03/12/1974 - Packet •
TIGARD WATER DISTRICT 8841 S. W. COMMERCIAL ST.
TIGARD, OREGON 97223
PHONE (503) 639-1554
New
March 12, 1974
AGENDA
CALL TO ORDER
1. RESOLUTION TO APPROVE MINUTES OF LAST MEETING
2. RESOLUTION TO PAY VOUCHERS
3. VISITORS
4. RESOLUTION TO APPOINT MEMBERS OF THE BUDGET COMMITTEE
5. RESOLUTION TO TRANSFJ!IR WITHIN THE GENERAL FUND, $20,000
IN THE OPERATING CONTINGENCY, ACCOUNT #553, TO WATt.
COSTS, ACCOUNT #525-2
6. RESOLUTION TO STANDARDIZE ALL METER INSTALLATION
/41110,
CHARGES THROUGHOUT THE DISTRICT BY INCREASING THE
CONNECTION tEE TO $200 VERSUS $55, EFFECTIVE JULY 1,
1974; AND TO TRANSFER THE PRESENT CONNECTION FEES FOR
BULL MOUNTAIN HOOKUPS FROM BOND SINKING FUND TO GENERAL
FUND
7. RESOLUTION TO DISAPPROVE EITHER ALTERNATIVE AS PROPOSED
BY PORTLAND BUREAU OF WATER WORKS, BUT TO INDICATE A
PREFERENCE OF THE ADDITIONAL GENERAL RATE INCREASE
(ALTERNATIVE #2) VERSUS THE SYSTEM DEVELOPMENT CHARGE
8. RESOLUTION TO SUPPORT A RESOLUTION BY THE TRI-COUNTY
WATER DISTRICTS ASSOCIATION REQUESTING A WRITTEN LEGAL
OPINION ON THE MERITS OF FILING A LAWSUIT CHARGING THE
CITY OF PORTLAND AS ARBITRARY AND UNREASONABLE IN
ESTABLISHING WATER CONSUMPTION RATES TO WHOLESALE WATER
PURVEYORS LOCATED OUTSIDE CITY BOUNDARIES
9. OTHER BUSINESS
ADJOURNMENT
veiv
ADMINISTRATOR'S REPORT
1. Resolution to approve minutes of last meeting.
2. Resolution to pay vouchers.
3. Visitors.
4. Resolution to appoint members of the Budget Committee.
Individuals suggested at the last meeting as possible candidates
for the budget committee were contacted and asked if they would serve
if selected. To date, the following persons have agreed to serve:
Neil Longfellow
George Marshall
yr William Stebbins
H. Dale Johnson
Michael D. O'Neil
5. Resolution to transfer within the General Fund, $20,000 in the,
Operating Contingency. Account #553. to Water Costs, Account #525-2.
The budget estimate for "Materials & Services" will be exceeded
this month and action should be taken to ensure that funds are available
for expenditures.
Water costs have exceeded the budget estimate due to the fact that
the wells are not producing as expected and more water had to be pur-
chased from Lake Oswego. $32,000 was budgeted for water costs during
fiscal year 1973-74, and already over $54,000 has been expended with 4
months to go.
The transfer of $20,000 from the contingency account will resolve
the problem for the present, but more fund transfers will be necessary
in later months or a supplementary budget prepared. At this date, it
appears that income will also exceed the budgeted amount so the district
should be in the "black" on June 30th.
-1-
•
*kw
ADMINISTRATOR'S REPORT (Continued)
6. Resolution to standardize all meter installation charges throughout
the district by increasing the connection fee to $200 versus $55.
effective July 1. 1974; and to transfer the present connection fees
for the Bull Mountain hookups from Bond Sinking Fund to General Fund.
In accordance with the instructions of the Board, an investigation
was made of the circumstances surrounding the imposition of the extra
$200 upon each new meter connection on the Bull Mountain system.
The minutes of July 10, 1962 revealed that the additional charge
was first imposed to partially offset the "unique and unusual" expenses
to provide adequate service to the Bull Mountain users. A general
obligation bond issue of $250,000 was approved by the Board for presenta-
tion to the customers of the district.
