Loading...
12/13/1977 - Packet TIGARD WATER DISTRICT 9641 S. W. COMMERCIAL ST. TIGARD, OREGON 97223 PHONE (503) 639-1554 d�flr✓ December 13, 1977 AGENDA CALL TO ORDER 1. RESOLUTION TO APPROVE MINUTES OF LAST MEETING 2. VISITORS 3. RESOLUTION TO PAY VOUCHERS 4. DISCUSSION OF FY 1976-77 AUDIT REPORT BY JAMES SAVAGE, COOPERS & LYBRAND 5. OTHER BUSINESS ADJOURNMENT rr ADMINISTRATOR'S REPORT 1. Resolution to approve minutes of last meeting. 2. Visitors. 3. Resolution to pay vouchers . 4. Discussion of FY 1976-77 Audit Report by James Savage, Coopers & Lybrand. A copy of the audit report will be delivered to each commissioner prior to the meeting. 5. Other business. v.. 6. Tigard Water District vs City of Lake Oswego. The attorney has advised that on November 9 , 1977, the Court of Appeals declined to reconsider its decision in reversing the opinion of Judge Dale, Circuit Court of Multnomah County. As a result of the Court of Appeals decision, the petition will now be considered by the Oregon State Supreme Court and a vote will be taken by the members of the Supreme Court to determine if they will act fur- ther in this case. 7 . Construction on 10-MG Reservoir. The general contractor is essentially finished with constructing the reservoir. Inclement weather has delayed painting outside wall with sika-seal for that portion of the tank which will be below ground and green paint for the exposed portion of the walls. Cleaning and testing the reservoir cannot commence until transmission and drainage mains are installed so that o, water can either be consumed (if potable) or drained (if contaminated) . Only about 300 feet of 36" D. I. and 300 feet of 24" concrete cylinder (drain) remains to be in- stalled to complete the system. Unfortunately, there is -1- ADMINISTRATOR'S REPORT (Continued) Now a pile of dirt about 40 feet high over the proposed rerouting of the main installations and this dirt was not scheduled to be moved until backfilling the site. The location of the main had to be changed because the residential development plat was modified by the Ames ' brothers. The dirt will have to be moved twice or arrive at an alternate solution for testing and filling the reservoir. District personnel are completing the concrete vault located just north of the reservoir. This vault is 18 ' x 15 ' and 8 ' high. It houses the 24" control valves, including altitude control valve and check valve. Provision has been made to install a pump station at a later date above the vault to pump water to High Tor. This would save power by eliminating a duplication of pumping water an extra 65 feet of elevation. Field personnel are doing an outstanding job con- structing this control vault. They are getting experi- ence in all facets of construction, including forming walls for concrete, placing steel for reinforcement, pouring concrete, in addition to installing 24" fittings. It is hoped that water will be in the tank within a month, tested satisfactorily, and fully operational by May 1978. 8. Development of the Willamette River as a source of water. The steering committee on developing the Willamette River as a source of water met on December 6, 1977 at Wolf Creek Highway Water District. Sub-committee assign- ments were made by Chairman Jonasson. The consensus of the committee members seemed to be that the common bond election should be delayed until November 1978. Beaverton seems to be in a turmoil and Wolf Creek has some special problems which makes it difficult for them to arrive at a firm commitment on participation. Some members expressed concern about the accuracy and updating of the engineering data and cost estimates. An independent study would be welcome. Such a study by an engineering firm would be relatively easy and inex- pensive. It would simply be a matter of