Loading...
Report OFFICE COPY ATE--torito .ot .v . RECEIVED sioN, r° srPtC OPYsreP416 CITY OFTIGARD BUILDING DIVISION wworExpreassfireSystsencoon EXPRESS FIRE SYSTEMS 670 S. 28TH STREET WASHOUGAL, WA 98671 PHONE: (360) 953-8432 W W W.ExpressFi reSystems.com FIRE SPRINKLER CALCULATION FOR Broadway Rose Theater EO Pig FF 's' SS S/lo/2\ OREGON 27 �'IR10,25) LAMED EXPIRES: / /3021 ARK Mohamed Hussein From: Mohamed Hussein Sent: Friday, April 30, 2021 3:17 PM To: Aaron Beattie Subject: RE: Broadway Rose Fire Flow Test Thanks Aaron, The test you attached is dated 2015. I will use these numbers for my calculations given that there were no changes per your email. Thank you, /�afasrre�OTua¢eTs� PE Design/ Project Manager Express Fire Systems, Inc. mohamed@expressfiresystems.com Office: 360-953-8432 Fax: 360-953-8394 CCB#193272/WA. License: EXPREFS895NS FIRE S v 9 T E M R www.ExprossFiroSyets+ns.00rn From:Aaron Beattie <abeattie@tigard-or.gov> Sent: Friday,April 30, 2021 2:20 PM To: Mohamed Hussein<mohamed@expressfiresystems.com> Subject: Broadway Rose Fire Flow Test Mohamed Attached is the last fire flow test we performed for the theater. It was back in 2005 and the test shows an abundance of available flow. Hopefully the Fire Marshal will accept this. There have been no changes to the water system in that area. All the other test I have near that area are form the same year as this one. Let me know if you need to have a test performed. Aaron Beattie Water Operations Supervisor CITY OF TIGARD Public Works 113125 SW Hall Blvd. I Tigard, Oregon 197223 Main: 503.639.4171 I Direct: 503.718.2690 Cell: 503.702.0780 Fax: 503.684.8840 Email: abeattic(tigard-or.gov 1 HYDRANT FLOW REQUEST FORM o PROJECT: SW PACIFIC HWY & SW SCHOOL ST. ADDRESS: CROSS STREET: FLOW HYDRANT LOCATION: SW SCHOOL ST. & SW GRANT ST. STATIC: 82 RESIDUAL: PITOT- 69 GPM: 1394 AT 20 PSI - 12,947 GPM DATED: 04.09.15 8:00 AM MONITOR HYDRANT LOCATION: SW PACIFIC HWY & SW SCHOOL ST. STATIC: 82 RESIDUAL: 82 GPM: DATED: 04.09.15 8:00 AM WITNESS WITNESSED BY: TITLE: ORGANIZATION: CITY OF TIGARD WATER DEPT. SIGNATURE: VIREAkli avail- Ems R Em1 OENTIAL • COMMERCIAL • I N In Li MT RI AL XCEEIC0INJG YOUR EXPECTATIONS 24/7 ! EXPRESS FIRE SYSTEMS 670 S. 28TH ST. WASHOUGAL, OR 98671 360-953-8432 Job Name : BROADWAY ROSE THEATRE Drawing : S21-029L Location Remote Area : 1 Contract : S21-029 Data File : S21-029L Area 1.WXF Date/Time : 05/04/2021 - 10:05 AM Computer Programs by Hydratec Inc. Revision; 50.54.4 EXPRESS FIRE SYSTEMS Page 1 BROADWAY ROSE THEATRE Date HYDRAULIC CALCULATIONS for Project name: BROADWAY ROSE THEATRE Location: Drawing no: S21-029L Contract number: S21-029 Date: 5/3/2021 Design Remote area number: 1 Remote area location: COSTUME SHOP Occupancy classification: M Density: 0.2 -Gpm/SqFt Area of application: 1611 -SqFt Coverage per sprinkler: 130 -SqFt Type of sprinklers calculated: SSU 8.0 No. of sprinklers calculated: 15 In-rack demand: -GPM Hose streams: 250-GPM Total water required(including hose streams): 647.4 - GPM @ 70.5 - Psi Type of system: WET Volume of dry or preaction system: - Gal Water supply information Date: 4/9/2015 Location: NEAR CITY CONNECTION