Loading...
Plans (14) P LM 2019 -00 107 STANDARD PLUMBING ABBREVIATIONS PLUMBING SYMBOLS GENERAL NOTE AD AREA DRAIN HT HEAT TRACE THIS ISA STANDARD LEGEND SHEET, THEREFORE, SOME SYMBOLS MAY ("1" n AFF ABOVE FINISHED FLOOR ID INSIDE(QIAMETERIQIMENSION) LTB THRUST BLOCK APPEAR ON THIS SHEET THAT DO NOT APPEAR ON THE DRAWINGS. AHP APPARATUS HOUSING PLENUM IE INVERT ELEVATION ,l CO CLEANOUT ALT ALTERNATIVE IN INCH(ES) AL ALUMINUM INSUL INSULATION C-II WCO WALL CLEANOUT 11. AP ACCESS PANEL JP JOCKEY PUMP 0 FCO FLOOR CLEANOUT MISC. VALVES & COCKS APPROX APPROXIMATELY JS JANITOR SINK 0 CTG CLEANOUT TO GRADE KW KILOWATT SHUT-OFF VALVE ARCH ARCHITECTURAL) I1 FD FLOOR DRAIN AUTO AUTOMATIC LWH LAVATORYKILOWAHOUR as S GLOBE VALVE BLDG BUILDING AD AREA DRAIN IX SHUT-OFF VALVE W/TAMPER SWITCH BOP BOTTOM OF PIPE L _A LB POUND ® GB CATCH BASIN i: i TRIPLE DUTY VALVE BSMT BASEMENT LF LINEAR FEET 2 FS FLOOR SINK MAX MAXIMUM T ; CHECK VALVE BTU BRITISH THERMAL UNIT MBH THOUSAND BTU PER HOUR ORD ROOF DRAIN BTUH BRITISH THERMAL UNITS PER HOUR2 WAY CONTROL VALVE BV BALANCING VALVE MECH MECHANICAL 0 OD OVERFLOW DRAIN IA 3-WAY CONTROL VALVE CALL CALCULATION MFR MANUFACTURER h� TD •TRENCH DRAIN BALANCING VALVE i i CFH CUBIC FEET PER HOUR MIN MINIMUM • CFM CUBIC FEET PER MINUTE MISC MISCELLANEOUS pm FLOW CONTROL VALVE I B I MS MOP SINK SYMBOLS D� SOLENOID VALVE RECEIVED I CLG CEILING OR COOLING MTD MOUNTED A CL CENTERLINENC NORMALLY CLOSED \A/ ACCESS PANEL n CAP EXISTING / CAP FOR FUTURE PRESSURE REDUCING VALVE ''. 1 1 2019 CO CLEAN OUT NIC NOT IN CONTRACT MAV CITY OF TIGARD Group CONC CONCRETE (R) AIR VENT MANUAL Dull Olson Weekes - IBI CONN CONNECT(ION) NO NORMALLY OPEN (B) BELOW GRADE l FLOOR RELOCATE EXISTING AAV 3UILD1NG DIVISION Architects, Inc. CONT CONTINUE ED UATION OC ON CENTER DISTANCE Q AIR VENT AUTOMATIC )� ) OD OVERFLOW DRAIN CONNECT TO EXISTING REMOVE EXISTING 907 SW Stark Street Portland OR 97205 CP CIRCULATING PUMP USA CI CAST IRON OS&Y OUTSIDE SCREW& YOKE GATE VALVE � ANGLE RELIEF VALVE tel 503 226 6950 fax 503 273 9192 PD PLANTER DRAIN n EXISTING TO REMAIN (i) NUMBERED NOTE OFFICE COPY www.dowa-ibigroup.com CTG CLEANOUT TO GRADE P/FT PITCH PER FOOT ' STRAINER �' CV CHECK VALVE � � www.ibigroup.com DF DRINKING FOUNTAIN PG PRESSURE GAUGE Q REVISION NUMBER STRAINER WITH BLOWDOWN PH PHASE DV DRAIN VALVE _€ _ DFU DRAINAGE FIXTURE UNIT PIV POST INDICATING VALVE / - DI DEIONIZER HB HOSE BIBS ;_ -"" PA E DIA DIAMETER PRV PRESSURE REDUCING VALVE / pae-engineers.com DN DOWN PSI POUNDS PER SQUARE INCH C ET-XXX DR DRAIN PSIG POUNDS PER SQUARE INCH (GAUGE) uL----- UNIT NUMBER G GWALL HYDRANT IH R (RAD) RADIUS DETAIL NUMBER A GROUND HYDRANT PROF DROP DROP (WITHIN FLOOR) FLOOR UNIT IS SYSTEM TYPE F&TIIB ' '%.• .D ��,, DWG DRAWING RISE RISE (WITHIN FLOOR) LOCATED ON DWG. SHEET NO. 1 `N O RD ROOF DRAIN RISER NUMBER STEAM TRAP : .�� (E) EXISTING EQUIPMENT TYPE (� ci 183 9,� -r.- EDR EXPRESS DRAIN RISER REV REVISION I PRESSURE GAUGE • RPM REVOLUTIONS PER MINUTE EQUIPMENT DETAIL CALLOUT RISER TAG ., ON EFF EFFICIENCY SA SHOCK ABSORBER -z- °�p, PRESSURE/TEMPERATURE TEST PLUG -"a , ... `0 �� ELEC ELECTRIC(AL) SAD SEE ARCHITECTURAL '5'o i' 19 � c7n ELEV ELEVATION SE SEWAGE EJECTOR THERMOMETER 4s P. CO\'`'' ENGR ENGINEER MISC. FITTINGS & SYMBOLS a,6,3-f719 EQ EQUAL SECT SECTION 4F EQUIP EQUIPMENT SF SQUARE FEET FLOW SWITCH SH SHOWER � DIRECTION OF FLOW Q �.x:=,;� 12- 1-19 ET EXPANSION TANKTEMPERATURE TRANSMITTER EWC ELECTRIC WATER COOLER SIM SIMILAR DIRECTION OF SLOPE Q (SIZE) EWH ELECTRIC WATER HEATER SK SINK - SHOCK ARRESTOR EXIST EXISTING SP STATIC PRESSURE PIPE SLEEVE VQ EXP EXPANSION SPEC SPECIFICATION REDUCER VACUUM BREAKER F DEGREES FAHRENHEIT S5 SERVICE SINK X ANCHOR1WFM RPBA WATER FLOW METER FCO FLOOR CLEANOUT SQ SQUAREr ELBOW(90°) CI DCVA REDUCED PRESSURE BACKFLOW ASSEMBLY FD FLOOR DRAIN SQ IN SQUARE INCH(ES) �" DOUBLE CHECK VALVE ASSEMBLY FDC FIRE DEPARTMNET CONNECTION STL STEEL t---/ ELBOW (45°) =1 DCDA DOUBLE CHECK DETECTOR ASSEMBLY FHC FIRE HOSE CABINET STRUCT STRUCTUR(E)(AL) -S TEE BWV BACKWATER VALVE FHV FIRE HOSE VALVE TDH TOTAL DISCHARGE HEAD II s CROSS UG FHVC FIRE HOSE VALVE CABINET UNDERGROUND GATE VALVE W/BOX FILT FILTER TEMP TEMPERATURE PIV FL FLOOR TMV TEMPERATURE MIXING VALVE IT PIPING CONNECTIONS UNDERGROUND GATE W/POST INDICATOR FLEX FLEXIBLE TOP TOP OF PIPE OUTSIDE SCREW&YOKE FP FIRE PUMP TPV TRAP PRIMER VALVE I JOINT OR COUPLING POINT �+ TS TAMPER SWITCH Y PATTERN BOILER BLOWDOWN VALVE U FPD FEET PER MINUTE PRESSURE DROP TSP TOTAL STATIC PRESSURE lIc UNION NON-RETURN STOP VALVE L FPM FEET TYP TYPICAL I I FLANGED CONNECTION .1.0FPS FEET PER SECOND UON UNLESS OTHERWISE NOTED QUICK OPENING BOILER SLOWDOWN VALVE Ci) FS FLOW SWITCH UP UP (PENETRATES FLOOR SLAB) CAP II PLUG OR BLIND FLANGE __** GAS COCK VALVE RI FSK FLOOR SINK UR URNIAL �I RELIEF VALVE 0 FT FEET/FOOT V VOLTS 0 RISER ►�� MIXING VALVE FU FIXTURE UNIT VB VOLUME BREAKER 0 ELBOW UP 0 FUT FUTURE VEL VELOCITY ELBOW DOWN PUMP O GA GAGE/GAUGE GAL GALLON VERT VERTICAL 0TEE UP 0 N GALV GALVANIZED VFD VARIABLE FREQUENCY DRIVE .. PLUMBING PIPING o v r- GPH GALLONS PER HOUR VTR VENT THROUGH ROOF TEE DOWN ^ 0,GPM GALLONS PER MINUTE W WIDTH HORIZONTAL TEE C J CC WC WATER CLOSET ® FLEXIBLE CONNECTION W W WASTE (ABOVE GRADE OR FLOOR) (.� 0 GV GATE VALVE WCO WALL CLEANOUT a] - -W--- - W WASTE (BELOW GRADE OR FLOOR) CO147-i- -� H HEIGHT BALL JOINT WFU WATER FIXTURE UNITS PW PW PUMPED WASTE (ABOVE GRADE OR FLOOR) 43) HB HOSE BIBS WG WATER GAUGE �� MECHANICAL COUPLING �.. 0, HD HUB DRAIN - -PW- - PW PUMPED WASTE (BELOW GRADE OR FLOOR) HORIZ HORIZONTAL W/ WITH HEAT TRACE CD SD STORM DRAIN (ABOVE GRADE OR FLOOR) cas- HP HORSEPOWER W/0 WITHOUT 73 = ZONE ZONE S PIPE CONTINUATION -SD- - SD STORM DRAIN (BELOW GRADE OR FLOOR) Q o r--- 00 00 OD OVERFLOW DRAIN (ABOVE GRADE OR FLOOR) M 1 I d- d- -OD- OD OVERFLOW DRAIN (BELOW GRADE OR FLOOR) >1 vr) PLUMBING DRAWING LIST DEMOLITION LEGEND D 0 DRAIN (CONDENSATE/INDIRECT) L V VENT as o co coSHEET # SHEET NAME - - o o o ?- - REMOVE EXISTING PIPE - - GW COLD WATER CM co cn c P0.01 SYMBOLS, LEGENDS & ABBREVIATIONS - PLUMBING - - - - - - HW HOT WATER ....--d- '-' P0.02 SCHEDULES - PLUMBING RHW RECIRCULATING HOT WATER P2.00 UNDERGROUND PLAN OVERALL - PLUMBING NEW AND EXISTING WORK TV] TW TEMPERED WATER P2.01 FIRST FLOOR PLAN OVERALL - PLUMBING -- - - -HTW- - -- -- HTW 140° HOT WATER P2.02 SECOND FLOOR PLAN OVERALL - PLUMBING t S 1 ; RHTW RHTW 140° RECIRCULATING HOT WATER OFFICE COPY P2.10 FIRST FLOOR PLAN SECTOR A - PLUMBING EXISTING PIPING NEW PIPING RTN' RTW RECIRCULATING TEMPERED WATER II P2.1 OU UNDERGROUND PLAN SECTOR A - PLUMBING C G NATURAL GAS (LOW PRESSURE) P2.11 FIRST FLOOR PLAN SECTOR B - PLUMBING MC MG NATURAL GAS (MEDIUM PRESSURE) P2.11 U UNDERGROUND PLAN SECTOR B - PLUMBING - - - -GV- - - - GV GAS VENT P2.12 FIRST FLOOR PLAN SECTOR C - PLUMBING - - - -GW- - - - GW GREASE WASTE (BELOW GRADE OR FLOOR) P2.13U UNDERGROUND PLAN SECTOR D - PLUMBING P2.14 FIRST FLOOR PLAN SECTOR E - PLUMBING P2.14U UNDERGROUND PLAN SECTOR E - PLUMBING P2.20 SECOND FLOOR PLAN SECTOR A - PLUMBING P2.21 SECOND FLOOR PLAN SECTOR B - PLUMBING P2.22 SECOND FLOOR PLAN SECTOR C - PLUMBING ApprovedTY OF TIGARDOei P2.23 SECOND FLOOR PLAN SECTOR D - PLUMBING Conditionally Approved [ ] P2.24 SECOND FLOOR PLAN SECTOR E - PLUMBING See Letter to: Follow [ t Attached }, P2.50 ROOF PLAN SECTOR A - PLUMBING Permit Number: PLM : 019-0U 617 _i P2.51 ROOF PLAN SECTOR B - PLUMBING Addres V44,56 5:+u• 11 tb'S-14- P2.52 ROOF PLAN SECTOR C - PLUMBING By: Date: -3._�5r zP2.53 ROOF PLAN SECTOR D - PLUMBING phase Bid & Permit U P2.54 ROOF PLAN SECTOR E - PLUMBING co P4.01 ENLARGED PLANS - PLUMBING E P5.01 DETAILS - PLUMBING date i February 8, 2019 LU P6.01 DIAGRAMS - PLUMBING revisions (71 P6.02 DIAGRAMS - PLUMBING P6.03 DIAGRAMS - PLUMBING P6.04 DIAGRAMS - PLUMBING o P6.05 DIAGRAMS - PLUMBING o P6.06 DIAGRAMS - PLUMBING cu P6.07 DIAGRAMS - PLUMBING -c 710 To project # 16055 o SYMBOLS. LEGENDS & co ABBREVIATIONS - li PLUMBING r - 1-,- 0 r~ r C7)o oC) N CVCT) a__- PLUMBING DESIGN CRITERIA (OREGON) DOMESTIC WATER PIPING SYSTEM: (....-7 BASIS OF DESIGN: 2017 OREGON PLUMBING SPECIALTY CODE,APPENDIXA'RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYSTEM'. PIPING SIZED ON 4 PSI/100 FT. DROP,VELOCITIES NOT TO EXCEED 8 FT./SEC. (COLD WATER) AND NOT TO EXCEED 5 FT./SEC. (HOT WATER). WASTE AND VENT PIPING SYSTEM: BASIS OF DESIGN: 2017 OREGON PLUMBING SPECIALTY CODE, CHAPTER 7,'SANITARY DRAINAGE'. - _ = - -- ALL WASTE PIPING SIZED AT 1/4"/FT. SLOPE UNLESS OTHERWISE NOTED. ROOF DRAIN/STORM DRAIN PIPING SYSTEM: --- BASIS OF DESIGN: 2017 OREGON PLUMBING SPECIALTY CODE, CHAPTER 11, 'STORM DRAINAGE'. STORM DRAIN PIPING SIZED AT 1/8"/FT. SLOPE UNLESS OTHERWISE NOTED AND A RAINFALL RATE OF 1.3"/HR.NATURAL GAS SYSTEM: BASIS OF DESIGN: 2014 OREGON MECHANICAL SPECIALTY CODE,APPENDIX C, 'FUEL GAS', SECTION C402, 'PIPE SIZING'. EQUIVALENT LENGTH OF PIPE: 150 FT. (MPG), 30 FT(G) = _ _ 111ti_ TANK SCHEDULE SYSTEM TEMP. RANGE FILL MAX RELIEF MIN TANK MIN ACCEPTANCE INLET PIPE OUTLET PIPE TAG PRESSURE PRESSURE VALVE VOLUME VOLUME SIZE SIZE MANUFACTURER r- -- " -1 1 ' - "'- --"°"�-""" """1N-- NUMBER DESCRIPTION LOCATION SERVICE TYPE MIN (°F) MAX(°F) (PSIG) (PSIG) (PSIG) (GAL) (GAL) (IN) (IN) & MODEL NOTES DOMESTIC WATER EXPANSION@it 1r DET-101 TANKCUST. B117 DOMESTIC WATER THERMAL EXPANSION- POTABLE 60 140 50 80 100 14 8 0.75 - AMTROL ' I DET-201 DOMESTIC WATANK TER EXPANSION CUST. A217 DOMESTIC WATER THERMAL EXPANSION-POTABLE 60 140 50 80 100 18 12 0.75 - AMTROL DET-202 DOMESTIC WATER EXPANSION CUST. B214 DOMESTIC WATER THERMAL EXPANSION-POTABLE 60 140 50 80 100 14 8 0.75 - AMTROL TANK DOMESTIC WATER EXPANSION Dull Olson Weekes - IBI Group DET-203 TANK CUST. D214 DOMESTIC WATER THERMAL EXPANSION- POTABLE 60 140 50 80 100 14 8 0.75 - AMTROL Architects, Inc. HT-101 HYDROPNEUMATIC TANK MECH 501 BOOSTED DOMESTIC WATER BLADDER 40 60 30 125 - 79 - 1.5 - 907 SW Stark Street Portland OR 97205 USA tel 503 226 6950 fax 503 273 9192 www.d ow a-i b ig ro u p.co m www.ibigroup.com WATER HEATER SCHEDULE IF-- ---77r--- _•- ,--- i------ _ 1 FUEL ELECTRICAL =_,; STORAGE RECOVERY INLET ._..; __ TAG CAPACITY @ 100F RISE PRESSURE FLOW NO. OF kW PER VOLT/ MANUFACTURER `_`_`_ PA E pae-engineers.com NUMBER DESCRIPTION LOCATION SERVICE TYPE (GAL) (GAUHR) TYPE (IN WG) (CFH) ELEMENTS TOTAL kW ELEMENT FLA PHASE &MODEL NOTES EWH-101 ELECTRIC WATER HEATER CUST. 8117 DOMESTIC HOT WATER ELECTRIC WATER HEATER 120 61 ELECTRIC - - 3 15 5 18 480/3 AO SMITH DVE PRO/45h, EWH-201 ELECTRIC WATER HEATER CUST.A217 DOMESTIC HOT WATER ELECTRIC WATER HEATER 120 98 ELECTRIC - - 6 24 4 28.9 480/3 AO SMITH DVE c--) G i N k/ � �j�J /" EWH-202 ELECTRIC WATER HEATER CUST.A217 DOMESTIC HOT WATER ELECTRIC WATER HEATER 120 61 ELECTRIC - - 3 15 5 18 480/3 AO SMITH DVE (!183.99 _ EWH-203 ELECTRIC WATER HEATER GUST. B214 DOMESTIC HOT WATER ELECTRIC WATER HEATER 120 74 ELECTRIC - - 3 18 6 21.7 480/3 AO SMITH DVE ON - - - c 14 , II GWH-201 GAS WATER HEATER CUST. D214 DOMESTIC HOT WATER CONDENSING, HIGH EFFICIENCY 100 239 NAT. GAS 18 199 5 120/1 BRADFORD WHITE EF100T ��'o{q ' i9 y\N I S P. COQ, c)-•6• 31ci EXPIRES 12-31-19 PLUMBING PUMP SCHEDULE PERFORMANCE SUCTION DISCHARGE TAG FLUID FLUID FLOW HEAD PRESSURE PRESSURE VOLT/ MANUFACTURER NUMBER DESCRIPTION LOCATION SERVICE TYPE TYPE TEMP. (F) (GPM) (FT) (PSI) (PSI) HP PHASE RPM VFD & MODEL NOTES RHWP-101 RECIRCULATING HOT WATER PUMP CUST. B117 HW CIRCULATION IN-LINE DOMESTIC WATER 120 2 32 - - 1/6 208/1 3250 NO TACO L1034 RHWP-201 RECIRCULATING HOT WATER PUMP CUST.A217 HW CIRCULATION IN-LINE DOMESTIC WATER 120 2 22 - - 1/8 208/1 3250 NO TACO 0014 RHWP-202 RECIRCULATING HOT WATER PUMP CUST. B214 HW CIRCULATION IN-LINE DOMESTIC WATER 120 2 20 - - 1/8 208/1 3250 NO TACO L1121 RHWP-203 RECIRCULATING HOT WATER PUMP CUST. D214 HW CIRCULATION IN-LINE DOMESTIC WATER 120 2 39 - - 1/8 208/1 3250 NO TACO 009 SP-101 SUMP PUMP ELEVATOR El SANITARY SEWER SUBMERSIBLE WATER 60 50 30 - - 1/2 208/1 1750 NO GRAINGER BP-101 BOOSTER PUMP(DUPLEX) RISER D218 DOMESTIC WATER MULTISTAGE DOMESTIC WATER 60 212 - 35 70 5 460/3 3500 YES FLOWTHERM SYSTEMS 0 S._ MISCELLANEOUS PLUMBING EQUIPMENT SCHEDULE PLUMBING FIXTURE SCHEDULE CO TAG -— NUMBER LOCATION DESCRIPTION NOTES TAG ROUGH-IN SIZE (INCHES) ELEC. MASTER MIXING VALVE NUMBER FIXTURE TYPE W V CW HW 1W GPM/GPF CONNECTION DESCRIPTION NOTES 26 GPM FLOW RATE,WITH 20 PSI LOSS WC-1 WATER CLOSET 4 2 1-1/2 - - 1.28 N FLOOR MOUNTED, MANUAL FLUSH VALVE (1.28 GPF) .,,.. MMV-101 CUST. B117 140°F INLET TEMPERATURE WC-2 WATER CLOSET 4 2 1-1/2 - - 1.28 N FLOOR MOUNTED, MANUAL FLUSH VALVE (1.28 GPF),ADA Q 120°F OUTLET TEMPERATURE L-1 LAVATORY 2 1-1/2 1/2 1/2 - 0.5 N WALL HUNG, 20"X 18", MANUAL METERING FAUCET,ADA BASED ON: LEONARD TM HIGH-LOW SERIES L-2 LAVATORY 2 1-1/2 1/2 1/2 - 0.5 N WALL HUNG, TROUGH TYPE (119.7"), MANUAL FAUCET,ADA 1 ..... Q ..:1- MASTER MIXING VALVE S-1 SINK(CLASSROOM) 2 1-1/2 3/4 3/4 - 1.5 N COUNTERTOP, 22"X 19", ADA 0 - CV 26 GPM FLOW RATE,WITH 20 PSI LOSS S-2 SINK(CLASSROOM) 2 1-1/2 3/4 3/4 - 1.5 N COUNTERTOP, 27"X 17", BUBBLER,ADA MMV-201 CUST.A217 140°F INLET TEMPERATURE S-3 SINK(BREAKROOM) 2 1-1/2 3/4 3/4 - 1.5 N COUNTERTOP, 22"X 19", PULL-DOWN SPRAY FAUCET, ADA 120°F OUTLET TEMPERATURE S-4 SINK(MAKER SPACE) 2 1-1/2 3/4 3/4 - 2.2 N WALL HUNG, STAINLESS STEEL, 18-1/2"X 23", SERVICE FAUCET E CD CC BASED ON: LEONARD TM HIGH-LOW SERIES I S-5 SINK 2 1-1/2 3/4 3/4 - 1.5 N DOUBLE COMPARTMENT,ADA (.0) O MASTER MIXING VALVE S-6 SINK 2 1-1/2 3/4 3/4 - 1.5 N COUNTERTOP, 27"X 17", BUBBLER,ADA C1'l 26 GPM FLOW RATE,WITH 20 PSI LOSS I 5-7 SINK(TEACHER DESKS) 2 1-1/2 3/4 3/4 - 1.5 N INTEGRAL EPDXY SINK, SAME FAUCET AS S-1 0 "... MMV-202 CUST. 8214 140°F INLET TEMPERATURE MS-1 MOP SINK 3 2 3/4 3/4 - 2.2 N FLOOR/CORNER MOUNTED, 24"X 24", BUMPER GUARDS, WALL GUARDS, WALL BRACKET CDa 120°F OUTLET TEMPERATURE SH-1 SHOWER 2 1-1/2 3/4 3/4 - 1.5 N GELCOAT ENCLOSURE, 36x36-INCH ENCLOSURE,ADA,ADAPTABLE ■� `L BASED ON: LEONARD TM HIGH-LOW SERIES EWC-1 DRINKING FOUNTAIN/BOTTLE FILLER 2 1-1/4 1/2 - - - Y WALL HUNG, DUAL HEIGHT, ADA, BOTTLE FILLER E MASTER MIXING VALVE ESEW-1 EMERGENCY SHOWER/EYEWASH - - - - 3/4 - N WALL MOUNTED, SINGLE ACTION OPERATION E 26 GPM FLOW RATE,WITH 20 PSI LOSS HB-1 HOSE BIBB - - 3/4 - - - - INSIDE USE, INTEGRAL VACUUM BREAKER, REMOVABLE KEY ..... MMV-203 CUST. D214 140°F INLET TEMPERATURE I SB-1 SUPPLY BOX - - 1/2 - - - - METAL BOX COLD WATER SUPPLY FOR ICE MAKER - 8 ~ 120°F OUTLET TEMPERATURE WM-1 WASHING MACHINE BOX 2 2 3/4 3/4 - - - METAL BOX WITH DRAIN CONNECTION, HOT AND COLD WATER HOSE CONNECTION/SHOCK ARRESTORS ti U 0 BASED ON: LEONARD TM HIGH-LOW SERIES I WB-1 WALL BOX HYDRANT - - 3/4 - - - - FREEZE PROOF, BOX/FLUSH TYPE w/LOCKING COVER, INTEGRAL VACUUM BREAKER O d' ..41- EMERGENCY FIXTURE MIXING VALVE (FOR COMBINATION EMERGENCY/SHOWER EYEWASH UNIT) OD-1 OVERFLOW ROOF DRAIN - - - - - - - SUMP BODY WITH 2 INCH DAM, CAST IRON GRATE 4,0N.