Loading...
05/20/1946 - Minutes TWENTY-THIRD REGULAR MEETING MAY 20, 1946, Meeting held at the Tigard Grade School at 8:00 o ' clock, evening of May 20th. PRESENT: Chairman Cook, Commissioners Anicker, Barber , Dietrich ,,,, and Hamilton. Meeting opened and a committee of Tigard citizens were heard from pertaining to the present water supply. Their questions were answered by Attorney Chinook and Engineer Carter. Minutes of the previous meeting read and approved . Account and Collector' s report read and approved . Check No . 193 Metzger Mater Dist. 155,500 o. ft . $419 .85 " • " 194 Consolidated Supply Co . fittings & pipe 54.764 • " 195 Oregon State Highway Dept. blueprint 2B-22-18 1.30 ' n " 196 Tigard Truck Service-transportation serv. 2.07 , • " 197 Neptune Meter Co . Repairs 4.32 • " 198 John W. O'Brien - Salary 165.00 • " 199 Schubr in & Brelin - Collection for April 11.00 ►t �, pppp E 0 jien - Labor - ., 4.60 00W430 O1 ay EL field " 7 .50- - - - X670.40 Auditor Ammacker explained what it would cost to audit the books provided there was no special work needed . The charges were $100.00 per year and any unforseen work would be w charged for at ; 25.00 per day. Commissioner Barber moved that we retain the services of Mr. Ammacker to make audit for period July 1, 1944 until June 30th, 1946 - seconded by Hamilton - carried 5 to O. Mr. Carter submitted report of progress on proposed or future pipe line and reservoir to be laid by Tigard ;dater District when conditions permit . He further pointed out the three or four most desirable pieces of property for the construction of the reservoir . The discussion following Mr. Carter's report brought out that we should try to secure the most desirable piece of property at a figure not over ; 1,000 .00 . This suggestion carried 5 to 0 . Was moved by r, seconded by Hamilton that we adopt same schedule for water use as Metzger has ; that being $1 .50 for the first 300 cubic feet, 40cents for the next 100 cubic feet, over 400 cubic feet 01.00 per 100 , over 700 cubic feet 41.50 per 100 . The question was asked of Mr. Carter about what it would cost for the laying and construction of the contemplated pipe line and reservoir running from Metzger's 8" line into the reservoir then on into the Tigard system. This figure was estimated at 475,500 .00 . Motion made by Cook that meeting be adjourned - seconded by Anicker. Carried . Chairman Secretary-Treasurer