extracting data Now and compiling information from existing or "in progress" engineering studies provided each entity as follows: -2- ADMINISTRATOR`S REPORT (Continued) �wr Wolf Creek Hwy Klein Engineers January 1977 Beaverton Meyer Engineers December 1977 Tigard ST&R July 1975 Metzger CH2M (in progress) Tualatin Wright Engineers (in progress) Wilsonville Westech Engrs. If such a document were requested with definitive guidance to a consulting engineer to consider only the Willamette River at Wilsonville and the participation of the six (6) governmental agencies noted above, the pertinent information could be available within a few weeks. Distribution and storage would 'not be elements of the study, only the size (& phasing) and cost of the intake, treatment plant, and pipeline to the various reservoirs. Metzger and Tigard Water Districts are the only ones, at this date, who have made a firm commitment to partici- pate in the project. Tualatin and Wilsonville, if they *sr— do not participate, would probably buy surplus water any- way. Therefore, delay in proceeding rests with Beaverton and Wolf Creek Highway Water District. The City of Beaverton was not represented at the meet- ing so they probably do not know as yet whether to partici- pate in the project. However, if their track record of past projects; namely: Tualatin, Phase I , is indicative of their interest, we will hear nothing from them. Wolf Creek has indicated that they cannot make a decision until April 1978, if then. They have tentative plans to request voter approval of a $6 million G.O. bond issue in March for internal capital improvements. Also, they are committed to negotiating with the City of Portland this Spring on a "betterment buy-in" program. If I may state a personal opinion without being "off- base" or accused of advising how Wolf Creek should conduct their business, I believe the biggest obstacle in their indecisiveness is really the obnoxious terms of the 10- year contract with the City of Portland that we were all forced to sign. Since Wolf Creek's contract is not a year old, and Willamette River water became available in 1982 , they would still be required to continue paying Portland millions of dollars without benefit. This is a tremendous financial burden and makes this an inopportune time for Wolf Creek to make a commitment. Metzger and Tigard have this same condition, but to a considerably less degree. -3- ADMINISTRATOR'S REPORT (Continued) If the Willamette River proposal were offered 3 or 4 years hence, I am confident it would appear to be more acceptable to Wolf Creek. If I am "off-base" in arriving at this conclusion, I apologize. In all sincerity, we cannot afford to delay the project beyond 1978. At best, Willamette River water will not be available until 1982 . With the phenomenal growth and significant increase in water consumption now occurring in eastern Washington County (and Lake Oswego) , it is believed that water shortages and pressure deficiencies will continue to become more acute each ensuing summer. At the suggestion of Verne Wheelwright, Gilbert R. Meigs, Senior Vice President, ST&R, has been requested to appear before the Board and review the long range needs of the district. The next meeting of the steering committee on the development of the Willamette River has been scheduled for noon, January 3, 1978 at Wolf Creek Highway Water District. 