-m-4 r- SCIENCE A101 7 GPM FLOW RATE, WITH 5 PSI LOSS RD-1 ROOF DRAIN - - - - - - - SUMP BODY, CAST IRON GRATE E dam' EFMV-101 SCIENCE A201 140°F INLET TEMPERATURE RH-1 ROOF HYDRANT - - 3/4 - - - - FREEZE PROOF, DRAIN-DOWN TUBING, HOSE THREAD CtS O M M 90°F OUTLET TEMPERATURE NOTE: DOWNSPOUT BOOT - - - - - - - SUMP BODY, CAST IRON GRATE 0) LC) CD C OC? BASED ON: LEONARD TM-300 SERIES 1. PROVIDE WITH SHROUD. '`� MECHANICAL TRAP PRIMER "r- _1--; , TP-1 FD'S 1-4 OPENING MANIFOLD CALIBRATED FOR EQUAL WATER DISTRIBUTION, 3/4" INLET CONNECTION BASED ON: PRECISION PLUMBING PRODUCTS MECHANICAL TRAP PRIMER, PPP SERIES NATURAL GAS UTILITY LOADS GREASE INTERCEPTOR SIZING (GI-1 ) RPBA-101 REDUCED PRESSURE BACKFLOW ASSEMBLY TAG TAG GAS INPUT SIZE TAG TAG DFU DFU TRAP (HVAC MAKE- RISER D218 20 GPM @ 10 PSI HEAD LOSS NUMBER DESCRIPTION (CFH) (IN) NOTES NUMBER DESCRIPTION EACH QUANTITY TOTAL SIZE/FLOW NOTES UP WATER) BASED ON: WATTS 1" B-101 BOILER 3,000 - BOILER E102 MOP SINK 3 1 3 3" GREASE INTERCEPTOR B-102 BOILER 3,000 - BOILER E102 1-05, 1-08 FREEZER &COOLER COILS 2 1 2 3" FS GI-201 EXTERIOR 100 GPM, 250 LBS GREASE RETENTION GWH-101 GAS WATER HEATER 199 - CUST. D214 1-12, 1-51. 2-05 HAND SINK 2 3 6 2" BASED ON: SCHIER GB-250 KITCHEN KITCHEN APPLIANCES 358 - LOCATIONS VARY 2-14, 2-16 HOT WELLS 3 1 3 3" FS • TOTAL 6,557 2-1/2" 1-53, 1-64 DISH TABLE 2 2 4 3" FS I NATURAL GAS SYSTEM: 1-13 WORK TABLE SINK 2 2 4 3" FS BASIS OF DESIGN (OREGON): 2014 OREGON MECHANICAL SPECIALTY CODE,APPENDIX C, 'FUEL GAS', 1-57 DISHMACHINE 4 1 4 3" I SECTION C402, 'PIPE SIZING'. 1-35 COMB! OVEN 2 1 2 3" FS EQUIVALENT LENGTH OF PIPE: 150 FT. (MPG), 30 FT(G) 1-55 SCRAP COLLECTOR 3 1 3 3" 'TOTAL DFU 31 GENERAL NOTES: A. PLUMBING FIXTURES NOT NOTED HERE ALL DISCHARGE INDIRECTLY TO THE FLOOR SINKS NOTED. REFER TO FOOD SERVICE DRAWINGS FOR FIXTURE AND EQUIPMENT TYPES, LOCATIONS AND QUANTITIES. ALL PLUMBING FIXTURES SERVING KITCHEN (PREP, SERVERY AND NUTRITION LAB) DISCHARGE INTO GREASE WASTE SYSTEM AND ARE ROUTED THROUGH THE GREASE INTERCEPTOR. - J g phase l Bid & Permit z w C.) aD date February 8, 2019 0 w 2 revisions N M r` 0 O U C/) a) 'a 'ea project# 16055 SCHEDULES - PLUMBING 0 Ei - _ < I N 401 ,_ , 0 � EM 02 \-)XT 0)O CD Cp _ _ � - id - _ Nm • 0 6 0 1a 0 4 r----) ---- -) I I I f I I I I 1 \ ,,,_,_,_____: „..,„:::17,.r,„„:„__ ::;.,,,.=_:,,._,_„:,_, ,,,,.;: :::,.:_=:r,:_:: III . . , /.. / ' _ _ 1 1 1 I - - I - - - I- - -; _ I , 0 ri f� 1 I ' I 1 I I I /ft ,• �c il L - - - II B I 0/� C r r 7 r� I i r i I I I I- ( I/_ - I — B - — - ----=-- --__._. 0 (6)0 8 9 1000 I I 4y.:......) I I I I I I In n 'Y' T 1 A ir ! �'A _ ,` I - I I SCIEN E 1 i L SCIENCE GENERAL NERAL GENERAL GENERAL CLASSR OM • 1 CLASSRCOM F CLASSROOM C SSROOM CLASSROOM CLASSROOM ■ I L __A I I I I I I i _ I i ,_,_I■l f fl_ -I. .- T , TT -1 � f I T TT1 1 If- 7T - - : - - 0___B 1{I tl fEt D SCIENCE HALL IIDF 1...- I PREP I 1111111+1111}1 I1i1111111111 = _ =',:r_ _' 1 i' 4I'tY SUB:.a• 1 ;rte GIRLS +r r LE oil' EXTENDED = _ �1, I I 1 RESTROOM �t � L I HAL_ SMALL 1111111111W LEARNING LLI I f E11-i 1111 = _ C I- ea 1 I B I L.�. B CONF. 1 �� I1� II lel- �IIYS_ - , I I I I I 1 - I II _L_ _L L ± J _ _ .LTJ u ,V L _L1 _ ri) RESTROOM L _ I ' r `� J Dull Olson Weekes - IBI Group I Architects, Inc. I I I GENERAL GENERAL I GENERAL GENERAL = I• I • CJMPUTER p CLASSROOM CLASSROOM CLASSROOM CLASSROOM 907 SW Stark Street Portland OR 97205 7 CLASSROOM USA = tel 503 226 6950 fax 503 273 9192 www.dowa-ibigroup.com 1 r 1 _ 1 _ _ �- I i I I www.ibigroup.com 1111111 11111, - — ������� —IIHH 1111/1/11 1 -1 1 .1111U IIIIIIIII I k - =: :1 PA PAr I I I I I I I °-' pae-engineers.com I I I I PR � pINOF�a � GE ,. 183.9i' 71 c— I1 LIBRARY 4,1 ' i Z A `p ` ON >i. i �! co I I I 1 I �'Soq ch 19 '`4�4')" I 1 P. I EXPIRES 12-31-19 -r ■j — — — — — I — — 1- GI 1 1 1ITIT11 ,1� - 1 1111111 111111111 11111111 111111111 '� — 1 1 1 1 1 1 1 1 I I I I I I I t I' ii — Ys* I — — a— 7 T CIO , _ • X • -I ORK'OOsU OFFICE E I - - - l TEel OI- 1ISTLGE 1 GENERAL GENERAL I GENERAL GENERAL FFIC- I CLASSROOM CLASSROOM CLASSROOM CLASSROOM GIRLS — IRESTROOM— Oi1 litall , L .1., - TTS 1- TIT - - TTS rip rTT I — ti r l'_1',.__: ACTATIOII BOYS _ ,'\ '-s IlI HumrIIFIIIIIIII1 _ _ -,I� •� • RESTROOM L 1t _ _ __ EXTENDED - v n I LEARNING = _ _ CUSTODIAL '•^ --•=•-•-_'; SMALL 311 I 1111 1111 111 111 111111 I - ' STORAGE 1 . •OFFICE 1` 0 _ _ _- v _ I --- IIIIIlIkIi„11111,411 1,111 I I 1 rlI - r 1- a �Ir' LT1 __ LJ_ q17---- L � � _. — — — O SUB 'l I 1 ELEC. _1-1 I O 1 c...-' •l I SCIENCE CLASSROOMGENERAL GENERAL GENERAL O N -- IDF CLASSROOM CLASSROOM CLASSFOOM 0 U N- I 1 ••:,, I 1 I C. O — :• I I I I. T 1 1 I��1 — - — — 0 1 CU I I II I I I a CZ _g) i I ; I 1i '13 Ws '—_,. Li CO ...rri I I I = = I I I Ic:Co0 r r . _ = VYST �� I 1 I 1 1 1 1 R= o c i C — co LO Lf) LO 0 �_ _ = 1 I--- I— I I I I I I I HALL rv1. .. .✓. 1__1n £ A I 1 I I LiI I . 0 ,, O 1 89R I y HB I s--\ I • \d 0 , / I I I I 1/ I I - 0 1 0,41 3 4 GEN. I 1 DRI A ° t C I I I 1 UILDING I STORAGE I I / , STORAGE ' / p I i,;I -u MAIN D E __ TOr...itis GYM HAL IL CU"�i� _ill � RESTROOM 1 I I r I I I I ,� - -." RESTROOM S- i J :f! I I r, `"1i=C keyy plan alr,. -61 g 1 I _ .._ M/y! rill HALL I �1 ,; I &PE 1I . - . . • phase Bid & Permit 1 .J__,.. z Soul STORAGE I , ,. W IJ u ' =, U �}► -- EX !OR I '�Y PE11111,f=11lf1111 1 date February8, 2019 1° I 1 I STORks5 1 1 1 Hi 11111 1 I IZ W1IJlllllllllllil111�/i . . �, - I -I r LA] " "� revisions el 1 MDF MAIN NI. I I I ELEC. 1 I I I S ° °e ° U 1 I AUX i 1 GYM --A I 73 1 I I 1 M CU I I - I ° I 1 I o project # 16055 ~ 1 E FIRST FLOOR PLAN 2, OVERALL - PLUMBING Q ' I 1 I I I I I ACV C'7 1 P 2 0 1 o-)o 0 FIRST FLOOR PLAN OVERALL - PLUMBING ■ .._CO CD 11" = 201-01, co 000 0 C--1) (9) 1-. 0 \____.2 431 T 1- .'' (.,) I I I I I I I I I I , i"-- n SCIENCE PREPI-A) IN I I I STAFF - I I - I�' I II ROOM _ _C 'lin c KITCHENETTE I I SCIENCE 7I ` - SCIENCE I F GENERAL GENERAL GENERAL GENERAL - - - I I CLASSROOM _ - LASSROC`M 1 I- CLASSROOM CLASSROOM CLASSROOM CLASSROOM • L _..... I I I0 . 1.L. I, ......._ I IJr I ! - — __ ..iL ��' L TTS ili TTT TT1 (1n � TT . - �\ rul 111111,,IL1 rrrrrrr - II J 1 l I ' I 1 I I 11111111111111 EXTENDED IIIIIIIIIIII 0 iiiiii I zt— 1 _ - - LEARNING ;_ ,. �,ART ART [RTRO III1 1 _ L - 0- - SUPPLY/ ' rim• ,I I I I I I I I I I I I 11111111111 H ++■ _ Ca I B I zit STORAGE r + n_Aiiiii L ' \_.I 1 TO 1ET "�` I I `�!l I _ ril� f\ irrrrrrrrr,,,, I ! 1 I I I J 40 ,� MAKERSPA E L 'OY5 lJ ,';, �;.,E - _l_ _L J \i V L J- 1 _ _ L _L J A V L L 1 i - - -- ! -ST .-Z4•••:----:-.' - I 11I. -.tel I. - — I Dull Olson Weekes - IBI Group slIt I III Y I Architects, Inc. 1 I+ I I I GENERAL GENERAL GENERAL GENERAL I I S ALL II SMALL CLASSROOM CLASSROOM CLASSROOM CLASSROOM 907 SW Stark Street Portland OR 97205 G OUP GROUP USA I MA CERSPACE �= CL4 SROOM Ii CLASSROOM tel 503 226 6950 fax 503 273 9192 L I II www.dowa-ibigroup.com I i I I I T T 11II i- T T - I I I I I www.ibigroup.com — .. . - -- . �. _ - - - - D III --Irrrrr r I �1Eitii Wit PA E pae-engineers.com 1 i 11 I I I 1 STEM/CTE , • I I 4 \ D�c�pROFF��, I L I I I I I ����� i NES STEM/CTE , — 1)4 ' S�Bf'A iE 183.9" , , 1 SPED SPED /•\ OFFIC OFFICE \ --C- °rc11 19 '°- 9; I 1 I I I I �qs P Co�\'\� a.6•�Ict 7. HALL r SPED I f \ CONF. !TIN. ITIN, , , EXPIRES 12-3'-19 OFFICE OFFICE I — — i — !- - E _ —I CO — TEST / 1 I _- r \ FUNCTIONAL ` 11111111 ROOM [.L \ I I I �r_: o;7r,�1 I I .� I I I 1-- , �,� - -- . -- CO -- - - — — — .17'4-'-iig II r r - /, , - - - - - ,_ F I CONF. I I •REGORID 4 i I BOOK- S ALL f LD KEEPER I ® OUP — GENERAL GENERAL GENERAL GENERAL I I _ I I CLASSROOM CLASSROOM CLASSROOM CLASSROOM OFF CS. REGIS RA 1TlN. U r -; r _ Zl ITIN. -r, u .n . :FF. I — — cF c I _ OFFICE _ _ R- * =li_k - TTS �I� r �tTT' T I �l � rTT " I — —I — _ OFFICE I r 1i irmoilg J �� J LLLrrrrrrriiiiiirii - -1- II -`'\ r 1-znllf�iim L] \ )iL T 0 I COUN . F TCH .I CONF. HALL I , n 1171:--.:7'" U OFFICE II I I % C7r I I I I I I I I I I I� !III 1111 Eti I I �i�- [H r \ L Y I - \iSi— I ' I I PARENT 11 r EP111 i IM .:�E '.]I� I � r^ CONF. I VOJ (JNTEELR ,� EXTENDED - I V J �.�_- �- DARNING 1111111-1111 II - - p� ,1 _ _.j _ _ _ QIP r_LJ r2ja�_���rsa_L- a'� - 121 — — — � Ir,ri rr, 111,11 r,i,ii� i i ,r �,.�� : - -- -- - I PR/NC. F SUPPLY 1111--1 I sTAGF-- SUB I I I 00 RECEPTION SSMC P.A.S.S. 1TORAGE ELEC. LI ' � I I 0 SECRETARY _ SOC I - I V V SCIENCE I CLASSROOM GENERAL GENERAL GENERAL 0 N - _ 1 0 1 i 1PRINC. I I CLASSROOM CLASSROOM CLASSROOM I 0 U STAGE NEC ESTIBUL SECRETARY J L i . T !-- KJ7riITi _ 0 = . co .= -6-,,, c...] _ 7 C I I I I I CD co cy) I CI -c:$ —co i= .12 = ., I I I I I I I I I I \\: I f� M co i I , � I ` cy) cn I I I I I I COMMONS I I I I p j C j I ,� I. . — (0 O o / \ I I I I I I I - I I I _ I\ ..1. I LnvrK TOILET TOILET x7 \ I /OFFICE CHAIPfTABLE I \ ' GI A / I & STORAGE I I 1 I SLOWER SH WE' VIII \`\ 1 I STORAGE. _— c - - —_ 4...,.=1 , .... I S / `, (i---,.1_„7.--.... 1 i _ _ \ III r `� ' I] y ♦ I HALL C \\ FALL 1 I r-sSERVERY u 00 s ill I �[;� s f \ / • I I ■■.Ii�I6 1 iiI•Ilu . o I I I B CHOIR 4LL - 1 � I111 GIRLS II� \ IIII `fir Ii� .r.1r.r.:aiiin d :.�.naw:■iii .1 . \\ MAIN '/ I 1 LI1 I KITCHEN 1 _ j - 1 ° \I\ GYM/'I ° �ii r, ir 1 1I I C�If,,'LIS#I I III LOCKER DR. MA D �7 R. WALK t Or"FIC i ;I I I OFFICE CLOS,!BOOM • 5 11#7�,`�: a I; \ 1 I I I I NK ,L.7'11' �Ir�� I , I +� I .1 IL sl I 1 I I - REF. = E 1 I 0_-I x5' _ / \ ORCHESTRA r = ...... 1 :I �. � .' m.\ / \ k e y p I a n _ \ Iii ig ��..., �,I III mil v J I PF ACT CE - II ALLI 7 phase WALK ,` Bid & Permit z I Iti ` ,[ . / \ II In IN Fin I I �t.�I / \ W / U ML SIC `I I I'..01 : T FREEZE �I 1,,,\J\ b �I LJ \ I 7OFFICE I I ' c0111 INSTRUMENT T I C 110E OFFICE IRI i., RISER I . \ I // v I II I 9,// / I I \\ date February 8, 2019 W 1 ROOM y L .r w 2 STORAGE is I -- _— ,' . • .• - • . _1 , . .. 7 lel revisions r SUB - i� i M ELEC. I - I I I i] I ° ° IE I I /,, •..• .. . . . ' _. I I I \ l I Aux , BAND -. ° GYM' . . , - I INSTR4JMENT — :• - - / \ — I I II I STORAGE - 7 2 r e4 I , ll// VV I i d I I f I I I I I i project # 16055 o 0SECOND FLOOR PLAN 1— OVERALL - PLUMBING Q E I I I I ! I I I I I ! Liz CV M E ,rP2 • 11:112 - _::,cs,,,,, C:74 co 0 SECOND FLOOR PLAN OVERALL - PLUMBING COM 1" = 20'-011 N co '41 I/ GENERAL NOTES: O NOTES: A. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATEn n 1. ROUTE HOT AND/OR COLD WATER PIPING DOWN AND MANIFOLD THE WORK WITH THAT OF ALL OTHER TRADES, INCLUDING BUT NOT LIMITED IN WALL TO FIXTURES/EQUIPMENT. I TO: ELECTRICAL, HVAC. FIRE PROTECTION, PLUMBING, STRUCTURAL AND GENERAL ARCHITECTURE. 2. PROVIDE SHUTOFF VALVES TO WATER SUPPLY TO ISLAND SINKS. WP B. ALL PLUMBING EQUIPMENT, PIPING, INSULATION, ETC., INSTALLED IN HVAC 3. PROVIDE 3/4" SHUT OFF VALVE IN CABINET SPACE FOR EXTERIOR PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND WALL HYDRANT. COMBUSTIBILITY, 4. ROUTE HOT WATER PIPING FROM ABOVE AND IN WALL TO J C. VERIFY EXACT SIZES, LOCATIONS, INVERTS AND ELEVATIONS PRIOR TO FIXTURES. RUNNING ANY PIPING. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS OF ALL FIXTURES AND EQUIPMENT. REFER TO KITCHEN LAYOUT 5. PROVIDE CLEANOUT WITH WATER TIGHT SEAL FOR DRAWINGS FOR EXACT LOCATIONS AND ROUGH-IN REQUIREMENTS OF ALL FOUNDATION DRAINAGE SYSTEM. COORDINATE LOCATION KITCHEN AND EQUIPMENT. AND REQUIREMENTS WITH CIVIL DRAWINGS. 1 1 Ca IBI 1 1 Dull Olson Weekes - IBI Group Architects, Inc. 907 SW Stark Street Portland OR 97205 USA tel 503 226 6950 fax 503 273 9192 GI (6) �� El.-9.) www.dowa-ibigroup.com 0 ® www.ibigroup.com iiiii ::lig lPAE II pae-engineers.com . 4" DSB-1(3 WCO 112" HW WH-1 0 wc0 WCO ; (TYP) `P\ (TYP 6)`� 4€, DSB-1 WCO ����D 1PROF / I ! 4" DSB-1 ! �� . " - I All 314 CW� I � � 183,9�� � /4 -- k. __. I- 1 --', •I•T^ —rte r.. �1f�' \�►s 91 } �� Y —Y � , -� L _ V`. -Y1 —.. ON ,r'T 1 �. 9 -y oh 19 \ 67' 2 VUP & ..- t S-1 I I- - I o� \> 2" W UPIDN k (TYP 6) - 0© I - si I 4S P. COL a,lfl•�I9 (TYP 6) WCO 112" HW UP 2"VIUP 2"VUP & i- - (TYP 6) 112" F 2" VUP & 112" CW UP 2" W UP/DN HW/CW UP L 2" W UP/DN I EXPIRES 2- i-�9 I 5-7 -r..