In addition to various other capital improvements, one project
pertaining to the Bull Mountain system specified:
"To construct a main with pumping facilities from
+mr district well /13 and connecting to the Bull Mountain
distribution system to provide an additional supply
of water to said area which is now supplied with but
a single 4" main and pumping equipment from district
well #2".
At the same meeting, H. Brown moved, C. F. Nicoli seconded,
that "in the event the resolution passed tonight for the sale of bonds
is approved by the voters and consummated that the Board put into effect
at that time a $200 differential connection fee for Bull Mountain users,
and that an additional 250 per month per meter differential be charged
to the Bull Mountain water users, and that these differentials be ear-
marked as partial compensation to the district for the unique and
unusual expense incurred to provide adequate and equal service to the
Bull Mountain users." Motion carried.
At the meeting on May 8, 1962 Elden Carter estimated costs to
improve the Bull Mountain system:
8" pipe line $ 28,700
Pump and equipment 4,000
200,000 gallon storage tank 25,000
$57,700
-2-
ADMINISTRATOR'S REPORT (Continued)
Mr. Wheelock in a letter to the Board of Commissioners dated
July 6, 1962 stated:
"Mr. Carter has furnished estimates to the Board of
Commissioners covering the proposed improvements,
and these are as follows:
(1)
(2)
(3) Construction of reservoir and mains to
provide additional supply to Bull Mountain
area -- $60,000.
The district has available in the Bull Mountain Fund,
per the report of June 1962 meeting, of $7,800, and I
understand that by virtue of additional connections,
this may now be approximately $9,000, and these funds
under the agreements and resolutions of the Boards of
Irkw Commissioners should be used to defray a part of the
cost of the proposed construction, provided, of course,
that the Commissioners submit the matter to the electors
and authority is given for the total program.
It is our further opinion that a differential connection
charge can be maintained with relation to the Bull Mountain
area now within the District by annexation from that lying
below present reservoirs, and that this differential rate
can be pledged directly to the fund used for the payment of
bond principal and interest."
Unfortunately, the bookkeeping records during those years for the
expenditure of the bond construction funds were not segregated per project,
but were combined into categories of transmission mains, of which there
were several, and reservoirs, of which there were two. No actual con-
struction figures are available; therefore, Mr. Carter's estimated
figure of $60,000 must be used as a basis for the improvements to the
Bull Mountain system.
-3-
ADMINISTRATOR'S REPORT (Continued)
Since the inception of the $200 connection fee for the Bull
Mountain users, the following amounts have been received annually:
1962-63: $ 700
1963-64: 3,000
1964-65: 4,080
1965-66: 3,350
1966-67: 2,850
1967-68: 4,200
1968-69: 2,600
1969-70: 4,000
1970-71: 3,000
1971-72: 6,800
1972-73: 8,400
Total: $42,980
1973-74: (to March 1, 1974): 4,800
1973-74: (est. to June 30th) 5,200
$52,980
Assuming that Mr. Wheelock was correct in stating that approximately
$9,000 was in the Bull Mountain hand in 1962, a total amount exceeding
$60,000 has been or will be collected by June 30, 1974. This would
account for the total investment of this particular improvement to the
Bull Mountain system.
It should be noted that Hugh Brown in his motion refers to "partial"
compensation and Mr. Wheelock's letter states "defray a part of the cost".
It appears that the intent of the Board was not to require that the entire
cost to improve the Bull Mountain system be borne by the new connection
fees, but some unannounced fraction thereof. Perhaps the $200 connection
fee should have been discontinued earlier.
Since the debt has been fully liquidated the extra connection fee
for solely the Bull Mountain system should be discontinued and new users
in that area should not be charged anymore than other users in the
district.
It is estimated that the district will lose between $8,000 and
$10,000 annually from this source of revenue. However, the district can
ill-afford to lose these funds.
