Permit CITY OF TIGARD BUILDING PERMIT
a COMMUNITY DEVELOPMENT Permit#: BUP2021-00157
T[GAR T7 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 7/28/2021
Parcel: 2S112DD01600
Jurisdiction: Tigard
Site address: 15495 SW SEQUOIA PKWY
Project: PCC Courtyard Renovations Subdivision: PACIFIC CORPORATE CENTER Lot: 4
Project Description: Multiple Addresses: 15495&15575.Courtyard renovation
Contractor: PACIFIC REALTY ASSOCIATES LP Owner: PACIFIC REALTY ASSOCIATES
15350 SW SEQUOIA PKWY#300 ATTN: N PIVEN
PORTLAND, OR 97224 15350 SW SEQUOIA PKWY#300
PORTLAND, OR 97224
PHONE: 503-624-6300 PHONE:
FAX: 503-624-7755
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: IIB Permit Fee-Additions,Alterations, 07/26/2021 $2,011.95
Occupancy Grp: U Occupancy Load: 0 Demolition
12%State Surcharge-Building 07/26/2021 $241.43
Dwelling Units: 0 Plan Review 07/01/2021 $1,307.77
Stories: 0 Height: 0 ft DC Provision Review,COM TI-Ping 07/26/2021 $434.00
Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Lg$2.00(over 07/26/2021 $12.00
Value: $250,000 11x17)
Erosion Control w/Development 07/26/2021 $311.40
Metro CET 07/26/2021 $300.00
Floor Areas: Tigard CET-Non-Residential-Admin 07/26/2021 $100.00
Total Area: 0 Tigard CET-Non-Residential-AH 07/26/2021 $2,400.00
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $7,118.55
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work
will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more
the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issued By: uoily vam/De•Weife Permittee Signature: OvvAppU atia t
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Building Permit Application
Commercial RECEIVE I FOR OFFICE USE ONLY
City of Tigard Received ,1 ` 1 `, t permit Nu.:
13125 SW Hall Blvd.,Tigard,OR 97223 JUN Ci 7n71 Date/By: ` •�Z, R V BV�.0Z.`'065.�1
g Plan Review
MiI
Phone: 503.718.2439 Fax: 503.598.1960 Date By: ��12—� f Other Permit:
TIGARD Inspection Line: 503.6394175 CITY OF TIGARD Date Ready/By: laris: tO See Page 2 for
Internet www.tigard-or.gov N. cd/Method�, // / //f Supplemental Information
RUIL DING nivis!Onl `l/y�r
A/J
t
"°"" 1f„IGIII '; y :�E;`OWORK REQUIRED DATA:1-AND 2-FAMILY DWELLING
■ New construction ■ •. Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
E Additionialteratioiereplacement ■ equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
Valuation: $
■ ■
■ ■ Number of bedrooms:
Accessory buildingEl Master builder D Other: Number of bathrooms:
• ; SITE INFORMATIONr LOCATION Total number of floors:
address:Job site New dwelling area: square feet
City/State/ZIP:Portland, • ' 97224 Garage/carport area: square feet
Suite/bldg./apt.no.: Project name:pcc225-226 Courtyard Covered porch area: square feet
Cross street/directions to job site: Deck area: square feet
Other structure area: square feet
REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: I Lot no.: Permit fees*are based on the value of the work performed.
Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the
DESCRIPTION OF,WORK work indicated on this application.
Project consists of major alterations to existing landscape area between 2 buildings.Work will entail the Valuation: $250,000.00
removal of landscaped areas&replaced w/paths,seating areas,covered areas,modification of trash
enclosure location,modification to parking and drive way aisles,modified landscaped areas& Existing building area: N/A square feet
replacement of garage door in bldg.225.Work includes selective demo,concrete flatwork and walls,
steel fabrications,landscape planting,and site lighting.Approved with MMD2021-00014. New building area: N/A square feet
® PROPERTY OWNER 0 TENANT Number of stories: 1
Name:Pacific Realty Associates,LP. Type of construction: II-B
Address:15350 SW Sequoia Parkway,Suite 300 Occupancy groups:
City/State/ZIP:Portland,OR 97224 Existing: N/A
Phone:(503)624-6300 Fax:(503)624-7755 New: N/A
® APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES*
(Please refer to fee schedule)
Business name:Pacific Realty Associates,LP.
Structural plan review fee(or deposit):
Contact name:Ryan McGuire
FLS plan review fee(if applicable):
Address: 15350 SW Sequoia Parkway,Suite 300
City/State/ZIP:Portland,OR 97224 Total fees due upon application:
Phone:(503)624-6300 Fax: :(503)624-7755 Amount received
E-mail:permits@pactrust.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
li(xtt�s srti,i;. Commercial and residential prescriptive installation of
In Ii� itACTOR roof-top mounted PhotoVoltaic Solar Panel System.
Business name:Pacific Realty Associates,LP. Submit two(2)sets of roof plan with connection details
and fire department access,along with the 2010 Oregon
Address: 15350 SW Sequoia Parkway,Suite 300 Solar Installation Specialty Code checklist.
City/State/ZIP:Portland,OR 97224 Permit fee(includes plan review $180.00
and administrative fees):
Phone:(503)624-6300 Fax:(503)624-7755 State surcharge(12%of permit fee): $21.60
CCB lie.: 153913 Total fee due upon application: $201.60
Authorized signature: This permit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
Print name:Ryan McGuire Date: 6/28/21 * Fee methodology set by Tri-County Building Industry
Service Board.
I:1Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(I 1/02/COM/WEB)
■ City of Tigard
ill
COMMUNITY DEVELOPMENT DEPARTMENT
TIcaRD Building Permit Review — Commercial - With Land Use
Building Permit #: ?2OZ\—CDC)1 1
Site Address: 7 ?CC- C.ot�7ype.P {PEj1c60ATla►1J Suite/Bldg#:
Project Name: C> I�-S-- SW S&UO IA 'KW)/
(Name of commercial business occupying the space. If vacant,enter Spec Space.)
Planning Review }
Proposal: c"7UryAgt) 1P-2(10 V/AT7ON
fy site address/suite#exists and active in permit system.
er Terrace Neighborhood: ❑ Yes No
nd Use Case#: MM92o2k -0001 y
Plans tch Approved Land Use:
Site Plan ❑ Landscape Plan ❑ Other:
0 Urban Forestry Plan ❑ Elevation Plan
Building Height: Maximum Height Actual Height
VA,
Conditions Met: 0 Prior to Submittal ❑ Prior to Permit Issuance
Business License:
/Exists: iYes 0 No,applicant was provided a business license application
,IG Public Facilities Improvement (PFI) Permit:
Required: 0 Yes, applicant was notified P4o Applied For: 0 Yes 0 No,stop intake
Notes:
Approved by Planning: &vim,. _i Date: (r/30/1
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved 0 Not Approved
Revision 2: ❑ Approved 0 Not Approved
Revision 3: ❑ Approved 0 Not Approved
Building Permit Submittal
Original Submittal Date: (p 2R`Z1
Site Plans: # S
Building Plans: # ./
Building Permit#: Lr Enter building permit#above. /
Workflow Routing KY-Planning Si'Engineering C' Permit Coordinator 2I Building
Workflow Sign-off: 2/Sign-off for Planning(include notes from planning review)
Route Application Documents: L//Building. original permit application, site plans,building plans, engineer and
beam calculations and trust details,if applicable,etc.
Notes:
By Permit Technician: \—\--6\) \)G'l e.\—A)�`L Date: 1\\\ 24
l:lBuilding\Forms\BldgPern itRvw_COM_WithLandUse_111819.docx
Engineering Review
L Slope at building pad: (19
I1'FI Permit#: f4 1 I A
conditions "Met"prior to issuance of building permit
ements (encroachments)per engineering conditions of approval and plat(not typical on SDR/CUP)
IV-Water Quality/Quantity Facility:
Assess Water Quality Fee.in-lieu: - ❑ Yes �No
Assess Water Quantity Fee in-lieu: ❑ Yes IT-No
LIDA Facility on lot: •❑ Yds Er No
❑ NOT Approved by Engineering: Date
Notes:
Approved by Engineering: 14, 11 ) 5 1k4_ Date: 7-8 zo z l
Revisions (after Building Submittal only) Reviewer Date
Revision 1: 0 Approved 0 Not Approved
Revision 2: 0 Approved 0 Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Permit Coordinator Review
Conditions "Met"prior to issuance of building permit
El Approved,NOT Released: Date:
Notes:
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applicant:
Revision Notice 3: Date Sent to Applicant
SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes 2/N/A
Tigard Trans SDC: ❑ Yes 4'N/A
Parks SDC: 0 Yes 41 N/A
( OK to Issue Permit Approved by Permit Coordinator: {n _y1)k Date: 1 `$12074
1:\Building Worms\BldgPermitRvw_COM_W ithLandUse_111819.docx