9. Accomplishments of Year 1977 . Accomplishments of this past year have been too numerous to list. However, 1977 represented the sixth (6th) consecutive year in which the patrons of the water district experienced no water shortages or restrictions. (Do you think we can ever get off the governor ' s list?) . The pipe replacement program progressed satisfactorily and is nearing a conclusion. The Board' s decision to commence construction expe- ditiously on the 10-MG reservoir proved to be a wise one. Although it was the driest year in the past 100 years, it was beneficial to the construction industry. Approximately 10% of the total cost was saved by starting construction at an early date. Progress continued toward development of an alternate source of water, including a favorable opinion by the Oregon State Public Health Division on the quality of the Willamette River. -4- ADMINISTRATOR' S REPORT (Continued) 10. Forecast for Year 1978 . The prospects of major accomplishments for 1978 appear very optimistic, and probably the best in the history of the water district. The 10-MG reservoir will be operational by this summer, providing the district with a total of 17. 5 MG' s of storage, adequate until year 1990 . 5, 300 meters are in service with an average daily use of 2. 1 MGD which computes to be over 8 days average daily demand on hand. The State Health Division requires only 3 days average daily demand. The pipe replacement program will be completed this year. This has taken eight (8) years to finish and means all pipelines are either cast or ductile iron, all ade- quately sized, and with excellent pressure throughout the system. This is reflected in the ever-decreasing water loss figure for the past several years. In fact, for the first 5 months of this fiscal year, the records show that the district has sold more water than it has pumped & purchased, an impossibility. This is due to the fact -4110, that billing customers is done bi-monthly with one-half the meters read and billed every two months while water pumped and purchased is recorded monthly. The discrepancy will correct itself next month. However, it is indicative of the small amount of water lost due to leaks, etc. It appears that this year the patrons of the water district will be provided the opportunity to vote on a bond measure whether to develop the Willamette River. 1978 looks like a busy and eventful year. 11. Unmetered Water. Pumped Purchased Total Sold Loss Month & Cu. Ft. Cu. Ft. Cu. Ft. Cu. Ft. Cu. Ft. Loss Year x 1000 x 1000 x 1000 x 1000 x 1000 % Nov 1977 -0- 6, 223 (L.O. ) 6,223 7 ,445 -0- 0% -0- (Port) Total: 9 , 605 39, 336 48, 941 49 ,279 -0- 0% (5 mo. ) -5- ADMINISTRATOR' S REPORT (Continued) 12 . Percentage of Bull Run water purchased for computing amount due for Systems Development Charge. Month & Well Lake Oswego Portland Total % Year Cu. Ft. Cu. Ft. Cu. Ft. Cu. Ft. Bull Run Jul 1977 1, 478, 780 8 , 090 , 600 2,065,700 11, 635, 080 17. 75% Aug 1977 3, 837, 780 5 , 992 ,800 5, 198,400 15,028,980 34. 59% Sep 1977 4, 037, 070 4 ,020 , 900 657,400 8 ,715,370 7 . 54% Oct 1977 251, 560 7 , 087, 000 -0- 7 ,338 , 560 0. 00% Nov 1977 -0- 7,176,700 300 7,177,000 0. 00% Total: 9, 605,190 32 , 368 ,000 7 , 921, 800 49, 894, 990 15. 88% Summary of water purchased and/or pumped and water losses. FY Well Lake Oswego Portland Water Loss 1973-74 48% 52% -0- 11. 1% 1974-75 40% 59% 1% 16. 2% 1975-76 39% 59% 2% 7. 4% 1976-77 33% 65% 2% 5. 5% 1977-78 (5 mo. ) 19% 65% 16% 0. 0% 13. Water pumped from wells, Calendar Year 1977 . Month Actual *Actual Allocation Remarks 1977 Cubic Feet Acre-Feet Acre-Feet Jan 1, 955, 100 44 . 9 88 (#3 & #4 off) Feb 1, 795, 820 41. 2 88 (#3 & #4 off) Mar 2, 081,770 47. 8 88 (#3 & #4 off) Apr 3, 068, 550 70. 4 88 (#3 & #4 off) & #1 deepened May 3, 224 , 240 74 . 0. 88 (#4 off & #3 off 3/4 month) Jun 3, 235, 440 74. 2 88 (#4 off) Jul 1,478, 780 34. 0 88 (#1 & #4 off) Aug 3, 837 ,780 88. 1 88 Sep 4, 037 , 070 92. 7 88 Oct 251, 560 5. 8 88 (All wells off Oct. 3rd) Nov -0- -0- 88 (All wells off) itiev Total: 24, 966,110 573. 