-4-
ADMINISTRATOR'S REPORT (Continued)
At this time I want to bring to your attention some other informa-
tion that is beginning to alarm me about the district's financial position
for next year. As everyone knows, the cost of doing business is going out
of sight. The cost of everything from postage stamps to pipe is higher by
a substantial margin. Increased efficiency and volume sales will not be
enough to offset these higher prices.
Of major concern to us is the cost to purchase water. Portland's
increase of 24% will not have an immediate effect upon the district. Of
more importance is the drastic reduction in the amount of water produced
by the wells. This was predictable, but not at such a fast rate. The
next page shows this reduced capacity and is summarized as follows:
PUMP CAPACITY
Well #1 Well #2 Well #3 Well #4
Gal/kin Gal/kin Gal/kin Gal/kin
Jan 1973 475 156 246 185
Dec 1973 295 144 67 169 (Sept)
Well #4 was turned off in September because of the poor quality
(high mineral content) of water, in addition to the possibility of the
oil used to lubricate the pump could contaminate the water. Oil lubri-
cated pumps for domestic water supply are not authorized by the Oregon
State Board of Health.
It is obvious that well #3 is going dry. Most discouraging is
well #1 which has been the district's best producer for years.
It is rather academic now that the State Engineer intends to
announce within a few weeks the planned reduction in pumping capacity
for wells in the Bull Mountain-Cooper Mountain area. Wells #3 and #4
will surely go in this edict.
The days of the cheap water are gone. More and more surface water
will have to be purchased.
The following list shows the monthly percentage of water purchased
from Lake Oswego since July 1973:
July: 50% Nov: 40%
Aug: 67% Dec: 50%
Sep: 50% Jan: 44% (1974)
+iwr Oct: 33% Feb: 60% (1974)
Average: 50%
-5-
4,,,r 1973
WATER CONSUMPTION AND COSTS
Water pumped from wells Water purchased
1973 Cubic feet x 1,000 Cubic feet x 1.000
Month #1 #2 #3 #4 Cap. Hwy. Lake Oswetra
Jan 2,836 913 1,423 964 770 -0-
(475 g/m) (156 g/m) (246 g/m) (185 g/m)
Feb 2,463 814 786 975 363 -0-
Mar 2,911 856 850 1,061 217 -0-
Apr 2,662 789 888 1,044 785 -0-
May 2,649 930 702 1,061 1,615 -0-
Jun 2,311 865 469 1,021 2,344 5,128
Jul 2,290 899 375 972 372 8,263
Aug 2,573 875 384 998 131 4,301
Sep 2,094 851 339 979 -0- 1,927
(169 g/m)
Oct 2,039 913 362 -0- -0- 2,311
Nov 1,861 856 382 -0- -0- 3,002
Dec 1,750 855 399 -0- -0- 2,472
(295 g/m) (144 g/m) (67 g/m)
vow
Total: 28,440 10,415 7,358 9,075 6,597 27,402
Electric
Costs: $5,235 $3,562 $3,246 $3,951 -0- $2,464
Average
Cost/100
Cubic feet: 2c 311c 41c 4c 38c 15c
-6-
moommimmimimo
Nosy
ADMINISTRATOR'S REPORT (Continued)
CH0M is now conducting an engineering study for the City of Lake
Oswego to determine the need for capital improvements in the near future.
Lake Oswego is planning on a $5 million general obligation bond issue to
make the necessary improvements. Of direct benefit to the Tigard Water
District will be a 5-million gallon reservoir at Waluga and the doubling
of the capacity of the treatment plant from 10 mgd to 20 mgd. The Director
of Public Works, Lake Oswego, has indicatedthat they will request finan-
cial assistance from both the City of Tualatin and the Tigard Water District.
(Stand-by for the "other shoe" to drop).
Cost of meters, brass fittings, copper, cast iron pipe, gate valves,
electrical costs, etc., have all gone up from 20 to 30% in the last year.
The district is committed to not increasing the tax rate and, if
possible, maintaining the same water rates until such time as Lake Oswego
should raise their rates. The only other place to obtain revenue is by
increasing meter installation charges which are now relatively low com-
pared to other water districts which are shown as follows: (this is
shown without the System Development Charge, except in the case of
Portland):
5/8"x3/4" 1"
Portland $ 510 $ 750 (effective July 1)
Metzger 350 550
Wolf Creek 250 350 will go up July 1
Lake Grove 300 500 (will go up July 1
Beaverton 250 (+ $100 310
per unit)
Powell Valley 255
Sherwood 495
Hillsboro 750 825
The present and proposed charges for the Tigard Water District
are shown on the next page.
_7_
err
ADMINISTRATOR'S REPORT (Continued)
APPENDIX 1 —Meter Installation Charges
Present. All installations,except Bull Mountain system:
Meter Size
5/8"x 3/4" 1"
Copper Service $ 65 $ 95
Meter 85 130
Connection Fee 55 55
$205 $280
All other meters: (Cost+$55) +25%
Present Installation on Bull Mountain System: and proposed for all installations:
Meter Size
5/8"x 3/4" 1"
Copper Service $ 65 $ 95
Meter 85 130
vow Connection Fee 200 200
$350 $425
All other meters: (Cost+$200)+25%
The approval of this increase would eliminate the entire loss from
the Bull Mountain connections in addition to gaining approximately
$20,000 annually to partially offset the higher costs of material, labor,
equipment, etc. If you desire to continue upgrading the system, this
increase is necessary.
It is recommended that the new meter installation charges become
effective July 1, 1974.
_g_
tore
ADMINISTRATOR'S REPORT (Continued)
7. Resolution to disapprove either alternative as proposed by
Porttand Bureau of Water Works, but to indicate a preference of the
additional general rate increase (Alternative #2) versus the system
development charge.
Ken Baines has prepared a letter for your approval regarding
the alternatives proposed by Portland. (See Mr. Hyle's letter and
attached letter prepared by Ken Baines).
8. Resolution to support a resolution by the Tri-County Water
Districts Association requesting a written legal opinion on the
merits of filing a lawsuit charging the City of Portland as
arbitrary and unreasonable in establishing water consumption rates
to wholesale water purveyors located outside city boundaries.
It appears that now is the time to make a stand with the City of
Portland to determine the true parity between in and out-of-city water
rates.
""'a'' On March 21st the Tri-County Water Districts Association meets
to discuss the Portland Bureau of Water Works new rate structure. I
would like to make the following motion:
"That the Tri-County Water Districts Association, or one
of its designated members, request a written legal opinion
on the merits of filing a lawsuit charging the City of
Portland as arbitrary and unreasonable in establishing
water consumption rates to wholesale water purveyors
located outside city boundaries.
That legal fees be pro-rated to all members of the
Association based upon the number of meters in service.
That the law firm of Wheelock, Niehaus, Baines & Murphy,
who are eminently qualified in legal matters involving
municipal water systems, be retained to represent the
Association, or the designated member, whichever is
applicable."
9. Other business.
It has been suggested that the name of the Tigard Water District
be changed. Comments and recommendations are desired.
-9-
4r.Y
ADMINISTRATOR'S REPORT (Continued)
10. Measures to be taken to reduce the fire protection rating from
Class 4 to Class 3.
At the last meeting the Board requested information on the
measures to be taken by the district which would reduce the fire
protection rating from Class 4 to Class 3.
Total deficiency points received for 1968 versus 1973 are shown
below:
1968 1973
Water Districts 805 (29.5%) 384 (23.4%)
Tualatin Rural F.D. 1926 (70.5%) 1255 (76.6%)
Total Deficiency
Points: 2731 (100%) 1639 (100%)
The above chart reflects that the water districts have reduced
the deficiencies by over 50% within the past 5 years; also, that the
water districts have only 23.4% of the deficiencies compared to 29.5%
in 1968. It would appear that the fire district with 76.6% of the
deficiency points have the best opportunity to improve the fire pro-
tection rating. It should be noted that water districts account for
39% of the fire insurance rating.