-4-' S 1 ^ ^� I (TYP 6) I 1 Sai": I ��`� 2" WUP I WCO 2€€ W UP , . S-7 SCIENCE CLASSROOM WCO o -CIENCE PRE l- -1 SCIENCE CLASSROOM GENERAL CLASSROOM GENERAL CLASSROOM GENERAL CLASSROOM GENERAL CLASSROOM _ A100 A101 I A102 A103 1A1041 A105 A106 I2"WUP- 1/2" CW I 1114" HW I WCO 1/2" HW I I (TYP 6) I 1 1/4"CWS (TYP 6) Vi 1 I 2 W ESEW-1 112" CW ck— — _ 131-' <' I [ (TYP 6) I I EFMV-1 FD-1 7:// 3"W UP/D 2"V UP WC0 - 2 WDN _ - _ _ _ _ WCO WCO _ 1 - " ` L _ _ _ _,_ :::0_ __ _, _ _ _ _, _ _ _, __ _T_ _ __ _,, ,' - - - - - - -' H \ I - - - - - - - _ 3 DSB-1 pp 1 7 - 'r' 1 r - — T � — — T - -r — � r - - - r - -- - T � J J r — .. . — — T o-k 7 — T — T - .? — — ii 1 I I I I �a r B. — iI I I — '41" ` o f' y 1 t —al off^ a r I, 11 La , 1. "i''' II ,_I LLL' B U o F TT. „ - 2 VUP &- I F 1 1 1 1 I I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I I . .. _ 4 SD 0 2" W UP/DN 1, I `. - I I I HALL CM 1 a WCO IDF ' EWC-1 2" CW A116 = = 02" CWUP & DN 3I4" CW0 2"VUP 1 11111 II J - - 1-_-_ - - - - - - I -° TP-1 3I4" HWO -- 4" w I r1- -1 UP&DN I - - a � - I I Y J HALL -I _ o ._ we-2 I, -_ I = - -I --- - O LI ��HB_1 ! r A113 EXTENDED LEARNING `� - - - 2" V UP & \ L-2 ILII 1.1 Alo71 - :I N �� GIRLS RESTROOM SUB ELEC. c� � 4 WUPIDN A114 A115 ��� _ � - - - - -' � O CV TYP 4 •FD-11 ITk k_ , _, I �< l U Wco I _1i - 0 o 2" WUP °:.,_ 3"W \\s_ ,• 4 W DPI - 0 r„._,, A SMALL 2ONF, a - . J 4 , . 1 O STAIR �� L } cla • ` _ I „ I I S1 1 / ;'1v e V I U=2 U_1 3€ WUP _ f„ _h_. - NVCO ll% I ! III 1 1 1 1 1 1 1 IIIIIII (� i�'1_ U i€ €i n u u _ U ° 411\I- .. .� - CO -0 $OY R WC-2 TO® \ I I I 1 — 1 I I I ._ = ai Q ESTRO c,) ,.... r1- - - - Jcl . . WC-1 1 A118 WC2�! I - I •- - 11 - - � - I M = o 8' r- -� (TYP4) Fl_)!1,.....2!... . 1- fi, . rn �� HB-1 =° / - izt M WCO 3/4” HW I I 1 RS W o 2" VUP & 2"VUP & 2"VUP & - C) Ln o 0 ° _ - 2" WUP/DN 4"WDN - 2" WDN ' - 314" HW0 2"VUP & 2" CW UP & o 3"W DN 1 1/2" CW DN 1 GENERAL CLASSROOM GENERAL CLASSROOM GENERAL CLASSROOM GENERAL CLASSROOM I I A111 A110 I A109 A108 314" CWO FD-1 COMPUTER CLASSROOM ..._.. , , '-' A _ A119 2' CW-\\N, I I I I 2" WUP \\t" / I Q I aN 2"WUP / _ - B, _ / - ,,-.- , . .. r =r' -- n - �— —� q 13--1 }--- -.:,1 1 �D L.I n T (3 W EU-..) • - 1 II I I I I I 1 1 1 1 1 1 1 1 �,ly, I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - I 1 1 1 1 1 I 1 1 1 1 1 1 1 1 1 I 4" DSB-1 WH-1 0 I 4" DSB-1 I I I I I I I I I I I I I I ! 1 I s 1 I I I I I I I I I I I I I I I f I N-WCO WCO 7/91 I - D E _. I I I I I I I I l l l l l l i t , I 1 _. - 1 1 1 1 1 1 1 1 I I I I I I I I t . I I . , I • 1 I I I I I I I I I I I I I I I I I 1 1 • •. L .. A J J_I_LLL _ � I �� • - ri I t I I _il o - key plan J a , - I LIBRARY 1-" d A120z I - I phase Bid & Permit C U L- - J _ I 1 1 I date February 8, 2019 CO HALL c I A113 W I revisions coN2"WUP / d.. / 2€€ CW I I I J o2"WUP 4" SDO _ u / . 1 I I I I rL J WCO I -Fri1 I • I 4,ar I ! I I I project # 16055 o I FIRST FLOOR PLAN co � SECTOR A - PLUMBING ¢ 'co- ®0 fb CIO (8) E19) ®:I o� co,_ •—N— P2 I 0 cr)o Ill LOWER LEVEL FLOOR PLAN - PLUMBING ....__._. ....__.._... ..__ . ■ (co Dor) 1/8" = 1'-0" ccs cim�. GENERAL NOTES: 0 NOTES: (.........)o- WORK A. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THE 1. SEE CIVIL SITE PLANS FOR CONTINUATIONS.WITH THAT OF ALL OTHER TRADES, INCLUDING BUT NOT LIMITED TO: ELECTRICAL, HVAC, FIRE PROTECTION, PLUMBING, STRUCTURAL AND GENERAL 2. 2" FOOT VENT AT 2% SLOPE. ARCHITECTURE. r B. ALL PLUMBING EQUIPMENT, PIPING, INSULATION, ETC., INSTALLED IN HVAC ii 11111 PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND COMBUSTIBILITY. C. VERIFY EXACT SIZES, LOCATIONS, INVERTS AND ELEVATIONS PRIOR TO RUNNING ANY PIPING. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT L _... LOCATIONS OF ALL FIXTURES AND EQUIPMENT, REFER TO KITCHEN LAYOUT DRAWINGS FOR EXACT LOCATIONS AND ROUGH-IN REQUIREMENTS OF ALL KITCHEN AND EQUIPMENT. ea IBI 0 60 I�8� 9 q__0-\ Dull Olson Weekes - IBI Group ._.___I } 4111Architects, Inc. 907 SW Stark Street Portland OR 97205 USA I I tel 503 226 6950 fax 503 273 9192 www.dowa-ibigroup.com I I I I I I www.ibigroup.com 0 O O PA E 14" STORM DRAIN I I 4" STORM DRAIN I 4"STORM DRAIN I 1 pae-engineers.com @ 1% SLOPE @ 1% SLOPE @ 1% SLOPE IE=2.0' BFG 2 W UP 2"WUP IE=2.0' BFG IE=2.0' BFG �Q,�-® PROFff' (2,765 SF @ 0.08 CPS) 3,139 SF 0.09 CFS) f/ I _ - 1- - _� - _ - T {�= _ @ r - - (3,367 SF @ 0.10 CFS) t� - - - �� 1 E� , , �N ' z � �� I r , , � , A k 183.9' " -5/-7-:- - - H 1- - - - - - - - -I- -I- H � �� I I ON 2"WU 2"WUP 1/21' HW UP 2"WUP I(314" 2"VUP O2 I © ? L.: 2" I 1/2" CW UP I I IHW UP 112" / I I 2" WUP I I I1Nc5,� n 2 W U, \2'l 2" W UI' HW/CW UP I P. CD 1;'6`94V19 &2"VUP . i �� I EXPIRES 12-31-19 �, -cl 2"WUP 6 i I I `4 3/4"-CW UP-2 \-2"VUP I I I 1II ! I ! I 0 /-2"WUP I3"STORM DRAIN 2"WU 2"WUP TO FD-1 @1°/o SLOPE 2"WUP3„W 3"W 2"WU -` IE: 21 BFG --TiL I 1/7 I2"WUP I I I (409 SF@0.01 CFS) T . � � 12"WUP /[ L J L rJ L � I– L7 r � Z \ i_ _ _J L — _ S - -L J L_ S Z J L - - - — S Z J L S Z J L S —L — — I — -- — ,,r - - - - " U — — — 7 — ti — — ,.,� —off — — — Cli0 L J / L — — -J L - - J V T \ / / / .— I 12 W I I � I I I f a � 3"WUP TO FD-1 0 a 3"W IIIII 1 12"VUP I I I I 1 a O (TYP 4) O /— 4"WUP 2"WUP 4 WUP O N 1 I (TYP 2) I "WUP 1 4 W UP TO I I 1 (..� rn WCO 1 a 3WUP ( 21IW&VUP I V 0 I TO FD-1 (13 I - I I I 1 � s — Z J L s _ Z - - -L - - _...r - 1._. J L s — L. rtZ -I- Ja) CT5 cm - - - - �� — -I o I- - - - - . . _ - - -- �' - J - - - CO ai. L_ �J I I 3 WUP -4 —L ___,- -1_ 1-- r - � ' „ „ TO FD-17.3 4WUP \ 4W UP / Q o I 1r � /2" W UP i I I D I I a o I 1 ti- - I-. � L JIL i 2"WUP 2 VUP .� L co I \ l \ I I I I !� M M IS ! I I(4"W I I ! I I I I I I 1 A ' [-I r-I I—L B I CD) � � I I II I I II I III 11 1 C 11 1 III 1 III 1 1 1 6"STORM DRAIN 4" STORM DRAIN 1 1111 I I I 1 I I 1 1 I d @ 1% SLOPE I @ 1% SLOPE I I I I LJ IL_ - - - - -J IL_ I I IE=3.0' BFG 1E4.0' BFG DI E (13,379 SF @ 0.4 CFS) (3,752 SF ©0.11 CFS) 0 I I J 0 0 1 1 L4J rI I I I k e y p l a n I I I I I I I phase Bid & Permit z w 0 co 1 I I 9 1 I 1 date February 8, 2019 Lu revisions co ti I E 1 I I I I 0 0U co a) I I r4 , I I I I 11 C L J ' 1=1 1 Ws I I I I I I I project # 16055 o UNDERGROUND PLAN co � SECTOR A - PLUMBING Q I Lo- ,N cri- M ,...„. P2 • 1 0 U '-',___ • r'� UNDERGROUND PLAN SECTOR A - PLUMBING N` 1/8" = 1-0" F13.12 Nm GENERAL NOTES: °NOTES: C-) A. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THE 1. ROUTE HOT AND/OR COLD WATER PIPING DOWN AND n n WORK WITH THAT OF ALL OTHER TRADES, INCLUDING BUT NOT LIMITED TO: MANIFOLD IN WALL TO FIXTURES/EQUIPMENT. ELECTRICAL, HVAC, FIRE PROTECTION, PLUMBING, STRUCTURAL AND GENERAL ARCHITECTURE. 2. PROVIDE CLEANOUT WITH WATER TIGHT SEAL FOR Iff 111 FOUNDATION DRAINAGE SYSTEM. COORDINATE LOCATION B. ALL PLUMBING EQUIPMENT, PIPING, INSULATION, ETC., INSTALLED IN HVAC AND REQUIREMENTS WITH CIVIL DRAWINGS. PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND COMBUSTIBILITY. C. VERIFY EXACT SIZES. LOCATIONS, INVERTS AND ELEVATIONS PRIOR TO L __. RUNNING ANY PIPING. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS OF ALL FIXTURES AND EQUIPMENT. REFER TO KITCHEN LAYOUT DRAWINGS FOR EXACT LOCATIONS AND ROUGH-IN REQUIREMENTS OF ALL KITCHEN AND EQUIPMENT. ea IBI I 1 Dull Olson Weekes - IBI Group Architects, Inc. 907 SW Stark Street Portland OR 97205 USA tel 503 226 6950 fax 503 273 9192 0 4 6 0 www.dowa-ibigroup.com 8 9 O www.ibigroup.com i --......: I 1 I I I I I HIV" P A E iEnSE pae-engineers.corn i 1 i Irlam...IMI... .=..I..l..■..����s,���:���!� I I����� .I�.....�- �������s��s �.-s,�s>_� I ! I A 1 N �j 1 1 I i,-c-• .• I1 � 183.9° ;.• 1 1 4 41i :. ON L' 1--1.71-1I I I I �o �� L — 4S J 1 . � P. CO�\` Q. Iq 1 1 II - r1-1� I LXPir,LS 19-31-19 I a I I I I L1_. J I I I 0 .41 ' I I I 1- _I-I rh ) —L a', _ f mIU 2" cW I LIBRARY ME1 I I I rI - -1 d LI 1 I ,�- - - - IIJ r1r --1--,-,-1-r- rr 4 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I I I I I I I I " I WCO CTG I I I 11 I " , I I I I 1 I IIIIIIII " S-1-1\- 2" WUP 77-3"WUP : 1 ! ! I I I 1 1 1 1 1 1 1 1 � �� 4" DSB-1 4" DSB1II: " 4" DSB-1 © �+ P- I I I I 1 1 1 1 1 , I I I I I I I I 1 I I I I I I 1 1 I I ! I 1 1 1 1 1 " " 1 4" STORM DRAIN "WUP — 1 I I I , 1 ! 1 III 1 I I ! I 1 I , , 1 WCO (TYP) 1'S.o1 WGO WCO .V @1% SLOPE0 2.. WUP r--.6 off' Y Y . Y Ii" I Y , � � � . WH-1 I I I AIIP IE= 2.0' BFG - - 1- - - " - - ;�.- �,z II II --i. r --'1 0 Ci) (3,807 SF @ 0.11 CFS) I I I - - - L - - _ 2" - - 2" WUPA I 2"VUP I r -1 / 1 J WORKROOM&TEXTBOOK OFFICE = I I I I STORAGE 16101ini O I r -1 a O H B100 -- O L _ 1 o I n I L - J I U I " L - O I 1/2" HW I I I 0 -� N 2"VUP 0 0 N- A 2"VUP& /1&2" WUPIDN . I GENERAL CLASSROOM GENERAL CLASSROOM GENERAL CLASSROOM GENERAL CLASSROOM O 4"WUP/DNCC 1/2 CW 2103 B104 B105 B106 I (TYP 8) u / I I Cl) }r 3/4 CW OFFICE llCZ 2" WUP/DN B102 / L1 EWC-1 &2"VUP �l/ (TYP 2) I CO 4" W r —I� FD-1 f \l, 2 VUP& I Q O I� L .-. J I HB 1 jl !7_ Ill,1 4" WUP/DN M I— = o 3/4 HW7 -- -1i,: - 41 I I• �- 1 r RLS RESTR OM LACTATI. • t B„3 WC 1 �`,. -- - . u �r E - - -1 I LL_2 _::: (TYP 4) 6114 � , 112" CWi , - 1 - -r 0 Cr) r—I I I I I I Ct d".) Io 1 G _ - _ — FD-1 !' r-��i —D� Er _ 1�-n a I, ,� „ q LY la G [� 1 1 4" W WCO / 1 1+ I �J 2„VUP& I 1 1 1 1 1 1 I I I I I I I I 1 1 1 1 1� o 0 • — — 1\,.. 4 W • 1 TYP 3} Q WC-2 • I • ,. I 4 W UP/DN HALL STi4 R �j -- CO I-O LO S\ _ � TOILET 8119 WC-2 �I , 61,5i/_3WUP Nere_ _ _ _ U1 I I r _ I 1 I I = r = - = = r -i) - 4” STORM DRAIN 211 w U I FD-1 I U-2 I 11 I 1 I I I _ _ _ _ _ I @ 1% SLOPE I 1 BOYS'RESTROOM WC-2- FD-1 I = _J IE=2.0' BFG I TP-1 , L - ' 6116 1 - A L-1 I 1. H (4,059 SF@0.12CFS) LId1J �‘ L_2 / - I- - - - - : - -1 [-t EXTENDED LEARNING I _ 1 �- �.- SHB 1 ���� H 8107 .i I _ 1 iii I =f -� � J 4"WUP �� .��f�l .» :Pi�,._ r1_1-1 CUSTODIAL STORAGE j / CUSTODIAL OFFICE I - _ — — _ -f — — — — — - =i = 1 U 1 81181 MS-1- • B117 I _ I I I 1- - _ - _ - - Ei \\:( � --- - 1/2" HW SMALL CONF. I - _ _ — — — — 2 WUP LI_IJ w1.0 `f' , — — ��'� - B112 1 I f' — B — 4 W U PV\N_ 1 1 FCO " I L I 4" SD© 314" CW FD-1 112" CWIN ilL - - -- 3" WUP I II .-,(WCO 2"VUP& C ..-.. 1 I I — _ — 1 1 - &2"VUP 2" WUP/DN 1111111 1111111111111111111 I . 1 u ,, „ m_._ ..,, . 1.1 11,1 (.. __ _,,, . . ._. --4) 3I - - - 1 - - - _ - I- _. . It I I I D E , ,_u_, I • L - - J 4—, 111 HW 4" SD DN--r — • Hi .. n kr- 2" , 1) I S_1 I I WCO 3 DSB-1 "\— EWH 101 P5o1 -� V UP & I I (TYP 6} P 4" STORM DRAIN - i /7 � � �TYP 6)/DN - � I 1 _ @ 1 /o SLOPE QZHWP 101 1E=2.0' BFG SUB ELEC. 1 I k e y plan ---i (3,419 SF @ 0.10 CFS) 1 I TP-1 I 8120 L--- 1 I 1 Q I 7 I SCIENCE CLASSROOM GENERAL CLASSROOM GENERAL CLASSROOM GENERAL CLASSROOM B111 B110 B109 B108 I 1 I phase Bid & Permit z w - U I ' I co - HALL !OF -I I s-i I I 0101 8121 (TYP 2} date February 8, 2019 Lu 0 t LT2"VUP& S_1 I - '"�'� 2" W UP/DN (TYP 2) revisions co 1 pH1=1 i - I 1 -g. - -I Ii (TYP 2) WCO 3" DSB-1 I I I 1 .. � / I --- - --- --- -- - - WCO I ' I I 0 1 1 1 1 - - I -C I LI Iu) ri L 1 rte— u suizi -- \--I It I h CD J " II 7 i — — —� L_ _ _I (j) 73 ---� M•41— - iii !�l� II!l�� ��i!!�! !!!� !!—!-- !— M—MMi 4� _1 I B — H-1 — �i \!! 411 f!!!� _S�r�\ • ,. � I I I FC0 1/2" HW& 0 I 4" DSB-1 WH 1 2" VUP & TO 1/2" CW 2" CW UP WCO 112" HW& 112" HW& 2" W UP/DN project # 16055 (TYP 6) 1/2" CW 1/2" CW (TYP 2) I— CI (TYP 2) (TYP 2) FIRST FLOOR PLAN I I 1 I I I SECTOR B - PLUMBING I N N 0} Lr7 r cnti r 0 C_) � E--0) 0 LOWER LEVEL FLOOR PLAN - PLUMBING p2 . 1 1� � 1/8" - 1'_011 (� Nm - . . .. . -• --- GENERAL NOTES: 0 NOTES: A. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THE 1. SEE CIVIL SITE PLANS FOR CONTINUATIONS. ,/ WORK WITH THAT OF ALL OTHER TRADES, INCLUDING BUT NOT LIMITED TO ELECTRICAL, HVAC, FIRE PROTECTION, PLUMBING. STRUCTURAL AND GENERAL n n ARCHITECTURE. B. ALL PLUMBING EQUIPMENT, PIPING, INSULATION, ETC., INSTALLED IN HVAC PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND COMBUSTIBILITY. C. VERIFY EXACT SIZES, LOCATIONS. INVERTS AND ELEVATIONS PRIOR TO RUNNING ANY PIPING. REFER TO ARCHITECTURAL DRAWINGS FOR EXACTIL J LOCATIONS OF ALL FIXTURES AND EQUIPMENT. REFER TO KITCHEN LAYOUT DRAWINGS FOR EXACT LOCATIONS AND ROUGH-IN REQUIREMENTS OF ALL KITCHEN AND EQUIPMENT. D. PLUMBING CONTRACTOR IS RESPONSIBLE FOR EXTENDING ALL REGULATOR VENTS TO ATMOSPHERE. REGULATORS ARE PART OF EQUIPMENT GAS TRAIN. E. WATER HEATERS SHALL BE INSTALLED WITH DRAIN PANS UNDER HEATERS. eaIl I B I ROUTE DRAINS TO NEAREST FLOOR DRAIN. 1 5 6 0 ® ___0),� 8 Dull OlsonWeekes tsslIncgl I Group 907 SW Stark Street Portland OR 97205 USA tel 503 226 6950 fax 503 273 9192 www.dowa-ibigroup.com I ! I I I I www.ibigroup.com I I I =_ _ o i :_2 _�'� PA E I I L � 1 I I I I I pae-engineers_com I I �� � I TO CTG I 6° SANITARY I I I � I N I 6" W SEWER @ 183.9 4 WHIP 4" W _ 1 /o SLOPE /kte'1 TO FCO I I E=268.58' Z� �Qr °� M I I I • 0 ± I do h 19 ��, a 8" STORM DRAIN qs P. COLS- c;.4" W @ 1% SLOPE �19 6" ShP IE= 270.2' 1 EXPIRES 12-3 1 I I I I TO CTG 1 (32,048 SF @ 0.96 CFS) I —r _H._ _t 4" STORM DRAIN � I I 4" W I 1• • @ 1% SLOPE r - - IE= 271.0' d 1 1 (2,589 SF @ 0.08 CFS) 3" STORM DRAIN 3" STORM DRAIN LTJ J @ 1% SLOPE @ 1% SLOPE o Ii I IE2.0' BFGIE= 2.0' BFG I r� - - - - � - - I 4" STORM DRAIN 1 III I I I I III I I d @ 1% SLOPE (2,146 SF @ 0.06 CFS) (1,803 SF @ 0.05 CES)I I I I I I I I I f °'�4 I E= 2.0' BFG 1 1 1 1 I III I I 0 (2,968 SF @ 0.09 CFS) 0 11 11 II 11 I 1 1 / 1 I J IL — J L. � J i_ _1 Li 1- - 0 1 4 -I Z - � _ T I 1 - TT T T TT 7 1 0 U • 11/ml 1. 1 I I 8" SD-\1 I O o o "C N I 3" WUP TO WCO 1 I I o ��0^ C) V J c C.) 0 - �'--W UPCl) - , - [ I G I I - I CD �"� / _ i_ :1) I "WUP ,- - - - _ I L _, r _J L1 i_ J L _, 0 '� = o I - _` I 1- -i 3" WUP 12��WllIIp l Ir I L s z L s Z 1 L s z J L s - Z 1 L 1 L WUP � 1 I I- Z _. - -I I- Z _ � Z - S 7 I- Z - � LI= ti /7-4" WUP - - - I / L - - J 1- _ - J L __ J I } r r 1f 1 o co c / L co I-0 LO 0 0 ri I 1 3I'WUP 1 4 WUP I I I 2'WUP 3" WUP / a )i ( 1 14"WUP 2" WUP),7 I r _ , I A 3"WU 4" WUPTOFC I o 1 1 ,I - - -. - ._..- 3 W UP - - � - \ - - � 4W - 1 H J ._i --\ _ I I _\� - _ 4.. 5 r - - � 1 - - - � - I - I- J B r -� \—\,- S Z J L S Z S -L J L A - - � Z - - � Z t- I - - 1 - - - - 1\—__I- \_2HWUP '..... - - .-.. 