2 968 (11 mo. ) * 1 Acre-Foot = 43 , 560 cubic feet. Actually pumped in prior years: 1974 : 924 Acre-Feet 1975: 930 Acre-Feet 1976: 847 Acre-Feet 1977 : 573 Acre-Feet (Est. ) -6- ADMINISTRATOR'S REPORT (_Continued) "'rrr 14. Work accomplished during November 1977. a. TWD installed control vault for 10-MG reservoir. b. TWD installed 700 feet of 6" concrete cylinder drain tile around outside perimeter of 10-MG reservoir. c. TWD installed fire hydrant along S. W. Grant Street, south of Tigard Avenue, for new warehouse being constructed for Seeber - Balzer Co. d. TWD cleaned reservoir #4 . e. TWD installed 49 meters. (5297 - 5249) . District also serves 41 meters out-of-district. Total: 5, 338. 15. Work to be accomplished during December 1977. a. TWD install 180 feet of 4" D. I . pipe from both low 125th Avenue (60 feet) and Bull Mountain Road (120 feet) to serve fire lines to 10-MG reservoir (for cleaning tank) . Also, 100 feet of 12" D.I . will be installed to serve a future pump station. b. TWD install 700 feet of 12" D.I . pipe along Durham Road from 98th westerly to begin initial phase of water service to KERWOOD ESTATES. c. TWD install 4" fire hydrant at S. W. Rose Vista and Gaarde Street. d. Private contractor install 200 feet of 6" D. I . pipe and 195 feet of 4" D.I . pipe + 1 fire hydrant for development of 8 houses on Watkins Street, north of Derry Dell Court. (WATKINS PARK) . 16. Work to be accomplished during Calendar Year 1978. January 1978 : a. TWD install 120 feet of 24" concrete cylinder pipe + 1 manhole along Hazeltree Drive to drain 10-MG low reservoir into drainage system of Hazeltree subdivision. -7- ADMINISTRATOR'S REPORT (Continued) Nov January 1978 (Continued) : b. TWD install 1370 feet of 6" D. I. pipe, 240 feet of 4" D. I. pipe + 3 fire hydrants for new development of 39 single family homes along Serena Court and Kimberly Drive, near Durham Road and 98th Avenue. (KERWOOD) c. Private contractor install 1900 feet of 8" D. I. pipe, 1400 feet of 6" D.I. pipe + 6 fire hydrants for 71 single family dwellings located at 88th Avenue, north of Durham Road. (STRATFORD) February 1978 : a. TWD install 680 feet of 12" D.I. pipe along S. W. Hazeltree Drive and 440 feet of 6" D. I. pipe + 1 fire hydrant along Duchilly Court to serve remaining 19 single family dwelling sites for Mr. Robert and Gary Ames . (HAZELTREE) b. Private contractor backfill and landscape 10-MG reservoir site. c. Private contractor install 300 feet of 36" D.I . pipe and 300 feet of 24" concrete cylinder pipe (drain line) from 10-MG reservoir to Corylus Court. d. Private contractor install 1535 feet of 6" D.I . pipe + 3 fire hydrants along Cresmer Drive and Renee Drive, near Ash and Garrett Streets, for new development of 37 single family dwellings. (RENEE' PARK) e. Private contractor install 1040 feet of 6" D. I . pipe + 3 fire hydrants for Phase II of ALDERBROOK APTS . (63 units) , and 560 feet of 6" D. I . pipe + 2 fire hydrants for Phase III of ALDERBROOK APTS. (63 units) . (SUMMERFIELD) March 1978: a. TWD install 980 feet of 12" D.I. and 1400 feet of 6" D. I. pipe along Gaarde, 121st, and access road to #2 reservoir to replace 6" O.D. steel pipe, pressurize 23 homes on Rose Vista Drive, and prepare for service line to 24" or 36" transmission main along S. W. Gaarde, including a pressure-reducing valve in concrete vault. b. TWD install 1300 feet of 12" D. I. pipe + 2 fire hydrants along S . W. 72nd Avenue, Kable to Upper Boones ,,, , Ferry Road, to serve a new commercial development. (Equities Northwest) . -8- ADMINISTRATOR'S REPORT (Continued) March 1978 (Continued) : c. TWD install 340 feet of 6" D. I. pipe + 1 fire hydrant along S. W. 111th Place, north of Fonner Street, for new development of 13 single family dwellings . (WILDERNESS) April 1978: a. TWD install 1st phase (18 homes) for new develop- ment of 99 homes near 115th Avenue, between Fairhaven and Terrace Trails, consisting of 540 feet