Chief Washburn has indicated that a Class 3 rating can be attained
if the fire district installs alarm boxes. Cost estimates are being
computed now.
The next 3 pages describe the deficiencies of the water district.
#6 - "adequacy of mains" accounts for z of the deficiency points. If
we continue on the present course, within 3 years the distribution system
will be entirely cast or ductile iron pipe, all-adequately sized. This
should reduce the deficiency points considerably.
It just takes time and money to make any substantial improvement in
a water system. Auxiliary power for the pressurized systems on Little
Bull Mountain and Bull Mountain, scheduled for next fiscal year, will
help.
'' "' -10-
•
INSURANCE SERVICES OFFICE
OREGON
STATE OFFICE
SUMMARY OF GRADING
GRADING SCHEDULE FOR MUNICIPAL FIRE PROTECTION
(1973 Edition)
Date Graded: August 1973 City or District: Tigard W.D. (Tualatin R.F.P.D.)
Total Deficiency: 1,639 Points. Graded by: A.N. & J.S. Engineering Representative
Protection Class 4
WATER SUPPLY
Assigned
Item Points
1. Supply Works 0
2. Reliability of Source Supply 15
%le 3. Reliability of Pumping Capacity 0
4. Reliability of Power Supply 0
5. Condition, Arrangement, Operation, and Reliability of System Components 10
6. Adequacy of Mains 193
7. Reliability of Mains `0
8. Installation of Mains 9
9. Arrangement of Distribution System 8
10. Additional Factors and Conditions Relating to Supply an Distribution 51
11. Distribution of Hydrants 3
12. Hydrants - Size, Type and Installation 45
13. Hydrants - Inspection and Condition 25
14. Other Conditions Adversely Affecting Adequacy, Reliability, or Operation of
the System 38
Total 397
•
FIRE DEPARTMENT
1. Pumpers
2. Ladder Trucks
3. Distribution of Companies and Type of Apparatus
4. Pumper Capacity
5. Design, Maintenance, and Condition of Apparatus
6. Number of Officers
7. Department Manning
8. Engine and Ladder Company Unit Manning
9. Master and Special Stream Devices
10. Equipment for Pumpers and Ladder Trucks
11. Hose
12. Condition of hose
*kw
TIGARD WATER DISTRICT
Tualatin Rural Fire Protection District, Oregon
RECOMMENDATIONS
The attached recommendations are offered to assist District
officials in planning improvements in the fire protec-
tion facilities. Since the District makes the final
decision on any improvement program, we have listed
several suggestions. We have not included every item
for which a deficiency is charged but have attempted to
cover the heaviest deficiency items.
We would like to emphasize that even a partial improvement
in any of the items could provide a beneficial effect
in the grading. It is possible to achieve a better
protection class by partial improvement in many items
or major improvement in a few important items.
If after reviewing these recommendations District officials
believe they can accomplish selected improvements, we
can estimate the effect those improvements would have
on the grading.
If work on these improvements is not started within six
months, we reserve the right to review this information
for conformity with standard in use at that time.
These recommendations are made of fire insurance rating
or grading considerations only and no representations
or warranties of any kind are made or intended.
•
February 12, 1974
Public Protection Department
INSURANCE SERVICES OFFICE of Oregon
Tualatin Rural Fire Protection
41ve District Recommendations
Based on 1973 Grading
TIGARD WATER DISTRICT:
Water Supply:
1. That all pumps be checked daily, including Sundays and holidays.
2. That recommended fire flows (see flow test sheet) be provided at all
commercial (other than residential properties) risks in the water
district.
3. That arterial and grid system be improved to eliminate single artery
feeds and dead end distribution pipe.
4. That reliability of all booster pumps be improved by providing stand-
by power or stand-by gas or diesel pumps.
sem, 5. That all,,feeders to booster pumps be in duplicate to increase
reliability.
6. That hydrant spacing at all oommercial risks be at one hydrant per
100,000 square feet; in residential areas, minimum spacing be
160,000 square feet.
