11/13/1973 - Packet TIGARD WATER DISTRICT 9841 S. W. COMMERCIAL ST.
TIGARD, OREGON 97223
PHONE (503) 639-1554
November 13, 1973
AGENDA
CALL TO ORDER
1. RESOLUTION TO APPROVE MINUTES OF LAST MEETING
2. VISITORS
3. RESOLUTION TO PAY VOUCHERS
4. OTHER BUSINESS
ADJOURNMENT
ADMINISTRATOR'S REPORT
1. Resolution to approve minutes of last meetink.
2. Visitors.
3. Resolution to pay vouchers.
4. Other business.
5. Installation of fire hydrant in Metzger Water District.
Permission is requested to install a fire hydrant at 72nd and
r..• Banmpton Street (north of bridge), providing Metzger requests same.
Again, a developer in the Metzger Water District is confronted
with the problem of installing a fire hydrant where fire flows are
inadequate. The fire district has prescribed a fire hydrant from
Tigard Water District's 12" main for the new office complex to be
constructed on the southeast corner of this intersection.
The developer intends to request Metzger Water District to
authorize Tigard Water District to install the fire hydrant. All
costs would be borne by the developer. Ordinarily the Tigard Water
District should not agree to supply fire protection for an out-of-
district area without some revenue; however, in this case, the fire
hydrant will also improve the fire protection at Phil Lewis Grade
School. Since that school is a part of School District 23J (Tigard)
residents in the Tigard Water District would benefit from a better
fire insurance rating for that area.
6. Annexations south of Durham Road, north of Tualatin River.
Eight home owners located along S. W. 108th have expressed a desire
to extend an 8" main a distance of 2,000 lineal feet at an estimated cost
of $20,000. Also, some residents along the south side of Durham Road
have requested water service. The area should be annexed prior to serving
*ow water. Guidance is requested on how to proceed. -- either annex the
entire area or by individual lot.
-1-
ADMINISTRATOR'S REPORT (Continued)
7. Unmetered water.
Cu. Ft. Cu. Ft. Cu. Ft. Cu. Ft. Cu. Ft.
Month & Pumped Purchased Total Sold Loss Loss
Year x 1000 x 1000 x 1000 x 1000 x 1000
Oct 1973 3,314 1,927* 5,241 5,845 (- 604) (-10.3%)**
Cumulative Total: FY73-74: 36,147 33,873 2,274 6.3
Final Total: FY72-73: 18.3
*About 1/3 of the water consumed during October was purchased
from Lake Oswego
**Negative balance because of bi-monthly billing, but monthly
readings.
8. Work accomplished during October 1973.
a. TWD installed 3360 feet of 12" C.I. + 5 fire hydrants along
Walnut Avenue, between 121st and 132nd Avenues. (Bond Construction #1A)
b. TWD installed 400 feet of 6" C.I. + 2 fire hydrants along 100th
Avenue, north of MacDonald Avenue, to replace 2" 0.D. steel pipe.
(General Fund)
c. TWD severed Metzger Water District connection to industrial
area, north of bridge on 72nd and Hampton Avenues. Circulation loop
was completed by tie-in at 72nd and Bonita Road with 16" main connected
to parallel 12" and 6" mains. (General Fund)
d. TWD installed 2- 6" Cla-valves on Bull Mountain Road and Roshak
Road, near West Colony Park, to reduce pressures from 160 psi to 110 psi.
(General Fund)
e. Private contractor installed 1,000 feet of 6" C.I. + 1 fire
hydrant along Post Road in Summerfield development for Tualatin Develop-
"' ment Company. (Developer's)
f. TWD installed 11 meters. (4021 - 4011). District also serves
118 meters in Metzger Water District.
-2-
Now
ADMINISTRATOR'S REPORT (Continued)
9. Work to be accomplished during remainder of fiscal year 1973-74.
November:
a. TWD install 660 feet of 8" C.I. + 1 fire hydrant along
Sattler Road, between 98th and 100th Avenues, to parallel pres-
surized system with gravity system and transfer 22 homes to gravity
flow. ( General Fund).
b. TWD install 350 feet of 6" C.I. on private easement
between 103rd and Hoodview Drive to complete circulation loop on
pressurized system. (General Fund).
c. TWD install 1650 feet of 8" C.I. + 2 fire hydrants along
133rd Avenue, south of Bull Mountain Road, to replace 4" O.D. steel
pipe. (General Find).
d. Private contractor install 1520 feet of 6" C.I. + 2 fire
hydrants along West Colony Place and West Colony Drive for Mr. R.G.
Peters. (Developer's).
December:
a. TWD install 4600 feet of 12" D.I. pipe + 4 fire hydrants
along Bull Mountain Road, between reservoir #2 and 132nd Avenue.
(Bond Construction #1A).
January:
a. TWD install 840 feet of 16" D.I. pipe along McDonald, from
Hall Blvd. to the west, to further Clackamas River main line to
reservoir #1. (Bond Construction #1A).
b. TWD install 500 feet of 12" D.I. along Pacific Highway,
between Johnson and MacKenzie Avenues. (General Fund).
c. Private contractor and TWD install 100 hp pump station at
#2 reservoir to pump water to Hi Tor reservoirs. (Bond Construction
#lA).
'"" -3-
ADMINISTRATOR'S REPORT (Continued)
February:
a. TWD maintain equipment, construct barricades, locate and
exercise gate valves, etc.
March:
a. TWD install 1500 feet of 6" C.I. + 3 fire hydrant to replace
4" O.D. steel pipe along 100th Avenue, Inez to MacDonald.
(General Fund).
April:
a. TWD install 800 feet of 8" C.I. + 2 fire hydrants from 90°
bend to south and West along Bull Mountain Road to replace 6" O.D.
and 4" O.D. steel pipe. (General Fund).
b. Private contractor provide and TWD install pump station
with auxiliary power at new Hi Tor reservoir to provide adequate
pressure in area. (Bond Construction #1A).
a. Private contractor install 20" steel casing under Pacific
Highway at Durham Road. TWD install 12" D.I. main in steel casing
and connect to existing 12" main on east and 8" and 6" mains on west
side of highway. (Bond Construction #lA).
June:
a. Inventory and prepare for long hot summer.
w
-4-