of 8" D. I. and 320 feet of 4" D.I. + 1 fire hydrant along S. W. Genesis, Nova, and Venus Avenues. (GENESIS) b. Private contractor install 1250 feet of 8" D. I . pipe, 60 feet of 6" D. I. pipe, and 530 feet of 4" D. I. pipe + 3 fire hydrants for new development of 30 single family dwellings located on S. W. 92nd Avenue, north of Sattler Road. (LAUNALYNDA PARK) c. Private contractor install 990 feet of 6" D.I. pipe + 2 fire hydrants for development of 15 single family '4%w dwellings on S. W. Pathfinder Way, 107th Court to Walnut Street. (YOLO ESTATES) May 1978: a. TWD install 2260 feet of 12" D.I . pipe + 4 fire hydrants from Fern Street pump station to 132nd Avenue pump station to parallel for pressure and eliminate the Fern Street pump station. b. TWD install 100 feet of 8" D. I . , 100 feet of 6" D. I. , and 300 feet of 12" D. I . pipe (under Fanno Creek) to serve North Dakota Street island, if approved by patrons OR TWD install 700 feet of 6" D.I . pipe + 1 fire hydrant along S. W. 106th Avenue (old USA Metzger access road) , north of North Dakota Street for development of 13 single family dwellings; (NORTHERN PINE) and, 300 feet of 12" D.I. pipe (under Fanno Creek) to serve patrons east of the USA access road on North Dakota Street.. c. Private contractor install mains near 92nd Avenue, N,,, south of Durham Road, for new development of 75 single family dwellings. (Donald E. Pollock, Inc. ) -9- ADMINISTRATOR'S REPORT (Continued) d. Private contractor install 1430 feet of 8" D. I . , 950 feet of 6" D.I. , and 500 feet of 4" D. I. pipe + 4 fire hydrants for new development called SHADOW HILLS consisting of 40 single family dwellings located north of S. W. Bull Mountain Road, near 117th Avenue. June 1978: a. TWD install 640 feet of 8" D.I . pipe along S. W. 141st Avenue, south of Bull Mountain Road, and 1370 feet of 6" D.I. pipe on Bull Mountain Road, east of 141st Avenue, to parallel for pressure and replace 6" O.D. steel pipe. b. TWD install 640 feet of 8" D.I. and 850 feet of 6" D. I. pipe along easterly extension of Sunrise Lane from B.P.A. to High Tor reservoir to complete circulation loop and replace 4" O.D. steel pipe. aawv, Amy -10- . , GENERAL FUND BUDGET REPORT ESTIMATE ESTIMATE + OVER 1976-77 1977-78 1976-77 NOVEMBER 1977-78 1976-77 NOV. ACCUM. 1977-78 - UNDER ACCOUNT ACTUAL BUDGET ACTUAL BUDGET ACTUAL ACTUAL BUDGET ACTUAL BUDGET Beginning Working Capital 63,833 111,000 169,760 197,700 167,972 63,833 111 ,000 129,437 + 18,437 INCOME: 406 Meter Installations 224,925 235,300 15,300 16,100 25,100 90,050 94,600 90,200 - 4,400 407 Line Extension Rebate 1,800 3,000 -0- 500 -0- -0- 1,500 1,562 + 62 408 Miscellaneous Income 34,593 9,000 40 500 181 2,269 3,500 1 ,733 - 1 ,767 412 Interest Income 369 600 -0- -0- -0- 369 200 -0- - 200 418-419 Water Sales 587,754 651,800 45,542 50,400 46,241 274,088 303,400 291,166 - 12,234 425 Penalties for Non-Pay 340 600 25 50 30 185 250 195 - 55 427 Sale of Equipment -0- 600 -0- -0- -0- -0- 200 -0- - 200 430 Developer's - 10% Overhead 33,505 24,000 116 -0- 586 9,240 8,000 3,765 - 4,235 430-1 Developer's - 8% Engineering 17,950 16,000 93 -0- 392 6,198 5,000 2,872 - 2,128 430-2 Developer's - Equipment 8,174 8,000 102 -0- 60 4,725 3,000 372 - 2,628 430-3 Developer's - Wage Reimbursement 12,142 12,000 170 -0- 157 7,901 4,000 684 - 3,316 TOTAL INCOME & WORKING CAPITAL 985,385 1,071,900 231,148 265,250 240,719 458,858 534,650 521,986 - 12,664 EXPENDITURES: Personal Services 500,1,2,3,4 Salaries 159,498 177,904 13,533 14,900 14,455 65,797 74,200 72,225 - 1,975 504-1 Overtime 5,441 7,200 376 600 570 2,484 3,000 3,433 + 433 505 Field Labor 26,861 32,996 2,414 1,700 1,593 11,278 14,700 15,946 + 1,246 506,1,2 Office Employees 20,422 22,200 1,836 1,800 1,840 8,436 9,200 9,965 + 765 212,222 240,300 18,159 19,000 18,458 