1' o - 41 -. -C CI C - - - --� — � L1 r1 � -1 r- 1 1 LC 1 I I I 1 I 1 2" WUP- I I I I J 4" SD 1 1 I 3" STORM DRAIN I I I @ 1% SLOPE D E I I 1 _ IE= 2.0' BEG (415 SF@001 CFS) H I I I IL _ _ _ _ J - I I I r2WuP-' I k e y p l a n 1 I I I i 2"W UP-N 1 I hase ct 1 �� p Bid & Permit 1- Lu 0 1 I 4.. W 00*LTI 1j: f\ 1 _ I— I date February $, 209 1 s. MLu \ %z 1 1 `D,L._ ,_ \ \ revisions I z. r\tL _4" W L - - - Nski, I I II °I 1 l I _ - - - - r_ __ ._0_0_ _ -tea 1 - - _ �- - I - -o LLJ 1 l cn SP - 101 > 2" WUP 2" WUP 12" WUP 2"WUP 2" WUP 2"WUP0 1 " WUP 4" STORM DRAIN 3" STORM DRAIN 70 TO FCO @ 1% SLOPE @ 10/c SLOPE IE= 2.0' BFG IE= 2.0' BFG rL3 (4.616 SF @ 0.14 CFS) (415 SF @ 0.06 CFS) project # 16055 D UNDERGROUND PLAN co � SECTOR B - PLUMBING < �r cy)CV iiUNDERGROUND PLAN SECTOR B - PLUMBING `Y'•� 1/8" = 1'-0, c33o P2 • 11U oc CV N m GENERAL NOTES: 0 NOTES: A. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THE 1. PROVIDE CLEANOUT WITH WATER TIGHT SEAL FOR ria.'')°.n WORK WITH THAT OF ALL OTHER TRADES, INCLUDING BUT NOT LIMITED TO: FOUNDATION DRAINAGE SYSTEM. COORDINATE LOCATION ELECTRICAL, HVAC, FIRE PROTECTION, PLUMBING, STRUCTURAL AND GENERAL AND REQUIREMENTS WITH CIVIL DRAWINGS. ARCHITECTURE. 1 B. ALL PLUMBING EQUIPMENT, PIPING, INSULATION, ETC., INSTALLED IN HVAC NI PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND COMBUSTIBILITY. C. VERIFY EXACT SIZES, LOCATIONS, INVERTS AND ELEVATIONS PRIOR TO RUNNING ANY PIPING. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT J LOCATIONS OF ALL FIXTURES AND EQUIPMENT. REFER TO KITCHEN LAYOUT DRAWINGS FOR EXACT LOCATIONS AND ROUGH-IN REQUIREMENTS OF ALL KITCHEN AND EQUIPMENT D. PLUMBING CONTRACTOR IS RESPONSIBLE FOR EXTENDING ALL REGULATOR VENTS TO ATMOSPHERE. REGULATORS ARE PART OF EQUIPMENT GAS TRAIN. I i E. WATER HEATERS SHALL BE INSTALLED WITH DRAIN PANS UNDER HEATERS. ea ROUTE DRAINS TO NEAREST FLOOR DRAIN. I Dull Olson Weekes - IBI Group Architects, Inc. 907 SW Stark Street Portland OR 97205 USA tel 503 226 6950 fax 503 273 9192 www.dowa-ibigroup.com www.ibigroup.com iii 60 (8) }_� PA E ., ) pae-engineers.com ca PROrfxr ,G 1 w [ I I 183,9' "� -� F., 1 qs P. C°� a.6•9‹:)I9 - JI I I T I I EXPIRES 12-31-19 I �„� 1 I I r' 1 I 11 .., \ --- - --- ---- --- II II _ I �cl� ." Imo: i �° --I0 Ye '--Th I tilli_ii I 74-1I- 7 7 12 '- L _ _ _FAL ry J - - _ 0 ill um=iiiii =MEP��i��MIMI�� ilIDIF11IIfIIIIIMI �10��� i�1 ��__ii��� -'7�L I I �_���1 � 7' Lii4i-�� T �IVCO °° (TYP 3) 4" SD 0 HALLC10 (TYP 3) . a i 0 -1 h 1 - • —1 r-CI I- J : _ U AM IN8" SD DN ., v I I A0 1 1 _ o I m I 1 o HALL O I:1 lar131 T 11,Ear. 0 U CNI N 2all012.73 1 I - .0Un) c 0 0 ci 8"SD--\ ----- _L . CO ,.., O I e• Ica cocis, STMR I I- • S5 co ■— 3" STORM DRAIN °P I { • M — £ 0 0 @ 1% SLOPE I I I` - IE.2.0' BEG 1 >141I `�� -0 rn r (1,746 SF @ 0.05 CFS) _C‘..19-3- C") 3"CW as Cn o I I I I 0 I I I I —�H.. CD ..__. I i I 11 I I I I I I - �� _i_ _ ,_ t - J I I I I I I 1 >r 0 A L - - - _1 L - _k - J I L - _k - J • • - . 4. -. -I i , :, of I . WCO - 4" SD I 1 I 0 - � fil -1 8 I I Bo D F: . u° u " a - 1,1a<. . . . . - w r µ •U V° _ - . •� ,ij Um - d_ i - ' ! �/ s.L. ._\ 'C I / D E / I] I 1 I \ \ / j \\ \ , . \ / - / _____„ o key plan 1 / .4.44-e phase Bid & Permit CL I I I I z w 0 cn21 1 I date February 8, 2019 w revisions M t•-•!- :--.5 I I I I 0 o U CO I I I 73project # 16055 o fi0 $ FIRST FLOOR PLAN MF- < - SECTOR C - PLUMBING Q ' co.op N c`ri� LOWER LEVEL FLOOR PLAN - PLUMBING . . 118" = 1'-0„ ,-r 1 2 ---- .o ■ NM CQ_ GENERAL NOTES: (_:---) A. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THE WORK WITH THAT OF ALL OTHER TRADES, INCLUDING BUT NOT LIMITED TO: ELECTRICAL, HVAC, FIRE PROTECTION, PLUMBING, STRUCTURAL AND GENERAL n n ARCHITECTURE. Er B. ALL PLUMBING EQUIPMENT, PIPING, INSULATION, ETC.. INSTALLED IN HVAC PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND COMBUSTIBILITY. C. VERIFY EXACT SIZES, LOCATIONS, INVERTS AND ELEVATIONS PRIOR TO 1,,,__ _...., RUNNING ANY PIPING. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS OF ALL FIXTURES AND EQUIPMENT. REFER TO KITCHEN LAYOUT DRAWINGS FOR EXACT LOCATIONS AND ROUGH-IN REQUIREMENTS OF ALL KITCHEN AND EQUIPMENT D. PLUMBING CONTRACTOR IS RESPONSIBLE FOR EXTENDING ALL REGULATOR VENTS TO ATMOSPHERE. REGULATORS ARE PART OF EQUIPMENT GAS TRAIN. I I E. WATER HEATERS SHALL BE INSTALLED WITH DRAIN PANS UNDER HEATERS. I B I C:D 411 CI E4--) 6 .C-7-) ROUTE DRAINS TO NEAREST FLOOR DRAIN. I I Dull Olson Weekes - 1BI Group Architects, Inc. I I I I I 0NOTES: 907 SW Stark Street Portland OR 97205 1. ROUTE GREASE WASTE AND GREASE VENT OUT TO INTERCEPTOR ON SITE. USA I I SEE CIVIL SITE PLAN FOR EXACT LOCATION OF INTERCEPTOR. tel 503 226 sfax 503 273 9192 I I www.dowa-ibigro oup.com r- — — — -� — — www.ibigroup.com 2. PROVIDE DRAIN AT KITCHEN EQUIPMENT AND DISCHARGE WITH AIR H1- I I I I co - J I I I 1 I I 1 I I GAP AT FLOOR SINK. L - J L - - - 3. ROUTE 314" HOT AND/OR COLD WATER PIPING DOWN AND MANIFOLD =t= ="_' pA E .,,.„ I IN WALL TO FIXTURESIEQUIPMENT. _= pae-engineers.com ,„ I I I ! I I I I 4. SEE CIVIL SITE PLAN FOR CONTINUATION. C PRo sD JD L 8 1111--- ---1111—o 1111-- -- - :183. .9' "� a (Fa 0 0 100 0 l� A� ���-5- 11'h 19 '�� c-D I I ! i I I s-! I ! QS P. CO� a.b•�Iq I\ I EXPIRES :2-3'- 9 i i \ 1 1 I TO WCO 1 \ ! 2"WUP I 1 / i ,/ I I ir/\ I 11 • b 1 I 1 I i 1 I I i ! L I J F J 1 _1111+ - - - ! I I -� — � — � 1 1� 0� � - - 0 1 1 a ! -V (- 1 L _ J L _ J -i i � i CO i 1 1 � i 1 2 1 i P4.01 I i I I i I I O 2" WUP I O I i Z cc',-, j ii i Iil . JE. . . . 1 . . II=1 ••••• CD P\ 11 1 I 1 1 I a 1 U O 4" W Ler_1 s — � r 1 IL of I - - tl) - - I _Li _ SB-1 �+ ! I ! L — _I 1 I _—'1,-`� 1 V /013 4" DOMESTIC COLD '� rics i= Q p ti WATER I,� o 0 ! 1 I 546 WSFU @ 212 GPM I I rn d- sir I j 4" SD SLOP •.' ■� (J J Ca o CO CO I 4,044 SF, 0.1 CFS, �. _ 'I O O 1 I E=2.0' BFG r I - - 22 rn Ls7 . -J • 2" V UP I •-- ° -i-j I. • 4" GW UP Si! I TO CTG I �I I I / I L _ . i IT J 2" WUP - --1111•---11-0-0—•---- -- .� _._: - A - 11 11 - - - 1111 -e 4" WUP `�` {r� �' I I l - 1 W T - - - - � TO CTG I C• I .�`' 4" SD UP 4" W I I \ 6" FW B I @ 2% SLOPE •• 0 I IE=280.00 O - 4" SD UP I 2"V TO CTG C I I I I I\ 1 o D , < > EH GI-101 - \ / G I I I I 4„ GW I @ 2a/a SLOPE key plan 1E482.20 1 I I I 1 I phase Bid & Permit z I o I I � date February 8, 2019 LI] I 1 1 J I I I . revisions N L J c) i i NI- 18 I I I I I I . o I U U) N I I I I I I 2 T project # 16055 o UNDERGROUND PLAN i- r -- UNDERGROUND PLAN SECTOR D - PLUMBING SECTOR D - PLUMBING ~ , 1/8" = I-0" � N `� • •M Lb,— 0-)6 P 2 • I 3 U .,, CDN. Nm_ — -- GENERAL NOTES: A. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THE (.......) ,(3- I WORK WITH THAT OF ALL OTHER TRADES, INCLUDING BUT NOT LIMITED TO: ELECTRICAL, HVAC, FIRE PROTECTION, PLUMBING, STRUCTURAL AND GENERAL ARCHITECTURE. B. ALL PLUMBING EQUIPMENT, PIPING, INSULATION, ETC., INSTALLED IN HVAC W In PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND COMBUSTIBILITY. C.VERIFY EXACT SIZES, LOCATIONS, INVERTS AND ELEVATIONS PRIOR TO RUNNING ANY PIPING. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS OF ALL III FIXTURES AND EQUIPMENT. REFER TO KITCHEN LAYOUT DRAWINGS FOR EXACT ® $ �9 CrL-DLOCATIONS AND ROUGH-IN REQUIREMENTS OF ALL KITCHEN AND EQUIPMENT. T I I D. PLUMBING CONTRACTOR IS RESPONSIBLE FOR EXTENDING ALL REGULATOR I I I VENTS TO ATMOSPHERE, REGULATORS ARE PART OF EQUIPMENT GAS TRAIN. I I I I I E. WATER HEATERS SHALL BE INSTALLED WITH DRAIN PANS UNDER HEATERS. ROUTE DRAINS TO NEAREST FLOOR DRAIN. , , , tect IBil II I I IEMERGENCY GAS SHUT I I I I � HALL `; I OFF VALVE -. C101 17 - - - 7 I (- - T - I /---r--1- Dull Olson Weekes - IBI Group i - I - I - - - - - I -I — — - — I — _ - 1-1 1H4 _ I-1 — — r-�` _ . — — Architects, Inc. - � + I I —�- I - — — —I I L I I I I 907 SW Stark Street Portland OR 97205 USA L - - - J 2 W LI L. - - - -I 0 I 2112"M tel 503 226 6950 fax 503 273 9192 TOUWPCO II www.dawa ibigroup.camI2"WuP — — - - -I I I 1 �_ I I I www.ibigroup.com " LI-7--\_ ___ _5: ,' ' NOTES: 2,.IA111 4 U IBOL.ER I Y4 U "�D Up �..----- 1. ROUTE HOT AND/OR COLD WATER PIPING DOWN AND EEo oa - " " Qo `� - -0 MANIFOLD IN WALL TO FIXTURES/EQUIPMENT. = PA E ae-en ineers.com oI —1 J I _1 L _ I I 1 I I I 1 I - I I I 1' g MP IMI.. .I� w� .I... f� ...I�.� . �?v.. �. .IIIA w� - �wwr �I!,_ �7 © 2. PROVIDE CLEANOUT WITH WATER TIGHT SEAL FOR 3 W I 4 W UP- UP i FD-1 ,T 9ir t 1 i FOUNDATION DRAINAGE SYSTEM, COORDINATE LOCATION a3q9I 7dr . I3EXTINGDRINKINGFOUNTAIANDCUSPIDORTOREMAIN, 41/F ,. - �_ /� `� RECONNECT EXISTING FIXTURE TO NEW PIPING IN THIS AREA.,i21t „ I •°� ON � `2WL�f / z I - 7 4"WUP ` r a ' I� 2„ MG D N I 'may��~oh 19 \( �, I L J I I (TYP 2) I I -5-0 'oh ` -�c' a►6,�Iq 4"WU )// „W / 4"W \_31wI I P. C///1 /JUP \ / 1 I EXPIRES 12-31-19 4'WU / I� „ - -1HALL - r, \\( I C2" I ` 4Wu� oE101 Iij I I I I 4 WU 2"WUP �= ,.F"WU� J I 2„VUPOt I MAIN GYM WUP 2"WDN DRAMA STORAGE 1 \-2"W UP �' "WUPMB i ,1 I 4r,W I J - I = 314"HW o 0 2 WUP J p D 2 CW 10 I I ~\-4"WUP I , / I u - r _ , TOILET I F; ''� INC [ E,07 1 TP-1 - I. — — 7, I I 41r W /- 1 L o J 3" CW UP ! L-1 I - FD-1 2"V UP& --f' - - - 2"WDN GEN.BUILDING STORAGE ^. _ (TYP 8) ' is I I I I I E100 I I FD-1 - --'1-1_ -_.-- - I I -GUST. I 314" RHWUP E104 y7 -• �--+ I I 1" HW UP MS-1 O O 2"CW (� LAI -u 3f4" HWICWO I a 2112" MG U' i SWC-2 r (TYP 2) II L I •. �r� _ 314 HW& I I I L - J 3"VUP& L- ` Eo `JL' CW DN I J • I ! 44"W \___ 2"WDN - _ -`� - HB-1 - - RESTROOM ` Q 314' HW UP ' (TYP 2) / = E105 L_2 ! i 2"1,(UP- a i i 1 ° 1 3/4"HW DN I 1- FD-1 i) ` I I0 HH l- r— — r J I ° I 314"CW DN O \-HB-1 WC-1 I 'I" l...r. 0 1 1 J L J L _ J CV WC-1 (TYP 7 , . L ± - . p 1 I I 7 1- >` L , t- - --- {-^�-i r q - (TYP 9) L I I71 I U 2"W DN-h...„ - WCO I I r 1 1 : '\ 1 v � CC I I f l l I I am �3.r: 11 ( ] C.) O © • I MAT 8 PE STORAGE 1 1 1 1 1 �` I I HALL 4"S D I I FD-� I ® 1 1 1 1 1 1 `, I I E108 7vTw -Ico��` �� Ii 1 1 1 rE I 11 11 I I E I \ I I CD co c 13 �:�i�, , 11 t t r EDI t g 1 s Il . ii 1 } :1 EXTERIOR PE STORAG ID 314" HW DN 19 FCO E E EECW-1 Q O f` I I I ; II 7 1-J 314"CW DN I� � �� I I � � � � 0 0 1 112 CW WH-1 -0 rn T d- - WM-1 1 1 1 1 1 1 1 , . . . 1 I I I , I I 1 milli 1 1 2”W$L 2"V }+ L 1 1 1 1 1 1 I 1 I 1 I _-_-__- . I I I I I I I I I E l UP/DN I. ! ly Sr I ;. I I I I I I I I l l l l r l I POMC) -1 I 1 , I e 1 -‘*7' 1 LJ L-J L_J la ° +,e7 i li Ii I I I I I FrI I I • • MDF 13113 JA - 1 i I ! I 1 MAIN ELEC. AUX GYM E110 II3 - - ! I i I - I I I B - I � , _1 C I I I I I I J O E ___. .. I 11 74 I I I I 1 key plan I I I I 1 I ! phase Bid & Permit Z w co I ci I I I I 1 date February 8, 2019 w 1 revisions f;: ) fw�;, _ I co I r I i I 1 1 I I I 0 1 .I 4.:, ,, , . . ,L. _ F...,._ . .. . ,___ i I I I I... I I 1 ,. ! I ! I I I I project# 16055 © FIRST FLOOR PLAN u) 21- SECTOR E - PLUMBING 0_,-- I I I I I I I -1-% 1 Au.-- o� ,__. LOWER LEVEL FLOOR PLAN - PLUMBING P2 . 14. ,-co 1/8" = 1-0" — OM NM Nm (..........)0.- n IL GENERAL NOTES: J A. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THE WORK WITH THAT OF ALL OTHER TRADES, INCLUDING BUT NOT LIMITED TO: ELECTRICAL, HVAC, FIRE PROTECTION, PLUMBING, STRUCTURAL AND GENERAL ARCHITECTURE. B. ALL PLUMBING EQUIPMENT, PIPING, INSULATION, ETC.. INSTALLED IN HVAC PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND 1 i COMBUSTIBILITY ea I B I C. VERIFY EXACT SIZES, LOCATIONS, INVERTS AND ELEVATIONS PRIOR TO 0 4" SANITARYRUNNING ANY PIPING. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT (611:) 8 I I (9) { SEWER @ CI -0) LOCATIONS OF ALL FIXTURES AND EQUIPMENT. REFER TO KITCHEN LAYOUT Dull Olson Weekes - IBI Group 1% SLOPE DRAWINGS FOR EXACT LOCATIONS AND ROUGH !N REQUIREMENTS OF ALL I I Architects, Inc. 5 ! I IE-272.2KITCHEN AND EQUIPMENT. I I -7 i--- - - - -I I- - - - - 71 I- �"" - -1 907 SW Stark Street Portland OR 97205 - .J L - D. PLUMBING CONTRACTOR IS RESPONSIBLE FOR EXTENDING ALL REGULATOR USA I_ L _ - - - - n n - - - - -` tel 503 226 6950 fax 503 273 9192 I- — _ VENTS TO ATMOSPHERE. REGULATORS ARE PART OF EQUIPMENT GAS TRAIN. 1 — _ 1 — — — — _ 1 — — — _ — TI — — — — - 1-- — —1 —� 1— _— — — �_ —1 — 1— — — 1 — www.dowa-ibigroup.com \, / I III - - - - - - -� rt- - - - - - � L_ _ __ _ _I I_ _ COwww.ibigroup.com L _ 4 I 1 III jE. WATER HEATERS SHALL BE INSTALLED WITH DRAIN PANS UNDER HEATERS._ _ — — — ROUTE DRAINS TO NEAREST FLOOR DRAIN. I I 1— 1- e(- - - - - TT in I I .. I I II II " :,. PA E I 11 II pae-engineers.com 1\- — — — r — I- -8-I 4" W 1111 L -� — ---I a o a 7111 -_1L91,_ I II 11 I 1 D ��oF�� T �� INE �— — - L J j j f 1 X183.9'/)R .^ II II , .-GON I I I I �o o`° -L. - - - -Tri -� T WUP _ _1 yo `-ch 19 '`( �' T - - - -�J TOED 7 AS P Co�� a,�,�,� E LI I 3" WUP I i I 1 0 ! 1 TO WCO I EXPIRES 12-31-19 I_pi 4" W 1 I I 1 - j I ! I i r- -1I ! ]— L � � L J 101 L n J 1 . I - II 1 I ]� I 1 I I1 I 2WUP I I { I I - - - -\ TO WCO 1 1 I I - - - -� — T 4"WUP � I I 0 1 1 \--- I LnJo-7- 2- 2„WUP 1 1 { 11 L �3"WUP I1 }+ II I \ TO FD- U ! I I I 1 1 I \� " WUP 1 I .� �__f I I LJ 2„WUP 1 - r � ---o .. WUP I �l � r / \ WUP J -— I L0J \\a""---------4” WUP I— fir- 0 I� (TYP 2)110\-4> _Ilic { 1 1 12"VUP 0 1I "WW UP N 2" WUP I I I I i - 0 TO FD TD ...a TOCNJ H WCO L V r- LJ -1 " WUP 0 N- I 101 ! L - - - - - - i L_ _I E- - -Z - - - r— :11 L �i L 4 WUP L J t..) O a el / I T2 „ � L - - � J I I � i P — I I 4 W i I (u (� 2 WUPI• cy) �I � I 1 I I I _ ,. TO FD _ _ _ 1 1 1 1 I I I n 1 r i 1 1 I I 1 1 2"W 7 -' I I I I I ma0 2 W UP - r - - J L FE ,_ D I I- - - -I I- - -I I- 7 I I I Q o 1� , L _ _ ___ _1 L _ J i 7 -I LI d- CD 'IN- 4" UP -- ) 1I I I I - J TO FCO 2WUP Cri o c) c o - - __ CO�j - -CD CD CD - I I I L 1- -1 � L � � � � - ____ � J � L I J � � � � � J -i--+ L� 1 - _1 _JI I I I I - - - - - —I H i_ _ _ _ _ _,i_ _1 E-- - - - - n r--t I /- -I I I --, t E 1 J r- - - -i-ILT_I _, I I I J I I A A 1 I I I- J B L J L, I I ! I C I L _J 17 _JD E I I I 1 key plan c phase Bid & Permit z U I 1 II codate February 8, 2019 0 111w 2 revisions I I 1 coNI- 111 0 o L 1 I M - - - -0- - ---0 - 0- Z -o _. - Iii - - M I I .1 project # 16055 o UNDERGROUND PLAN 1- SECTOR E - PLUMBING I Z;.,... Mr t UNDERGROUND PLAN SECTOR E - PLUMBING 118" = 1'-0" rno P2 . 1 4 liJ OCry cfl Nm,� GENERAL NOTES: (NOTES: A. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THE 1. ROUTE HOT AND/OR COLD WATER PIPING DOWN AND WORK WITH THAT OF ALL OTHER TRADES, INCLUDING BUT NOT LIMITED TO: MANIFOLD IN WALL TO FIXTURES/EQUIPMENT. ELECTRICAL, HVAC, FIRE PROTECTION. PLUMBING, STRUCTURAL AND GENERAL ir"."--)°-n ARCHITECTURE. 2. ROUTE 314" CW UP TO ROOFTOP HOSE BIBB. I B. ALL PLUMBING EQUIPMENT, PIPING, INSULATION, ETC., INSTALLED IN HVAC 3. SEE CIVIL SITE PLAN FOR CONTINUATION. IN 111. PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND COMBUSTIBILITY. C. VERIFY EXACT SIZES, LOCATIONS. INVERTS, AND ELEVATIONS PRIOR TO RUNNING ANY PIPING. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT L __...., LOCATIONS OF ALL FIXTURES AND EQUIPMENT, REFER TO KITCHEN LAYOUT DRAWINGS FOR EXACT LOCATIONS AND ROUGH-IN REQUIREMENTS OF ALL KITCHEN EQUIPMENT. IBI I � Dull Olson Weekes - IBI Group CII) r3) (4) Ci) C7) $ r9) 0 Architects, Inc, _ 907 SW Stark Street Portland OR 97205 USA tel 503 226 6950 fax 503 273 9192 www.dowa-ib ig ro u p.corn www.ibigroup.com 1 I I I I I I I ._____ PA E pae-engineers.com 1 I I I I I I I I 3/4" HW& S_1 314" CW (TYP 6) (1F (TYP 6)1 I `�. lI _ —•--_- _-"_moi , 1k R' i' •-t. -. y' iirr- ,_ ---_,. - I � .......-"� �_._.._., p .-', _'�I r-'_ y � pi 1 A.) � 183.9/14/F ! !:::T.• • 2"W& - � -__�=_ JI 112" HW - � ---- --- �qro °2„V F 2,. W&11 I yo h9 1 (TYP 6) 1 AI 2 V 1 I g_1 3,VTR I 2"V UP & 1 I I CAS p. CO - a� SIR 1 I ' ,IPI SS=7 2I V DN ----- HW/CWS=1 I I 314 (TYP 6) I 2" W DN TIN I – (TYP 6) I EXPIRES 12-31-19 FROM - 112" HW 1 icol ��3 VTR �J 3'V0 � I BELOW 3„V I � _ \ STAFF ROOM&KITCHENETTE F & \ { A220 I I 1 _ I 2" W 2" V I AZDO I SCIENCEA201�RE I� SCIENCE/CLASSROOM 1 I F GENERAL CLASSROOM GENERAL CLASSROOM GENERAL CLASSROOM GENERAL CLASSROOM SCIENCE CLASSROOM I 112" CW I t _ I A2021 I I A203 A204 A205 A206 1 ° 3/4" HW/CW I , 1 -- _ FROM BELOW Iia - - S-7 P5.01 I - 314" HW legI 1 (TYP 6) _�1JYRI 11 i 2 HW 1,�1. [ � �314" CW 1 KO b < EFMV 1 FD-1 ESEW-11_:-.6„7_,:.. (TYP 6) I ? ` „ I I i 112 CW I KILN ��'r :- �_— ' 4LIIT) 1 11 `. I 7 .,_ r _ r _ _ _ r _ _ - - Y _ _ _ T _ 7 r _ — _ r _ r Ill 1 11 A223 rli I- - - T - — r -- DT — -, — — Al — — r f T — r — T _ _ �L I — I I I I I I I I I — — — i - - ,g �,�� I �, ii ❑ I ll�j a �g� �_,.I II Illllllllllllfll EIfIIIIIIIIIIIIIIIIII V „ _ <Ist -- -- 2"VUP & - - 3 DSB1 � -i I 2"W DN = , \A/ HALL / A207 3/4" CW UP }• I 2" HW r."7/1 ` I • 1 _ _ _ . I FD-1 1" CWQ 1 112" CW 0 I { 1 I I ! 1_ - - - 1 0 fWC2I FD1 11 - 3SD y 1� 7 I r I _� SUB ELEC. '[-!� �HB 1_ �t l f A215 I © EXTENDED LEARNING — 1 I LL_2 I TOILET A207 LV S-5 I I GIRLS RESTROOM i - 2„ W&fir L-1 O U N-- 2” � V1 rr I - I2" „ 2" W &2"W 1 SUPPLY!STORM 1�1 I ��(�2j�!^.,FyI LW -- �� i 2"`f & I I r — O ��f) 0) 314" CW - ,I _ I 2 A224 - - 3/4" HW I /' V l ! I 1 L - F f rCC „ V � M��� QRHWP-201 I � �EWC-1 � V 0 314 HW 0 �IIM 2"VTR ' , I MS 1 I HALL . rrr� 2V& 2W �� 4W& FD-1 A�o7 i- d U-2 UU-11 1,t' ca trilI 2" V I 314" RHWI it V I I I ! I I I I I ! I I I I I I I I I I I I I ! I 1I �- = I - - - (TYP 4)- - - - I II - _ „ - __ __ - __ 410 H �� — 1 1 1 1 1 1 1 1 I 1 1 WC-2 WC-1 CU 0 ,� S�1 - 314" HVA N - 1 - - - - - 1 - - - - - - - - 1 - .� Qor• �' i BOYS RESTROOM 17 ' ED-1I . (TYP 4) ----- I _u, 314 C N ( M i ! celia - I 1__ -- -- -- -- --_-�- _Tiiii n I I 1 1 o0_(-1 1 m� ti `Ct•�-(---- _- rII �r�i "" � r - I ■` ., 1,Fr HB-1 EWH-202 r �'3 DSB17 _ I \._ i U3 `P5.01 CO o co co �� I I I 1 — 314" CW UP 1 ®TP-1 fl 2 CW DN I f - (0 o 0 �' 1— LLQ LO I I I 2" V DN EWH-201 p5.01 � .�.� +{_ 0 I 314" HW 0 I �- 2"VUP & 3" SD I 2" CW 2" W DN SM L GROUP CLASSROOM SMALL GROUP CLASSROOM GENERAL CLASSROOM GENERAL CLASSROOM GENERAL CLASSROOM GENERAL CLASSROOM I I MAKERSPACE SLI R. 1 1„ ow O I A213 1 IA2121 A211 I.A210 eI A209 A208 IIr 1 I MAKERSPACE n S_5 I I I I A225 H 112" CW L - 4"VTR 2"V& 2" W I I� - I V 1 I 1/2" HW _ iii - - 1/2" CW F74-1 1 2"V& 2"W *II I I - �- - - - T - - - , r - - - T — - - Y - - -1IIII 1I � V — I — — — 1 — — [ , — �..._. J Imo_ _a g a I� I _>I I .-- - �1 -a i`—_ ..d r . i �— — I — _ .. 1 i i I ' i I f , i - i i D 1 Aii - 1 1 I I 1 �' , 1 I 'A., 1 I ' j1` 1 . iLii _ , _ ,/ E . I . - I 1 / 1 3" DSB-1 I 1 I I I I �> I f 1 1 ` -.E' r11 key plan 1 1 CP3 I I I - - � I I I I I phase Bid & Permit Z 3" SD ' 1 1 . U 1 I STEM/CTE CO1 I. I I A227 I E I S-5 I I 1 I I I 111 I I I 112" CW O1 1 STEM/CTE STORE HALL 11 revisions � Alza A2,s co 2"V & 2"W L_ 11 ' 1 1 3/4" HW 0 4M=2 I I 1" CW% ! I 1 1 I ! - - E__. _ 0 1 _c 2"V&2" W 41.-1 2 VTR 1. �' 1 ., 7 CD i I '1 ,' I I I -4111..1.�r...-i,- -S-1.III 71 IMP IMP--�II i ii.I. i.�II,• ..�..� ...1 IP Il III��II Il 7 fl.x....111..1.1111•00..�'MIA 7 7 I_' project # 16055 1 1 WCO Q I I I 2„ CW I I I SECOND FLOOR PLAN u) 21- SECTOR A - PLUMBING i c7-)N- c=,04 UPPER LEVEL FLOOR PLAN - PLUMBING MNI.� 118" = 1'-0" cnO P2 • 2O O,tp M eci. co_ N m GENERAL NOTES: 0NOTES: A. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THE 1. ROUTE HOT AND/OR COLD WATER PIPING DOWN AND MANIFOLD IN // WORK WITH THAT OF ALL OTHER TRADES, INCLUDING BUT NOT LIMITED TO: WALL TO FIXTURES/EQUIPMENT. ELECTRICAL, HVAC, FIRE PROTECTION, PLUMBING, STRUCTURAL AND GENERAL ARCHITECTURE. 2. ROUTE 3/4" CW UP TO ROOF TOP HOSE BIBB. PROVIDE SHUT OFF VALVE WITH ACCESS. B. ALL PLUMBING EQUIPMENT, PIPING, INSULATION, ETC., INSTALLED IN HVAC PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND 3. ROUTE PIPING IN WALL BELOW WINDOW TO SINK. COMBUSTIBILITY. C. VERIFY EXACT SIZES, LOCATIONS, INVERTS, AND ELEVATIONS PRIOR TO RUNNING ANY PIPING. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT L II LOCATIONS OF ALL FIXTURES AND EQUIPMENT. REFER TO KITCHEN LAYOUT DRAWINGS FOR EXACT LOCATIONS AND ROUGH-IN REQUIREMENTS OF ALL KITCHEN EQUIPMENT. •17 BI I E-F--) :iii GI 6 8 ���o ®1 ii Dull OlsoeekBI Group Aectc. 907 SW Stark PortR 97205 USA tel 503 226 69x 503 273 9192 www.dowa-ibigom to 1 I www.ibigroup. f 1 ,i!!!! 4 ,!IF!4!! !!!!I! !Y s!!!!!!! !!!!!!!!!!! !!i!!— I I I `� I I I _ ::_: PAa.:M_ paineers.com SPED OFFICE SPED OFFICE HALL8222 B223A219 - I I1 I I 1 ,� Jr).� 4,. 7: HALL F •, 8224 ^u /�IAI ' ON r • I I I GVYY I f I _z. mi co n CI Or SPED CONF. I 'S'O 6 1 cc) \c'' cm \ S p co �} IT .OFFICE ITIN.OFFICE -- p� �'�vl 9 8226 B225 I I I I I I 1 I EXPIRES 12-31-19 1 L,_ - TEST. I I 6229A I 1 I 1 I I L=1 4I! -l- I -I-�-- I I 1 I I - DSB-1 I I 2"W DN & I I I I I 1 FUNCTIONAL ROOM 2"V DN FD-1 6228 I ' 314" HW O 1 ET , 1 ., & CWA‘611-roli_l H81 I - � I I � � � I � � ,,1 1 CO WC-2 1 f I s-1 I ' 1 112"CW DN_O__ T1-11 I I �.N1 C , •■In �� c I OILET 6,17:17-'1.' r 0 41 _ 4I I 2"W ON & B3D � - - - - 2"V ON I'". - n -- "1 IL-- , I V_ u w Y >� <>< I I I s. c+ d A 1 4" 2"VDNWDN & _ I _ Q SH-2 I SMALL GROUP ELD B202 I 1 1 CONF. RECORDS REGISTRAR BOOK-KEEPER i7 _ 6201 6231 B232 B233 6233 3"�/TD I I — O i Y I Il GENERAL CLASSROOM GENERAL CLASSROOM GENERAL CLASSROOM GENERAL CLASSROOM O HALL I 1••••B2062D3 B204 6205 6206 AL — I (1 I .i. I _ - 314"CW UP 1 HB-1 FD-1 I O U Tti 314" HW/CW WC-2� counts.OFFICE I O N3„ R82371JiL=2 \ I UT,\ I 6 I . 0-1.-Clo czi GIRLS RESTROOM j� — lit \` STUDENT RECEPTION MN.OFFICE ITIN.OFFICE I B213 �� d i+,I -1 I— • COUNS.OFFICE ——— ——— 6255 B236 8235 WC-2 -� r- - 04 I - - z - - - "ILI: .)_L„ , - - - F TION - � T - - � r � i - r - - -r - i - Y N �/ III B238 I I I 84 I (TYP P 2 ` ]�/y�/J R !/� I1// i ,. 111Lif II ■ 0 4” DSB-1H _ J FD-1 �? CW� L-1 1 f I 1 1 1 1 1 I I 1 1 1 1 1 1 I I I I I 1 1 1 1 1 1 1 1 1 I III A o 0 ri- U c` 'N WC-1 ` - - p— I 3/411 I 314 HW S-5 1- - �, uVl� �� (TYP 4) I 2"V&2"W _ - {� " ,I CW/HW i COUNS.OFFICE '''----11 _ PARENT!B202 VNTEEI- C8043. — 14jr FD-1 (�I' j. -, (TYP 2)2 V 3/4"CW 1 I I I f _ I li r - - -ill CU co— 6239KIT® I 2" W&2"V I - ) WC-2 IL " u 11 I II ) r� 0 0 1 �'; , 1 'BOYS REST / 411 W& FD-1 r1.0 B217 I L V } I�_ i- N- v ti O I - I I L-2 1 (TYP ) CusT. I 1 I I f �� HB-1 B214 MS-1 EXTENDED LEARNING Irl Ii HALL �__',...� I?� 6207 - - - L`1 WC-2 I 8244 I L i+lR _ I CONF. II I I \ HWP-202 2"W& — -I 6240 - 2 VTR I 314 HWICW A TP-1 2 VI I - 1 Ji O I . . 0 I 0 I H HI I IC.) C E (TYP g HI I FD-1 _c ,, ` TOILET HE tTH 1 0 P5.01 ( I I I I - ` t B246 B245 0 __— — — ——— .71 ' Ii is _a --- D4 -- --- --- ——— -- -- HALL 4 TOILET �. rz I i — — - - - - — � 6207 I =--- 'J l I I 1- I 1 4" DSB-1 - ,i— F - _ _. }tea 1) k - _ - I I I I I I I III I I I I I I I I I L 1 I __ I, I. 1 I I I i I I I I I I I I I I I I I I I ., . „F ., CI B - - - , . ...._____ :TO . . . . 1 ' - 0 ' - '---- '. .---. I - . ' / WC O SUPPLY ..�r.�l -� I— C LI L 1 I 6250 1 .J - PRINC. WC-2 - 4" SD D '" I I 6248 I r P.A.S.S. " SD UP 112" HW/CW z ASSOC.PRINC B218 J FD-1 �j 8251 (TYP 6) I I O E �I � STAGE STORAGE - B219 FROM ABOVE-r I I I I -- I I SUB ELEC. I I 1 , [ ) I r 6212lu 1 -- SCIENCE CLASSROOM GENERAL CLASSROOM GENERAL CLASSROOM GENERAL CLASSROOM .• P (/ I I-- S-1 1 B211 B210 6209 B208 k e V p I a n ASSOC.PRINC. 7 J I I B252 I (TYP 6) I I I SECRETARY I - - 1 k I phase Bid & Permit STAGE STAGE STORAGE • w 6227 8220 �- U I I I Q 3"VTR 1 I RECEPTION B249co I I L' --- -- --- , -- --- __ —; __-- —__ I date February 8, 2019 ILI SECRETARY L i ——T , ; — 1 — , M _ _ B253 -(-1: �1 I — — I S-1 I S_1 I — S-1 revisions I.1.1 -1 cv I I I I ' I - I r h - -- �. -- �� /I�j —1 I �_...._ —� :ROM I j —' L_r "`�]cy r I�� 4_. _—_J — — — . . 0 oo \BELOW .. 1 II I I I 1 I I I cii 1/2" HW/CW 2" W& a (TYP 4) 2"V (TYP 4) I M project# 16055 I- o SECOND FLOOR PLAN 1- SECTOR B - PLUMBING < I P2 �r 410 UPPER LEVEL FLOOR PLAN - PLUMBING f cn� 118 - 10 --„ .0 • 2 1 ,,, NM ,. Nm GENERAL NOTES: NOTES: A. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THE 1. COMBINED STORM DRAIN SYSTEM THAT COMBINES ON THE VERTICAL. lii _O WORK WITH THAT OF ALL OTHER TRADES, INCLUDING BUT NOT LIMITED TO: ELECTRICAL, HVAC, FIRE PROTECTION, PLUMBING, STRUCTURAL AND GENERAL ARCHITECTURE. n B. ALL PLUMBING EQUIPMENT, PIPING, INSULATION, ETC., INSTALLED IN HVAC IF PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND COMBUSTIBILITY. C. VERIFY EXACT SIZES; LOCATIONS, INVERTS, AND ELEVATIONS PRIOR TO RUNNING ANY PIPING. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT L -Ai LOCATIONS OF ALL FIXTURES AND EQUIPMENT. REFER TO KITCHEN LAYOUT DRAWINGS FOR EXACT LOCATIONS AND ROUGH-IN REQUIREMENTS OF ALL KITCHEN EQUIPMENT. 1 eft up IBI 1 Dull Olson Weekes - IBI Group Architects, Inc. 907 SW Stark Street Portland OR 97205 USA tel 503 226 6950 fax 503 273 9192 www.dowa-ibigroup.com www.ibigroup.com Rite"OE " P A E pae-engineers.com k 4183.99r2 "b ! 0 ' ov ' Q ''5' rC'h 19 1�'°'�� - CAS p co\- a s/, -eDI9 ED C2) c-3) 4 E5) 6 0 c-_.) 9� Exf'IES 2-31-19 ! I 1 I I I I I dem, - I: — , I i I (770 - - - - - -I I I __ _... _. _ J:1. ---------■-I- t - 1 - ' •i .L�. VESTIBULE C200 r HALL T - �+/ C228 I I I 1 HALL C228 1 I �_(^/ 0 I — — — — — _ r - - - — - - l ® 0 Q 'I' • - 0 N I Iil i L _I � I a o W u\ O I t!]1 I I I I I I:3 co 11 1 iI I ! I I 1 ■— 1 CC i - o o -,.. COMMONS 1 ! C201 ? I I 0) ! }>I - 1 I � , .1 I I I I ,i- r i CU l'isf l llric) co co y co 0 L i cp I I I I 3" DSB-1 I I II 1 I1 1 _I 1 _ - � I I I A I I I I 1 I I I — r_ L—fr. _. 1 B - --- •,...i_____-_p- , • 1 I I I 4" RD UPC) I a I 4" RD UP 1 I I 4 RD UP 0 I j CHOIR OFFICE&STORAGE CHAIRITABLE STORAGE ;c. P4-01 -4" OD U P D200 D201I 4" OD UPO EWC 1 4" OD UP -" EWC-1 O E i7- ,, . I i , In' I , J 1 I ik_-_ �IIL_..�h�n-1-11perh, , J _ _i.-,-t) 1 1 Li. 1 1 L f.. -.1 Hi H ®_ �� �1 ti im' j I i r� rl JIl 7_, iY —-I�-: . rllf�■■�����l ► rI ' _r�, T 8SH) R � ICB an IIIIM rH TOILET&SHOWER ■ HALLy I i_ I I HALL E201 �1AIIE205E206 DRAMA CLASSROOM I MULTI USE SPACE I 1ai'1luIIii MI lilygmi ` I I l ' E290 CHOIR• fli El _= -- - , a11f i - -� I� LI__ - - phase Bid & Permit HALL SERVERY I OUST. I I I ��J _ -OW— .A. --- - L z 1203 D213 D214 - I., u t nr..,, -\ U I • ! I I I l I SI. 1 -• . E �+ ,i. r 1 .0 _ 1 1 _ . ET_ I I I_ OILS ��V LL/ �Ls�L1. " N � V'J 1-1.-1 RL date February 8, 201 7 - 1 BOYS RESTROOM _ - E204 IT E207 - —.-- ---- .. .—.---------------- -----•---- h revisions co1 I I I I 1 N I I I 0 Cl)o I 0 UPPER LEVEL FLOOR PLAN - PLUMBING 1/8" = �[1-011 V r project# 16055 o SECOND FLOOR PLAN u) SECTOR C - PLUMBING ,- 00 C N(v) C)1 0)o P2 . 22 E4, c)) (NE I 50 1 40 I 30 1 20 1 10 1 0 I GRID, GRI 1 (E) PLYWOOD N. (E)2X12, SEE PLAN I Q 114'-5112" - _ _ BORA - 114'_5112" � .._ V 1 (E) 2X4 STUD ALONGSIDE (E) DBL 2X6 PL • (E) 16" TJI @ 16" OC EA TJI (E)&MP H2.5 I (E) 518" PLY (E) 518" PLYWOODNNN, I f / L @ EA STUD ; 6 I a VARIES - - . . . Iii 6 1"--. SEE PLAN i Bora Architects, Inc. 1 720 SW Washington, Suite 800 . . . . Portland, Oregon 97205 HSS COL BEYOND SEE PLAN (E) 3"X61' 503.226.1575 LEDGER W/ (2) 30d @ EA STUD _ CZ) www.bora.co i.:- X IL s; mr- SDS 1/4X4112@8"OC c> kr.:101:1g1X11(11aK (E) 16"TJI @ 16" OC ��� (E)2X6 BLKG1 PANEL EQGE FASTENING EA N I 'I SEE PLAN (E)TJI BLKG PANEL // ::..—__:(.: I i',� CONSULTING AND (E) 4X6. CUT AT 2X4 @16" OC 110'-0" _ 4x6 BLKG STRUCTURAL ENGINEERS �' (3) 16d EA BAY I NEW BM AND WI LUS24 HANGER (N) BUILT UP HEADER SINCE 1919 INSTALL(N) ft,, 5 2X6 1022 SW SALMON STREET,SUITE 300 PANEL EDGE FASTENERS LUS46 HANGER GL 5 1/2 ( ) PORTLAND.OREGON s7zps J4 (E) 2x6 STUDS @ 16" OC I Tel:(503)274-1843 Paz(503)273-5696 D-F (E) 2X6 @ 16" OC STOREFRONT N031642.03 SAD --- SURFBOARD PANEL SURFBOARD PANEL WHERE REQUIRED WHERE REQUIRED ,‘",k)CTvki -- ROOF FRAMING DETAIL STOREFRONT HEAD DETAIL ROOF FRAMING DETAIL r 15,386 e!1l 7 314" = 11-0" 8 314" = 11-0" 3/4" = 1'-0"' •� OREGON 41 k 5 - 5 �N T. o°P - - (E)2X6 @ 16" OC GRID} EXPIRATION DATE: 12-31-19 (E)518" PLYWOOD DIGITAL SIGNATURE: 12-1918 i N 2' TO E FRAMING (E) 2X CONT j> '':: 1 VARIES (E) DBL 2X6 PL —�� 114' S 1I2" AAA = 1 (E) 2X4 STUD ALONGSIDE - (E) 112" PLYWOOD 1 /I ` EA TJI ,/ (E) 2X6 © 16" OC (E) 518" PLYWOOD / / I (E)2X12 LEDGER r (E) 16"TJI @ 16"OC -' (E) 2X12# 16 OC (E) 2X12 @ 16" OC Y� Wr1 / (E) 518"PLYOD (E) 112 PLYWOOD 5/8" PLYWOOD tij v TOE U FRAMING ..=....