Loading...
Permit CITY OF TIGARD ELECTRICAL PERMIT IN ■ COMMUNITY DEVELOPMENT Permit#: ELC2021-00322 Date Issued: 6/24/2021 T I C_l A R D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S113AB00701 Jurisdiction: Tigard Site address: 16145 SW UPPER BOONES FERRY RD Project: Kiddie Academy Subdivision: CIRCUIT PARTITION Lot: 2 Project Description: Electrical for a new 10,864 sq.ft.daycare facility: Contractor: ACCURATE ELECTRIC UNLIMITED INC Owner: PO BOX 871866 VANCOUVER, WA 98687 PHONE: PHONE: 360-567-3330 FAX: 360-567-3320 FEES Quantity Description Date Amount 1 ea Services or Feeders-601 to 06/22/2021 $301.04 Specifics: 1000 amps 52 crt Branch Circuits w/Purchase 06/22/2021 $385.84 Type of Use: COM Service or Feeder Class of Work: NEW 1 ea Plan Review Electricial 06/22/2021 $171.72 Type of Const: 1 ea 12%State Surcharge- 06/22/2021 $82.43 Electrical 1 Occupancy Grp: 5 ea Info Process/Archiving-Lg 06/22/2021 $10.00 $2.00(over 11x17) 7 ea Info Process/Archiving-Sm 06/22/2021 $3.50 $0.50(up to 11x17) Total $954.53 Required Items and Reports(Conditions) This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. Y�btain a c y of the rules or direct questions to OUNC by calling 503.231987 or 1.800.332.2344. Issued By: �� Permittee Signature: Lid /It /��j OWNER INSTALLATION ONLY The installation is being made on property I own which is not intended for sale,lease or rent. OWNER'S SIGNATURE Date: CONTRACTOR INSTALLATION ONLY SIGNATURE OF SUPR.ELEC' Date: LICENSE NO. Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Electrical Permit Application.� —S 27 2 j City of Tigard CEIVE�.-.... Received Ft llt (t lFI(CI': 1..51 I 1\1., 13125 SW Hall Blvd.,Tigard,OR 97223 I{ i l�q DatHny: '/ e ] Gn l Penat#: 'q]_)--Op 1f1 u Phone: 503.718.2439 Fax: 503.598.1960 'MAY 2 r! 2UL'i Review ' �c•rr <- �` Inspection Line. 503.639.4175 1•t Date: : / ✓ VA Related Permit a: .1J dr���C/ll(.�7 '!e ll ! �'+ rvw 1 • Internet www.ligard-or.gov (-Y OF TIGAlr✓ :at r ,�11� . pl ePage 2ta . 1F�i av I Supplemental ladarmaaon IPTCON pap :Iht► VAIN! .4 ❑New construction . .��. _. ®Addititm/5lterat' placement Please that all that apply(submit Lasts sts ofpiens w/hems checked): ❑Demolition ❑Other: ['Service or feeder 400 amps m more ❑Building over three stories. m yv where the available fault current ❑Marinas and boatyards. _-G�:.. .u..-w.:r ff� ISYJS� t.!re .s3w.!+a,A ..::::t „ ";_,.« exceeds 10,000 a at 150 volts or ❑Floatingbuildings.❑ I-and 2-family dwelling ®CommerciaVndustrial ❑Accessory,building kas to ground, amps 14.000 ❑Commercial-use agr icultural ❑Multi-family 0 Master builderamps for all other installations. buildings. ,.. i -seas ylak. .. .y� .Q Other: ❑Fire pump. ❑Installation of 150 KVA or 71. 7.."A +.:�r Y.a!MP :ilittO. RS9 3,'01.. s '.MN •' O eraisency system. larger separately derived Job#:80-1193 Job site address:16145 SW Up s er Boones Ferry Rd ❑odd motor load of ❑system 0HP or more. City/State/ZIP:Tigard, Oregon 97224 ❑Six or more residential units. ❑RecreationalOcc .❑Health-care facilities. vehicle parks. Suite/bldg./apt.#: Project name:Kiddie Academy Tigard ❑Hazardous locations. 0 Supply voltage for more than ®Service or feeder 600 alma a more. 600 vote nominal. Cross sin:et/directions to job site: FEE SCHEDYILE tlmeriodon I Qty. I Red, 1 Total I • New residential single-or multi-family dwelling unit. Subdivision: Lot#: Includes attached garage. Tax map/parcel#: 1.000 sq.ft.or less 168.54 4 portion ,,m;,•rr.