7. That all hydrants be installed on 6-inch laterals from the main, and
be standard hydrants with two 21/2-inch and one pumper outlets.
February 12, 1974
Public Protection Department
INSURANCE SERVICES OFFICE of Oregon
view
ADMINISTRATOR'S REPORT (Continued)
11. Savings by purchasing water from Lake Oswego versus Portland.
Cost Cost Savings
Month & Cu. Ft. Lake Oswego Portland from
Year Purchased @ 140/100 @ 250/100 Portland
Feb 1974 3,907,200 $ 5,470 $ 9,768 $ 4,298
Cumulative
Total:
FY73-74:
31,309,600 $43,833 $78,274 $34,441
12. Unmetered water.
+r.r
Cu. Ft. Cu. Ft. Cu. Ft. Cu. Ft. Cu. Ft.
Month & Pumped Purchased Total Sold Loss Loss
Year x 1000 x 1000 x 1000 x 1000 x 1000 %
Feb 1974 2,737 3,907* 6,644 4,891 1,753 26.4%
Cumulative
Total:
FY73-74:
59,700 54,779 4,921 8.2%
*About 60% of the water consumed during February 1974 was purchased
from Lake Oswego.
yaw
-11-
440.0.
ADMINISTRATOR'S REPORT (Continued)
13. Work accomplished during February 1974.
a. TWD installed 470 feet of 8" C.I. and 60 feet of 6" C.I.
+ 1 fire hydrant near Durham and Pacific Highway for new Tebo's
restaurant. (Developer's and General Fund, pipe extension).
b. TWD installed 2070 feet of 6" C.I. + 4 fire hydrants along
both 100th Avenue and View Terrace, between Inez and MacDonald Streets,
to replace 4" O.D. steel pipe. (Pipe replacement, General Fund).
c. TWD installed 54 feet of 4" C.I. + 2 fire hydrants along
Crestview Drive, near Varns Street. (Pipe extension, General Fund).
d. TWD installed 150 feet of 4" C.I. + 1 fire hydrant on private
easement (Mr. Ems) to complete a circulation loop between 76th and
Fir Streets. (Pipe extension, General Fund).
e. TWD installed 30 meters. (4100 - 4071). District also
serves 115 meters in Metzger Water District.
14. Work to be accomplished during remainder of fiscal year 1973-74.
March 1974:
a. TWD install 800 feet of 8" C.I. + 2 fire hydrants from 90°
bend to south and west along Bull Mountain Road to replace 4" and 6"
O.D. steel pipe. (Pipe replacement, General Fund).
b. Private contractor install for TWD 140 feet of 20" steel
casing under Pacific Highway at Durham Road to complete circulation
loop. (Bond Construction #lA).
c. TWD install 150 feet of 12" D.I. pipe in 20" steel casing
as noted in "b" above. (Bond Construction I/lA).
d. Private contractor install 2800 feet of 8" C.I., 1700 feet
of 6" C.I., and 1000 feet of 4" C.I. + 9 fire hydrants in the Summer-
field development, Townhouses (Phase II), for Tualatin Development
Company. (Developer's).
-12-
wrw
ADMINISTRATOR'S REPORT (Continued)
April 1974:
a. TWD install 4600 feet of 12" D.I. pipe + 4 fire hydrants
along Bull Mountain Road., between reservoir #2 and 132nd Avenue.
(Bond Construction #1A).
b. TWD install, along with Cornell Manufacturing Company, a
100-hp pump station at #2 reservoir to pump water to Hi Tor reser-
voirs. (Bond Construction #1A).