-1-/------ Z` `, AI 109'-10" - - �( (E) 16"TJI @ 1 --/// '6" OC BO CEILING (E)TJI BLKG PANEL < AI 109'-0" SEE ARCH y , H > 4 �. 1 - - - . Z' - 4 REPLACE 112" PLWD -- A BO (E) CEILING AFTER WALL DEMO - - jpg'_i" GLULAM GL 5 112 TYP 1/4 I/ (N) BUILT UP HEADER - - ■ SEE PLAN L �� - 112" DIA THRU BOLT (E) GL 5 1/8X22 1/2 All'i EM ,,,,,Z Cr) (E)2X6 @ 16" OCEOMA PL 1/4X4X0'-6 1/2 ■ 114 f NO ROOF AT SIM / 0 114 V GLULAM HEADER DETAIL L4X4X114X0' S (Th ROOF FRAMING DETAIL � N 15 314" = 1' SECTION A-A 3 3/4" = 1'-O"" p - (E) PLWD GRID 65 Q O� O Ocn SEE PLAN L to t 112" � DSL 2X6 WI ID W N� 314" 314" (2} 16d @8" OC CO ?_. . TO (E�FRAMING� C 4„ 112'-7"± BUILT UP —_'v . MIN STUD COL A, )( SEE PLAN 3 . HSS ' I j SIMPSON A35N. 3 CZCO : i EA SIDE / (E) 112" PLWD I� I ij*A 112"TYP . - 11 (E)2X12 �" ` I / I PL 1/2X6X0'-7 - (E) HSS 2X2 VERT TRUSS MEMBER @ 16" OC �� 1 f (E) 2x6 STUDS @ 16" OC 1 �` O • BO GLULAM (E) SOG 7 SEE PLAN D (E) HSS 4X4 BOT CHORD TRUSS q — 110-2" B!(E)CANOPY TRUSS U MEMBER (2) SDS 114X6 PL 112X4X7 WI(6) SDS - (E)2X6 PLATE SCREWS @ 114 X 3 112 SCREWS ` " W151$" DIA AB @ 4'-0"OC 7---yil \ . = (3) JOISTS - N.._ 311 PL 114X4X0'-4 EA SIDE >11 - 314" DIA A307 BOLTLilk TO CONC 11. (113 .-� W/ 112DIA THRU BOLT AT BOT OF 13116X2 114VSH (E) PLYWOOD - 3116 V I " " SEE PLAN • • - 0) PL1/4X4X4EASIDE \ I i====1 f ' � 314" DIA A307 BOLT TYP I IN 13/16"X2 114"VSH (E) CONC WALL _ -_ PL 1/4X4X4 EA SIDE ,'-/-2" 9- HSS 5X2 COLUMN 1 HSS 5X5 COL (E) FOOTING SEE PLAN R - yo1P41 (E)VENEER PLASTER (E) 16"TJI CEILING DBL TOP PLATEGYM ENTRY DETAIL HSS CONNECTION DETAIL '\ FOUNDATION DETAIL DEFL TRACK WI Um 2 {2} sas114x2 314" = 1.4. 314" = 1'-0" r __)SCREWS EA JOIST j 3/4" - 1"-0" 2 2 @ — INT STUD WALL LOCATION AND GRID STUD PER ARCHPL 112 X 6 X COL / WIDTH + 5"WI (2) TITEN 5/8" DIA X 4" ---N--- M_ WALL PERPINDICULAR TO (E) JOISTS 10 O PL 112 X 4 X11 - DBL 2X6 AT (2)TITEN 5/8" DIA X 4" 1/4 ✓ A / NEW WINDOW SILL (E) PLWD — f-- - 0 114 V / ti o HSS COLUMN SEE PLAN / { ), l E 112" PLWD MARK DATE DESCRIPTION (E) 16"TJI _ L L.--JJ L I ,. —\_ s- o / Issued: 12.21.18 HSS COLUMN (E)2x6 STUDS @ 16"OC DEFL TRACK WI --- I ti l < f± 1" NON SHRINK SEE PLAN (E) SOG Scale: 314" = 1'-0" 4" (2) 8d TO 2X BLKG IMIN 1 1/2" TYP GROUT SEE PLAN 1 112" TYP I (E) CONC SOG FILL VOID WI '/ PLATE l NON SHRINK GROUT WI 5/8" DIA AB @ 4'-0" OC (E)VENEER PLASTER FLAT 2X6 @ 4'-0" OC MAX II TO (E) CONC _Iii -- (E) CONC SOG T_O CONC =/ CEILING SPAN (3) JOISTS i SEE PLAN . (2) SDS 114"X3" 2X BLKG BTWN `� TO CONCAIL 1.1" SCREWS @ (3)JOISTS FLAT 2X6's SEE PLAN (E) CONC WALL Copyright 16015 1 DBL TOP PLATE INT STUD WALL N. 11-± DEMO (E) SOG (E) FOOTING BID/PERMIT SET 0_ —�- LOCATION AND STUD • o ,, 10 4,1 _ (2)#4 PER ARCH LO WALL PARALLEL TO (E) JOISTS a _ DETAILS [V co 13 TYPICAL INT NON-'BRG WALL CONN r--0„- GYM ENTRY DETAIL FOUNDATION DETAIL ri ,, FOUNDATION DETAIL N 314 - 1 -0 � ) 314 - 1 -0 �5 314 - 1 -0 314 - 1 -0 S400 • C I 50 I 40 I 30 i 20 I 10 I 0 1 1.-- --(s)rn Er 0GENERAL NOTES: L _.. ® E-8D ® E-1 -0) 0 • A. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THE WORK WITH THAT OF ALL OTHER TRADES, INCLUDING BUT NOT LIMITED T0: I T ELECTRICAL, HVAC, FIRE PROTECTION, PLUMBING, STRUCTURAL AND GENERAL ARCHITECTURE. I I I I I I I I B. ALL PLUMBING EQUIPMENT, PIPING, INSULATION, ETC., INSTALLED IN HVAC I PLENUM. .._ ' . COMBUSTIBILITY. _ AB I _. _ ,. 1 I I . , ,, _.. _ . 1 I 1 1 1I I SHALL MEET CODE REQUIREMENTS FOR SMOKE AND I C.VERIFY EXACT SIZES, LOCATIONS, INVERTS,AND ELEVATIONS PRIOR TO RUNNING ANY PIPING. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT 4 OD 4" OD Q - `e LOCATIONS OF ALL FIXTURES AND EQUIPMENT. REFER TO KITCHEN LAYOUT .. . • _ • _ a, Q �- �°-`- = ~a. Dull Olson Weekes - IBI Group „ SD 0 WCO 4" SD 0 -- : - , I r� DRAWINGS FOR EXACT LOCATIONS AND ROUGH-IN REQUIREMENTS OF ALL Architects, Inc. "= d :tea– -1 I -- 0 KITCHEN EQUIPMENT. 907 SW stark Street Portland OR 97205 ECW-1 3 VTR /4hlsD ECW-1 _– . -- . - \ • • USA ' d a = / \ / ' ` tel 503 226 6950 fax 503 273 9192 I _ 4 asd j j tel 503 2 i 69roup.com =�� a 4" S " -. - a ` , - ..• : " www.ibi rou .com 11 I 1 SD _ •: I ONOTES: T �~' SH-2 1�� J��.�. . I ° '"_ P"` e,y ,4 , da < r e I - 1. COMBINE STORM AND OVERFLOW DRAINS ON THE VERTICAL, ui �� pA E ri_i 1 �` •rill �\ Y W O 4=171 'LL„' -.._,_L� / 1 DOWNSTREAM OF THE LAST HORIZONTAL OFFSET AND SIZE AT TWICE THE pae-engineers.com I1.IP OMNI.IIM `7, "... L_14, I I I I I J I I RAINFALL RATE PER CODE. - '�”W TOILET E20 SHO R TOILET E205 O �11 D HB-1 , P HALL 2"V FD-1 ►1 fICO L 1 t ��-D RacyIEzaa 7 L_1 ® WC-2 1 U I 1° D-1 1 < G E I1 -� — n HALL I ism _ 1 1 , n Z a♦ (A � 2„w& �V "r ' -- ,� .:I_:�. 2 V I 183.9�� .i 1 — — — — — 14 _} • i!, ,' I ,_._ WG-21 I ' `7 �QY 11A1 , �` L.1 1 , L` V11 1 _ "� � , � 2�rW& 1 U1 I 1 1 '�y�� rc�' 19 �� �,���'' ,� �` _/1',_•.:"\ 1 ,� P 2 V qS P co\- 3"VTR „ , _ I 1 SH 1 4, W& - 3 VTR a 6 19 WC-1 HB-1 -4��r{1W 8t 2'V I EXPIRES 12-31-19 (TYP 3) � L Y I I BOYS RESTROOAIE —1 4"W& �11Fr LS RESTROOM 1 I y E207 WC-1 I I I -r- I __ -,e- ___it (TYP 4)-N :1 P I I I i I I 1 I I 1 DRAMA CLASSROOM ., FD-1 , 4"W &2"V ® ] _ – – 2" CW I – – i - (TYP 4) 1 I I _ 1 L_2 – \-L_2 1 WC-2 2" CW(TYP 4) MULTI USE SPACE MAIN GYM I I - .. f ® E103 I I I I I I I I I FD-1 I I 1 I I I I f I I I _ 3"VTR GIRLS LOCKER ROOM - - BOYS LOCKER ROOM - OFFICE I I •' = R E242 — — E209 I F_208 OFFICE — I 1 E203 — — I – – 1 II I I a 1 3 CW UP I �� I 1 I � � � }+ I ! I I I I'_J – – L� 1 1 f3I4HRHWUP ,iiHWUP i .V 4 CW I I _ – I _ _ _ _ _ 2112" MG UP L I 314" RHW \, - - __ --- __ --- __ f • I I Li X14 HW I I I I 1 1 , I --- - –_ 2112" MG N I ! I L � i � � i t R .' f I I I f I �I l _ l l i l l _ 3°V 3"V 0 I I rI1 -- - - _ _ - � N ' Hmir7771" -T1111 � � 1III .nI l}I 1_.. I I - — dr 0 = N 1 `i `I 0 V _ I .i . I = CO I 1 • - HALL E210 „SD I 1II I I I 1 7 ' V O= _ /\ } `co cri F - • I lj 1:3/4" HW DN 3/4"CW DN 1"' SSDD \-4" S " SD 4" SD .2 I I Io 2"V UP 314" CW I N- o �o li 1 L VJ I I I I I I „,c3).- ,:j..C7 occ CD L - LC-0 LLL J LJ J C) 1 +j L� I I I I I . , — A II I I I I I I , - II I I I I I B 1s 1- i ,. C I , AUX GYM I I i ® D E , p I 11 1 I 1 I .E key plan —i 1 I I I I phase Bid & Permit z w 0 co E 1 1 I I 1 date February 8, 2019 w : 2 revisions M R- 1 I I I 1 0 - - — - - — „ . , , . - ----, - - - - - . . .—..,_,_._ - ' NA) t a) I I I I I I I 702 rt; I I I I I project # 16055 0 SECOND FLOOR PLAN 21- SECTOR E - PLUMBING Q ` I I 1 i 1 1 4M ✓ r� 0 rnp 2 . 2 4 o UPPER LEVEL FLOOR PLAN - PLUMBING —________... _. NM 1/8 – 1 -D C42 GENERAL NOTES: A. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THE (r) WORK WITH THAT OF ALL OTHER TRADES, INCLUDING BUT NOT LIMITED TO: ELECTRICAL, HVAC, FIRE PROTECTION, PLUMBING, STRUCTURAL AND GENERAL n n ARCHITECTURE. 1 B. ALL PLUMBING EQUIPMENT, PIPING, INSULATION, ETC.. INSTALLED IN HVAC NI PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND COMBUSTIBILITY. C. VERIFY EXACT SIZES, LOCATIONS, INVERTS. AND ELEVATIONS PRIOR TO RUNNING ANY PIPING. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT J LOCATIONS OF ALL FIXTURES AND EQUIPMENT. REFER TO KITCHEN LAYOUT DRAWINGS FOR EXACT LOCATIONS AND ROUGH-IN REQUIREMENTS OF ALL KITCHEN EQUIPMENT. c2--- 3� El_LO6 / Cs) 9 10 X11 IBI Dull Olson Weekes - IBI Group I I 1 I I I I I I Architects, Inc. 907 SW Stark Street Portland OR 97205 USA tel 503 226 6950 fax 503 273 9192 www.dowa-ibigroup.com • I I I I I I I I www.ibigroup.com _ -__. I�1 I I f-7 I f-1 . 1 - PA E pae-engineers.com r LJ u Li ,c,c'CO PROffso, I I 1 I I I I I� (if , 183.9/.74 --- TV1 311 VTR 3 VTR o 'C) ..4., <0�� ��. \—I I I I I I I I do �h g �� '' 4-3 P C° ai 6•9‹,I9 EXPIRES 12-31-19 1 I I I I I I I I I c I I. I I I I I I I I I 1 RI — I — — —rI — . — — I — -- — — — _.._ — --- — _ —II 1 I I I I rg MI .) I I I I . Iu ! " I' ` e.-, I I RH-1 -ii-0 V I I I I I I I I I c U) 0 I I I I II I c I I I O z o , 0 , 2 O = c;l 9 (>3 2"VTR I I I I\ I I I I rn Ct F , c II I I I I L -_.,,=, -2 1 I I I ICD CZ co D 73 CO W H-1 •- = ....e>. I I I I Ie �, fi 15e I I I I M 1 0= o 0 I I I I I I I I I CO CD CO CO \-- 4 VTRF._ I I I I I I I I I I I J < n A I I I I I I I I I I I I I I I I 1 C B , � C '11 I I I I I 1 I I J D E 1 I I I I I I k I f key plan L _ phase . Bid & Permit � I I I I I I l— z I.1.1 0 1oo I I I I I date February 8, 2019 w o revisions (-7, 211 VTR ti 1 ' I f I I I I 1 0 - i . MIMED 111111=0 ii iii , ihi0U I F I I 1 Ia) I I I 73 2 project # 16055 l40— ROOF PLAN SECTOR A - PLUMBING Q 1/8" = 1'-01' ROOF PLAN SECTOR A - w mi- < PLUMBING Q , c-.1- LC.M Mr P 2 • 50 r= (7,6 r M CVS GENERAL NOTES: � A. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THE // WORK WITH THAT OF ALL OTHER TRADES. INCLUDING BUT NOT LIMITED TO ELECTRICAL, HVAC. FIRE PROTECTION, PLUMBING, STRUCTURAL AND GENERAL "..---- n ARCHITECTURE. B. ALL PLUMBING EQUIPMENT, PIPING, INSULATION, ETC., INSTALLED IN HVAC INI PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND COMBUSTIBILITY. C. VERIFY EXACT SIZES. LOCATIONS. INVERTS, AND ELEVATIONS PRIOR TO RUNNING ANY PIPING. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT L _.. LOCATIONS OF ALL FIXTURES AND EQUIPMENT. REFER TO KITCHEN LAYOUT DRAWINGS FOR EXACT LOCATIONS AND ROUGH-IN REQUIREMENTS OF ALL KITCHEN EQUIPMENT. 0 ED c,--) 5 6D co ED (9) @ s . . ec, IBI 1 i I 1 I I I i 1 Dull Olson Weekes - IBI Group Architects, Inc. 907 5W Stark Street Portland OR 97205 USA tel 503 226 6950 fax 503 273 9192 it www.dowa-ibigroup.com www.ibigroup.com I 1 I I I Ilittii I I - a s" PA E pae-engineers.corn 1 I I I I I I I ,�3cc,p PROF( I I I I iz l 8 3.9�, 9 . . _ _ _ _. if I ! I I I I /' — -II - -'_. CO .z, 4... � , ---t: 'S-0 Q/-ch 19 '\( \�`-7' 4s , co\., a.l,�Ig 'I I I 1 1 EEI -1E9 ">- "-19 I I I I I� I I I I 1 1 p-71I — - - - - n - _ - - - - 0 r 0 II ! I - . I I I I I '' I I I 1 I I 1 I I V w ee i 3" VTR Cn II I I 1 o -a p v p o v v v v ' v v v v v v v o v Y O I I I I I 0 -...,- c, 1 IRH-1 0 V rn 7 0 I I I I - - 1 - - . L ^ - - - - - - - - - - --�- v _/ _ , _ _ _ _ _ u) .= ,i- ♦.• L co EI ,11 I I I ^ � I l � � i- ■� Q O r` I L ID I I CO o� o� 1 I 2 VTR-\ ,, l'' F— . 1- 4 f n n n n n n n o o n 0 ct 0 ! I\ 1 I I _ J — ...— — —._- _ `rt -- — — _ — —_— - - — — NM ,J,_ I I I 4" RD-1 4" 61i-1 I : t- I I I r I I - B _ I I 1 I I = 1 .. .. _ ...� I I I J I I I 1 I I D, E ii i 1 ._,---- 2" VTR key plan o I I 1 _ I I phase Bid & Permit 0 U4— - — _ .�. .�r�����4r-Mip�i��O's��ilr� �ib� �11IM�--� date February 8, 2019 ET I I I I I I I I 1 1 revisions O O U Cr) a) � project # 16055 ROOF PLAN SECTOR B - . 0 ROOF PLAN SECTOR B - PLUMBING •.- • .-. PLUMBING 2� X18'1 = 1'-011 Q 1 upN .M Mr` ,----- c)--)( 3 —�c)--)O 13 2 . 5 I ,_.c.,) .0,-) CO_ GENERAL NOTES: A. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THE (_, WORK WITH THAT OF ALL OTHER TRADES, INCLUDING BUT NOT LIMITED TO: ELECTRICAL, HVAC, FIRE PROTECTION, PLUMBING, STRUCTURAL AND GENERAL ARCHITECTURE. 1 B. ALL PLUMBING EQUIPMENT, PIPING, INSULATION, ETC., INSTALLED IN HVAC W. PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND COMBUSTIBILITY. C. VERIFY EXACT SIZES, LOCATIONS. INVERTS, AND ELEVATIONS PRIOR TO RUNNING ANY PIPING. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT L _.. LOCATIONS OF ALL FIXTURES AND EQUIPMENT. REFER TO KITCHEN LAYOUT DRAWINGS FOR EXACT LOCATIONS AND ROUGH-IN REQUIREMENTS OF ALL KITCHEN EQUIPMENT. eef:iIBI Dull Olson Weekes - IBI Group Architects, Inc. 907 SW Stark Street Portland OR 97205 USA tel 503 226 6950 fax 503 273 9192 www.dowa-ibigroup.com www.fbigroup.com Lig 111miPAE pae-engineers.com --) 1� 2 I3 4� c- 5 6 ® 8 9 X183. 4ti2 4 dr . o . ,a1v ��yO 4rc/ 19 1c' ��. I I I I I I I ! 4S P. CO\- a,6• ,c)iR EXPIRES 12-31-19 I I I I I I ------- , 2"VTR 0 — — — l — — — — — — — — — — — — — — — — L — it — i i _. I i 1 I I ! V1 1 I I—I a I I I 0 U }/ I l I f I I I . . 0 I O I I I I I I I I I 0 o = N 0 rrO� N. I I I I I I I I I - v! 0 0 Cn .- L CD co a 1 I I I173 co I I I I I f- cii- �� O t` I I I I I I f I M 1- Q N--- O O � d- � � s,_ / \ i CQ CO CO__, 1- . _ . c� c i I I II I I I 1-0 LO ISI I ` I I fi — EH _ _ _ hi ______ hi 1111 - A I I I ! I � 4" RD-1 4" 4D-1 4" RD 1 4"Oyu 4" RD 1 4" ODS \ ' hi I . 0 0 t 1� o E In of �_._ _ '�_ 1 4m amr4 C I 1I I I I I - D E I , O I 3" VTR I I II I I I RH-1 key plan J I Q I I z I I I phase Bid & Permit w U co c date February 8, 2019 w revisions `~ 1 ROOF PLAN SECTOR C - PLUMBING co i~ 1/8" = 1'-O" 0 0 U c1) cu 70 2 rTi project # 16055 o ROOF PLAN SECTOR C - 1- PLUMBING Qi co— ocNi �r • P2 • 52 �r a)O _ O cci51 [D Nm ___ ,---:__.) n wn J . . 0 0 0 0 IBI C4) 5 C6) I I Dull Olson Weekes - IBI Group Architects, Inc. I II 907 SW Stark Street Portland OR 97205 I ' \� GENERAL NOTES: USA tel 503 226 6950 fax 503 273 9192 www.dowa-ibigroup.com II I A. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THE www.ibigroup.com I I 11 I WORK WITH THAT OF ALL OTHER TRADES, INCLUDING BUT NOT LIMITED TO: — — — ELECTRICAL, HVAC, FIRE PROTECTION, PLUMBING, STRUCTURAL AND GENERAL hi e ARCHITECTURE. __' T � B. ALL PLUMBING EQUIPMENT, PIPING, INSULATION, ETC.. INSTALLED IN HVAC -- pae engineers.com I I I —�I ` _ 4" OD-1 4" RD-1 I I PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND I ,__ „, COMBUSTIBILITY I ®° ®° _ C. VERIFY EXACT SIZES, LOCATIONS, INVERTS, AND ELEVATIONS PRIOR TO �� G 1 N E vq II In H i. ib _ II I RUNNING ANY PIPING. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT g�.g �'• Limiiir� 1 _�i —i mom LOCATIONS OF ALL FIXTURES AND EQUIPMENT. REFER TO KITCHEN LAYOUT /42 ! �� DRAWINGS FOR EXACT LOCATIONS AND DOUGH IN REQUIREMENTS OF ALL = ' V`�.• o� Z L. KITCHEN EQUIPMENT. -, Qr o5� -7 1 S- ch 19 \'5 I I I I I I I °`/IS P. GO�� a, �I i � c( RH-1 1 EXPIRES 12-31-19 I I I I I I i I I I I II I 0 0 I I 3"VTR I I I I I I I �I I — o a , I r, , -, ' �I II I I ___ I .,.... — I I I I II I U) I 0 I I I 1 I I 0 i - 0 t o - N I 0 C.) CV I I I I 1 II I = CO a7 I (0 C.) 0 I I I I 1 I I CD as a 13 co .