Loading...
08/08/1952 - Minutes Called Meeting Tigard Water District August 8, 1952 Present, C.L.Osborne, President; J.P.Lohrenz Supt . L.L.Maclntyre Civil Engineer and O Soule Contractor, H.M.Propst Clerk. The meeting was held in the Gourmet Cafe at 2 otclock P.M. Friday August $ th, 1952. The purpose of the meeting was to award and sign the contract for the work and back filling, on the pipe line construction on Highway 99W The contract was written, dated, and the contractors name inserted by L.L. Maclntyre. The contract was signed by C.L.Osborne, O.L.Soule, Darwin Shinn Raymond Meyers and notary D.M.Miller. The date of signing was August $ th. 1952. The contract was awarded to O.L .Soule. Mr. Soule stated that he intended to start the work Monday August 11 th. 1952. J.P.Lohrenz took Mr. Soule over the route of the pipe line, to acquaint him with the details of the installation. After the signing of the contract the meeting adjourned. Clerk , , 1/j, President s! /_4 '