-rr r>, r ?ey` ,, ::ll1�O11::0)WORK < • . ,r.. . .:i a . Limied energy,resident 75.00 2 Ground upbuildingTI (with above sq.fl.) Limited energy,multi-family residential(with above sq.fl.) 75.00 2 F Heaewable Energy 0 See Page 2 a ,la,PRO R7r11';AWI$EIt . , ;1 , . plow r Services or feeders installation,alteration,and/or relocation Name:Kalvi LLC 200 amps or less 100.70 2 Address:8821 NW Savoy Lane 201 amps to 400 amps 133.56 2 401 amps to 600 amps 200.34 2 City/State/ZIP:Portland, OR 97229 601 amps to 1,000 amps 1 301.04 301.04 2 Phone ( ) Fax:( ) Over 1,000 amps or volts 552.26 2 Temporary services or feeders installation,alteration,and/or Email: relocation Owner installation:This installation is being made on property that 1 own which is not 200 amps or less 59.36 I intended for sale,lease,rent,or exchange,according to ORS 447,449,670,and 701. 201 amps to 400 amps 125.08 2 Date: 401 amps to 599 amps 168.54 2 Owner signature: Branch circuits—new,alteration,or extension,per panel -.; (a:,,OPUCANT j 0 coNTACT PERSON.' A.Fee for branch circuits wish sassiness name:Accurate Electric Unlimited above service or feeder fee, 52 7.42 385.84 2 each branch circuit Contact name: Jodi Lewinsohn B.Fee for branch circuits without service or feeder fee.first 56.18 2 Address: 600 SE Maritime Ave, Suite 260 branch circuit Each add'l branch circuit 7.42 2 City/State/ZIP: Vancouver,WA 98661 Miscellaneous(service or feeder not Included) Phone:( 3604567-3330 Fax::(360.567-3320 Each manufactured or modular 67.84 2 dwelling,service and/or feeder Email: jodi@aeuinc.com Reconnect only 67.84 2 cover *ci'oa Pump or irrigation circle 67.84 2 . . .. Sign or outline lighting 67.84 2 Business name:Accurate Electric Unlimited Signalc;ret;t(s)orlimited-energy ❑ See Page 2 2 Address:600 SE Maritime Ave, Suite 260 panel,alteration,or extension. Each additional inspection over allowable in any of the above City/State/Z1P:Vancouver,WA 98661 Additional inspection(1 hr min) 66.25/hr Phone:( 360-567-3330 I Fax:(360-b67-3320 Investigation('hr min) 90.00/car Industrial plant(I hr resin) 78.181 hr Email:Jason( aeUlflC.cOm Inspections for which no fee is 9000/hr Electrical Lic.:C638 Su• .Lie.:5580S specifically listed(Vs hr min) CCB Lic.:191346 rtRCirniCAl:.PEm►uT FE$s. `; . Suprv.Electrician signature,required: . /. Subtotal: Mee i 5- to Fa Plan Review Required(25%of permit fee): 171.72 Date: Print name:Jason Dixon 5 State surcharge(12%of permit fee): Alf V p( TOTAL PERMIT FEE. 858.60 ' Au,thet3zed signature:joot4I" This permit appacedon expires n a permit h rot obtained within 160 ����� Date: f-74I1-1 days ones It boa bten accp t�µ complete. i Print name: •eG 1: Lei,"•'sari s� I • Number of inspections allowed per permit. I Uluad sptmainELC_PP�e'nniIApp ELR ERE doe Rev Md17/2015 ixsa6I5T111N5!cOa1AVEB Electrical Permit Application-City of Tigard Page 2-Supplemental information Limited Energy Permit Fees: Renewable Energy Permit Fees: RESIDENTIAL WORK ONLY: • Description 1 oh. I E— I Tea I ° Fee for all residential systems combined: $75.00 Renewable electrical energy systems: 5 kva or less 100.70 2 Check Type of Work Involved: 5.01 to 15 kva 133.56 2 ❑ Audio and Stereo Systems* 15.01 to 25 kva 200.34 2 Wind generation systems in excess of 25 kva: ❑ Burglar Alarm 25.01 