Source: TIGARD WATER Name of contractor: EXPRESS FIRE SYSTEMS Address: 670 S. 28TH ST. / /WASHOUGAL, OR 98671 Phone number: 360-953-8432 Name of designer: MH Authority having jurisdiction: Notes: (Include peaking information or gridded systems here.) Computer Programs by Hydratec Inc. Revision: 50.54.4 Water Supply Curve EXPRESS FIRE SYSTEMS Page 2 BROADWAY ROSE THEATRE Date City Water Supply: Demand: Cl - Static Pressure : 82 D1 - Elevation : 11.494 C2 - Residual Pressure: 82 D2 - System Flow : 397.385 C2- Residual Flow : 1394 D2 - System Pressure : 70.527 Hose ( Demand ) : 250 D3 - System Demand : 647.385 Safety Margin : 11.473 150 140 130 P 120 : R 110 E 100 S 90 C1 C2 ci S 80 D2 U 70 R 60 D3 E 50 40 30 20 10 D1 . . I . 200 400 600 800 1000 1200 1400 1600 1800 FLOW ( NA1.85 ) Computer Programs by Hydratec Inc. Revision: 50.54.4 Fittings Used Summary _ EXPRESS FIRE SYSTEMS Page 3 BROADWAY ROSE THEATRE Date Fitting Legend Abbrev. Name / % 1 1% 1'% 2 2''/ 3 3% 4 5 6 8 10 12 14 16 18 20 24 E NFPA 13 90'Standard Elbow 1 2 2 3 4 5 6 7 8 10 12 14 18 22 27 35 40 45 50 61 G NFPA 13 Gate Valve 0 0 0 0 0 1 1 1 1 2 2 3 4 5 6 7 8 10 11 13 Mfx Metraflex Loop Fitting generates a Fixed Loss Based on Flow T NFPA 13 90'Flow thru Tee 3 4 5 6 8 10 12 15 17 20 25 30 35 50 60 71 81 91 101 121 Zcd Colt C300 Horz Butt Fitting generates a Fixed Loss Based on Flow Units Summary Diameter Units Inches Length Units Feet Flow Units US Gallons per Minute Pressure Units Pounds per Square Inch Note: Fitting Legend provides equivalent pipe lengths for fittings types of various diameters. Equivalent lengths shown are standard for actual diameters of Sched 40 pipe and CFactors of 120 except as noted with *. The fittings marked with a * show equivalent lengths values supplied by manufacturers based on specific pipe diameters and CFactors and they require no adjustment. All values for fittings not marked with a *will be adjusted in the calculation for CFactors of other than 120 and diameters other than Sched 40 per NFPA. Computer Programs by Hydratec Inc. Revision: 50.54.4 ' Flow Summary - NFPA EXPRESS FIRE SYSTEMS Page 4 BROADWAY ROSE THEATRE Date SUPPLY ANALYSIS Node at Static Residual Available Source Pressure Pressure Flow Pressure Total Demand Required Pressure TEST 82.0 82 1394.0 82.0 647.38 70.527 NODE ANALYSIS Pressure Discharge Node Tag Elevation Node Type at Node at Node Notes 101 26.54 8 11.1 26.65 0.2 130 102 26.54 8 11.15 26.72 0.2 106 103 26.54 8 11.39 26.99 0.2 121 105 26.54 8 11.04 26.58 0.2 121 106 26.54 8 11.11 26.67 0.2 121 107 26.54 8 11.38 26.98 0.2 121 104 26.54 12.29 108 25.58 13.91 109 25.58 15.15 110 25.58 25.03 111 20.0 35.14 TOR 20.0 39.79 BOR 1.5 50.23 TUG 1.5 53.29 BUG -3.5 55.63 VO -3.5 62.91 CW -3.5 71.52 TEST 0.0 70.53 112 26.54 8 10.0 25.3 0.2 88 113 26.54 8 10.08 25.4 0.2 127 115 26.54 8 10.1 25.42 0.2 82 116 26.54 8 10.15 25.49 0.2 127 114 26.54 10.53 117 25.58 11.99 118 25.58 12.72 119 26.54 8 10.63 26.09 0.2 127 120 26.54 8 10.72 26.2 0.2 127 122 26.54 8 10.71 26.18 0.2 127 123 26.54 8 10.8 26.29 0.2 127 121 26.54 11.2 124 26.54 8 14.47 30.43 0.2 121 125 26.54 14.62 HOSE -3.5 71.4 250.0 Computer Programs by