— = Q I I I I I, I m o ~ 3"VTR I0 0 0 : 0 \ W 6 8 9Ei6) 0 0 T L._ J I I I I I ____,, I I I I I I I l__ f)ea , IB �____ ____ __ , � i , —1 G i - _, 1— _ 1 / , 1 hi _ iii Dull Olson Weekes - 181 Group _________- 1 , Architects, Inc. 1I I I 1 947 SW Stark Street Portland OR 97205 'Q-1 4"0�- 'Q-1 4" OD 1 USA IGENERAL NOTES: tel 503 226 6950 fax 543 273 9192 ®O O www.dowa-ibigroup.com A. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THE www.ibigroup.corn - III I I 1 I I WORK WITH THAT OF ALL OTHER TRADES, INCLUDING BUT NOT LIMITED TO: 111111111111.11111111.11.11 ELECTRICAL, HVAC, FIRE PROTECTION, PLUMBING, STRUCTURAL AND GENERAL 1 7 7 ARCHITECTURE. = ==_ 9=i� _:::: n C /' B. ALL PLUMBING EQUIPMENT, PIPING, INSULATION, ETC., INSTALLED IN HVAC PA E pae-engineers.com II I o I I I I I PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND 3"VTR COMBUSTIBILITY. % C. VERIFY EXACT SIZES, LOCATIONS, INVERTS, AND ELEVATIONS PRIOR TO c3a PROrerr 4G I N E , O I 1 Ii I I I RUNNING ANY PIPING. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT �1 B3.9 R LOCATIONS OF ALL FIXTURES AND EQUIPMENT. REFER TO KITCHEN LAYOUT �� . DRAWINGS FOR EXACT LOCATIONS AND ROUGH-IN REQUIREMENTS OF ALL 4A ? "b. ON I KITCHEN EQUIPMENT. z �Q c0 �� c�y '`ch 19 10 �, I I I I I 1 1 c")- 0 \ -\ �o�-�� I o o a.���l� VTR 1 EXPIRES 12-31-19 I 3"VTR II I I I I I I II I I I I I I I II I I I II I I II I I I I I A—IP U I3" VTR \ . ..^ II 1 I I I � . _ I '0 O 1, - ! - - ` I 1 I O 4" OD-1 4" RD-1 4" OD-1 4" RD-1 N p rrU^^ l- I� I �/� � ' ® ® I i I v ! cc . RH-1 V � O Ci;3.lul:4).3. I c�I I I I I I I — z 0 3 VTR Q o II: I I �� I I f ti o 0 c7) c7 .-1: c . >, 7:3 cr, 4 L CU) iiCU I I I I I I I I0.) O C'7 M CSO 0 LO 0 0 0 0 n p 0 -! ~� 1� I -i--. 4-- I I I I I I I I J A - I' I I I I I I I I , 1 I I B - 1 , C I I I 1 I I J D E I I I I I k e y p l a n Q CC I I I I I phase Bid & Permit 1— z UJ U CO E T_ 1 I � I I I date February 8, 2019 Li] 411- revisions co ti I I IL I I I 0 iDU (.1) I I I I 70 2 A r I I I I I I I project # 16055 o I ROOF PLAN SECTOR E - 1- PLUMBING Q ' ROOF PLAN SECTOR E - PLUMBING NN 1/8" = 1-0" ti c'" 'r cs)O P2 • 54 O� NM c. Nm GENERAL NOTES: )0- A. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THE �-� WORK WITH THAT OF ALL OTHER TRADES, INCLUDING BUT NOT LIMITED TO: r '1 ELECTRICAL, HVAC, FIRE PROTECTION, PLUMBING, STRUCTURAL AND GENERAL 4 56 C _._5_.} ARCHITECTURE. 1 IV I B. ALL PLUMBING EQUIPMENT, PIPING, INSULATION, ETC., INSTALLED IN HVAC PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND I I I I I I I COMBUSTIBILITY. 1 C. VERIFY EXACT SIZES, LOCATIONS, INVERTS, AND ELEVATIONS PRIOR TO u , G - Y/ RUNNING ANY PIPING. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT RI �; , ti 1J LOCATIONS OF ALL FIXTURES AND EQUIPMENT. REFER TO KITCHEN LAYOUT I I I I l I I DRAWINGS FOR EXACT LOCATIONS AND ROUGH-IN REQUIREMENTS OF ALL 3 W U I Tr 1I { }R .1,0• � j KITCHEN EQUIPMENT. I I 111•111M IBM 11 11 To Gr�asc �tK. •-� ■■*� D. PLUMBING CONTRACTOR IS RESPONSIBLE FOR EXTENDING ALL REGULATOR I VENTS TO ATMOSPHERE. REGULATORS ARE PART OF EQUIPMENT GAS TRAIN. I - \\314"CW I E. WATER HEATERS SHALL BE INSTALLED WITH DRAIN PANS UNDER HEATERS. 1 ROUTE DRAINS TO NEAREST FLOOR DRAIN. ea I B I 0 0 0 0 CUST. I I \_2"WDN &„ HALL �� D214 , - - 1 I , 1E2001 F. VERIFY ALL KITCHEN EQUIPIMENT PIPE CONNECTION SIZES AND I E I I I 1 314 HW I REQUIREMENTS WITH KITCHEN CONSULTANT'S DRAWINGS. SERVERY o 1 1 1� Dull Olson Weekes - IBI Group ID2131 216 J FD-1 -11I - i - - - J Architects, Inc. 2-14 - -LI - - - I I 1 `T” 1 I II I NOTES. 907 USA SW Stark Street Portland OR 97205 - - - - - 9. % F *B, t• 1 1 I 1 , I 1. ROUTE GREASE WASTE AND GREASE VENT OUT TO INTERCEPTOR ON SITE. tel 503 226 6950 fax 503 273 9192 I SEE CIVIL SITE PLAN FOR EXACT LOCATION OF INTERCEPTOR. www.dowa-ibigroup.com 3"GW i __ _ - .- - - - www.ibigroup.com 4. UP TO FS __ 1 , I�--- _-_--7/-r_ 2. PROVIDE DRAIN AT KITCHEN EQUIPMENT AND DISCHARGE WITH AIR 3"GW I IjUP TO FD 1/2" CW rFS-1 E GAP AT FLOOR SINK. HIM) - 2-04 FD-1 I S ���ii PA E 3" GW 2" GW& - �-_ \ --- r �\ / ® , -- - _ _ r 3. ROUTE HOT AND/OR COLD WATER PIPING DOWN AND MANIFOLD =�--._-_�"_�__ UP TO FS 2 V 2'D6 I / \ ,--c HWP-203> IN WALL TO FIXTURES/EQUIPMENT. pae-engineers.com 1 I I 112 HW L_ I } ! k FS-1 L - I I I 4. PROVIDE REGULATOR AT GAS METER AND 2-1/2" NATURAL GAS SUPPLY PIPE ��® PRO�� ___ L� 3"VUP 3" GWUP I � \ - 'U -� oTO WCO TI 2"V Uf �� __ I __ _ __ I _ __ __ e o . BELOW GRADE TO EMERGENCY GENERATOR(2,340 CFM @ 0.5 PSI). VERIFY �j G I N���� i ; , EXACT LOCATION WITH CIVIL SITE DRAWINGS. • w ,. q 3" GWUP 1, CW D �o - ',����_ __ _n G_ - ,—, 1 183.9' TO FD I o 3„ GWUP I I 112" MGD . . I ��r WCO �* , 21/"2Vii I i ,,� 'I� TO WCO ° .1—'1 b ON 314 CWD2"V UP -i I I I ! 1 2.FV I ° �` .4: \ 112" CWS _- _ 2" CW I 0 3” 3W UP (TYP 3) 2"VUP _� _ ' 0 FD-1 o j . _ _ i I I (TYP 3) 2"GW&2"V 1-57 n 1� "54 /-eh�h �g 1� �`�,�' TO FD I 1 1 L- _� �- _ - //1 iii-- WCO S P. CO\ �I1 y i F. (-533 I o . a 2"''J UP I '\ I \�- �) / I -- 112 HW D n i EXPIRES 12-31-19 3 G' 3"GWUP )3 - 1 — ♦- - - ,4� ! 7 _J _ �� �� —o- I /TO FCO I ill // I \ I _A__-in.µ 11-35i 11 I x' , I. r� I ° 1 1 I / / U FS-1 -- I ■ I I �►J Isi_i_i _ illm\kG , I I ° 1-33rivxii L_l' —�— , _ \-. Q.161.0-201 > \._ — — -Th. I / 1 '� I a I 1.551 FD-1 I 1-5 1V 11 / 3 GWUP L I TN_ I TO FS I d o I I _ -I - I I ® I I I �i r T ® FD 1 1-56 ., .... .. ,L - I 1-64, 1 1-G5 I / I 3F. GW UP %114. 1 f -1 i { tA I I RPBA FS-1 I III / 1 I �2" HW 3"GW UP \ TO FD I sorer`wit 1-32 1 _ - - TO FD j3" GW I 2"VUP 4�3,1 GW UP 1 : I _ 1 i..r -.-.I- �; �. d i c4L\ & 2"V TO FSF �1-7__-_ , � I �i I '---- 11 1 �� :�� - � ---- � -- - .-� �I UP I 3" GW I SIII \\\ i 1 V 7 ! : . .,......,i, /—c\-3" GW& I Ire I n I i iC I a--+ —� 2 VUP I ��� vi" CW -U -1"CW 3 L. _ 2"V UP \ ' - �' �5� 314"CW „ DRY STOR. I I 1 ,71 1 / I 1-52 -2 GW& (n / I I 14_ 12"GW& 2"V Vi • 3 I . _ )222 i I I , / I ITCHEN 2"V 3 GW i / I� 1 1/ 3 t 1" HW O 0 „ ' I, / , 1 /A I D215 3/4" HW 2"VUP 2"VUP \lt 3 GW UP / / 1 1 O TO FD I 'F � / 1 . / I I tiI- I I \,I I// I + , - 1l 1%. \I I WALK IN TIS 0 I I I REF. N r-- ! - - ® FD-1 I I — N I I1 / D2161 4 — Q (.) rn �_ _ _ I y/ I ` 1 \ / I I ti- --, — - CSG 1 I I t lam [TJ �-WCO I 1/ I L 1\__. „ �� I 1 /� 3F1 CW O I 4 GW 0000 0000 I / \ -rw.. H _--� , �� L... 3 GW& 0 0000 E I it/ I 1 / \ 2112” MG 3IF° 2"VUP o00�000 I�' 211 HW (� I I I 000a Hfi I II Icrl - �l I Icz i- 4"W UP `0000 HEgiN 2 I ai TO WCO —4 iii•_III FS-1 73 = Q o r--- / � I / r—_- L, I I . 1 = oo1 II I 08 ! a7 WCO r / I 1-05 i 6i o� = .6..i L. c� c7] I / 1 / r a oMM I I O) Ln o 0 311GWUP 3" GWUP I I / 1 - I 1 I - - -;_: ,., TO FS TO ED / I71-1-i<7 /-FS'.:1 M71------c--- ,-- --- 1 I I .: I I " . -4 ~'112 CW1 , _ i.. 3" GW UP a 4,. W& �� 1-13 C i, . 1 TO WCO& - . p I 2 V ;r 2"VUP PRACTICE &lbw' ® FD-1 1-12 I y I � Q � D210 � a 1-11 I I '� I • l 1/2" HW ;� 4" WUP - �' 31.VTR I TO WCO \ I .1, 6 I 2 CW I \'�i I ; 1 ' 2"VUP \2"VUPW \ � L 4WUP _\0__ f I _ I 4W IIN a r - I raj ± i ,7 li 0- vr T . \ J , ..., RACTICE r - - 2}1 V '' I FD-1 tWC0 ° WM-1 7 I 1 /_)_/ . 4' GW I I a , 1 D211 I � 1 112" CW& I 11 I ' I c WC-2 ILET I 3 CW WALK IN ' /r _ 112" HW ! FREEZE I1 \ \ 11•121/1 ' I _ I - - 31,VTR I I 11r 4 . Ir V -� : LI 611FW ,I I 2HW � - � �V.�..♦ � Y���XLS Y_YYY YYYY7LL IaUP/DNf2112" MG ; j phase Bid & Permit a .-II .° �- I \:\-3:,' „ CW \ � �WBP-201 r Iz 1 /d/Ir 1 4 W 31. W UP \�_ FD-1 �' `' \�6” FW DN U co fir. i_ �- a 4.' E I 11. 4" SD UP IDF 2"VTR RI Z ROOM date February 8, 2019 w 1 I : . 1 • D219 8 I / I 2"V DN-- I, 1 -� revisions r a /_ J N / I Z,///.�/ \4PlCW a I ti UP/DN I - ' 1 I :Ia 1 f '1 7A y 4 --- ....._I. �,,, I x x x x x x r x x x x n x x x x x x x x .. x .. x x x x n x n x n n ' nH J"i x� x x n 4\_,, x n �����Q I 11 Un-c I c_ 2112 MG DNI / 2 12 MG DN r) i. 1 .J. 4- _. 1 I " SD UP " CW DN I I O I 2112 MGI OFFICE I 2"V ON 2"V DN II 711 D220 TO GI I •3 project# 16055 I-- p I 2 ENLARGED UNDERGROUND KITCHEN PLAN - PLUMBING 0 ENLARGED KITCHEN PLAN - PLUMBING ENLARGED PLANS - -2 � 114" = 1'-0" 1/4" = 1'-0" PLUMBING mi- c•o•(y) N P4 • 0 1 •M MrrE cmc) 0� NM [fl Nm --)RHWP-101 4 THERMOMETER (......Y.- SOV THERMOMETER P501 (TYP.) 1-3/4"RHW 314"RHW (TYP.) \-1 n ASME TEMP/ PRESSURE �' - - - - - - - - - SEE FLOOR \ Er RELIEF VALVE - 1" HTVV - - - - 1 CW �� � - I _ _ _ _ PLAN FOR - �� rtre PIPE SIZES 1" CW �I 1 1 1"HW ASME TEMP/ ROUTE T&P RELIEF I r I PRESSURE DISCHARGE TO MOP SINK T i RELIEF VALVE L_ _. _ i a I SEISMIC BRACING I PER CODE (TYP) 1 - ,/- SHUT EWH-101> DRAIN VALVE I 111- 11II OFF °I / < DET-101 > < MMV-101 X / 5'-0" / 1 1 DRAIN PAN 1 CARRIER PIPE ea I B I -1 1 1 EXTERIOR FLOOR SLEEVE AND SEAL 1 i )41.4 -< _ WALL 1-'IRHWP ,. 1' Dull Olson Weekes - IBI Group 1 1-0" Architects, Inc. EVVH > T 907 SW Stark Street Portland OR 97205 GRADE FIN. FLR. USA tel 503 226 6950 p fax 503 273 9192 www.dowa-ibi rou com TO FLOOR DRAIN - _ _ ANCHOR ' � � �� \� \�/\ i\�\� \�� % \> 5-0 C-E www.ibigroup.com L PLATE \\//\//\\/� /\/\\ /\\ \\ - 1 '\ '\ L EXTERNAL JACKET I fi PA E DV,, H H, CHECK VALVE(TYP.) T ff pae-engineers.com • ROUTE PAN DRAIN 51-0" �— f •DIELECTRIC UNION �D PROF MOP SINK (TYP.) J 90%%127 ELBOW ���,,,,, I NEGrsf/ . JL_____________:-------- WALL SLEEVE AND SEAL �' 'c'1133.9;14, i GENERAL NOTES: CONCRETE ANCHOR FOUNDATION ? °N L• 1. SEE SPEDIFICATION FOR SEISMIC RESTRAINT REQUIREMENTS BLOCK -5'01 /.c6 19 1� �6'. qs . CO -'\ \ a.6,^k,lq 4 NONE ELECTRIC WATER HEATER DETAIL 0 NONE BUILDING RISER ELEVATION DETAIL EXPIRES 12-31-19 AIR GAP MS-1 V EXTEND LOOP AS HIGH AS POSSIBLE SINK VENT UP --\L 0 WALL MOUNTED ELECTRIC WATER HEATER lb 4 NONE • von WALL r / l -4_ _4,_ -A 3" 0 OUTSIDE FACE OF WALL �� L CLEANOUT 1 WCO J I WALL SLEEVE AND SEAL % Cl) °; PW � CARRIER �\� � . f0 ELEVATOR LCEILING 7 PIPE \� \ FLOOR / 1 / //iI SHAFT CONTROL 0 Er PANEL 0 ♦ LOCATEDb O � N HIGH LEVEL WATER ( ) VW M' • 0 V FLOAT/SWITCH, 0.3 2" PW FOOTING VENT INSULATION \/� S CO w / [FLOOR / i WASTE EXTERNAL JACKET /\ + ,-.._,....--,„.„../ ___...._., [ UNION I ? %IAI j LINK SEAL (o - a 4 WASTE i Q GRATE SHUTOFF VALVE 22 = 3 rii --SPRING CHECK VALVE MINIMUM 0 ISLAND SINK PIPING DETAIL0 WALL PENETRATION DETAIL m I— a ti NONE NONE I ti FLOAT SWITCH 0 g I ----.� —0 cm SUMP SUMP PUMP 0 — L C)as C) THERMOMETER CU o c n cc 7 (TYP) .EDI coo L s 0 NOTES: I I— _;_; ,4 1. PROVIDE LOCAL DISCONNECT FOR PUMP WITHIN AIR INTAKE ELEVATOR SHAFT. SEE DIV.26 FOR REQUIREMENTS. (TYP) 2. PROVIDE CURRENT TRANSFORMER AND DIGITAL INPUT INTO BUILDING AUTOMATION SYSTEM. EXHAUST SEE FLOOR (TYP) PLAN AND RISER _ NONE _ DIAGRAMS FOR 8 SUMP PUMP DETAIL - - I 1 PIPE SIZES 1 120E z ; ASME TEMPI -, PRESSURE ( I r _ w RELIEF VALVE P 1 PP) I H>--I = : TO FLOOR ; • DRAIN �I I 1 MV-101 + - .. .} i' (TYP) THERMOSTATIC - _ _ MIXING VALVE - . -•• I ASSEMBLY IN EXTERIOR WALL 2-45 DEGREE BENDS . ` . • J +a• • = LOCKING CABINET • LINK SEAL I - — CONNECT z '`.. SEISMIC SHUT FH -101 —/ WI TRANSITION phase Bid & Permit w RESTRAINT 0 OFF 1�- -+ COUPLING 0 ) )1 I (TYP) (TYP) 1oo 7 Y i1I T GLOBE VALVE TO I , — date February 8, 2019 M 45 DEGREE BENDS • • ACID GWH-102 I BALANCE SYSTEM DOWNSPOUT - revisions C71. 4 4 NEUTRALIZER 0 A - - - I (SEE ARCHITECTURAL DWGS.) ti SWEEPING WYE FITTING - v '° (� W ✓ �_� — 4''HUB PIPE /� DET-101 WALL CLEANOUT o o•• tiIJ }—_1 I �i� — O D .o•4 • • ''O °VII ' • — L1 I F� Ilk VENTLESS REGULATOR T . si - a . �� dG a • ;p . o •,� • • - �� ! CHECK VALVE (TYP) _ : a •• ' a DIELECTRIC UNION (TYP) ° C • 4 4 4 4 NO-HUB q C °� •4 •• 4 • •• t a qa 6 C q4 a d d cq °q 4 4 a I DRAIN VALVE (TYP) COUPLING(TYP.) f •; • • + Tti • • • 4 • —4 Li CONCRETE PAD project# 16055 0co FOUNDATION DRAIN DETAIL DETAILS — PLUMBING 9 1" = 1,-0" °NOTES: 111111 II • 4" NO-HUB < I cow 1. SEE SPECIFICATION FOR SEISMIC RESTRAINT REQUIREMENTS 1/8TH BEND M CONNECTION TO CIVIL A ,,...,-- c � 2. PROVIDE CONDENSATE DRAIN ACID NEUTRALIZER ON EXHAUST PIPE STORM DRAINAGE SYSTEM P5 • 0 - 1 o 6 GAS WATER HEATER DETAIL 0 DOWNSPOUT CONNECTION cv NONE NONE CD_ Nm — --- I I � I � 3" VTR 1 3" VTR II II 1 ROOF I1 I1 7-3" 4(- 3„ 1 1 f3u .] 1I � I , i-1 °-n -r -T T -r `' -I 7 r 1 r f—I T -1 I r T SECTOR A CONT'D I I I I I I I f ! I f I W M f I I I I f I I f I I I I I I I I I I I I I I r---n r----" r----1 r---- I--- r---, I----, r---i f-...---i h---, f----' " 1/--I2112„ 22 " „ I2,1 I2„ f2f2" "4/2 I i I I— I.--, S-1 S-1 ESEW-1 I 2" Si- S-3 S-1 Si- - Si- Si- Si- S-1 S-1 S-1 Si- S-1 Id- l) -\ Um lr=\ lim Um Um Um l)m Um lr-\ l r-\• lr-\- Lim Lim lrm � S-7 S-7 I B I 3" �� FD-1 SECOND FLOOR L ) j o \,_......--- '-11 r Dull Olson Weekes - IBI Group --- --- --- --- --- ----- --- Architects, Inc. \ //-- 907 SW Stark Street Portland OR 97205 USA ` tel 503 226 6950 fax 503 273 9192 www.dowa-ibigroup.com www.ibigroup.com x 2" � 2" r 2" x 211 211 � 21, •211 �2„ �2„ �2„ r 2" x 211 x 211 2"—\ r 2„ /[ 2 /2" /- e'11 7 311 2,1 /[2 /[ 2 ,! 2„ � / 2„ �„ 21, „ 2,1 211 /[2 l, ���iPAE G /ruy/ z_._ 112 r. rl i r. r r r: lb A - A r. b F-- ,..c:c.-.)\\- ci 1 NR.4,-7.4 °�v w183.9'7, i- S-1 S-1 ESEW-1 S-1 S-1 S-1 S-1' S-1 S-1 S-1 S-1 S-1 S-1 S-1 �� �� ON lam\ Ute\ lr� lam\ lam\ lam\ lam\ u--L\ V \ U� lam\ ^ S17 lam\ lam\ l� 4Q�c N �L S-7 do h 1 s \�� /\—Li wco WCO wco �qS A. CO' a�lo•�IR ,-Ii WCO ro WCO 3" FD-1 ,-I1 WCO /-Il WCO /--II WCO Ifli /-II /--II FIRST FLOOR 1 EXPIRES 12-31-19 / l.J --) /- /- L L /- 2,1 2!1 r]11 �3" 2,1 /-- 21, /--21, /_ 2! 2" 2" � 2" 2" r�2" 2„ ']L,1 � L q I2-5,1 134 4 b is \ i 3" 3" \ \ \ \ ,c11' \ frl- \ ,i) \ 3c-i,-4_ w baa o" e-e-LLQ -1-0 V Q tif�wi 3•ti:2` tt Is" 311 fo,jj'ilIN ' \ 95-4( \ /i 0 SECTOR A CONT'D 0 UNDERGROUND 0 o N o (-) 0 WASTE & VENT DIAGRAM - SECTOR A1 • CO None �1,7_ 3"VTR � 2"VTR V c - — - }n ,,z, 1 ROOF CD cocy 3,. f I 31, 1 I CO ai 73 a) T Z T T ''- T I_ i �' I o 4_ I I I I I I I I I f I � r--- 0 0 SECTOR A CONTD f I I I rn I —11 I 11 I I 11 i- i SL I II I II I— " T 11 R L �, r I1 I 11 \_J `-J272 I 2 I I 2 i 2 I 2 I 2 2 r2'' 1{-21, 2 2 I (2" (2" (2" IIII (-I 1 � RS � occ;) )I I I 1.n 0 r-,(-1 -I -1 Pf t I L_2 L_2 I L_2 1 L-2 S-1 S-5 S-1 f S-5 S-1 S-5 I EWC-1 I' }' `~ L_1 \ � i U-22 i U_1 lr\li-t.) 1.7 ./-LJ lr\z-LJ I l.)