May 1974:
a. TWD install 400 feet of 6" C.I. in 36" steel casing under
2 sets of railroad tracks along Bonita Road, between 74th and General
Chain Bar Company. (Pipe extension, General Fund).
b. TWD install 280 feet of 6" cast iron + 1 fire hydrant at
the terminus of 98th Avenue, near Tigard Avenue, including the crossing
of 2 sets of railroad tracks with 12" steel casing. (Pipe extension,
General Fund). Also, install 1 fire hydrant between RR and Greenburg Rd.
wow
c. TWD install 240 feet of 12" C.I. along North Dakota Street,
west of Tiedeman, for Mr. Lee Robinson. (Developer's).
d. TWD abandon 4" galvanized main on Hunziker between Hall Blvd.
and Irvington-Moore Company by connecting services to 12" main on south
side of Hunziker. (General Find).
e. TWD install 50 feet of 6" C.I. near Hiranport, Inc. on S. W.
Hunziker to complete circulation loop between 12" main and 6" main.
(Pipe extension, General Fund).
June 1974:
a. TWD install, along with Cornell Manufacturing Company, a
pump station with 2-25 hp pumps, including auxiliary power, at new Hi
Tor reservoir to provide adequate pressure in area. (Bond Construction
#lA).
b. TWD inventory, maintain equipment, and locate gate valves.
July 1974:
a. TWD install 300 feet of 12" C.I., 1960 feet of 8" C.I., and
500 feet of 6" C.I. + 5 fire hydrants along 108th Avenue, south of
Durham Road, for Mrs. Ogle, et al. (Developer's).
-13-
•
•
-' THE CITY OF
PORTLAND
•
0,. ot*:
•
•
February 14 , 1974
OREGON
DEPARTMENT OF
PUBLIC WORKS Mr. Robert Santee , Administrator
LLOYD E. ANDERSON Tigard Water District
COMMISSIONER 8841 S. W. Commercial Street
Tigard, Oregon 97223
BUREAU OF Dear Mr. Santee :
WATER WORKS
ROBERT C. HYLE At the February 5th meeting of Water Districts served by
MANAGER the City of Portland, questions were raised regarding the
1800 s.w.SIXTH AVE. System Development Charge as proposed by the Portland
PORTLAND,OR.97201 City Council.
Representatives of the Water Districts and the Portland
Water Bureau agreed that the Water District Bbards would
be given an opportunity to indicate their preference
between a System Development Charge and a general rate
increase for all outside water users over and above the
one already proposed.
•
As explained at the meeting, our main concern is to
develop the necessary revenue from both inside and outside
City users in order to meet our projected obligations +for
the next 4 years. How this revenue should be raised from
outside users is somewhat flexible and open to negotiation.
Following are the two alternatives we are offering for
your consideration:
1) We would maintain the Size of Service Charge Sche-
dule under the System Development Charge , but we would
eliminate the Per Unit Charge Schedule. The charge
imposed for each new water service connecting to your
system would be as follows :
Size of Service Charge Schedule
Size of Service Charge
3/4" $ 300
1" 500
1-1/2" 800
2" 1,200
3" 2 ,000
4" - 2 ,800
**kw 6" 3 ,600
8" 4 ,500
• 10" 6 ,000
12" 10 ,000
� y
Page 2 February 14 , 1974
2) We would eliminate the System Development Charge
entirely and increase the rates proportionately to
generate the anticipated amount of revenue that would
have been collected under the System Development
Charge. Rates would be proposed as follows :
Outside City
Rate Rate
Cubic Present With Without
GRAVITY: Feet Rate SDC SDC
First 20 ,000 . 36 . 38 .43
Next 100 ,000 .24 . 30 . 35
Over 120 ,000 .18 . 25 . 29
Rate Rate
Cubic Present With Without
PUMP: Feet Rate SDC` SDC
First 20 ,000 .44 .45 .48
Next 100 ,000 . 32 . 36 .40
Over 120 ,000 . 25 . 31 . 34
` we We would ask that you review these proposals and indicate
your preference to us in writing by April 1 , 1974 . As
stated at the February .5th meeting, we will review the*
wishes of the Water Districts. Following this response we
will recommend a rate structure revision to the City Council
if such action seems appropriate.
If you have any further questions or comments , please do not
hesitate to call me.
Si ely,
Oa,
t
Robert C. Hyl
Manager
RCH/mka
TIGARD WATER DISTRICT 8841 S. W. COMMERCIAL ST.