Hydratec Inc. Revision: 50.54.4 Final Calculations : Hazen-Williams EXPRESS FIRE SYSTEMS Page 5 BROADWAY ROSE THEATRE Date Node1 Elev1 K Qa Nom Fitting Pipe CFact Pt to or Ftngs Pe """`„ Notes ****** Node2 Elev2 Fact Qt Act Eqiv Len Total Pf/Ft Pf 101 26.540 8.00 26.65 2 8.570 120 11.098 to 0.0 102 26.540 26.65 2.157 8.570 0.0065 0.056 Vel = 2.34 102 26.540 8.00 26.72 2 9.670 120 11.154 to 0.0 103 26.540 53.37 2.157 9.670 0.0239 0.231 Vel = 4.69 103 26.540 8.00 26.99 2 T 12.307 5.430 120 11.385 to 12.307 0.0 104 26.540 80.36 2.157 17.737 0.0510 0.904 Vel = 7.06 0.0 104 80.36 12.289 K Factor= 22.92 105 26.540 8.00 26.58 2 11.110 120 11.038 to 0.0 106 26.540 26.58 2.157 11.110 0.0066 0.073 Vel = 2.33 106 26.540 8.00 26.67 2 11.110 120 11.111 to 0.0 107 26.540 53.25 2.157 11.110 0.0238 0.264 Vel= 4.68 107 26.540 8.00 26.98 2 T 12.307 5.680 120 11.375 to 12.307 0.0 104 26.540 80.23 2.157 17.987 0.0508 0.914 Vel = 7.04 104 26.540 80.36 2.5 T 16.474 0.960 120 12.289 to 16.474 0.416 108 25.580 160.59 2.635 17.434 0.0692 1.206 Vel = 9.45 108 25.580 206.37 3 10.920 120 13.911 to 0.0 109 25.580 366.96 3.26 10.920 0.1132 1.236 Vel = 14.10 109 25.580 30.42 3 T 20.159 45.750 120 15.147 to E 9.408 29.567 0.0 110 25.580 397.38 3.26 75.317 0.1312 9.879 Vel = 15.27 110 25.580 0.0 3 2E 18.815 3.580 120 25.026 to Mfx 0.0 18.815 7.174 ** Fixed Loss=4.757 111 20 397.38 3.26 22.395 0.1312 2.938 Vel = 15.27 111 20 0.0 3 2E 18.815 16.670 120 35.138 to 18.815 0.0 TOR 20 397.38 3.26 35.485 0.1312 4.654 Vel = 15.27 TOR 20 0.0 3 18.500 120 39.792 to 8.012 BOR 1.5 397.38 3.26 18.500 0.1312 2.427 Vel = 15.27 BOR 1.5 0.0 3 2E 18.815 3.160 120 50.231 to G 1.344 20.159 0.0 TUG 1.5 397.38 3.26 23.319 0.1312 3.059 Vel = 15.27 TUG 1.5 0.0 4 5.000 120 53.290 to 2.166 BUG -3.5 397.38 4.26 5.000 0.0356 0.178 Vel = 8.94 BUG -3.5 0.0 4 5E 72.668 152.810 140 55.634 to 72.668 0.0 VO -3.5 397.38 4.1 225.478 0.0323 7.281 Vel= 9.66 VO -3.5 0.0 4 T 29.067 15.250 140 62.915 to Zcd 0.0 29.067 7.174 * * Fixed Loss=7.174 CW -3.5 397.38 4.1 44.317 0.0323 1.430 Vel= 9.66 Computer Programs by Hydratec Inc. Revision: 50.54.4 Final Calculations : Hazen-Williams EXPRESS FIRE SYSTEMS Page 6 BROADWAY ROSE THEATRE Date Node1 EIev1 K Qa Nom Fitting Pipe CFact Pt to or Ftngs Pe ******" Notes .>.«. Node2 Elev2 Fact Qt Act Eqiv Len Total Pf/Ft Pf CW -3.5 250.00 6 47.720 140 71.519 to -1.516 TEST 0 647.38 6.16 47.720 0.0110 0.524 Vel = 6.97 0.0 TEST 647.38 70.527 K Factor= 77.09 112 26.540 8.00 25.30 2 13.680 120 9.998 to 0.0 113 26.540 25.3 2.157 13.680 0.0061 0.083 Vel = 2.22 113 26.540 8.00 25.40 2 T 12.307 8.570 120 10.081 to 12.307 0.0 114 26.540 50.7 2.157 20.877 0.0217 0.453 Vel= 4.45 0.0 114 50.70 10.534 K Factor= 15.62 115 26.540 8.00 25.42 2 8.900 120 10.099 to 0.0 116 26.540 25.42 2.157 8.900 0.0061 0.054 Vel = 2.23 116 26.540 8.00 25.49 2 T 12.307 5.110 120 10.153 to 12.307 0.0 114 26.540 50.91 2.157 17.417 0.0219 0.381 Vel = 4.47 114 26.540 50.70 2 T 12.307 0.960 120 10.534 to 12.307 0.416 117 25.580 101.61 2.157 13.267 0.0786 1.043 Vel = 8.92 117 25.580 0.0 2 9.260 120 11.993 to 0.0 118 25.580 101.61 2.157 9.260 0.0787 0.729 Vel = 8.92 118 25.580 104.75 2.5 10.810 120 