to 50 kva 301.04 2 50.01 to 100 kva 552.26 2 ❑ Garage Door Opener* >100 kva(tee in accordance with OAR 918-309-0040) 552,_, 6 2 D Heating,Ventilation and Air Conditioning Solar generation system in excess of 2S kva: System* Each additional kva over 25 7.42 3 ❑ Vacuum Systems* >100 kva-no additional charge 0.0 3 Each additional inspection over allowable in an of the above: ❑ Other: Each additional inspection is 66.25!hr 1 charged at an hourly(1 hr min) Inspections for which no fee is 90.00/hr specifically listed Qh hr min) COMMERCIAL WORK ONLY: • ;'ELE4TRICAL;PERMIT FEES " . Fee for each commercial system: $75.00 Subtotal(Enter on Page I): (SEE OAR 918-309-0000) • Number of inspections Allowed per permil. Check Type of Work Involved: ❑ Audio and Stereo Systems El Boiler Controls ❑ Clock Systems ❑ Data Telecommunication Installation ❑ Fire Alarm Installation ❑ HVAC ❑ Instrumentation ❑ Intercom and Paging Systems ❑ Landscape Irrigation Control* ❑ Medical ❑ Nurse Calls ❑ Outdoor Landscape Lighting* ❑ Protective Signaling ❑ Other: Total number of commercial systems: *No licenses are required. Licenses are required for all other installations I laudda, PermurlELC-PernoApp ELR EKE.dot Res a6/1721115 • COMcheck Software Version 4.1.5.2 Interior Lighting Compliance Certificate RECEIVED Project Information Energy Code: 90.1 (2016)Standard NAY 2 7 202l Project Title: Kiddie Academy Project Type: New Construction CITY OF TIGARL BUILDING DIVISION Construction Site: Owner/Agent: Designer/Contractor: 16145 SW UPPER BOON ES FERRY RD TIGARD, OR 97224 Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts/ft2 (B X C) 1-School/University 10320 0.81 8359 Total Allowed Watts= 8359 Proposed Interior Lighting Power A B C D E Fixture ID : Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. 1-School/University LED 1:Al:2X4: Other: 1 132 40 5280 LED 2: B1:2X2:Other: 1 21 30 630 LED 3: D1:4"DIA DOWNLIGHT:Other: 1 2 13 26 LED 4: F:TAPE LIGHT: Other: 1 1 500 500 Total Proposed Watts= 6436 Interior Lighting PASSES: Design 23% better than code Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed interior lighting systems have been designed to meet the 90.1 (2016) Standard requirements in COMcheck Version 4.1.5.2 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name-Title Signature Date Project Title: Kiddie Academy Report date: 05/17/21 Data filename: M:\03 Projects\21-10 Kiddie Academy\05 Lighting\21-10 KIDDIE ACADEMY.cck Page 2 of 8 COMcheck Software Version 4.1.5.2 ii Exterior Lighting Compliance Certificate Project Information Energy Code: 90.1 (2016)Standard Project Title: Kiddie Academy Project Type: New Construction Exterior Lighting Zone 2(Neighborhood business district(L72)) Construction Site: Owner/Agent: Designer/Contractor: 16145 SW UPPER BOONES FERRY RD TIGARD, OR 97224 Allowed Exterior Lighting Power A B C D E Area/Surface Category Quantity Allowed Tradable Allowed Watts Watts (Unit Wattage (B X C) Parking area 38280 ft2 0.04 Yes 1531 Total Tradable Watts(a)= 1531 Total Allowed Watts= 1531 Total Allowed Supplemental Watts(b)= 400 (a)Wattage tradeoffs are only allowed between tradable areas/surfaces. (b)A supplemental allowance equal to 400 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. Proposed Exterior Lighting Power A B C D E Fixture ID: Description/Lamp!Wattage Per Lamp I Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Parking area(38280 ft2): Tradable Wattage LED 1:SA1:BUILDING MT FLOOD:Other: 1 10 40 400 LED 2:SB1:BUILDING MT DOOR:Other: 1 13 26 338 LED 3:SC1:POLE MT SINGLE:Other: 1 4 155 620 LED 4:SC2:POLE MT DOUBLE:Other: 1 1 310 310 Total Tradable Proposed Watts= 1668 Exterior Lighting PASSES: Design 14% better than code Exterior Lighting Compliance Statement Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed exterior lighting systems have been designed to meet the 90.1 (2016) Standard requirements in COMcheck Version 4.1.5.2 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name-Title Signature Date Project Title: Kiddie Academy Report date: 05/17/21 Data filename: M:\03 Projects\21-10 Kiddie Academy\05 Lighting\21-10 KIDDIE ACADEMY.cck Page 3 of 8 COMcheck Software Version 4.1.5.2 Inspection Checklist Energy Code: 90.1 (2016) Standard Requirements: 100.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions & Req.ID 4.2.2, Plans, specifications, and/or ❑Complies Requirement will be met. 8.4.1.1, calculations provide all information ❑Does Not 8.4.1.2, with which compliance can be Location on plans/spec: E1.1, E3.1, E4.1 8.7 determined for the electrical systems ['Not Observable [PR6]2 and equipment and document where ❑Not Applicable exceptions are claimed. Feeder connectors sized in accordance with approved plans and branch circuits sized for maximum drop of 3%. 4.2.2, Plans, specifications, and/or ❑Complies Requirement will be met. 9.4.3, 9.7 calculations provide all information ❑Does Not [PR4]1 with which compliance can be ❑Not Observable Location on plans/spec: E1.1, E2.1 determined for the interior lighting and electrical systems and equipment ❑Not Applicable and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts,transformers and control devices. 9.7 :Plans, specifications, and/or ❑Complies Requirement will be met. [PR8]1 calculations provide all information ❑Does Not :with which compliance can be ❑Not Observable Location on plans/spec: E1.1, E2.1 determined for the exterior lighting land electrical systems and equipment :Not Applicable :and document where exceptions to :the standard are claimed. Information provided should include exterior lighting power calculations, wattage of :bulbs and ballasts,transformers and control devices. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact (Tier 3) Project Title: Kiddie Academy Report date: 05/17/21 Data filename: M:\03 Projects\21-10 Kiddie Academy\05 Lighting\21-10 KIDDIE ACADEMY.cck Page 5 of 8 Section Rough-In Electrical Inspection Complies? Comments/Assumptions & Req.ID 8.4.2 At least 50%of all 125 volt 15-and ❑Complies ,Requirement will be met. [EL10]2 20-Amp receptacles are controlled by ❑Does Not an automatic control device. [Not Observable Location on plans/spec: E2.1, E3.1 ENot Applicable 8.4.3 New buildings have electrical energy ❑Complies Exception: Buildings 25,000 ft2. [EL11]2 use measurement devices installed. ❑Does Not Where tenant spaces exist, each tenant is monitored separately. In ['Not Observable buildings with a digital control system ENot Applicable the energy use is transmitted to to control system and displayed graphically. 9.4.1.1 Automatic control requirements ❑Complies Requirement will be met. [EL1]2 prescribed in Table 9.6.1,for the ❑Does Not appropriate space type, are installed. ['Not Observable Location on plans/spec: E1.1, E2.1 Mandatory lighting controls (labeled as 'REQ') and optional choice controls ENot Applicable (labeled as'ADD1' and 'ADD2') are implemented. 9.4.1.1 Independent lighting controls installed ❑Complies Requirement will be met. [EL2]2 per approved lighting plans and all ❑Does Not manual controls readily accessible and Location on plans/spec: E1.1, E2.1 visible to occupants. ENot Observable ENot Applicable 9.4.1.1f :Daylight areas under skylights and ❑Complies Requirement will be met. [EL13]1 roof monitors that have more than ❑Does Not :150 W combined input power for general lighting are controlled by ['Not Observable photocontrols. ENot Applicable 9.4.1.4 Automatic lighting controls for exterior ❑Complies Requirement will be met. [EL3]2 lighting installed. ❑Does Not ENot Observable Location on plans/spec: El 1, E2.1 ENot Applicable 9.4.1.4d*Outdoor parking area luminaires >= EComplies Requirement will be met. [EL21]2 78W and <= 24 ft height controlled to ❑Does Not reduce wattage by 50%when area ❑Not Observable Location on plans/spec: E1.1, E2.1 unoccupied over 15 minutes. Controlled power limited to<_ ENot Applicable 1500W. 9.4.1.3 Separate lighting control devices for ❑Complies Requirement will be met. [EL4]1 specific uses installed per approved ❑Does Not lighting plans. ENot Observable Location on plans/spec: E1.1, E2.1 ENot Applicable 9.6.2 Additional interior lighting power ❑Complies Requirement will be met. [EL8]' allowed for special functions per the ❑Does Not approved lighting plans and is ENot Observable Location on plans/spec: E1.1, E2.1 automatically controlled and separated from general lighting. ENot Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact(Tier 3) Project Title: Kiddie Academy Report date: 05/17/21 Data filename: M:103 Projects\21-10 Kiddie Academy105 Lighting\21-10 KIDDIE ACADEMY.cck Page 6 of 8 Section # Final Inspection Complies? Comments/Assumptions & Req.ID 8.7.1 Furnished as-built drawings for ❑Complies Requirement will be met. [FI16]3 electric power systems within 30 days ❑Does Not of system acceptance. O Not Observable', ❑Not Applicable 8.7.2 Furnished O&M instructions for ❑Complies Requirement will be met. [FI17]3 systems and equipment to the ❑Does Not building owner or designated representative. ['Not Observable ❑Not Applicable 9.2.2.3 Interior installed lamp and fixture ❑Complies See the Interior Lighting fixture schedule for values. (FI18]1 lighting power is consistent with what ❑Does Not is shown on the approved lighting plans, demonstrating proposed watts ❑Not Observable are less than or equal to allowed ❑Not Applicable watts. 9.4.2 Exterior lighting power is consistent ❑Complies See the Exterior Lighting fixture schedule for values. [F119]1 with what is shown on the approved ❑Does Not lighting plans, demonstrating proposed watts are less than or equal ❑Not Observable to allowed watts. ENot Applicable 9.4.4 At least 75%of all permanently ❑Complies Exception: Requirement does not apply. [FI20]1 installed lighting fixtures in dwelling ❑Does Not units have>= 55 Im/W efficacy or a Location on plans/spec: N/A I >= 45 Im/W total luminaire efficacy. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact(Tier 3) Project Title: Kiddie Academy Report date: 05/17/21 Data filename: M:\03 Projects\21-10 Kiddie Academy\05 Lighting\21-10 KIDDIE ACADEMY.cck Page 7 of 8