08/08/1952 - Minutes Called Meeting
Tigard Water District
August 8, 1952
Present, C.L.Osborne, President; J.P.Lohrenz Supt . L.L.Maclntyre Civil
Engineer and O Soule Contractor, H.M.Propst Clerk.
The meeting was held in the Gourmet Cafe at 2 otclock P.M. Friday August
$ th, 1952. The purpose of the meeting was to award and sign the contract
for the work and back filling, on the pipe line construction on Highway 99W
The contract was written, dated, and the contractors name inserted by L.L.
Maclntyre. The contract was signed by C.L.Osborne, O.L.Soule, Darwin Shinn
Raymond Meyers and notary D.M.Miller. The date of signing was August $ th.
1952. The contract was awarded to O.L .Soule.
Mr. Soule stated that he intended to start the work Monday August 11 th.
1952.
J.P.Lohrenz took Mr. Soule over the route of the pipe line, to acquaint
him with the details of the installation.
After the signing of the contract the meeting adjourned.
Clerk , , 1/j, President s! /_4 '