°411MIV TIGARD, OREGON 97223
PHONE (503) 639-1554
March 13, 1974
Mr. Robert C. Hyle, Manager
Portland Bureau of Water Works
1800 S . W. Sixth Avenue
Portland, Oregon 97201
Dear Mr. Hyle:
In response to your letter dated February 14 , 1974 , the Commis-
sioners of the Tigard Water District prefer Alternative No. 2
to Alternative No. 1. This expression of preference shall not
be construed as an approval of either alternative, nor shall it
be construed as a waiver of any rights the Tigard Water Dis-
trict may have to attack these proposals if they are ultimately
implemented.
We feel it is inequitable to impose greater user rates for non-
" row residents than for users residing within the City, because,
among other things, your present system was not constructed from
tax revenues , but from user charges paid by users both within
and without the City.
The system-development charge, which appears equitable on the
surface, imposes an excessive financial burden upon the devel-
oper outside the City, who must also bear the entire expense
of installing all mains within his development. This is not
the case for developers within the City.
It is our opinion that the inequality in water rates should be
resolved at this time, and we urge the City of Portland and all
other water customers of the City to jointly initiate an inde-
pendent study to determine the true parity between water rates
in and out of the City. We second Commissioner Lloyd Anderson 's
suggestion that all facts and figures be "placed on the table. "
Very truly yours,
TIGARD WATER DISTRICT
C. F. Nicoll
Chairman, Board of Commissioners
Badger Meter,Inc. Water Meter Division
4545 West Brown Deer Road
Milwaukee,Wisconsin 53223(414)355-0400
To Badger Meter Customers February 18, 1974
For the last four years, Badger Meter has held the line against revising
its price schedule on water meters despite inflationary pressures on manu-
facturing costs. In fact, many of our meters are priced lower today than
they were in 1969.
During this period we have absorbed additional expenses by improving the
productivity and efficiency of all our operations. We have also introduced
innovative meter concepts involving a variety of materials. However, the
cost of raw materials is changing so quickly that we are compelled to revise
our prices on certain meter lines. You may reasonably expect us to raise
our prices, and in some cases we are. You will also be surprised and pleased
to know that some of our prices will not be changed, particularly our Recordall
line of thermoplastic meters. Essentially we are offering you quality at a
variety of prices.
Since you are a valued customer, we want to provide you some specific
information about the real magnitude of our increased costs. In 1973, we
experienced a 55 per cent increase between the beginning and the end of the
year in the price of ingots used for bronze meters. Based on price increases
already received from suppliers, we estimate that our expenses for material
and labor will be 112 per cent higher in 1974.
In order to give you ample advance notice, we are applying our new price
schedule to all orders received on or after March 15, 1974. Present prices
will be honored on orders placed before March 15 for delivery no later than
June 30, 1974.
Information concerning our new price schedule is available from our sales
representatives. We trust that we have explained the circumstances leading
to our price revision to your satisfaction, and we thank you for your business
in the past. We also pledge that Badger will always strive to give you the
best quality product at the price you want to pay.
Sincerely yours,
BADGER METER, INC.
itare
yak
Robert K. Bourne, Ph. D.
General Sales Manager
Water MPtir 1livisinn
•
l//k./7
•
Jv� i c ?
if V
*r+
CAr lad pi?.E
ESCALATION
The prices quoted herein are based on the current market
price of scrap metal , as defined below. Due to the complete
uncertainty of future scrap prices , our prices to you are subject
to the following Scrap Surcharge.
For each $1 .00 per ton increase in the Pittsburgh, Philadelphia,
Chicago composite price for "Scrap No. 1 Heavy" published weekly in
IRON AGE Magazine , our prices herein will be increased `;>.L•. 00 per
ton.
"Current market price" of "Scrap No. 1 Heavy" is defined as
$102 . 83/ton published in the February 11, 1974 issue of IRON AGE.
The scrap price published in IRON AGE (in the week that shipment „
of your order is made) shall determine the amount of Scrap Surcharge
to you.