-\./-LJIw /i v I /-LJ 2" A ';,pivit*- 4- 1 3" FD-1 3" FD-13" FD-1 3"MS-1 3" FD-1 I SECOND FLOOR WC-2 ___I� la We-1 \ we-1 we-1 ' we-1—c WC-2 1 WC-2 / B LJV LJ ' L-- --, ---� I--� ----, I 1 \ / f I I 2„ 1 2,. ( 2.1 f 2., (- 2,. f 2,. /- 2„ C I I I �/- 2,1 4,1 41. ir�4„ �/-4„ e[`21, � 4�= - I I ' D E . 44 r4: r I 1----- 1 I--1 1--I L-1 1 1 L_2 1 L_2 EWC-1I I L2 L2- k e y p l a n �\ � U-2 � U-2 ec I-- L_1 phase Bid & Permit z U co I date February8, 2019 w /� WCO3" FD-1 i 3" FD-1 3" FD-1 /-lo WCO FIRST FLOOR U we-1N, WC-1 WC-1 ' WC-1 WC-2 I WC-2 l.) I kJ WC-2 revisions ,.. r 3., 4„ 4" 411 4" 4" 1- 3" 21, 4" 4„ /- --t. r o U \ 7-4" TOSECTOR B 1a) 4L . , / P6.02 ` -"u 0-`� . � v v Ivo- � 74 project # 16055 o a � � 4" 4, 411 411 /-6" DIAGRAMS - PLUMBING Q~ SECTOR A CONT'D q'.t&I IN-"�' . AI"' !b3-�` \ `; b_� :�rl- ' \\ / o-)- TO CIVIL -1;coCNI 19I-Ct. tir UNDERGROUND M .6 0 WASTE & VENT DIAGRAM - SECTOR A 2 P6 • 01 a7<-,co NONE - c� Nm _ .-_. .. .- .._.. lI 3,VTR i i i 3" VTR I 3"VTR dr E f 1 ROOF )0-- Ii I � Ii 3„ I E 3,. I 3„ I E n n i1E III EIE r Z I r r r f2u1L11LTI1cI, LLITILz3, iff 1 (-2" 2!, (2" 2" ; 2" j ; I 2" 2., e:/" ,! 2.! 2,! 2,. ; fi i 2,! 2„ i 2" r 2" T 2") {221 I I 2,. �__i ---- I (-2I-2" I 7-2" 1/_21 (-2" 47 I I I I 2" i----1 2,! (2" —Ns.L_2 1 L_2 ea I B 1 L-1 EWC-1 - 1 r-- L_2 L_2 L_1 L_1 SS-55 L-1 L-1 WM-1 I 1 L� L-\ A_Il U_1 u�2 /-l) /Z U \ J\ Dull Olson Weekes - IBI Group Architects, Inc. 907 SW Stark Street Portland OR 97205 ,. rL_ USA WC-2 3" FD-1 3" MS-1 3" FD-1 WC-1 WC-1 WC-1 WC-1 WC-2 WC-2 WC-2 3" FD-1 3" FD-1 WC-2 3" FD-1 3" FD-1 WC-2 WC-2 WC-2 1 3" FD-1 3" MS-1 SECOND FLOOR tel 503 226 6950 fax 503 273 9192 www.dowa-ibigroup-com Tht--\_ �—\ I / U U \ www.ibigroup.com 4i, I 3,. r-- L---1 L___ L----1 11--� \ _ \ \ 2 a� v 1- 3 W i . ;elf iii 11 \ \ \ . \ \(-- i--4 11= PA E pae-engineers.com ii-2" Mt �ar lo- \ PR0 2" 2„ 3„ 2„ 2„ 4 2" 4„ 4-, z N E�O 4„ /-2„ 3., 4,. �4/7-4 F 4,1 i I � 2" /Yt /[2 � w183.9' ",� ir _ I _ el L2 1 L2 �� e ON 11 r 6 4 r h • z ,r =,..- L_1 � EWC-1 r---I1 - --1 � L_2 L_2 I �--� CAS R C()\- Q-4). 0141 III U_1 I U-2 WCO V \ I EXPIRES 12-31-19 I /-III WCO WC-2 WC-1 3" FD-1 3" FD-1 WC-1 WC-1 3" FD-1 3" MS-1 j-I I WCO WC-2 WC-2 3" FD-1 FIRST FLOOR 2" ThL 2" WC-1 I WC-1 ��— / U I c lt-te /-4" r3" 4" r'" 4" 4" 4" 3" 3 [ 3" 4" /-311 i4 r s ii r i, ) Z. (. i E la __ C.) / / / / MI � (-4" 4,. /11 4" / ,, / , (-4" 6 p-c, 2 / yh / r SECTOR B CONT'D 0 O T4 SECTOR A .,t P6.01 ,, 0 CVN o V UNDERGROUND . Ci) w C.) 0 c -- }N L 0 WASTE & VENT DIAGRAM - SECTOR B 1 - ---- ...._._. .. - W co a NONE 13 coi_ .. P = Q O r` iv, 31, VTR M I- ti O O ROOF 1° O • LM 3,1 I ' C/) �- I i 3CU O c� M r —r T 1 r —1 7 T r - - CSU LOOC) HL! I GiI7-2" 2! 7-2" �1 �, L1i . 2, 2, I. 2„ �2„ I 2„ 7-2" 2„ 2"-Nis 7-2" 2„ �2 '-\ ! I I I I I I I I I I I I I I S-1 S-1 S-1 I S-1 I S-1 I S-1 I S-1 I S-1 I S-1 I S-1 I B Lr \ L-\ L-N,I lrN,I LT\I um 1 L-I h1 LSI ls-\l Jo SECOND FLOOR D E -_. .._.... I 1 I ___ ___ ___ ___ I ___ ___ ___ ___ --, � � /- r 2"�2" �'2" L) 21, ,� /")!, 2" 2" 2" A e y p � a n hale z i. I x { i. r; i. I'E . r P Bid & Permit w U co S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 date February 8, 2019 2 UMrevisions r co \ UML L)--- L)--\L 1J--\L Lf-\L UML if—\ Lf—\, U--\ FCO FCO /--I I WCO FIRST FLOOR {I J^J `.'F L L [ 2! r2„ L a 2 r [ 2.1 [ 2" r " r 2" M > : : r. 1 -/ 31! ,; ) ."' ) (- ) ) � 3� project# 16055 ~ 4" 4" DIAGRAMS — PLUMBING / 1.<1/ 21- ' /--/ 4,1 2" PW LocNI SECTOR B CONTD /—/ 5P-1 UNDERGROUND r"r 0)6WASTE & VENT DIAGRAM - SECTOR B 2 P 6 • 02 ..,,r, NM NONE ---- --- N m V- V 3" VTR 3" VTR I j 3" VTR (........) _(. .)I ROOF fI Ii I - - 1 211V [ 311 1 3„ \ W. 7- � T -1 7 � T 1_ i7- -1 r T 1- F T -r 7 L _....I I I 2" 7-2" 2" y_3h1 {2" 2" 2" 7-2" 7 2" 4/-2" 2" 7-2" (-2" 7--2" 72" 72" 72" ctr2" 7- S-6 S-6 S-6 8-6 WM-1 2 u- 1-k- 1--,-k ea IBI L_2 L_2 EWC-1 L_1 U \ U \ U \ U \ J \ J \ EWC-1 L-1 I I WCO WCO U 4 k- 3" FD-1 3" FD-1k- FCO-1 4+ I -� I 3" FD-1 4 3" FD-1 " 1 ., 3" FD-1 SH-1 SH-1 SH-2 SH-2 43" Fp-1 SECOND FLOOR Dull Olson Weekes - IBI Group WC-2 / U / J WC-21 WC-2 I WC-2 I/ U WC-2 V \ WC-2 I/ U WC-2 J Architects, Inc. \ \ \ \ �3" \ 3" 907 SW Stark Street Portland OR 97205 rrU (. .-2" � USA 2 2 2 4 3" 2" 4" 4" 4" 411 3" y21' \x —2" �, 2" <-21 4" / 3'F 3" ` 2" / �,\ 2" 4" tel 503 226 6950 fax 503 273 99 92 www.dowa-ibigroup.com CI I Ci C� c• �' C► _{, •• - - c- CI 1-u T 2-u �` www.ibigroup.com II 4"-\ t . \ . / 4" 2.-4, 4.,, \8C / 7-4 N\ 9.-t.k..,�\ f 2r�-u gZ rA 247 26-1k f' 3,o-,t.7' iii Ali ¢ r `� Himp PA E �. \ 4 T pae-engineers.com \ N \Y` �• 3.- 4 S— SECTOR E CONTINL w J :a , ��f 1( 11-.1\71)r:''). PROF ek I:e, 4 w183.9'" q '' : TO CIVIL . 0 . FIRST FLOOR F• ON z � � i• --(-1- ' pyo arch 19 \c54 � AAs p. cQ--`' ,-.?..67.019 EXPIRES 12-31-19 UNDERGROUND 1110 WASTE & VENT DIAGRAM - SECTOR D & E NONE �+ 0 MI rwrwr I1 3„ VTR r Manila 0 ROOF li o 1 I3�� O 11 r T T 7 _, 0 U ti s (l) w . C) o V) .- 7-2" 2" 2" 2" 2" co CD DI 73 CO = Q Or--- L_2 L-2 -0 0") d- • U-1 U-2 11 3" VTR 7-3" VTR = L CC 3" ez_ FD-1 I i SECOND FLOOR l''' � � ...__ 2,1 1 f 3" 2" 2" 4" 4" Cl 1 „ I I I Q 3 \ I A. \ \ \ 7_4" \ 7-2" 2117 .x--2" 7-2" 7-2" 2,, I 2"7- 2„ I 2,1 21, 1 2"dir 211 7-2" I'4hZ-2,1 il)z-2,1 r 1 f4'1 B 1E, ` EW C C-1 L-2 L_2 L_2 L_2 L-1 \ u--\/—LJ , U—\_/—L, Li \ FCO-1 3" FD-1 3" MS-1 3" FD-1 3" FD-1 3" FD-1 3" FD-1 FIRST FLOOR ED E --- - WC-1 i WG-2 VVL-1 WC-1 i U \ WC-1 WC-1 WC-1 �..... . . U _._...... _._. WC-2 I WC-2 U \ WC-1 WC-1 WC-1 I ! 4„ /— / \ 2" \I r 1/ .t-4 211 Atl All 2" 3,1K 31, 4,1 �� 3" 2" I ,t-4 4'1 4,1 o a F \\ CJ k e y p l a n N \ ":j \ \ \\ \ \ \ N v \‘/ TO CIVIL :11 "��? 33- 7` I 401' 53-44 ' phase Bid & Permit li-tA LB U c date February 8, 2019 w revisions M UNDERGROUND _._.-... .. r-!-- ..., WASTE & VENT DIAGRAM - SECTOR E 0 8 NONE U u -a 70 M 4rts'. project# 16055 o DIAGRAMS - PLUMBING I- 1 N`— ON • M M rr �� P 6 . 0 3 r(,) NM [D_ NE 3 ._. .....---__ ,,.,—.. I 3"VTR 3"VTR 17- 2"VTR 3"VTR(1)/7 (..........)0- I ROOF -------) IE i li I � , wm ir I 3„ 2„I —I 7 I — — — I � � 7-3" y 1 L _..4 2" 2„ 2.r 2r 2„ 2„ 2" lir 2,. 2" 2„ 2" 2�, y-2" 2° lir L z-I y- tf_ 4g 7- 7 7 1 1 ea IBI ,... . , . 4111) I I C-52) 2-05 41110 0;sr. T , 4110 GREASE INTERCEPTOR AT Dull Olson Weekes - IBI Group 0-06D 1-56 1-64BUILDING EXTERIOR / U Architects, Inc. 2-16 P USA l I 1 UC1-08 rre isf 4 r 907 SW Stark Street Portland OR 97205 / U / v / r / U A r�� T LI, coker cods I S Sr tel 503 226 695D faX 503 273 9192 C-14) (2-04) 111) 40 1-64 1-05 - CO www.dowa-ibigroup.com /--I I WCO I WCO / I I WGO I WCO www.ibigroup.com ' FS-1 FD-1 FS-1 FCO FD-1 FS-1 FD-1 FD-1 FS-1 FS-1 FD-1 FS-1 FD-1 FS-1 I� CTG SECOND FLOOR / U / U / U / U / U / U / U / U - / U / U / U / U _= _`f"' PA E pae-engineers.com 7-3"GW7-3"GW 3"GW73"GW7-2"GW7-2"GW7-3"GW7-3"GW7-3"GW7-2"GW7-3"GW7-3"GW .Z-2"G -2"GW 3"GW 3"GW 3"GWd-3"GW 3" 1c1 PROTC' C� — - - - - - - - ��� �c, I NES ' 4183.9'1, � n n u �, ON i 6 . 1\I 3 GW \ \ 3 GW \ 3 GW N \ \ \ \ \ < GI-1 �' °/-c19 Ng��\\ I: 0)c° Cl > 7-4"GW p4"GW p4" GW p4" GW 'is P CO\> a,(o,%Dlg \ \ \ \ \ \ \ 7 \ \ i ' ' \ /4" I EXPIRES 12-31-19 TO CIVIL UNDERGROUND 41110 GREASE WASTE SYSTEM RISER NONE 0 I. C!) 0 0 0mia U 0 oN o 0 (f) --1- 01 }a L W coa -0 co _P = ''' ■� < cD N - i- -1-• O O c r - c c co - c%) F LS I— V-- --_ _; ,i. — A T IIkgrsww- - D E _. 17 key plan J phase Bid & Permit w U co date February 8, 2019 w revisions c r-2.- ii- 0 `i- U u) 73 710 To project # 16055 © DIAGRAMS - PLUMBING Q . co— OCV MM 6]p P6 • 04 r,.. OM CV„ TERMINATE WITH TURN DOWN (.........)0 ELBOW AND BUG SCREEN 7{1YP} LROOF ROOF ,,-, I - BUILDINGWALL—\\ I - I = _-- MPO � I MPG - 21/2"MPG I __ 1-1/4"G 6,000 MBH BUILDING WALL—N CD *Al ►4 © I1 C I 1" MPG I TO KITCHEN - - tt --- - ... 4110I EQUIPMENT CONNECT TO AUTOMATIC I (557 MBH) HOOD FIRE SUPPRESSION 120 MBHI ®Ct CIO I B 70- 21/2"MPG PROVIDE VENTLESS1-1/4"G 140 MBH I I (7 6,557 MBH REGULATOR G 314"G T C MPG 0 I o Dull Olson Weekes - IBI Group A 3/4"0 Architects, Inc. :!i!:! 907 SW Stark Street Portland OR 97205 2-1/2"NATURAL GAS METER 0 u USA tel 503 226 6950 fax 503 273 9192 @ 2PSI u GWH-201 6,557 MBH @ 150'TDL ,.. 3/4"G 199 MBH 2-1/2"MPG-/6 www.dowa-ibigroup.com .com EMERGENCY "') '-'-'i www.ibigroup.com com (BY SERVING UTILITY) ----)1><I EARTHQUAKE u u RANGE r - -_ _ --_ - _ - -- _ �, SHUT OFF VALVE �- COMBI-OVEN CONVECTION ,,,� 4110 OVEN COMBi-OVEN A Q _ PA E pae-engineers.com 34 (DOUBLE} ►� a uj � 48 MBH 50 MBH 2 12 G SECOND FLOOR 3/4"G FLEX — ,����� PRO��s�j CONNECTOR .". � , O NOTES: (-ryp 3} ;; 183.9' W A 1. PROVIDE REGULATOR AT GAS METER AND 2-1/2"NATURAL GAS SUPPLY PIPE BELOW GRADE 44/4t 1 TO EMERGENCY GENERATOR(2,340 CFM @ 0.5 PSI). VERIFY EXACT LOCATION WITH CIVIL SITE DRAWINGS. -Z- ,i, �o~�h 19 '���� �-.) -MPC lqS P. CO''��� �.h.7.oIR C 2-1/2"MPG-' I EXPIRES 12-31-19 G 2-112"MPG I 2"MPG 2"MPG — , I I a m' B-101 3 B-102 3,000 MBH 3,000 MBH A ,� A . C.) EMERGENCY GAS ►t 0 ►.4 0 .L SHUT OFF VALVE u u .1.111 FIRST FLOOR Cn ill NATURAL GAS RISER DIAGRAM NONE 0 0 0 = N 0 Ca c Ce 0 0 CO .— -6 CD as c7)cu "0 To' 1-7: Q M oil` dao >+ -0 d- 0" s LC) — ;v L,7 phase Bid & Permit z w U op date ( February 8, 2019 revisions N co ti O 1) 1 I N 73M .F3 project# 1 16055 I- 0 DIAGRAMS - PLUMBING co mac ' M"- , N (-Ir. t` P6 . 05O Qtr} RH-1 RH-1 RH-1 (00......)C1 ROOF 314° 3/4'- - 1-I/2" 3/4"--,i314"' 2-1/2" - - - - - - - - - - - - - - - - - - - - - - - - - --- - - - - - - - - - - -_ _ _ _ _ 2112 _ -- - - - - a - - - 14 0- -i.r, - � - - I -- - - - - -- - - - - - = - _ I1 -. - 1 r 1 .1 I-- IT 1,....\ 1,4 _i_.\_____e fi - - - *A X XX X s4 XX X"Z -4 _ __. * (>4.- 1 _ ri ---4T- 3/4" I 1" 3/4" 3/4" 14" 314" 314" 314" -114" 314" 314" 314" 2,:CW 1 3/4" 3/4" I 3/4" 2„ ` _ 0 �- 3/4 RHW - \ � �� -� vit. � '' 2 H 1 I I 1-112 HW j__Ati_0 +► p \ 3/4 RHW \. _ I 1-112 CW = I ( ( 1 1 1 I X I v ' }t 1 }} II }t }! 4t ' tt tI I fl I II I tt I tt ' S-1 I I 1 1 1 1 - 1 WC-2 WC-2 WC-1 WC-1 C-1 U-22 WC-1 U_1 314 314�I 3l4 1 314"-- L,3!4 3I4��� 3l4 �I4--�13J4-� 13!4 3!4 1314 R 1314�� I I I I I I I I I WHA 44H,A1 � ®� `� �` d tD rJ �i' U �A '6'‘11' `p� `b �jb -1 I S-1 S-1 S-1 S-1 S-1 S-1 WC-2 L-1 MS-1 EWC-1 HB-1 L-2 I L-2 HB-1 - 1 I I I ESEW 3/4" 4 I — 1 I I I I I I I I I P5.01 i S-1 S-1 1 S-11 S-1 S-1 S-1 S-3 S-5 S-1 S-5 S-1 S-5 S-1 I 314" S-7 1 SS-7 1 1 I 1 I 1 1 I 1 / /� I V I , - I 1 I I SECOND FLOOR - - II 1 L _ I I I I - - I I 1 L - - - - - - - - - - - - - - - - - - - - 2 ` D II I 3J4 I II1117-1" - - _ u OlsonWeekes - IB Group 1----:- - a ! ,� I- s-I- - I - - - - - - - - - - - - I m - - t 2 Architects, Inc. l i t 1" I E �1-1/2" \ \6.00 I I I - - - _ _ 907 SW Stark Street Portland OR 97205 r- F- 0 I -a - w e I -r - - fl- - —J USA I I I I I 1 tel 503 226 6950 fax 503 273 9192 3/4" , I 3/4" , 3/4" 13/4" I 3I4" I 3/4" 13/4" I 314"-N3/4" 3/4"-\\ 3/4'" 3M" 3/4" 3/4" 3/4" 3/4"--N3/4" 2" 3/4" 314'" 2" 3/4" 2"'CW www.dowa-ibigroup.com -S I I N 1� ( l j \ O www.ibigraup.com. _ = A I I I - - - � 1 1 i 11 I 1 1 1 1 I I X X 1 1 X 1 I nvi I I I I I ::=sr 'siii PA E b-I— I I -- pae-engineers.com ESEW 1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 WC-2 WC-2 WC-1 WC-1 WG-1 U-2 WC-1 U-I WC-2 WHA L_1 WH-1 S-1 S-1 S-1 S-1 S-1 S-1 EWC-1 HB-1 .-2 WHAl• 0 1 1 - 1 1 -1-- L_2 HB-1 f 7 Asa PROFls ��w cIN4'4' LPY I 183.9' Pit t 9 1 ` i = S-7 1" I S-7 'GON 3/4" 3I4" - Q~ch 19 fig() �> . _ o 1 FIRST FLOOR <AS p. COLS r)- - - J.6.7-0i9 EXPIRES 12-31-19 DOMESTIC WATER RISER DIAGRAM SECTOR A NONE -il--8 0 IN MUM= SWUM CO -- a 0 �.. 0 d- M.Cr Nti 0 /". N(3) MC Ct �r C.) 0 c ♦ -a -2 as a a) cp 72 =m F. Q ROOF CU 6 o Fri% i rD..61.;,' ()_ " !_..j_1 1-1/2" ,''~,�r� 21/2 -- - - - - - - - - - - - - - -- - - - - - - - -- - - - - - - - - _- - - - \ - - - - - - - - - - - - - - - --- -- - k - ._ _._ 7 - _ X.7--1- - __1 _ to_,-, _-7il,..._r ___ rx - _x_0-x4- f )1-- - - -IT -- -,_1 -4- 9-- - --]1- r- - ,_.! 7 T- ' 1' A X 1 44-11 . 1 1 1 1 r 1 1 7 A .— 1-1/2" I 1 I I 1-112" I I 1-112 2 I I 1 1, , I 1 1/4" 3/4"' 3/4" 1 1/4" 314" 3/4" 3/4" 3/4" 3l4" 314" 1-114" 3/4" 314" 1-114" 3/4" 314" 2" 3J4" 3/4" 3/4"RHW 314" 3/4" 3/4" 3/4" 314" 3/4"" 3/4" 3/4" 3/4" 3/4"- v) 3/4" 2-112" WHA 1-1/2 HWS �� � -� q� � u� ' �� O 1-1J2'"GW '' - � �' - `) t' -e �' ' 't� ' t I , 0 b 1 1 I 1 I I 4I I I I I • i I I I I I I III I I V WHA 11 I I i WHA I WHA WC-2 WC-2 WC-1 WC-1 WC-1 U-2 WC-1 U-1 - I 11 - 1 l - i 1- -1 I AA HB-1 WC-2 WG-2 Lam' S-5 WG-2 L-1 L_1 L-'' WM-1 SH-. L,•_2 L_ WC-2 EWC-1 HB-1 L-22 HB-1 (Th h MS-1 S-1 S-1 S-1 S-1 S-1 S-1 S S-1 S-1 5-1 I ' C P5.01 I SECOND FLOOR ED, 2" 1-1J2'�� --- --- - - - -- 2-112"" 3"" 3 E -\ 1 16 - - - � - �- - - - -0 ?'- - -- - - ._ - ___i „ ...., /� 1 � s 0 0 1 .' . .1- P6.06 - - \ 1 P6.07 .."-- T I i.-. —.. - - w•- R - it _- - -- - _-4 - _AlEc A XX XX I---41;\,_ I j ft I I k e y p l a n lt: e 2-112” I 1-1/2"" 1"" \j —r arcA 3/4'--.‘''' I 3/41\1 3/4" 3/4"RHW ! 314" 314" 2" 3I4" 3/4" 3/4" 314" 1 1 314" 314" 314" 314" 314" 314" 3l4" 3I4" 314" 314' 314" 314" phase Bid & Permit z 1-112' HW � ' _� 1� +► 1e , ^� � 6�' w 1-112 CW--- \ 1 I I 1 i - �" U 1 1 1 1 �A 1 1 1 1 1 1 1 I I I I ► , 1 1 1 1 1 I I - - - 1 I WHA 1 1 I 1 1 I I date February 8, 2019 w �?\ WC-2 WC-2 WC-1 WC-1 WC-1 U-2 WC-1 U_1 , -- 40 0 1 1 - 1 1 -1—i revisions TNI cWH-1 WH-1 HB-1 /� MS-1 L_2 L_2 HB-1 _1 EWC-1 WC-2 L-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 WH-1 S=1 S_1 I r 15.06_ o ca a. FIRST FLOOR73 I •75 0 DOMESTIC WATER RISER DIAGRAM SECTOR B I-- NONE project# 16055 a DIAGRAMS - PLUMBING co aI NN L/ MN- P6006 cmQ �I "" VIII-1111" v- I I_I I —I -r Nom] ROOF (..."-***) ---(:)n _i_,_,_,_ :_,, - - - - - - X - -1, - 7f— eX I `�� �- I XX4 \11/2 2 3-1/2"