87,995 101,100 101,569 + 469 EXPENDITURES: Materials & Services 507 Blue Cross of ORegon - Medical 3,426 7,200 318 600 562 1,422 3,000 2,754 - 246 405-1 Bankers Life Nebraska - Dental 880 1,200 65 100 74 324 500 390 - 110 508 Retirement 7,663 12,600 (263) (450) (358) 4,094 6,750 5,907 - 843 509 Social Security 11,473 13,200 834 1,100 839 4,535 5,500 5,300 - 200 510 State Accident Insurance Fund 10,305 13,200 -0- -0- -0- 2,671 3,300 3,482 + 182 511 State Unemployment Compensation 2,451 4,800 -0- -0- 17 618 1,200 969 - 231 512 Advertising & Elections 728 600 -0- -0- -0- -0- 100 -0- - 100 514 Equipment Rentals 283 600 157 50 63 577 250 124 - 126 515 General Insurance 16,495 18,000 925 -0- -0- 2,104 1,500 1,454 - 46 516 Miscellaneous Expenses 2,077 1,800 68 150 216 868 750 1,571 + 821 517 Dues & Subscriptions 678 900 380 100 343 453 400 414 + 14 518,1,2 Office Supplies 10,126 9,000 854 750 804 3,106 3,750 3,860 + 110 519,1,2 Professional Fees 15,732 10,500 2,651 -0- -0- 10,146 6,000 5,807 - 193 520 Meter Maintenance 4,921 6,000 1,192 1,000 400 2,261 2,000 1,036 - 964 521,1,2,3 Repairs - Lines, Pumps, etc. 4,863 6,000 423 -0- 391 1,639 3,000 3,293 + 293 t GENERAL FUND BUDGET REPORT (Cont.) ESTIMATE ESTIMATE + OVER 1976-77 1977-78 1976-77 NOVEMBER 197778 1976-77 NOV. ACCUM. 1977-78 - UNDER ACCOUNT ACTUAL BUDGET ACTUAL BUDGET ACTUAL ACTUAL BUDGET ACTUAL BUDGET 522,1,2,3 Utilities 6,890 7,200 639 600 565 2,755 3,000 2,880 - 120 523 Fire Hydrant Maintenance 2,078 2,400 129 200 -0- 1,244 1,000 12 - 988 524 Truck & Equip. - Maintenance 5,453 7,200 465 600 597 2,914 3,000 2,861 - 139 524-1 Gasoline & Oil 6,376 7,200 596 600 496 2,843 3,000 3,097 + 97 524-2 Tires & Batteries 778 1,200 56 100 304 426 500 447 - 53 525,1 Water Costs - Electricity, etc. 30,766 36,000 2,879 3,000 1,877 14,175 15,000 14,109 - 891 525-2 Water Costs - L.O. , Portland 100,005 112,500 6,619 7,600 10,251 48,015 55,100 70,514 + 15,414 526 Interest Expense 984 600 -0- -0- -0- -0- -0- -0- -0- 527 Small Tools 887 1,200 143 100 48 651 500 648 + 148 529 Rain Gear, Safety Equip. , etc. 1,025 1,200 17 100 136 394 500 544 + 44 530 Employee Training 433 600 -0- -0- -0- 144 200 -0- - 200 247,776 282,900 19,147 16,300 17,625 108,379 119,800 131,473 + 11 ,673 EXPENDITURES: Capital Outlay 548 Fire Hydrants 2,750 2,400 -0- -0- -0- 93 1,600 1,597 - 3 549 Equipment 73,738 33,200 15,329 200 893 25,295 1 ,200 1 ,207 + 7 550 Buildings & Additions -0- 3,600 -0- -0- -0- -0- -0- -0- -0- 551 Meter Installations 38,063 43,300 6,425 6,700 2,417 21,407 22,400 19,814 - 2,586 552 Land & Improvements 8,434 51,000 -0- -0- -0- 6,007 41,000 41,000 -0- 553 Operating Contingencies -0- 53,400 -0- -0- -0- -0- -0- -0- -0- 554 Line Extensions 1,765 39,600 -0- -0- -0- -0- -0- -0- -0- 555 Pipe Replacements -0- 139,200 --0- (500) -0- -0- -0- -0- -0- 124,750 365,700 21,754 6,400 3,310 52,802 66,200 63,618 - 2,582 700 Transfer to Bond Sinking Fund 271,200 72,000 -0- 6,000 6,000 { 37,594 30,000 30,000 -0- Net Fund Balance 129,437 111,000 172,088 217,550 195,326 i 172,088 217,550 195,326 - 22,224 -1- 985,385 1,071,900 231,148 265,250 240,719 458,858 534,650 521 ,986 - 12,664 November 30, 1977 Inventory Balance = $ 80,669.11 t I t BOND SINKING FUND NOVEMBER YTD 103 Cash balance at first of period 6,755 353 108 Invested monies at first of period 170,603 265,307 INCOME: 400 Transfer-in from General Fund 6,000 30,000 412 Taxes: Current 11,316 11,316 413 Delinquent 1 ,104 8,270 414 Trailer House -0- -0- 415A Land Sales -0- -0- 418 Interest Earned from Invested Monies 980 4,076 419 Interest Earned from Property Taxes -0-- -0- Transfer-in from Invested Monies 4,000 126,200 23,400 179,862 EXP END ITURE S: 585 Bond Principal 10,000 52,000 586 Bond Interest 701 81,076 587 Bank Fees & Postage -0- 188 Transfer-to Invested Monies 19,380 