Loading...
Correspondence I (o082 SU1SNIN . L6(41" Iv c.021-OOpe1 t�(�SO Sv�9�i ne Mg-2,021-pato Branden Taggart From: Omar Alami Abouhafs <OAIamiAbouhafs@taylormorrison.com> Sent: Wednesday, March 24, 2021 3:29 PM To: Branden Taggart; #Building Permit Technicians Cc: PermitSubmittals_WL;Allyson Armstrong;Tina Escalera Subject: Re: Polygon at Roshak Ridge, Lot 167 & Lot 169 Caution!This message was sent from outside your organization. Allow sender I Block sender Branden, I didn't know the other 2 duplexes will be available to slip-sheet, so I will have to print those revisions and come back to slip-sheet them.$will provide the yellow transmittal form with details for each permit when I come back. Please let me know if I can stop by on Monday at 1:00? Thanks, Omar Alami Abouhafs Permit Coordinator T: OAIamiAbouhafs@taylormorrison.com M: +13609468674 www.taylormorrison.com This message may contain confidential information and is intended only for the named addressee.If you are not the named addressee you should not distribute or copy this e-mail.If you have received this e-mail by mistake please delete it from your system. "Taylor Morrison received the highest numerical score in the proprietary Lifestory Research 2016,2017,2018,2019,2020,and 2021 America's Most Trusted®Home Builder study.Study results are based on experiences and perceptions of people surveyed.Your experiences may vary. Visit www.lifestorvresearch.com. From: Branden Taggart<brandent@tigard-or.gov> Sent: Wednesday, March 24, 2021 3:14 PM To:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov>; Omar Alami Abouhafs <OAla miAbouhafs@taylormorrison.com> Cc: PermitSubmittals_WL<PermitSubmittals@taylormorrison.com>;Allyson Armstrong<AllysonA@tigard-or.gov>;Tina Escalera <tinae@tigard-or.gov> Subject: RE: Polygon at Roshak Ridge, Lot 167& Lot 169 This message originated from outside of our organization 1 Omar, I see that (1) of the (3) sets of duplex plans were slip sheeted. Are you coming back today to finish the others today? If not, when will you return? Also, per my previous email, we will need you to complete a Transmittal Letter for each permit with changes—this form is also available in the lobby—it's the yellow one. Thanks, Brandon Taggart ipiw City of Tigard it , Senior Permit Technician Community Development TKO 13125 SW Hall Blvd Tigard, OR 97223 (503)718-2449 brandent@tigard-or.gov From:#Building Permit Technicians Sent: Wednesday, March 24, 2021 9:31 AM To: Omar Alami Abouhafs<OAIamiAbouhafs@taylormorrison.com> Cc: PermitSubmittals_WL<PermitSubmittals@taylormorrison.com>; Allyson Armstrong<AllysonA@tigard-or.gov>; Dianna Ornelas<Dianna@tigard-or.gov>;Tina Escalera <tinae@tigard-or.gov> Subject: RE: Polygon at Roshak Ridge, Lot 167 & Lot 169 Importance: High Hi Omar, There was some confusion with regard to slip sheeting plans, and now I see that you are referring to slip sheeting two different sets of permits. We will have the duplex/ADU permits ready for you to slip sheet at 1:00 today in the open Permit Center conference room. Regarding lots 154, 167, 168, 169 and 171, we received what appeared to be new submittals for lots 167 and 169 -- not 168. Any time you need to make revisions, we ask that you complete the attached Transmittal Letter so that we know what changed. The submittals for lots 167 and 169 that we received on Monday did not have a Transmittal Letter, and they appeared to be entirely new permit submittals,so we completed additional review that may have not been necessary. In this case, we do not know if your intention is to change the house plan and void the original submittal, or to make minor changes. Communication before you submit would be much appreciated. I checked with our Residential Plans Examiner,Allyson Armstrong, and she was not aware that you were going to slip sheet these plans or submit replacements. What is changing? Please complete the attached Transmittal letters for each permit. Additionally,we have already completed plan review for lots 167 and 169. Theses permits are basically ready to issue, but we have not completed our final review. For reference, the permit numbers are as follows: • Lot 167 = MST2020-00068. • Lot 169 = MST2019-00450. Lastly, we would appreciate it if you can provide us with a more thorough Description of Work on the applications when necessary. I noticed that the duplex/ADU permits simply say"New Single Family." Thank you for your cooperation. 2 Thanks, Branden Taggart IIIIIw 4 City of Tigard a Senior Permit Technician Community Development 13125 SW Half Blvd Tigard,OR 97223 (503)71B-2449 brandentOtigard-o r.gov From: Omar Alami Abouhafs<OAIamiAbouhafs@taylormorrison.com> Sent: Tuesday, March 23, 2021 6:24 PM To:#Building Permit Technicians<TigardBuildingPermits(«tigard-or.gov> Cc: PermitSubmittals_WL<PermitSubmittals@taylormorrison.com> Subject: Re: Polygon at Roshak Ridge, Lot 167 & Lot 169 Hi Tina, After looking at some previous emails, it looks like lots 154, 167, 168, 169 and 171 were kept open because we are going to use the original permit#. The new plans that I submitted yesterday were supposed to be a slip- sheet not new submittal, sorry for the confusion! Please let me know if you can discard the original plans for lot 167 & 168 and consider the new plans and calculations as slip-sheet under the original permit#. If you have any questions, please let me know. Thank you! Omar Alami Abouhafs Permit Coordinator T. OAIamiAbouhafs(a�taylormorrison.com M: +13609468674 www.taylormorrison.com ' = t E =- 3 this message may contain confidential information and is intended only for the named addressee.If you are not the named addressee you should not distribute or copy this e-mail.If you have received this e-mail by mistake please delete it from your system. *Taylor Morrison received the highest numerical score in the proprietary Lifestory Research 2016,2017,2018,2019,2020,and 2021 America's Most Trusted®Home Builder study.Study results are based on experiences and perceptions of people surveyed.Your experiences may vary. Visit www.litestoryresearch.com. From: #Building Permit Technicians<TigardBuildingPermits(a tgard-or.gov> Sent:Tuesday, March 23, 2021 6:10 PM To: Omar Alami Abouhafs<OAIamiAbouhafs@taylormorrison.com> Cc: PermitSubmittals_WL<PermitSubmittalsPtavlormorrison.com> Subject: Polygon at Roshak Ridge, Lot 167& Lot 169 This message originated from outside of our organization Hi Omar, I was attempting to create permits for Polygon at Roshak Ridge Lot 167 &Lot 169, but I see there is older submittals for these lots in our system already. If the older submittals need to be voided a request for action form will need to filled out for each address. This needs to be done prior to us creating a permit for the newer submittal. If this is not the case please let us know how you would like us to proceed. Thank you and have a great night, Tina Escalera Permit Tech Assistant City of Tigard I Community Development 13125 SW Hall Blvd.Tigard, OR 97223 DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules"City General Records Retention Schedule." 4