Loading...
Permit Support Document CITY OF TIGARDvis. ELECTRICAL PERMIT 'PI { Permit#: ELC2021-00306 COMMUNITY DEVELOPMENT - y� Date Issued: 6/3/2021 T I G A R D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 1 S134AB00100 Jurisdiction: Tigard Site address: 10980 SW SPRINGWOOD DR Project: 10960 SW Springwood Dr#10980/Humidistat&Watei Subdivision: ENGLEWOOD Lot: 90 Project Description: Unit#10980-install of Humidistat&Water Heater 7/2/2021: REPRINT permit to correct address from 10960 to 10980. Contractor: SQUIRES ELECTRIC INC Owner: MEACHAM CREEK PARTNERS LLC 2203 NE MARTIN LUTHER KING JR BLVD BY DALTON MANAGEMENT INC PORTLAND, OR 97212 8417 SW BEAVERTON HILLSDALE HWY PORTLAND, OR 97225 PHONE: PHONE: 503-252-1609 FAX: 503-253-5831 FEES Quantity Description Date Amount 2 crt Branch Circuits wo/Purchase 06/03/2021 $63.60 Specifics: Service or Feeder 1 ea 12%State Surcharge- 06/03/2021 $7.63 Type of Use: MF Electrical Class of Work: ALT Type of Const: Occupancy Grp: Total $71.23 Required Items and Reports(Conditions) This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR.952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. f' Issued By: ,.f �f %�`� v° f ° '+ Permittee Signature: OWNER INSTALLATION ONLY The installation is being made on property I own which is not intended for sale,lease or rent. OWNER'S SIGNATURE Date: CONTRACTOR INSTALLATION ONLY SIGNATURE OF SUPR.ELEC' Date: LICENSE NO. Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection.