02/14/1978 - Packet TIGARD WATER DISTRICT 8841 S. W. COMMERCIAL ST.
TIGARD, OREGON 97223
PHONE (503) 639-1554
February 14 , 1978
AGENDA
CALL TO ORDER
1. RESOLUTION TO APPROVE MINUTES OF LAST
MEETING
2. VISITORS
3. RESOLUTION TO TRANSFER FUNDS WITHIN THE
GENERAL FUND FROM CAPITAL OUTLAY TO
MATERIAL & SERVICES
4. RESOLUTION TO PAY VOUCHERS
5. RESOLUTION TO APPROVE CPA'S TO CONDUCT
ANNUAL AUDIT FOR FY 1976-77
Akar'
6. APPOINTMENT OF BUDGET COMMITTEE FOR
FY 1978-79
7. OTHER BUSINESS
ADJOURNMENT
ADMINISTRATOR'S REPORT
1. Resolution to approve minutes of last meeting.
2. Visitors.
3. Resolution to transfer funds within the General
Fund from Capital Outlay to Material & Services.
The attorney has advised that the Oregon Supreme
Court will not hear the district' s case against the
City of Lake Oswego. Thus, the decision of the Court
of Appeals, reversing Judge Dale' s favorable opinion,
stands.
As of December 31, 1977 , the district owed Lake
Oswego the difference between 14c vs 25 water for 22
years, or a total of $196, 201. 52, including 6% interest.
Detailed computations of the amount due are shown on
page 3.
It is time to reassess the situation and minimize
`r the losses. What amount has the water district really
lost as a result of this lawsuit? Ken Baines made the
point early in the proceedings: "we have everything to
gain and very little to lose" . If the lawsuit had not
been filed, cost of water would have been 25 /100 cubic
feet. The interest expense has not been lost because
the district had use of the money during the litigation
period. In the final analysis, the district is out
$9, 143 which represent attorney fees. In retrospect,
if it had happened today, I believe the Board of Com-
missioners would have taken the same course of action
on this matter. It was a worthwhile venture and there
was no guarantee that the district would emerge a winner.
The ruling of the courts emphasizes the fact that
all the advantages of a surplus water agreement rest
with the seller. We have always believed that the
seller held all the "aces in the deck" , and the courts
have confirmed this opinion.
The results of this lawsuit are not all bad.
Certainly, it must become obvious to the patrons that
the district is "at the mercy" of other governmental
bodies in regards to quantity, quality, and cost of water.
The resultant effect should mean a more favorable reaction
141B, to developing an independent source of water.
To account for the increased water costs, including
the past due difference, funds should be transferred from
Capital Outlay to Material & Services , totaling $272,100
as follows:
-1-
ADMINISTRATOR'S REPORT (Continued)
GENERAL FUND
TO: Material and Services :
Acct #525-2: Water Costs:
Lake Oswego (past due 22 yrs) $182 , 700
Deficit (Jul to Dec 1977) 18, 500
Projected Deficit (Jan - Jun' 78)
Deficit: $18,500
Lake Oswego: 39, 400 57 , 900
Sub-total: $259 ,100
Acct #526: Interest Expense 13, 000
TOTAL: $272,100
FROM: Capital Outlay:
*Or
Acct #549: Equipment:
Auxiliary generator $ 22, 000
Pump station @ #2 6, 200
Sub-total: $ 28 , 200
Acct #550: Bldgs and Additions 2 ,700
Acct #552: Land and Improvements9 , 000
Acct #553 : Operating Contingencies53,400
Acct #554 : Line Extensions 39 , 600
Acct #555: Line Replacements 139 , 200
TOTAL: $272,100
-2-
TIGARD WATER DISTRICT
AMOUNT DUE LAKE OSWEGO FOR WATER PURCHASED DURING PERIOD
vow
JULY 1, 1975 TO DECEMBER 31, 1977
Month & Billed @ Paid @ Time Interest
Year 25 /100 14 /100 Difference Months @ 6%
Jul 1975 $18, 936. 25 $10, 526. 46 $8, 409. 79 30 $1, 261. 47
Aug 1975 16, 328. 75 9, 066. 26 7, 262. 49 29 1, 053. 06
Sep 1975 16, 252. 25 9, 023. 42 7, 228 . 83 28 1, 012 . 04
Oct 1975 10, 490. 50 5, 796. 84 4 , 693. 66 27 633. 64
Nov 1975 7 ,513. 00 4,129 . 44 3, 383. 56 26 439 . 86
Dec 1975 11, 053. 25 6,111. 98 4 , 941. 27 25 617. 66
Jan 1976 9, 091. 50 5, 013. 40 4, 078 . 10 24 489. 37
Feb 1976 8, 285. 50 4, 562. 04 3,723. 46 23 428. 20
Mar 1976 8, 778. 50 4, 838.12 3, 940. 38 22 433. 44
Apr 1976 8 , 976. 25 4, 948 . 86 4, 027 . 39 21 422. 88
May 1976 11, 447. 75 6, 332. 90 5,114 . 85 20 511. 49
Jun 1976 17, 079. 25 9,486. 54 7 , 592. 71 19 721.31
Jul 1976 19,484. 75 10, 833. 62 8 , 651. 13 18 778. 60
Aug 1976 17, 025. 50 9, 456. 44 7, 569 . 06 17 643 . 37
Sep 1976 14, 429. 25 8, 002. 54 6, 426. 71 16 514 . 14
Oct 1976 12, 084. 00 6, 689. 20 5, 394. 80 15 404. 61
Nov 1976 11, 594. 00 6, 414. 80 5, 179 . 20 14 362. 54
Dec 1976 10, 893. 75 6, 022. 66 4, 871. 09 13 316. 62
Jan 1977 14, 183. 25 7 , 864. 78 6, 318. 47 12 379. 11
Feb 1977 11, 498. 00 6, 361. 04 5,136. 96 11 282. 53
Mar 1977 12, 356. 75 6, 841. 94 5,514. 81 10 275.74
Apr 1977 11,219. 25 6, 204. 94 5, 014. 31 9 225. 64
May 1977 13, 265. 25 7, 350. 70 5, 914. 55 8 236. 58
Jun 1977 17, 846. 75 9, 916. 34 7 , 930. 41 7 277. 56
Jul 1977 20, 365. 50 11, 326. 84 9, 038. 66 6 271. 16
Aug 1977 15,121. 00 8, 389. 92 6, 731. 08 5 168 . 28
Sep 1977 10, 191. 25 5, 629. 26 4, 561. 99 4 91. 24
Oct 1977 17, 856. 50 9, 921. 80 7, 934. 70 3 119 . 02
Nov 1977 18, 080. 75 10, 047. 38 8, 033. 37 2 80. 33
Dec 1977 18, 213. 50 10,121. 72 8 , 091. 78 1 40. 46
TOTAL: $409 ,941. 75 $227,232. 18 $182,709 . 57 $13,491. 95
Difference: $182, 709 . 57
+ Interest: 13, 491. 95
ww
AMOUNT DUE: $196, 201. 52
-3-
ADMINISTRATOR'S REPORT (Continued)
Aow
It should be noted that this loss does not pre-
clude the district from accomplishing the goals estab-
lished with the present General Fund budget and the
Bond Construction Fund. (Detailed requirements of the
Bond Construction Fund are shown on pages 5 and 6) .
Sufficient funds are available to finish the 10-MG
reservoir and all pipeline replacements , except along
S. W. Gaarde Street. The net effect of the loss is
that funds will be unavailable to construct a major
transmission main (24" or 36" ) and a 12-inch main
(to replace 6" O.D. ) along S. W. Gaarde. The question
whether the size of this main should be a 24" or 36"
is now moot. Installation of this major transmission
main should be delayed because it should rightfully be
a part of a larger bond issue for developing the
Willamette River. The size of the main could be 60"
if Wolf Creek and Beaverton participate in the project.
4 . Resolution to pay vouchers.
.460 5. Resolution to approve CPA' s to conduct annual audit
for FY 1976-77.
Jim Savage of Coopers & Lybrand has reported that
his firm has had to spend considerably more time this
year in auditing the district' s accounts. This is shown
as follows:
Year Hour
1974 265
1975 280
1976 287
1977 330
Accordingly, he has asked for a substantially
higher fee for next year. His proposed contract is
enclosed.
Enclosed is a letter from Mr. Roy Rogers of Pauly
& Rogers, CPA' s, advising of a firm price to conduct the
annual audit. It is noted that Pauly & Rogers perform
the annual audits for School District 23J, Metzger Water
District, and City of Sherwood, among other water districts
and municipalities. They are a local firm, with an office
at S. W. Pacific Highway and Walnut Street.
You may desire to consider a change.
-4-
ADMINISTRATOR'S REPORT (Continued)
BOND CONSTRUCTION FUND
February 1, 1978
Resources
Available funds on hand $333 ,400
Interest Income 6, 600
Total Resources: $340, 000
Requirements (Feb - Jun 1978)
10-MG Reservoir:
R. L. Martin, Inc $55,500
Reinf. steel for vault1, 500
Drain rock 3, 000
Backfill + 36" cover35,000
Cyclone fence 2, 000
Telemetry 5, 000
Electrical 4, 000
Alt. control valves 1, 000
Convert pump @ #2 6, 000
Miscellaneous 3, 000 $116, 000
Transmission Mains:
10-Mg res. to Corylus:
280 ' of 24" conc. pipe $ 3, 000
24" D.I. fittings 1, 000
Labor 4 , 000
Gravel 1, 000 $9, 000
Upper Boone' s Ferry Rd. ,
72nd to Durham Road:
1300 ' of 12" @ $15/ft19, 500
72nd Ave. , north of Kable:
800 ' of 12" @ $15/ft12, 000
50 ' bore under RR tracks 3, 000 15, 000
Gaarde and Rose Vista:
980 ' of 12" @ $15/ft14 , 700
1400 ' of 6" @ $8/ft 11, 200
PRV & control vault 3 , 500 29 ,400
Fern St. pump station to
132nd St pump station:
2260 ' of 12" @ $15/ft33, 900
Durham Road: 79th to Upper
Boone' s Ferry Road:
1450 ' of 12" @ $15/ft21, 800
26 ' bore under RR tracks 2, 000
Fanno Creek crossing5, 000 28, 800 135, 600
Total Requirements: $251, 600
Amount remaining for next FY: 88, 400
Total: $340,000
-5-
ADMINISTRATOR'S REPORT (Continued)
BOND CONSTRUCTION FUND
July 1 , 1978
For Fiscal Year 1978-79:
Resources:
Available funds on hand $88, 400
Interest Income 2 , 600
Total Resources: $91, 000
Requirements:
10-MG Reservoir:
Improve 125th Avenue $ 5,000
Curbs 500
Bike path 500
Street lights (2) 1, 200
low Landscaping, including:
barkdust
arborvitaes
pine trees 2, 500 9, 700
Transmission Mains:
North Dakota Street:
300 ' of 12" @ $15/ft. . $4, 500
Fanno Creek crossing. . 5, 000 $9,500
Hi Tor to BPA:
640' of 8" @ $10/ft. . . 6, 400
850 ' of 6" @ $8/ft. . . . 6, 800 13, 200
141st & Bull Mt. Rd. :
640 ' of 8" @ $10/ft. . . 6, 400
1370 ' of 6" @ $8/ft. . . 10, 900 17, 300
Duchilly to 121st &
Gaarde Street:
700 ' of 36" @ $70/ft. . 49, 000 89, 000
Total Requirements: (Sub-total) 98 ,700
From General Fund: -7 ,700
Total Requirements: $91, 000
-6-
ADMINISTRATOR' S REPORT (Continued)
Noy
6. Appointment of Budget Committee for Fiscal Year
1978-79.
The following individuals have volunteered to
serve on the Budget Committee if appointed:
Bill Stebbins
Don Thomas
Dale Johnson
Mike O'Neil
Raleigh Meyer (King City)
The proposed budget document will be promulgated
immediately following publication of the monthly
financial report of March 31, 1978. This provides 9
months of historical data and is most valuable in
projecting costs and future commitments.
The first meeting of the budget committee has
been scheduled for April 11th, immediately following
the regular Board of Commissioners' meeting.
The committee to establish employee' s salaries
should meet later this month with recommendations
`"`" presented to the Board of Commissioners at the regular
meeting in March.
The following major items will be proposed in the
new budget:
a. No increase in either consumer or tax rate.
(However, this may be dependent upon Lake Oswego and
Portland) . Consumer rates have not been increased since
April 1975. In the past, rates have generally increased
every third year. This will be an exception.
b. Hire a 3rd office employee. For the past 10
years the district has been able to function adequately
with only a bookeeper and a billing clerk. The district
has doubled in size during the past 10 years and addi-
tional office help is urgently needed. To offset this
added expense, a computerized billing system will not
be recommended this year. However, other billing systems
will continue to be studied.
c. Purchase dump truck. The one dump truck on hand
is now 10 years old and worn out. A dump truck is re-
quired, almost daily, in all facets of construction work,
including pipeline maintenance, most meter installations,
etc. Frequency of use precludes renting a truck because
of excessive costs.
-7-
ADMINISTRATOR'S REPORT (Continued)
7. Regional Study of Water Resources.
Enclosed is a copy of "Working Paper 2" (Conceptual
Alternative Plans) of the Portland-Vancouver Metropolitan
Area Water Resources Study being prepared by the U. S.
Army Corps of Engineers. This is a very interesting,
comprehensive document which addresses the water supply
problem for the entire Portland Metropolitan area. This
is a federally funded project and the plan is due for
completion in September 1978 .
There are approximately 60 individual purveyors of
water within the planning area with six (6) different,
feasible sources of water, listed as follows:
1. Bull Run River
2. Clackamas River
3. Tualatin/Trask Rivers
4. Willamette River
5. Columbia River
6. Groundwater
Subregional groupings are as follows:
I. West Washington County
II. East Washington County
III.Portland (and small purveyors immediately
adjacent)
IV. East Multnomah County
V. Clackamas River area
Our subregion, East Washington County, is the most
critical of the five subareas in terms of adequacy of
water supply. According to the plan, Tigard has the
alternative of all six sources of water, except the
Columbia River. Both Metzger and Wolf Creek have the
the alternative of three sources; namely: Bull Run,
Tualatin/Trask, and Willamette River. It is emphasized
that these alternatives may be changed when further
investigation of the facts become available. The follow-
ing paragraphs relate to some of the interesting conclu-
sions established by this part of the study which pertain,
specifically, to East Washington County.
a. The lower Columbia River is deleted as a viable
source of water because of distance and high pumping
elevations of over 1, 000 feet over the Tualatin Mountains .
(Both the consulting engineer and staff engineer at Wolf
Creek would probably differ with this conclusion) .
-8-
ADMINISTRATOR' S REPORT (Continued)
b. Utilizing the existing facilities on the
Tualatin/Trask Rivers, including Scoggins Lake, adequate
water would be available for only Beaverton of those
purveyors in East Washington County. (Thus, our decision
to abandon our rights to 2500 acre-feet of water at
Scoggins Lake appears correct) .
c. East Washington County could be served by the
Tualatin/Trask River system if the proposed Gaston Dam
were constructed. (Exception is taken to this conclu-
sion. The amount of municipal and industrial (M&I) water
planned for this project is not close to the projected
needs of all of East Washington County. Wolf Creek has
indicated a desire to subscribe to all available M&I
water from this source. Whether there is enough water
for all of Wolf Creek is questionable. )
d. The Clackamas River has available water to
serve Tigard, but not Metzger. (A difference of opinion
exists here. If there is enough water for Tigard, there
should surely be adequate water for a water district the
size of Metzger also. However, with existing storage on
the river, there is not sufficient water for either Tigard
and/or Metzger for the long range. )
e. If upstream impoundments are built on the Clacka-
mas River, all of Eastern Washington County could be
served. (The chances of another dam being constructed on
the Clackamas River are nil. Even then, it is doubtful
that adequate water would be available to Wolf Creek) .
In summary, it appears that, for the long range,
if Bull Run is deleted, alternatives for water source
appear as follows:
Tigard: Willamette River
Metzger: Willamette River
Wolf Creek: Willamette River
Tualatin/Trask Rivers (If Gaston
Dam, Phase II, is constructed)
4110,
-9-
ADMINISTRATOR'S REPORT (Continued)
8. Development of Willamette River at Wilsonville.
The City of Beaverton has expressed an interest
in participating in this project. The city council
has approved the expenditure of funds for their share
in the engineering update study by ST&R which should
be completed by mid-March. Pro-rata shares of the
study are as follows:
Wolf Creek Highway $5, 832
Beaverton 2 ,400
Tigard 1, 680
Metzger 1, 440
Tualatin 408
Wilsonville 240
$12 , 000
The Beaverton City Council has also appointed a
committee, headed by Bruce Nichols, to recommend a
course of action for future water supply. They have
three choices: Bull Run, Tualatin/Trask, or Willamette
River. It would be helpful if Beaverton arrived at a
decision at an early date.
Recently, Robert Meyer, Consulting Engineer, com-
pleted a detailed study for Beaverton, at which time,
the Tualatin/Trask River was recommended over the Bull
Run system.
It appears that the course of action taken by
Beaverton will have a significant effect upon the de-
cision by Wolf Creek. Therefore, one can conclude
that it is Beaverton' s move.
A response has been received from DEQ on using the
Willamette River for domestic purposes. They report that
they have no authority to approve or disapprove our choice
of water supply. They will only be involved in the intake
structure and any anticipated discharges. Their guidelines
for any new filtration plant would require settling and
reuse of all filter backwash water so that no discharge
to public waters occurs.
To date, no reply has been received from E.P.A. on
our letter dated January 12, 1978 . Their response is very
important since they now have primacy in Oregon for com-
pliance with the Safe Drinking Water Act of 1974. I am
sure they are examining, in detail, the water quality
study prepared by ST&R during the period October 1975 to
'J'" October 1976.
-10-
ADMINISTRATOR'S REPORT (Continued)
Now
A meeting of the steering committee is scheduled
for noon, February 14th, the same day as our regular
meeting. At that time, ST&R will make a preliminary
report on updating the engineering data and cost esti-
mates.
A discussion will be held on the "Agreement for
Inter-Governmental Cooperation" . The approval of an
acceptable agreement document by all agencies will be
a major accomplishment and is appropriately being
considered early in the planning schedule.
It is noted that the agreement being proposed is
an "Agreement for Intergovernmental Cooperation" .
This appears to be a first step, and eventually, an
"Agreement" to establish a joint commission for the
production of wholesale water must be prepared. There
is a distinction here, and it is assumed that such a
beginning is necessary. I had thought we could go
directly to the "Agreement" with a limiting provision
that the agreement was null and void if the bond issue
of any one of the four larger entities failed at the
polls. Such a rescinding clause is included in the
Hillsboro - Forest Grove Agreement.
To assist in the preparation of this document,
the Board of Commissioners, Metzger Water District,
has recommended that an attorney be retained who is
independent of any of the entities involved. Dennis
Quade, our attorney, and I agree this would be a good
idea and concur with the concept. We differ somewhat
with Metzger on the timing.
It is believed that the difficulties in preparing
an agreement, satisfactory to all, will not be legal,
but rather differences of opinion as to what is fair
and business decisions. Some controversial issues may
be:
a. Extent of participation of each entity.
(Whether an entity participates in the cost to extend
the pipeline beyond it' s boundaries)
b. Voting rights based on percentage of participa-
tion or by entity.
c. Priorities during water shortages.
d. Financing of future expansion of treatment
plant, river intake, parallel pipelines, etc.
-11-
ADMINISTRATOR' S REPORT (Continued)
These issues can best be resolved by the Manager/
Administrator of each entity concerned who has practi-
cal knowledge about the functioning of a water system.
Subject to the approval of the chairman of the steering
committee I would suggest that representatives from the
staff of Wolf Creek (Gene Seibel) , Metzger (Jesse Lowmanl
and Tigard, (Bob Santee)be directed to prepare an accept-
able draft of an agreement. The following documents are
on hand to assist us:
a. Agreement between Hillsboro and Forest Grove
b. Agreement between Oregon City and West Linn
c. Agreement between Coos Bay and North Bend
d. Agreement draft prepared by University of
Oregon, Bureau of Governmental Research and Service
e. Agreement draft prepared by DeMar Batchelor,
attorney for Wolf Creek, Metzger, and Tualatin
When an acceptable draft has been prepared*, it
should be referred back to the chairman for considera-
tion by each board/council. It would be appropriate for
each board/council to direct their individual attorney
to review the document and make comments on the proposed
agreement. At this point in time, each attorney must be
very provincial about the interests of his client. It
is believed that this step cannot be omitted under any
circumstances.
Finally, if approved by all entities, it can be
referred to an independent attorney for review, if
deemed necessary.
Metzger Water District has supported Tigard every
step of the way, including making a firm commitment to
participate. It would be appropriate to show reciprocal
support for their recommendation, if possible.
9. 10-MG Reservoir.
The reservoir is now full and testing for leaks has
commenced. Hopefully, backfilling can begin by March 1st..
If there are no leaks, and the water tested is potable,
Amur the water will be consumed by our patrons when the 36"
pipeline is connected to the reservoir.
10 MG of water costs $3, 333 from Lake Oswego. It
is sold for $6, 667. Therefore, it is important that the
water be sold and not wasted.
*As an afterthought, prior to submission to the chairman,
it may be wise to consult with the independent attorney
so that he can review the document and refine the language.
-12-
ADMINISTRATOR' S REPORT (Continued)
."`° Unmetered Water, Fiscal Year 1977-78.
Pumped Purchased Total Sold Loss
Month & Cu. Ft. Cu. Ft. Cu. Ft. Cu. Ft. Cu. Ft. Loss
Year x 1000 x 1000 x 1000 x 1000 x 1000 %
Jan 1978 -0- 8, 631 (L.O. ) 8 , 631 7 , 288 1,343 *15. 6%
-0- (Port)
Total: 9, 688 55,197 64 , 885 62 , 575 2, 310 3. 6%
(7 months)
*Includes filling 10-MG reservoir.
Water pumped from wells, Calendar Year 1978 .
Month Actual Actual Allocation
1978 Cubic Feet Acre-Feet Acre-Feet Remarks
Jan & Total: -0- -0- 88 (All wells off)
Actually pumped in prior years: 1974 : 924 Acre-Feet
1975: 930 Acre-Feet
441,0° 1976 : 847 Acre-Feet
1977 : 575 Acre-Feet
Percentage of Bull Run water purchased for computing
amount due for Systems Development Charge, FY 1977-78.
Month & Well Lake Oswego Portland Total % Bull
Year Cu. Ft. Cu. Ft. Cu. Ft. Cu. Ft. Run
Jul 1977 1, 478, 780 8, 090, 600 2 , 065,700 11, 635, 080 17. 75%
Aug 1977 3, 837,780 5, 992, 800 5, 198, 400 15, 028, 980 34. 59%
Sep 1977 4, 037, 070 4, 020, 900 657 , 400 8 ,715 , 370 7. 54%
Oct 1977 251, 560 7 , 087 , 000 -0- 7 , 338 ,560 0. 00%
Nov 1977 -0- 7 ,176,700 300 7 ,177 ,000 0. 00%
Dec 1977 82, 870 7, 229, 800 300 7 , 312, 970 0. 00%
Jan 1978 -0- 8, 631, 000 -0- 8, 631, 000 0. 00%
Total: 9, 688, 060 48, 228 , 800 7, 922,100 65, 838 , 960 12. 03%
(7 months)
Summary of water purchased and/or pumped and water losses.
Niew FY Well Lake Oswego Portland Water Loss
1973-74 48% 52% 0% 11.1%
1974-75 40% 59% 1% 16. 2%
1975-76 39% 59% 2% 7. 4%
1976-77 33% 65% 2% 5. 5%
1977-78 (7 mo. ) 15% 73% 12% 3. 6%
-13-
ADMINISTRATOR'S REPORT (Continued)
"® Work accomplished during January 1978.
a. TWD installed 1400 feet of 12" D. I. pipe +
2 fire hydrants along S. W. Upper Boone's Ferry Road,
72nd Avenue to Durham Road, to complete circulation
loop.
b. TWD installed 700 feet of 12" D. I. pipe along
Durham Road, west of 98th Avenue, as initial phase of
pipeline construction of new development of 39 single
family homes along Serena Court and Kimberly Drive.
(KERWOOD ESTATES) .
c. Private contractor installed 1535 feet of 6"
D. I. pipe + 3 fire hydrants along Cresmer Drive and
Renee Drive, near Ash and Garrett Streets, for new
development of 37 single family dwellings. (BEREA) .
TWD personnel installed copper services to all future
home sites.
d. TWD installed 23 meters. (5333 - 5311) .
District also serves 41 meters out-of-district.
Total: 5374.
aw..
Work scheduled to be accomplished during 1978 .
February:
a. TWD install 1370 feet of 6" D. I . and 240 feet
of 4" D. I. pipe + 3 fire hydrants to finish new develop-
ment of 39 single family home sites along Serena Court
and Kimberly Drive, near 98th and Durham Road. (KERWOOD) .
b. TWD install 980 feet of 12" D. I. and 1400 feet
of 6" D. I. pipe along Gaarde, 121st, and access road to
#2 reservoir to replace 6" O.D. steel pipe, pressurize
23 homes on Rose Vista Drive, and prepare for service
line to 36" D. I. transmission main along S. W. Gaarde
Street, including a pressure-reducing valve in vault.
c. TWD install 800 feet of 12" D. I. pipe + 2 fire
hydrants along S. W. 72nd Avenue, north of Kable Street,
including a railroad spur crossing, incl. fire spr. tap.
d. TWD install 1" PVC service line to Grange located
on Pacific Highway and Watkins Avenue (and move meter) to
replace 1" galvanized ("so-called" ) main.
-14-
ADMINISTRATOR' S REPORT (Continued)
Now
March:
a. TWD install 500 feet of 8" D. I. + 1 fire
hydrant along S. W. 131st Avenue, south of Fischer
Road, to serve 4 new homes and several existing homes.
(Sam Gotter)
b. TWD install 340 feet of 6" D. I. pipe + 1 fire
hydrant along S. W. 111th Place, north of Fonner Street,
for new development of 13 single family dwellings.
(WILDERNESS) .
c. TWD install 1300 feet of 12" D. I. + 2 fire
hydrants along S. W. 72nd Avenue, Kable to Upper Boone' s
Ferry Road, to serve new commercial development.
(EQUITIES NORTHWEST) .
d. TWD install altitude control valve at #2 reser-
voir and adjust altitude control valves at all other
reservoirs in preparation of utilizing 10-MG reservoir
as the terminal reservoir.
e. Private contractor backfill and landscape 10-MG
reservoir site.
vow
f. Private contractor install 300 feet of 36" D.I.
pipe and 300 feet of 24" concrete cylinder pipe (drain
line) from 10-MG reservoir to Corylus Court in AMES
Subdivision.
g. Private contractor install 120 feet of 24"
concrete cylinder pipe + 1 manhole along Hazeltree Drive
to drain 10-MG reservoir into drainage system of HAZELTREE
Subdivision.
h. Private contractor install 340 feet of 8" D.I.
and 140 feet of 4" D. I. pipe to serve 14 single family
dwellings along S. W. Highland Drive, east of 109th
Avenue. (SUMMERFIELD XI) .
April:
a. TWD install 1st phase (18 homes) for new develop-
ment of 99 homes located near 115th Avenue, Fairhaven and
Terrace Trails, consisting of 540 feet of 8" D. I. and
320 feet of 4" D. I . pipe + 1 fire hydrant along S. W.
Genesis, Nova, and Venus Avenues. (GENESIS) .
b. TWD install 400 feet of 8" D. I . + 4 fire hydrants
and fire sprinkler tap for new lumber facility located on
S. W. Hunziker Street, near Western Foundry. (NORTHERN
PACIFIC YARDS, PALMER LEWIS, INC. )
-15-
ADMINISTRATOR' S REPORT (Continued)
April (Continued) :
c. TWD install 680 feet of 12" D. I. pipe along S.W.
Hazeltree Drive and 440 feet of 6" D.I . pipe + 1 fire
hydrant along Duchilly Court to serve remaining 19 single
family dwelling sites for Mr. Robert and Gary Ames.
(HAZELTREE) .
d. Private contractor install 990 feet of 6" D. I.
pipe + 2 fire hydrants for development of 15 single
family dwellings on S. W. Pathfinder Way, 107th Court
to Walnut Street. (YOLO ESTATES) .
e. Private contractor install 1040 feet of 6" D. I.
pipe + 3 fire hydrants for Phase II of ALDERBROOK APART-
MENTS (63 units) , and 560 feet of 6" D. I. pipe + 2 fire
hydrants for Phase III of ALDERBROOK APARTMENTS . (63
units) . (SUMMERFIELD)
May:
a. TWD install 2260 feet of 12" D. I. pipe + 4 fire
hydrants from Fern Street pump station to 132nd Avenue
pump station to parallel for pressure and eliminate the
"`"` Fern Street pump station.
b. Private contractor install 1250 feet of 8" D. I.
pipe, 60 feet of 6" D. I. pipe, and 530 feet of 4" D. I.
pipe + 3 fire hydrants for new development of 30 single
family dwellings located on S. W. 92nd Avenue, north of
Sattler Road. (LAUNALYNDA PARK) .
June:
a. Private contractor install 1450 feet of 8" D.I .
1350 feet of 6" D. I. , and 100 feet of 4" D.I . pipe + 4
fire hydrants for new development called SHADOW HILLS
consisting of 40 single family dwellings located north
of S . W. Bull Mountain Road, near 117th Avenue.
b. TWD install 1450 feet of 12" D. I. pipe + 2 fire
hydrants along S. W. Durham Road, 79th Avenue to Upper
Boone' s Ferry Road, including a railroad crossing and
a Fanno Creek crossing.
-16-
ADMINISTRATOR'S REPORT (Continued)
July
a. TWD install 100 feet of 8" D.I . , 100 feet of
6" D.I . , and 300 feet of 12" D. I. pipe (under Fanno
Creek) to serve North Dakota Street island if approved
by patrons.
OR
TWD install 700 feet of 6" D.I. (to parallel
Metzger' s 8" main) + 1 fire hydrant along S. W. 106th
Avenue (old USA Metzger access road) , north of North
Dakota Street, for development of 13 single family
dwellings: NORTHERN PINE. Also, install 300 feet of
12" D. I. pipe under Fanno Creek to serve patrons east
of the USA access road on North Dakota Street.
b. Private contractor install 1030 feet of 8" D. I . ,
2340 feet of 6" D. I. , and 100 feet of 4" D. I. + 7 fire
hydrants for new development of 75 single family homes
located along S. W. 92nd Avenue, south of Durham Road,
across the street from Tigard High School. (KNEELAND
ESTATES) (Donald E. Pollack, Inc. ) .
4000`
August:
a. TWD install 1650 feet of 8" D. I. pipe + 4 fire
hydrants along S. W. 76th Avenue, north of Durham Road
to serve existing homes in the area.
b. TWD install 640 feet of 8" D. I. and 850 feet of
6" D.I . pipe along the easterly extension of Sunrise Lane,
from B.P.A. to High Tor reservoir to complete circulation
loop and replace 4" O.D. steel pipe.
September:
a. TWD install 640 feet of 8" D.I. pipe along S. W.
141st Avenue, south of Bull Mountain Road, and 1370 feet
of 6" D. I. pipe on Bull Mountain Road, east of 141st
Avenue, to parallel for pressure and replace 6" O.D. steel
pipe.
-17-
GENERAL FUND BUDGET REPORT
ESTIMATE ESTIMATE + OVER
1976-77 1977-78 1976-77 JANUARY 1977-78 1976-77 JAN. ACCUM. 1977-78 - UNDER
ACCOUNT ACTUAL BUDGET ACTUAL BUDGET ACTUAL ACTUAL BUDGET ACTUAL BUDGET
Beginning Working Capital 63,833 111,000 106,450 250,250 202,376 63,833 111,000 129,437 + 18,437
INCOME:
406 Meter Installations 224,925 235,300 9,000 9,500 11,500 120,740 126,900 111,830 - 15,070
407 Line Extension Rebate 1 ,800 3,000 -0- -0- -0- -0- 1,500 5,764 + 4,264
408 Miscellaneous Income 34,593 9,000 654 500 1 2,923 5,000 2,007 - 2,993
412 Interest Income 369 600 -0- 50 -0- 369 350 -0- - 350
148-419 Water Sales 587,754 651,800 43,776 48,400 44,213 362,242 400,900 375,051 - 25,849
425 Penalties for Non-Pay 340 600 20 50 80 230 350 305 - 45
427 Sale of Equipment -0- 600 -0- 50 -0- -0- 350 -0- - 350
430 Developer's - 10% Overhead 33,505 24,000 -0- 2,000 3,152 22,512 14,000 7,570 - 6,430
430-1 Developer's - 8% Engineering 17,950 16,000 -0- 1,300 2,522 15,794 9,300 5,916 - 3,384
430-2 Developer's - Equipment 8,174 8,000 -0- 600 -0- 7,626 4,600 372 - 4,228
430-3 Developer's - Wage Reimbursement 12,142 12,000 -0- 1,000 -0- 11,441 7,000 685 - 6,315
TOTAL INCOME & WORKING CAPITAL 985,385 1,071 ,900 159,900 313,700 263,844 607,710 681,250 638,937 - 42,313
EXPENDITURES: Personal Services
500, 1,2,3,4 Salaries 159,498 177,904 13,315 14,800 14,428 92,971 103,800 101 ,163 - 2,637
504-1 Overtime 5,441 7,200 537 600 711 3,443 4,200 4,831 + 631
505 Field Labor 26,861 32,996 1,418 2,750 1,600 16,112 19,250 19,221 - 29
506,1,2 Office Employees 20,422 22,200 ; 1,719 1,850 1,840 12,103 12,950 13,645 + 695
212,222 240,300 16,989 20,000 18,579 124,629 140,200 138,860 - 1 ,340
EXPENDITURES: Materials & Services
507 Blue Cross of Oregon - Medical 3,426 7,200 294 600 848 2,033 4,200 4,216 + 16
507-1 Bankers Life Nebraska - Dental 880 1,200 1 101 100 104 490 700 595 - 105
508 Retirement 7,663 12,600 { 2,441 4,050 3,364 6,273 10,350 8,914 - 1,436
509 Social Security 11,473 13,200 993 1 ,100 1,126 6,348 7,700 7,247 - 453
510 State Accident Insurance Fund 10,305 13,200 1 -0- -0- 5,694 6,600 6,391 - 209
511 State Unemployemnt Compensation 2,451 4,800 284 -0- 1,112 902 2,400 2,081 - 319
512 Advertising & Elections 728 600 -0- -0- -0- -0- 300 17 - 283
514 Equipment Rentals 283 600 ! 12 50 24 206 350 219 - 131
515 General Insurance 16,495 18,000 -0- 700 674 2,196 2,200 2,174 - 26
516 Miscellaneous Expenses 2,077 1,800 350 150 61 1,275 1,050 1,722 + 672
517 Dues & Subscriptions 678 900 125 80 100 578 530 539 + 9
518,1,2 Office Supplies 10,126 9,000 1,982 800 1,127 5,810 5,300 5,852 + 552
519,1,2 Professional Fees 15,732 10,500 117 2,000 2,134 10,435 8,000 8,101 + 101
520 Meter Maintenance 4,921 6,000 1,220 500 217 3,922 3,500 1,506 - 1 ,994
521,1,2,3 Repairs - Lines, Pumps, etc. 4,863 6,000 288 500 465 3,526 3,500 4,090 + 590
1
( ( (
GENERAL FUND BUDGET REPORT (Cont.)
ESTIMATE ESTIMATE + OVER
1976-77 1977-78 1976-77 JANUARY 1977-78 1976-77 JAN. ACCUM. 1977-78 - UNDER
ACCOUNT ACTUAL BUDGET ACTUAL BUDGET ACTUAL ACTUAL BUDGET ACTUAL BUDGET
522,1,2,3 Uitlities 6,890 7,200 693 600 724 3,712 4,200 4,284 + 84
523 Fire Hydrant Maintenance 2,078 2,400 386 200 246 1,639 1,400 258 - 1,142
524 Truck & Equip. Maintenance 5,453 7,200 660 600 960 4,561 4,200 4,203 + 3
524-1 Gasoline & Oil 6,376 7,200 540 600 661 3,920 4,200 4,254 + 54
524-2 Tires & Batteries 778 1,200 74 100 -0- 500 700 822 + 122
525,1 Water Costs - Electricity 30,766 36,000 2,726 3,000 1,802 19,682 21,000 17,932 - 3,068
525-2 Water Costs - L.O. & Portland 100,005 112,500 8,068 9,300 21,920 62,310 71,600 102,760 + 31,160
526 Interest Expense 984 600 -0- -0- -0- 984 -0- -0- -0-
527 Small Tools 887 1,200 8 100 115 666 700 1,243 + 543
529 Rain Gear, Safety Equip. , etc. 1,025 1,200 160 100 273 743 700 845 + 145
530 Employee Training 433 600 110 100 -0- 254 300 -0- - 300
247,776 282,900 21,633 25,330 38,057 148,659 165,680 190,265 + 24,585
EXPENDITURES: Capital Outlay
548 Fire Hydrants 2,750 2,400 -0- 200 130 93 1,800 1,830 + 30
549 Equipment 73,738 33,200 6,992 -0- -0- 53,675 2,500 2,432 - 68
550 Buildings & Additions -0- 3,600 -0- -0- -0- -0- -0- -0- -0-
551 Meter Installations 38,063 43,300 791 900 4,966 25,552 26,800 26,438 - 362
552 Land & Improvements 8,434 51,000 -0- 200 184 6,007 41 ,200 41 ,184 - 16
553 Operating Contingencies -0- 53,400 -0- -0- -0- -0- -0- -0- -0-
554 Line Extensions 1,765 39,600 -0- -0- -0- -0- -0- -0- -0-
555 Pipeline Replacements -0- 139,200 -0- -0- -0- -0- -0- -0- -0-
124,750 365,700 7,783 1,300 5,280 85,327 72,300 71,884 - 416
700 Transfer to Bond Sinking Fund 271,200 72,000 22,600 6,000 6,000 158,200 42,000 42,000 -0-
Net Fund Balance 129,437 111,000 90,895 261,070 195,928 90,895 261,070 195,928 - 65,142
TOTAL BUDGETED EXPENDITURES 985,385 1,071,900 159,900 313,700 263,844 607,710 681,250 638,937 - 42,313
Inventory Balance January 31, 1978 = $ 100,382.47
BOND SINKING FUND JANUARY YTD
103 Cash balance at first of period 6,029 353
108 Invested Monies at first of period 260,250 265,307
INCOME:
400 Transfer-in from General Fund 6,000 42,000
412 Taxes: Current 790 85,120
413 Delinquent 590 9,106
414 Trailer House -0- -0-
415A Land Sales -0- -0-
418 Interest Earned fron Invested Monies 1,281 6,318
419 Interest Earned from Property Taxes -0- -0-
Transfer-in from Invested Monies 179,500 305,700
188,161 448,244
EXPENDITURES:
585 Bond Principal 115,000 167,000
586 Bond Interest 70,507 151,583
587 Bank Fees & Postage -0- 188
Transfer-to Invested Monies 2,660 123,803
118,167 442,574
TOTAL CASH AT END OF PERIOD 6,023 6,023
TOTAL INVESTED MONIES AT END OF PERIOD 83,410 83,410
TOTAL CASH & INVESTED MONIES $ 89,433 $ 89,433
( ( (
BOND CONSTRUCTION FUND - Issue 1976 JANUARY YTD
101 Cash balance at first of period 44 55
106 Local Government Pool at first of period 452,151 770,797
235 Due (to)/from General Fund (109,254) (8,524)
INCOME:
410 Sale of Bonds -0- -0-
412 Interest Income 2,708 18,812
Transfer-in from Government Pool 20,000 415,750
22,708 434,562
EXPENDITURES:
521 Bond Costs -0- -0-
522 Professional Fees -0- -0-
523 Bond Interest -0- -0-
TOTAL MATERIALS & SERVICES -0- -0-
540 Purchase of Land -0- -0-
541 lOMG Reservoir @ 125th & Bull Mt. Rd. -0- 187,667
542 Major Transmission Lines (Extensions) 12,252 186,090
543 Pipeline Replacements -0- 73,986
TOTAL CAPITAL OUTLAY 12,252 447,743
Transfer-to Government Pool 2,708 79,811
14,960 527,554
TOTAL CASH BALANCE AT END OF PERIOD 44 44
TOTAL INVESTED MONIES AT END OF PERIOD 434,859 434,859
DUE (TO)/FROM GENERAL FUND (101,506) (101,506)
$ 333,397 $ 333,397
TIGARD WATER DISTRICT JANUARY 31, 1978
WELL RECORDS:
WELL HOURS STATIC PUMPING COSTS-ELECT.
NO. OFF LEVEL LEVEL CUBIC FEET PUMPS, ETC. HOURS
1 OFF $ 21.10 -0-
2 OFF 274.20 -0-
3 OFF 23.44 -0-
4 OFF 33.83 -0-
All 7 pump stations & Alarm-Telemetry Phones 1,449.25
$ 1,801.82
METER RECORDS:
Meters #5,311 through #5,333 = 23 meters sold.
BILLING DETAIL:
January $ 44,247.25
Delinquent 82.68
7,288,000 cubic feet of water billed.
wr.
TIGARD WATER DISTRICT January 1, through 31, 1978
SCHEDULE OF DISBURSEMENTS
GENERAL FUND
CHECK# PAYEE AMOUNT ACCOUNT
19476 Northwest National Life Insurance Co. 3,722.18 508
19477 Petty Cash 23.89 516, 518, 518-1
I ,o.. 19478 Bloodworth, Hayes & Peterson Dev. Co. 996.10 240, (430)
19479 Portland Bureau of Water Works .62 551
19480 Art Lutz #3A-136 2.50 121 set 1
19481 Art Lutz #3A-175 10.50 121 set 1
19482 King City Branch - U. S. N. B. 1.15 201
I 19483 King City Branch - First N. B. 2.00 201
19484 Frank's Disposal Service, Inc. 11.45 201
19485 City of Tigard - Sewer 15.00 201
19486 Bureau of Water Works 204.00 201
19487 City of Lake Oswego 10,121.72 201
19488 Goodyear Truck Tire Center 420.43 201
19489 Burroughs Corporation Business Mach Grp 109.60 201
19490 Burroughs Corporation Business Forms Grp 429.27 201
19491 Power Rents, Inc. 321.50 201
19492 Doug's Auto Parts 15.06 201
19493 Milwaukie Crane & Equip. Co. 165.60 201
19494 Knauss Chevrolet 66.07 201
19495 Cantel Incorporated 71.40 201
19496 Homelite Textron 108.79 201
19497 Southwest Office Supply 26.75 201
19498 Marine Lumber Co. 5.67 201
19499 Valley Auto Parts 2.83 201
19500 Six Robbles, Inc. 42.30 201
19501 Western-Pacific Const. Materials Co. 346.50 201
I 19502 Badger Meter, Inc. 759.60 201
19503 Meter Box Equipment Co. 1,072.65 201
"o' 19504 Pacific Water Works Supply Co. , Inc. 949.37 201
19505 Hinds Supply Company 1,738.73 201
19506 Portland Concrete Pipe Co. 29.90 201
19507 Cascade Microfilm Systems, Inc. 58.19 201
1. 19508 Sanderson Safety Supply Co. 21.74 201
19509 Safeway Scaffold Co. 59.50 201
19510 A-Boy West Supply Co. 2.42 201
19511 Willamette Industries, Inc. 384.48 201
19512 L. H. Cobb Crushed Rock 630.60 201
19513 Pacific Stationery 27.10 201
' 19514 Secretarial Answering Service 27.50 518
19515 Pacific Paging 29.00 518
19516 Martig's Inc 194.50 518
19517 Kilham Stationery & Printing Co. 42.00 518
19518 Watt Welding Supply 4.02 524
19519 General Telephone 192.22 522
19520 Everett L. Wiggins 2,423.63 125
19521 Oliphant & Bates - Insurance 674.00 515
19522 Electromatic Associates, Inc. 32.10 524
19523 Valley Concrete Products 10.58 150, (408)
19524 U. S. Postal Service 400.00 518-1
19525 Crystek Crystals Corp. 35.00 524
19526 Robert E. Santee 636.28 500
19527 Nancy L. Larson 366.18 506
19528 Annie L. Schwartz 366.45 506-1
wwww 19529 John P. Miller 512.29 502
19530 Russell A. Thomas 431.53 501, 504-1
19531 William C. Bryant 487.57 504, 504-1
19532 John C. Dixon 498.53 501-1, 504-1
19533 Harold H. Kuehn 261.10 503-2
19534 Robert M. Adams 195.46 503-1
19535 Donnie R. Foster 239.09 503
TIGARD WATER DISTRICT January 1, through 31, 1978
SCHEDULE OF DISBURSEMENTS
GENERAL FUND
CHECK# PAYEE AMOUNT ACCOUNT
19536 Randy J. Volk 442.89 502-1, 504-1
19537 Curtis D. Heintz 299.35 503-1, 504-1
Naar'. 19538 Bonnie D. Hall 265.97 501-2
19539 Guy Williams 188.35 505
19540 Michael D. Shock 212.29 505
19541 Pioneer National Title Insurance Co. 205.15 552
19542 Girods 272.30 529
19543 Dennis Reed #1-21 8.00 121, set 1
19544 General Telephone 186.81 522, 525-1
19545 Washington County - Dept. Public Works 100.00 517
19546 Sidney Smith #5-8-1 4.00 121, set 1
19547 David M. Kelley #4-195-6 6.50 121, set 1
19548 John DeGroat-Canterbury Day School #9-17-8 21.00 121, set 1
19549 Robert E. Santee 685.91 500
19550 Nancy L. Larson 332.04 506, 522-3
19551 Annie L. Schwartz 335.86 506-1, 522-3
19552 John P. Miller 547.77 502
19553 Russell A. Thomas 479.31 501, 504-1
19554 William C. Bryant 459.02 504
19555 John C. Dixon 459.68 501-1, 504-1
19556 Harold H. Kuehn 179.86 503-2
19557 Robert M. Adams 234.35 503-1, 504-1
19558 Donnie R. Foster 374.25 503, 504-1
19559 Randy J. Volk 493.56 502-1, 504-1
19560 Curtis D. Heintz 323.59 503-1
19561 Bonnie D. Hall 274.48 501-2
19562 Guy Williams 281.95 504-1, 505
19563 Michael D. Shock 340.60 505
wrr 19564 Public Employees Social Security 2,253.24 211, 509
19565 U. S. N. B. - Federal Deposit 3,001.90 212
19566 Department of Revenue 1,097.00 213
19567 Washington County Federal Credit Union 1,591.00 216
19568 Blue Cross of Oregon 847.95 507
19569 Bankers Life Nebraska 202.52 217, 507-1
19570 Bankers Life Nebraska 81.05 217
19571 Family Cancer Plan Insurance Co. 36.20 218
19572 TWD - Bond Sinking Fund 6,000.00 700
19573 Petty Cash 46.75 516, 518, 518-1
19574 Frank's Disposal Service, Inc. 11.45 522-3
19575 NW Natural Gas Co. 134.48 522-1
19576 Portland General Electric Co. 1,816.21 522-2, 525
19577 Coopers & Lybrand 884.00 519
19578 Pitney Bowes 42.00 518
19579 Brewed Hot Coffee 10.50 516
19580 Willamette Industries, Inc. 89.49 150, 520, 527
19581 Doug's Auto Parts 14.85 150, (408) , 524, 527
19582 Portland General Electric Co. 130.27 548
19583 Mercer Industries, Inc. 1,412.00 150
19584 Power Rents, Inc. 710.58 125, 527
19585 Valley Office Equipment 34.75 518-2
19586 Zidell Explorations, Inc. 13.50 150
19587 Wheelcok, Niehaus, Hanna, Murphy & Ogilvy 987.00 519-1
19588 Rentex Corporation 142.56 522-3
Nifty $60,642.28
TIGARD WATER DISTRICT January 1, through 31, 1978
SCHEDULE OF DISBURSEMENTS
OTHER FUNDS
CHECK# PAYEE AMOUNT ACCOUNT
BOND SINKING FUND
wrrr'
230 Wash. County - Dept Finance & Admin $185,506.25 585, 586
BOND CONSTRUCTION FUND
150 TWD - General Fund $20,000.00 235
TWD - GENERAL FUND - FNB
178 TWD - General Fund - USNB $ 586.00 107
i
Tigard Water District
1-78 Regular Meeting
January 10, 1978
PRESENT: Hugh A. Brown, Chairman
Clarence F. Nicoli, Treasurer
Jerald R. Heater, Secretary
Gene H. Chamberlin
Robert E. Santee, Administrator
John P. Miller, Foreman
Dennis H. Quade, Attorney
VISITORS: None.
The meeting was called to order by Chairman Brown
at 7: 34 p.m.
Motion was made and seconded to approve the minutes
of the last meeting, as written. Motion carried unani-
mously.
Motion was made and seconded to pay the vouchers.
vow
Motion carried unanimously.
Motion was made by Jerald Heater and seconded by
Gene Chamberlin to appoint the Administrator, Bob Santee,
as the Budget Officer for the new budget commencing
July 1, 1978. Motion carried unanimously.
Chairman Brown appointed the following committee
to discuss and recommend proposed employee pay scales
and fringe benefits for the next fiscal year, 1978-79 :
1. Jerald Heater -- Board of Commissioners
2. Verne Wheelwright-- Board of Commissioners
3. Employees to appoint representative from
office group
4. Employees to appoint representative from
field group
5. Bob Santee -- ex officio
Motion was made by Clarence Nicoli and seconded by
Jerald Heater to approve the expenditure of a maximum
of $2, 100 as the district' s pro-rata share for an up-
dated water source study of the Willamette River at
Wilsonville to be prepared by ST&R. (See enclosed letter) .
Motion carried unanimously.
-1-
Re: Tigard Water District Minutes (Continued)
January 10, 1978
Motion was made by Jerald Heater and seconded
by Clarence Nicoli to proceed and adopt a revised
time schedule for development of the Willamette River,
and any delay be held to a minimum only as necessitated
by the ST&R study, and that the bond election date of
August 8th be retained, if possible. (See enclosed
revised time schedule, including the fact that the
final date for a decision by entities whether to parti-
cipate has been extended to March 17 , 1978) . Motion
carried unanimously. (By copy hereof, the Board of
Commissioners, Metzger Water District, is advised of
the revised time schedule and possible adoption at
their next regular meeting. )
Motion was made by Clarence Nicoli and seconded
by Jerald Heater to execute a document revoking the
power of attorney to Kenneth W. Baines regarding the
Tigard Water District Pension Plan and Trust. Motion
carried unanimously.
It was noted for the record that the two trustees
of the Pension Plan and Trust, Verne Wheelwright and
Bob Santee, would authenticate a new Trustees' Conver-
sion Fund Agreement with Northwestern National Life
Insurance Company, subject to the approval of the dis-
trict' s attorney.
Motion was made to adjourn at 8 :42 p.m. Motion
carried unanimously.
-2-
REVOCATION OF POWER OP ATTORNEY
The undersigned, HUGH A. BROWN and JERALD R. BEATER,
the Chairman and Secretary, respectively, of the TIGARD
WATER DISTRICT, and acting for and on behalf of said
District, and pursuant to the authority of its Board of
Commissioners, hereby revokes the appointment of KENNETH W.
