07/13/1976 - Minutes Tigard Water District 7-76 Regular Meeting July 13, 1976 PRESENT: Clarence F. Nicoli, Chairman Hugh A. Brown, Secretary Don W. Thomas R. Verne Wheelwright Robert E. Santee, Administrator John P. Miller, Foreman Kenneth W. Baines, Attorney VISITORS: Cheryl Beshears, Tigard Times Stuart Nestor, The Oregonian Contractors interested in bid opening: Robert M. Eudaly Cherrie M. Eudaly Everett L. Wiggins Hallie Wiggins Jim Fowler Bill Forman Eric M. Jockim The meeting was called to order by Chairman Nicoli at 7:30 p.m. Motion was made and seconded to approve the minutes of the last meeting, as written. Motion carried unanimously. Motion was made and seconded to pay the vouchers. Motion carried unanimously. Motion was made by Verne Wheelwright and seconded by Hugh Brown to award the contract to excavate and remove approximately 60,200 cubic yards of soil in preparation for construction of a 10-million gallon reservoir to the apparent low bidder, F d F Dozing, Amity, Oregon, subject to staff analysis. Motion carried unanimously. (See attached summary of bids). Motion was made by Verne Wheelwright and seconded by Don Thomas to transfer the district's water rights to 2,500 acre-feet of Scoggin Dam impoundment to the Hillsboro-Forest Grove Joint Water Commission with the provision that the district can attain those rights back with three (3) years prior notice. Motion car- " ried unanimously. -1- ti • X Tigard Water District Minutes (Continued) Motion was made by Verne Wheelwright and seconded by Hugh Brown to authorize Mr. R.C. Newcomb, Consulting Geologist, to conduct a ground water study for the triangular area formed by Tigard, Wilsonville, and Newberg at a cost of $1,600. Motion carried unanimously. Motion was made by Verne Wheelwright and seconded by Don Thomas to award the contract to purchase 320 lineal feet of 48" and 60 lineal feet of 24" corrugated steel pipe, including accessories, to the apparent low bidder. Motion carried unani- mously. Bids were as follows: Oregon Culvert Co., Inc $ 5,600.00 Armco Steel Corporation 9,596.00 Motion was made by Verne Wheelwright for the water district to provide water for two proposed drinking fountains and to pro- vide labor to assist in installation of same if and when a donor is found to purchase the fountains. This was in response to a letter from the City of Tigard dated June 22, 1976. (See 41a„ Administrator's report). The motion died for lack of a second. Motion was made to adjourn at 8:58 p.m. Motion carried unanimously. lay -2- ($p R - ( i d k SUMMARY OF BIDS EXCAVATION FOR 10MG RESERVOIR 4- 4. F & F Dozing Ousley Const. E. J. Welding - Eudaly Bros. Perry Hayes Amity, Oregon Eugene, Oregon Clackamas, Ore. Portland, Ore. Portland? Ore. Item Quantity Unit Total Unit Total Unit Total Unit Total Unit Total 10MG reservoir, excavation, 60,200 inc. access road cu. yds. $0.77 $46,354 $1.19 $71,638 $1.14 $68,628 $1.12 $67,424 $1.30 $78,260 Removal of filbert trees 226 each 10.00 2,260 6.25 1,412.50 23.50 5,311 24.00 5,424 40.00 9,040 Grade new access road 940 feet 2.00 1,880 2.00 1,880 1.10 1,034 4.20 3,948 3.00 2,820 Install corrugated pipe, 48" 320 feet 12.00 3,840 10.00 3,200 15.00 4,800 12.10 3,872 10.00 3,200 Install corrugated pipe, 24" 60 feet 12.00 720 8.00 480 12.00 720 12.10 726 10.00 600 Misc. and clean-up All ---- 9,000 ---- 400 ---- 1,000 ---- 860 ---- 500 Total: $64,054 $79,010.50 $81,493 $82,254 $94,420 Time of Completion Days 75 58 80 { 45 60 Page 1 4 { ► e SUMMARY OF BIDS (CONTINUED) EXCAVATION FOR lOMG RESERVOIR Pepper Const. Presley & Co. George Schmid Columbia Excavation Esta Inc. ' Everett Wiggins West Linn, Ore. Portland, Ore. Washougal, Wash. Tualatin, Oregon Boring. Ore. Portland, Oregon Quantity Unit Total Unit Total Unit Total Unit Total Unit Total Unit Total 60,200 cubic yards $1.45 $87,290 $1.89 $113,778 $2.00 $120,400 $2.00 $120,400 $2.20 $132,440 $2.90 $174,580 226 each 25.00 5,650 17.00 3,842 10.00 2,260 19.00 4,294 6.50 1,469 6.90 1,559.40 940 feet 1.50 1,410 1.00 940 1.45 1,363 11 1.70 1,598 1.00 940 6.00 5,640 320 feet 10.00 3,200 10.00 3,200 13.00 4,160 14.25 4,560 20.00 6,400 4.50 1,440 60 feet 7.00 420 10.00 600 13.00 780 14.25 855 20.00 1,200 4.00 240 Clean-up ---- 2,000 4,150 1,000 500 4,000 ---- 1,000 Totals 99,970 126,510 129,963 132,207 146,449 184,459.40 Time of Completions Days 90 90 65 80 50 90 Page 2