATURE SETPOINT. MAINTAINING THIS 2°F DEADBAND. 3. DURING HEATING DEMAND THE PRIMARY AIR DAMPER WILL REMAIN AT DESIGN MINIMUM. AS THE HEAT DEMAND DROPS THE REVERSE WILL OCCUR. 3. TEMPERATURE SENSOR SHALL DISPLAY TEMPERATURE SETPOINT AND ROOM TEMPERATURE. AS THE DEMAND FOR COOLING INCREASES THE PRIMARY AIR DAMPER WILL INCREASE FROM DESIGN MINIMUM TO 100%DESIGN MAXIMUM AS THE COOLING DEMAND RISES FROM 0%10100%. IN THE EVENT OF A POWER BUMP OR THERE IS A LOSS OF PRIMARY AIR FLOW DURING OCCUPIED 4. USER ADJUSTABLE OFFSET TEMPERATURE OVERRIDES SHALL BE AUTOMATICALLY RESET AFTER 2 HOURS,OR UPON NIGHT OR WEEKEND UNOCCUPIED MODE,DAY SET BACK MODE PER THE OCCUPANCY SENSOR,OR FOR DIVISIBLE ROOMS WHEN THE ROOM IS SWITCHED BETWEEN'OPEN'AND"CLOSED." O , L ALL OF THE PRIMARY AIR DAMPERS WILL GO TO A PREDETERMINED VALUE OF 15 PERCENT.THIS WILL PREVENT OVER PRESSURIZATIONOF THF SHE BUILDING. C. ADDITIONAL INFORMATION FOR HIGH-OCCUPANCY ZONES WITH OCCUPANCY SENSORS. 4. START/STOP AND MORNING WARMUP: 1. ZONES WITH PARTICULAR DESIGNATIONS THAT HAVE LOW VARIABLE OCCUPANCY SHALL HAVE AN OCCUPANCY SENSOR. 4.1. WHEN AN AHU IS ENABLED,THE DOC SHALL ALSO ENABLE CONTROL OF THE PRIMARY AIR VALVES IN THE VAV BOX THAT SERVE THAT AHU. 2. THE OCCUPANCY SENSOR(PROVIDED BY ELECTRICAL CONTRACTOR)CONTROLS THE UGHTS IN THE HIGH OCCUPANCY ROOMS. FOR ROOMS DURING MORNING WARMUP,EACH BOX'S PRIMARY AIR VALVE SHALL GO TO OPEN.DURING MORNING WARMUP,EACH BOX'S PRIMARY AIR WITHOUT CO2 SENSORS BUT STILL WITH HIGH VARIABLE OCCUPANCY,THIS OCCUPANCY SENSOR SHALL HAVE A SPARE OUTPUT WHICH WILL SIGNAL VALVE SHALL CLOSE AND THE FAN SHALL BE STARTED.UPON CONFIRMATION THAT THE FAN IS OPERATING,THE DDC SYSTEM SHALL OPEN THE THE CONTROLLER WHEN THE ROOM HAS OCCUPANTS. IF THE ROOM HAS BEEN EMPTY FOR MORE THAN 10 MINUTES THEN THE CONTROLLER SHALL PRIMARY AIR DAMPER TO FULL OPEN AND MODULATE THE VAV BOX'S HEATING COIL TO FULL HEATING. DURING MORNING WARMUP,EACH REDUCE THE PRIMARY MINIMUM AIRFLOW TO 0 PERCENT OF SCHEDULED MINIMUM. BOX'S PRIMARY AIR VALVE SHALL CLOSE AND THE FAN SHALL BE STARTED.UPON CONFIRMATION THAT THE FAN IS OPERATING,THE DDC a. IF THE SPACE DEMANDS EITHER HEATING OR COOLING IN EITHER SCENARIO ABOVE,THEN THE STANDARD SEQUENCE WILL APPLY. SYSTEM SHALL OPEN THE PRIMARY AIR DAMPER TO MINIMUM POSITION AND MODULATE THE VAV BOX'S HEATING COIL TO FULL HEATING.AS D. UNOCCUPIED MODE:DURING UNOCCUPIED PERIODS,PRIMARY AIR DAMPERS IN INDIVIDUAL UNITS SHALL CLOSE. THE SPACE TEMPERATURE REACHES 70 DEG F,THE DDC SYSTEM SHALL RESUME VAV BOX DISCHARGE TEMPERATURE CONTROL AS 1. UPON AN OCCUPANT PRESSING THE OVER-RDE BUTTON ON A BUILDING QUADRANT SENSOR WHEN