BAINES as the District's attorney in fact, to act for and
on behalf of said corporation in connection with all
matters arising out of the submission and approval, or
amendment, of the TIGARD WATER DISTRICT PENSION PLAN AND
TRUST, pending before the Treasury Department of the
United States of America, including the Bureau of Internal
Revenue, or any of its agents, in connection with quali-
fication of such Plan and Trust Agreement, pursuant to
the Internal Revenue Code of 1954, Section 401, and
following.
IN WITNESS OP THIS REVOCATION, the TIGARD WATER DISTRICT
has caused this document to be executed by its Chairman and
its Secretary and its corporate 'pal affixed, and the
Secretary's attestation, this / day of January, 1978.
TIGARD WATER DISTRICT
B ca .__
ATTEST:
i
By ,/l ►
e r_ a +'
STATE OF OREGON )
: ss.
County of Washington ) January /Q , 1978.
Personally appeared HUGH A. BROWN and JERALD R. HEATER,
who being each duly sworn did say, that they are the Chair-
man and Secretary, respectively, of the Tigard Water District,
a municipal corporation organized under the laws of the State
of Oregon; that the seal affixed to the foregoing instrument
is the corporate seal of said corporation, and that said
instrument was executed in behalf of said corporation by
authority of its Board of Commissioners , and that they
acknowledged said instrument to be the free act and deed
of said corporation .
Before me: -AelOi1%
4—
Notary Public for Oregon My Commission Expires: t{a /f 7,
Page 1 - REVOCATION OF POWER OF ATTORNEY
Stevens, T1iompson & .tnny:arn, Irac.
Engineers / Planners
5505 S.E. MILWAUKIE AVE. • BOX 02201 • PORTLAND, ORE. 9/202 • TELEPHONE (503) 234-0721
1920
January 9, 1978
Mr. Dennis Lively
Member, Engineering Committee
East. Washington County Water Purveyors ' Committee
c/n l S. W. Mt. Jefferson Terrace
Lake Oswego, Oregon 97034
Subject: Engineering Study for East Washington County Water Purveyors
Dear Mr. Lively:
Pursuant to our discussion on December 16, Stevens, Thompson ? Dunyan
is pleased to make this proposal for a preliminary design and costs
study of the water system to serve the Wolf Creek Highway Water Di stri c:t,
the City of Beaverton, the Metzger Water District, the Tigard Water
District, and the Cities of Tualatin and Wilsonville, all from an intake
located on the Willamette River in or near to the City of Wilsonville.
Apart from the possibility of some construction phasing, the plan will
include no alternatives for locations or routes.
The scope of the study would include consideration of the following
seven topics:
1. Population studies would be made with data provided from
``"w Washington County, CRAG, and service connections provided by
each District or City.
2. Water consumption studies would be based on records of the
Cities and Districts for both purchased and self-produced water
and also these studies would be based on, such reports as the
Cities or Districts may have from their own engineering staffs
or consultants.
3. Water demands will be projected on the basis of the two fore-
going studies and will result in estimates of average and
•
design capacity requirements for the years 1980, 85, 90, 95,
and 2000.
PORTLAND-SEATTLE-BOISE-SPOKANE-HOUSTON-MILWAUKEE-ROCKVILLE-WASHINGTON, D.C.
Ste-vens,Thompson Liz Itunyan.nee.
Engineers/Planners
Mr. Dennis Lively
Member, Engineering Committee
East Washington County Water Purveyors ' Committee
Page 2 - January 9, 1978
4. There will be a review of contracts between Districts and Cities
with both the City of Portland and the City of Lake Oswego to
determine how the details of such contracts might affect the
initial and future sizing of proposed facilities.
5. Required capacities and sizes for water production, water treat-
ment, transmission and pumping will he based on subparagraphs 3
and 4 above. In addition, this item will include the development
of recommended phased construction.
6. Locations and route studies will be made from maps and other pub-
lished and -information and locations for initial installations and
later iir.lallations wi I I he developed.d. No field work or iie -
,q)0, i t ie !Judie'. will he Ride.
1. Construction cost estimates based on conceptual plans and unit: cosi.
of water estimates will be prepared based on both the initial and
later construction that may be proposed. These studies will include
the cost of debt service, power, labor, chemicals, and other fore-
seeable costs of an engineering nature. Unit cost based on the
average demand for water will be prepared for the five years men-
tioned in subparagraph 3 above.
Based on the foregoing studies and office calculations , we will prepare
a report together with text, tables, charts , and one map in aid of
explaining the text. At this time we propose that the map be in three
colors -- black plus two others. One hundred copies of the report will
he delivered upon completion of our work.
We estimate that the cost for such a study and report would be about
$12,000. From commencement of work on the study until its completion,
we estimate that approximately two months' time interval will be re-
quired.
We are pleased to have been asked to make this proposal and will he
happy to go into further detail regarding it at your request.
Very truly yours,
STEVENS, THOMPSON & RUNYAN, INC.
-/ L .
Carter H. Harrison for
Gilbert R. Meigs
Senior Vice President
GRM:lp
January 10 , 1978
REVISED TIME SCHEDULE
TO DEVELOP THE WILLAMETTE RIVER AT WILSONVILLE AS A
err SOURCE OF WATER
Bond Election Date : August 8 , 1978 .
1978
DATE EVENT
January 13 Submit letter to E.P.A. for approval .
January 13 Submit letter to D.E.Q. for approval .
January 16 Staffs commence work on conditions and
terms of intergovernmental agreement.
January 16 ST&R commence work on updated engineering
study to be completed within 60 days .
February 14 Referral of tentative intergovernmental
greement to steering commi l.t eo .
March 1.4 PresenLation and report by :1T8,k upWed
'0411e study to steering committee and/or all
elected officials of gover_ni_ny bodies .
March 14-20 Referral of proposed intergovernmental
(regular agreement to each governing body .
meeting)
March 17 Final date for decision by entities
whether to participate in the project.
March 20 Request State Engineer to approve water
rights for one of the following:
A. Issue permit to Wolf Creek
(Application #50693)
B. Issue permit to Tigard Water Dis-
trict if Wolf Creek authorizes
transfer of "holder of permit"
on their application
C. Issue permit to Wilsonville with
expanded boundaries
blv
-la-
REVISED TIME SCHEDULE (Continued)
March 20 Request Washington County for variance
in county Master. Water Plan.
March 21 Request Clackamas County to approve
construction of proposed facilities
on county roads and right-of-ways.
March 21 Correspond with PGE on waiver of riparian
water rights on Willamette River.
March 21 If necessary, correspond with Army Corps
of Engineers regarding availability and
cost of stored water.
March 21 Attorney for each entity commence prepara-
tion of appropriate resolution authorizing
city/district to proceed with bond election.
March 31 Submit plan to Boundary Review Commission
for permission to extend pipeline extra-
territorially. (This approval would include
input from both CRAG and LCDC) .
April 11 - 20 A. Approval of each governing body of
( renin l n r• i n t.rrgovernmenta 1 nrgres m 'n t. , >uh-j ert.
moot-ing) to r>a:wing fplaropt_ iat e henel Tt '/lr;ur'c'
`mow on August 8th .
B. Resolution by each governing body for
authorization to proceed with bond
election.
April 21 Attorney for each entity commence prepara-
tion of "Notice of Election" , stating date
of election, ballot title , and statement of
purpose, etc. , in accordance with ORS 259 .
090; and obtain "blessing" of approving bond
counsel.
May 3 Public hearing before Boundary Review Com-
mission for permission to extend pipeline
extraterritorially.
June 30 Each entity submit "Notice of Election" to
Elections Officer.
May 4 to
August 7 Publicity and promotion.
August 8 Bond Election.
-2a-