46,876 30,081 180,140 TOTAL CASH AT END OF PERIOD 75 75 TOTAL INVESTED MONIES AT END OF PERIOD 185,983 185L983 TOTAL CASH & INVESTED MONIES $ 186,058 $ 186,058 ( BOND CONSTRUCTION FUND - Issue 1976 NOVEMBER YTD 101 Cash Balance at first of period 53 55 106 Local Government Pool at first of month 525,503 770,797 235 Due (to)/from General Fund (58,919) (8,524) INCOME: 410 Sale of Bonds -0- -0- 412 Interest Income 3,066 13,572 Transfer-in from Government Pool 99,000 354,800 102,066 368,372 EXPENDITURES: 521 Bond Costs -0- -0- 522 Professional Fees -0- -0- 523 Bond Interest -0- -0- TOTAL MATERIALS & SERVICES -0- -0- 540 Purchase of Land -0- -0- 541 lOMG Reservoir @ 125th & Bull Mt. 40,441 184,235 542 Major Transmission Lines (Extensions)35,872 124,289 543 Pipeline Replacements -0- 73,986 TOTAL CAPITAL OUTLAY 76,313 382,510 Transfer to Government Pool 64,066 74,572 140,379 457,082 TOTAL CASH BALANCE AT END OF PERIOD 43 43 TOTAL INVESTED MONIES AT END OF PERIOD 490,569 490,569 DUE (TO)/FROM GENERAL FUND (97,222) (97,222) $ 393.390 $ 393.390 TIGARD WATER DISTRICT NOVEMBER 30, 1977 WELL RECORDS: iv WELL HOURS STATIC PUMPING CUBIC FEET COSTS-ELECT. HOURS NO. OFF LEVEL LEVEL PUMPS, ETC. 1 OFF $ 156.00 -0- 2 OFF 302.49 -0- 3 OFF 19.71 -0- 4 OFF 22.28 -0- All 7 pump stations & Alarm-Telemetry Phones 1,376.37 $ 1,876.85 METER RECORDS: Meters #5,249 through #5,297 = 49 meters sold. mow BILLING DETAIL: November $ 46,525.50 Delinquent 85.35 7,445,200 cubic feet of water billed. TIGARD WATER DISTRICT November 1, through 30, 1977 SCHEDULE OF DISBURSEMENTS GENERAL FUND CHECK# PAYEE AMOUNT ACCOUNT 19264 Petty Cash 36,59 516,518,518-1,522-3 19265 Frank's Disposal Service 11,45 201 19266 Martig's Inc. 87.00 201 19267 Sanderson Safety Supply Co. 196.95 201 19268 Pacific Stationery 55.62 201 19269 Rodda Paint Co. 34.25 201 19270 Willamette Industries, Inc. 82,41 201 19271 Homelite Textron 215.26 201 19272 Doug's Auto Parts 69.21 201 19273 Coast to Coast Stores .98 201 19274 Alaska Steel 45,00 201 19275 City of Lake Oswego 9,921.80 201 19276 Knauss Chevrolet 125.07 201 19277 Fruehauf Dist. Co, 3.27 201 19278 Rentex Corp. 125,08 201 19279 Cascade Microfilm Systems, Inc. 81.80 201, 518 19280 Valley Auto Parts 23.90 201 19281 Pacific Water Works Supply Co. , Inc. 2,221.00 201 19282 Chevron USA, Inc. 482.13 201 19283 Watt Welding Supply 41.26 201 19284 L. H. Cobb Crushed Rock 1,845.00 201 19285 Consolidated Supply Co. 191.09 201 19286 Farmcraft, Inc. 97.00 201 19287 Dicks Trailer Shop 11.00 201 19288 Southwest Office Supply 25.45 201 19289 Oliphant & Bates Insurance 50.00 201 19290 Cantel Incorporated 46.90 201 19291 Meter Box Equipment Co. 219.85 201 19292 Portland Concrete Pipe Co. 863.24 201 19293 Gray's Automotive 15.00 201 19294 Power Rents, Inc. 105.30 201 19295 Goodyear Truck Tire Center 39.00 201 19296 Diesel Service Unit Co, 8.18 201 19297 Goodyear Service Stores 3.50 201 19298 Case Power & Equipment 30.63 201 19299 Baltz & Son Co. 22.05 201 19300 Hinds Supply Company 6,488.13 201 19301 Oregon Asphaltic Paving Co. 179.89 201 19302 Ross Island Sand & Gravel Co. 277,65 150, 201 19303 Badger Meter, Inc. 1,237.84 201 19304 U.S. Pipe & Foundry 22,879.99 150, 201 19305 Everett L. Wiggins 425.00 201 19306 Pacific Paging 29.00 518 19307 Secretarial Answering Service 27,50 518 19308 Pitney Bowes 168.00 518-2 19309 Brewed Hot Coffee, Inc. 18.85 516 19310 Engineering Examiners (OSBEE) 13.00 517 19311 Tri-County Water Dist. Assoc. 262.40 517 19312 Tigard Sand & Gravel Co. , Inc. 538.93 150 19313 Art Lutz & Co. #3A-363 8.50 212 set 1 19314 TWD - Bond Sinking Fund 6,000.00 700 19315 Robert E. Santee 702.67 500 19316 Nancy L. Larson 322.77 506 Allow 19317 Annie L. Schwartz 322.65 506-1 19318 John P. Miller 571.12 502 19319 Russell A. Thomas 413.05 501 19320 William C. Bryant 436,88 504 19321 John C. Dixon 449.95 501-1 19322 Harold H. Kuehn 290,15 503-2 19323 Robert M. Adams 214.65 503-1 TIGARD WATER DISTRICT November 1, through 30, 1977 SCHEDULE OF DISBURSEMENTS GENERAL FUND (Cont.) CHECK# PAYEE AMOUNT ACCOUNT 19324 Donnie R. Foster 355,69 503, 504-1 19325 Randy J. Volk 472.46 502.-1, 504-1 l„o,,. 19326 Curtis D. Heintz 291,.61 503-1 19327 Bonnie D. Hall 339.13 501-2 19328 Guy Williams 262.02 505 19329 Eric G. Brewington 290.15 505 19330 General Telephone 376.54 522, 5251 19331 Petty Cash 21,80 516, 518 19332 Douglas Slaughter #2,215 10.00 121 set 1 19333 TWD - Bond Construction Fund 61,000.00 125 19334 Robert E. Santee 753.73 500 19335 Nancy L. Larson 334.43 506, 522-3 19336 Annie L. Schwartz 336,90 506--1 , 522-3 19337 John P. Miller 608,11 502 19338 Russell A. Thomas 445.16 501, 504-1 19339 William C. Bryant 513.55 504, 504 -1 19340 John C. Dixon 563.38 5011, 504-1 19341 Harold H. Kuehn 145.01 5032 19342 Robert M. Adams 233,03 503-1 19343 Donnie R. Foster 332,96 503 19344 Randy J. Volk 445.94 502-1, 504-1 19345 Curtis D. Heintz 291.77 503-1 19346 Bonnie D. Hall 334,53 501--2 19347 Guy Williams 289.10 504-1, 505 19348 Eric G. Brewington 304.72 504-1, 505 19349 Social Security 1,678,88 211, 509 19350 USNB - Federal Deposit 2,920.80 212 19351 Department of Revenue -- State of Oregon 1,088.00 213 Nor 19352 Blue Cross of Oregon 562,05 507 19353 Washington County F C U 1,394.00 216 19354 Bankers Life Nebraska 164.19 217, 507-1 19355 Bankers Life Nebraska 81,05 217 19356 Family Cancer Plan Insurance Co. 36,20 218 19357 Petty Cash 19.06 516, 518-1, 529 19358 U.S. Postal Service 400.00 518-1 19359 Frank's Disposal Service, Inc. 11,45 522-3 19360 P G E 1,850.10 522-2, 525 19361 Northwest Natural Gas 55,67 522--1 19362 National Society of Professional Engineers 68.00 517 19363 Keplers Custom Upholstery 82,00 514 19364 Wilsonville Concrete Products 213,50 150, (408) 19365 Industrial Gasket, Inc. 68.79 150 19366 Tualatin Valley Glass 4.50 524 19367 Pumlite Bldg. Materials Co. 8.00 150 19368 Ross Island Sand & Gravel Co. 762,26 150 19369 Frahler Electric Company 292.48 521-3 19370 Western-Pacific Construction Materials Co. 669.17 150, 520, 521 19371 Chevron USA, Inc, 101.75 150 19372 Empire Building Materials Co. 44.00 150 19373 Water Metrics Co. 176.56 520 19374 Rentex Corp. 104.85 522-3 $141,920.82 TIGARD WATER DISTRICT November 1, through 30, 1977 SCHEDULE OF DISBURSEMENTS OTHER FUNDS CHECK# PAYEE AMOUNT ACCOUNT BOND SINKING FUND Nw 229 U.S.N.B. - Corporate Trust & Agencies $ 10,701.25 585, 586 BOND CONSTRUCTION FUND 143 Pittsburgh Testing Laboratory 16,50 541 144 Richard L. Martin, Inc. 40,424.40 541 145 TWD - General Fund 582.568.83 235 $ 99,009.73 TWD - GENERAL FUND - FNB 176 TWD - General Fund - USNB $ 1,018,50 107 Nisaw 0 wow- Tigard Water District 11-77 Regular Meeting November 8, 1977 PRESENT: Clarence F. Nicoli, Treasurer Jerald R. Heater, Secretary R. Verne Wheelwright Robert E. Santee, Administrator John P. Miller, Foreman Edward Murphy, Jr. , Attorney VISITORS: None. The meeting was called to order by Acting Chairman `- Nicoli at 7: 35 p.m. Motion was made and seconded to approve the minutes of the last meeting. Motion carried unanimously. Motion was made and seconded to pay the vouchers . Motion carried unanimously. Verne Wheelwright advised the board about the meet- ing held at Grandma's Table Restaurant this afternoon involving water districts and cities interested in de- veloping the Willamette River at Wilsonville. The meeting was believed to be very beneficial and a step in the right direction toward the reality of an inde- pendent source of water. The next meeting will be held at noon, December 6th, at the Wolf Creek Highway Water District. Motion was made to adjourn at 8 : 07 p.m. Motion carried unanimously.