THAT ZONE IS IN UNOCCUPIED MODE,THE ENTIRE DESCRIBED BELOW. FLOOR SHALL CHANGE TO OCCUPIED MODE FOR 2 HOURS(ADJ.).THE RTU ASSOCIATED WITH THAT ZONE SHALL BE ENABLED,BUILDING QUADRANT 5. TEMPERATURE CONTROL: OVERRIDE BUTTONS SHALL BE MOUNTED ON THE INTERIOR CORE,UP TO 6 PER FLOOR AS SHOWN ON FLOOR PLANS.THESE QUADRANT OVERRIDE 5.1. EACH SPACE TEMPERATURE SENSOR SHALL RESET THE BOX DISCHARGE TEMPERATURE TO MAINTAIN THE SPACE SETPOINT THROUGH BUTTONS SHALL CHANGE ALL TERMINAL UNITS WITHIN THAT QUADRANT THAT ARE IN UNOCCUPIED MODE TO OCCUPIED MODE.AN ADJUSTABLE MODULATION OF THE PRIMARY AIR VALVE AND OPERATION OF THE FAN. TIMER WILL PUT THE ASSOCIATED ZONES INTO THE OCCUPIED MODE FOR THAT TIME,INITIALLY SET AT 7200 SEC.(2 HOURS). 5.2. AT PEAK COOLING,THE DDC SYSTEM SHALL MAINTAIN THE PRIMARY AIR DAMPER AT FULL OPEN POSITION WITH THE FAN OFF. AS THE CALL E. FIRE ALARM UPON RECEIVING A FIRE ALARM SIGNAL FROM THE FIRE ALARM SYSTEM,THE BAS SHALL SHUTDOWN ALL FANS AND CLOSE ALL PRIMARY AIR FOR COOLING DROPS,THE DDC SHALL MODULATE THE BOX'S PRIMARY AIR DAMPER TO MAINTAIN SPACE TEMPERATURE.AS THE CALL FOR DAMPERS. COOLING CONTINUES TO DECREASE,THE DDC SYSTEM SHALL CLOSE THE PRIMARY DAMPER AND START THE FAN.AFTER VERIFYING FAN OPERATION(CURRENT SENSING RELAY OR AIRFLOW SENSOR),THE DDC SHALL MODULATE THE BOX'S PRIMARY AIR VALVE BETWEEN THE MINIMUM DAMPER POSITION AND FULLY OPEN TO MAINTAIN SPACE TEMPERATURE. SINGLE DUCT VARIABLE Al R VO L U M E TERMINAL UNIT 5.3. AS THE PRIMARY AIR DAMPER REACHES ITS MINIMUM SETTING WITH THE FAN ON,AND THERE IS A CONTINUED DROP IN CALL FOR COOLING(A CALL FOR HEATING),THE DDC SHALL INITIATE THE PARALLEL FAN POWERED VAV BOX HEATING SEQUENCE AS DESCRIBED BELOW: SEQUENCE OF OPERATION 5.4. PPOS ARALLEL ON MODULFAN POWERED THE VAV BOX'S HEATING COIL TO MA NTVAV BOX HEATING SEQUENCE TAAIN THE SPACE SETPOINTA FURTHER CALL FOR EATING ,THE DDC SHALL MAINTAIN MINIMUM DAMPER 6. NIGHT SETBACK 1 ASI 1 02/09/2021 NO SCALE 6.1. WHEN IN UNOCCUPIED MODE AND ANY SPACE TEMPERATURE DROPS TO 60 DEG F(ADJUSTABLE),THE DDC SHALL CALL FOR HEATING IN THAT # DESCRIPTION DATE ZONE.REFER TO'PARALLEL FAN POWERED VAV BOX HEATING SEQUENCE'DESCRIBED ABOVE.AS THE INDIVIDUAL SPACE TEMPERATURES REACH 70 DEG F,THE SATISFIED ZONE HEATING COILS SHALL DISABLE AND THE FANS SHALL STOP. p C� B. ADDITIONAL INFORMATION FOR ALL CONFERENCE ROOMS WITH 12 OR MORE OCCUPANTS. Oregon PERS 1. THESE ROOMS SHALL HAVE A TEMPERATURE SENSOR WITH DIGITAL DISPLAY AND USER ADJUSTMENT. 2. USER ADJUSTABLE OFFSET SHALL MAINTAINING THIS 2°F DEADBAND. H VAC Full Design BE 1°F UP AND 1°F DOWN(ADJ). THE OFFSET SHALL MOVE THE TEMPERATURE SET POINT UP OR DOWN WHILE 3. TEMPERATURE SENSOR SHALL DISPLAY TEMPERATURE SETPOINT AND ROOM TEMPERATURE. 4. USER ADJUSTABLE OFFSET TEMPERATURE OVERRIDES SHALL BE AUTOMATICALLY RESET AFTER 2 HOURS,OR UPON NIGHT OR WEEKEND UNOCCUPIED MODE,DAY SET BACK MODE PER THE OCCUPANCY SENSOR,OR FOR DIVISIBLE ROOMS WHEN THE ROOM IS SWITCHED BETWEEN'OPEN'AND"CLOSED." C. ADDITIONAL INFORMATION FOR HIGH-OCCUPANCY ZONES WITH 002. Oregon Public 1. ZONES THAT HAVE HIGH VARIABLE OCCUPANCY SHALL HAVE A CO2 SENSOR.WHEN IN OCCUPIED MODE,THE CONTROLLER SHALL MEASURE ZONE CO2 LEVELS AND MODULATE THE ZONE DAMPER OPEN ON RISING CO2 CONCENTRATIONS,OVERRIDING NORMAL DAMPER OPERATION TO MAINTAIN A CO2 SETPOINT OF NOT MORE THAN 900 PPM(ADJ.). Employees Retirement 2. UNOCCUPIED MODE DURING UNOCCUPIED PERIODS,FANS SHALL STOP AND PRIMARY AIR DAMPERS IN INDIVIDUAL UNITS SHALL CLOSE. System 3. ON A DROP IN SPACE TEMPERATURE BELOW THE UNOCCUPIED SETPOINT,THE TERMINAL UNIT FAN AND HEATER SHALL BE ENERGIZED UNTIL THE SPACE TEMPERATURE IS 2 DEGREES ABOVE THE UNOCCUPIED SETPOINT.AT THAT POINT THE ZONE SHALL RETURN TO UNOCCUPIED MODE. UPON AN OCCUPANT PRESSING THE OVER-RIDE BUTTON ON A BUILDING QUADRANT SENSOR WHEN THAT ZONE IS IN UNOCCUPIED MODE,THE ENTIRE FLOOR SHALL CHANGE TO OCCUPIED MODE FOR 2 HOURS(ADJ.).THE RTU ASSOCIATED WITH THAT ZONE SHALL BE ENABLED.BUILDING QUADRANT OVERRIDE BUTTONS SHALL BE MOUNTED ON THE INTERIOR CORE,UP TO 6 PER FLOOR,AS SHOWN ON FLOOR PLANS.THESE QUADRANT OVERRIDE BUTTONS SHALL CHANGE ALL TERMINAL UNITS WITHIN THAT QUADRANT THAT ARE IN UNOCCUPIED MODE TO OCCUPIED MODE.AN ADJUSTABLE TIMER WILL PUT THE ASSOCIATED ZONES INTO THE OCCUPIED MODE FOR THAT TIME,INITIALLY SET AT 7200 SEC.(2 HOURS). 4. INDIVIDUAL TERMINAL UNIT TEMPERATURE SENSOR OVERRIDES SHALL BE INACTIVE.THESE SENSORS WILL BE LABELED APPROPRIATELY. F. MORNING WARM-UP: 1. MORNING WARM-UP START TIME SHALL BE CALCULATED BY THE DDC OR EMCS OPTIMAL START PROGRAM. 2. UPON INITIATION OF MORNING WARM-UP,EVERY TERMINAL FAN THAT IS IN WARM-UP MODE SHALL BE STARTED AND THE HEATING ENABLED UNTIL THE SPACE OCCUPIED TEMPERATURE SETPOINT IS REACHED.THE PRIMARY AIR DAMPER SHALL REMAIN CLOSED.WARM UP MODE AT TERMINAL UNIT ENDS AT SCHEDULED OCCUPIED TIME OR WHEN SPACE TEMPERATURE IS SATISFIED,WHICHEVER COMES FIRST. G. FIRE ALARM UPON RECEIVING A FIRE ALARM SIGNAL FROM THE FIRE ALARM SYSTEM,THE BAS SHALL SHUTDOWN ALL FANS AND CLOSE ALL PRIMARY AIR DAMPERS. VARIABLE AIR VOLUME TERMINAL UNIT SEQUENCE OF OPERATION ISSUE FOR BID C4) NO SCALE Project: Contents: w MECHANICAL w CONTROLS DIAGRAMS Drawn: CM Checked: GMJ Date: 11/30/2020 co�a m Sheet Number v a 0RIO 7 I 0 1 M 1;; C'r) r N N