12.722 to 0.0 108 25.580 206.36 2.635 10.810 0.1100 1.189 Vel = 12.14 0.0 108 206.36 13.911 K Factor= 55.33 119 26.540 8.00 26.09 2 13.680 120 10.635 to 0.0 120 26.540 26.09 2.157 13.680 0.0064 0.087 Vel = 2.29 120 26.540 8.00 26.19 2 T 12.307 8.570 120 10.722 to 12.307 0.0 121 26.540 52.28 2.157 20.877 0.0230 0.480 Vel = 4.59 0.0 121 52.28 11.202 K Factor= 15.62 122 26.540 8.00 26.18 2 13.680 120 10.711 to 0.0 123 26.540 26.18 2.157 13.680 0.0064 0.088 Vel = 2.30 123 26.540 8.00 26.29 2 T 12.307 5.110 120 10.799 to 12.307 0.0 121 26.540 52.47 2.157 17.417 0.0231 0.403 Vel = 4.61 121 26.540 52.29 2 T 12.307 0.960 120 11.202 to 12.307 0.416 118 25.580 104.76 2.157 13.267 0.0832 1.104 Vel = 9.20 Computer Programs by Hydratec Inc. Revision: 50.54.4 Final Calculations : Hazen-Williams EXPRESS FIRE SYSTEMS Page 7 BROADWAY ROSE THEATRE Date Node1 Elev1 K Qa Nom Fitting Pipe CFact Pt to or Ftngs Pe *"***** Notes ****** Node2 Elev2 Fact Qt Act Egiv Len Total Pf/Ft Pf 0.0 118 104.76 12.722 K Factor= 29.37 124 26.540 8.00 30.43 2 T 12.307 5.430 120 14.469 to 12.307 0.0 125 26.540 30.43 2.157 17.737 0.0085 0.150 Vel = 2.67 125 26.540 0.0 2 T 12.307 0.960 120 14.619 to 12.307 0.416 109 25.580 30.43 2.157 13.267 0.0084 0.112 Vel = 2.67 0.0 109 30.43 15.147 K Factor= 7.82 HOSE -3.5 H250 250.00 6 62.760 140 71.401 to 0.0 CW -3.5 250.0 6.16 62.760 0.0019 0.118 Vel = 2.69 0.0 CW 250.00 71.519 K Factor= 29.56 Computer Programs by Hydratec Inc. Revision: 50.54.4 At' firess F A R E SYSTEMS, RESI O ENTI Al_ • COMMERCIAL • I NJ MI MTRIAL EXCEEDING YOUR EXPECTATIONS 2 .4/7 ! EXPRESS FIRE SYSTEMS 670 S. 28TH ST. WASHOUGAL, OR 98671 360-953-8432 Job Name : BROADWAY ROSE THEATRE Drawing : S21-029L Location Remote Area : 2 Contract : S21-029 Data File : S21-029L Area 2.WXF Date/Time : 05/04/2021 - 11:00 AM Computer Programs by Hydratec Inc. Revision: 50.54.4 EXPRESS FIRE SYSTEMS Page 1 BROADWAY ROSE THEATRE Date HYDRAULIC CALCULATIONS for Project name: BROADWAY ROSE THEATRE Location: Drawing no: S21-029L Contract number: S21-029 Date: 5/3/2021 Design Remote area number: 2 Remote area location: REHEARSAL STUDIO Occupancy classification: A Density: 0.1 - Gpm/SqFt Area of application: 1208 -SqFt Coverage per sprinkler: 148-SqFt Type of sprinklers calculated: SSU 5.6 No. of sprinklers calculated: 12 In-rack demand: - GPM Hose streams: 100- GPM Total water required(including hose streams): 287.6- GPM @ 68.7- Psi Type of system: WET Volume of dry or preaction system: - Gal Water supply information Date: 4/9/2015 Location: NEAR CITY CONNECTION Source: TIGARD WATER Name of contractor: EXPRESS FIRE SYSTEMS Address: 670 S. 28TH ST. / /WASHOUGAL, OR 98671 Phone number: 360-953-8432 Name of designer: MH Authority having jurisdiction: Notes: (Include peaking information or gridded systems here.) Computer Programs by Hydratec Inc. Revision: 50.54.4 Water Supply Curve EXPRESS FIRE SYSTEMS Page 2 BROADWAY ROSE THEATRE Date City Water Supply: Demand: C1 -Static Pressure : 82 D1 - Elevation : 7.995 C2 - Residual Pressure: 82 D2 - System Flow : 187.597 C2 - Residual Flow : 1394 D2 - System Pressure : 68.680 Hose ( Demand ) : 100 D3 - System Demand : 287.597 Safety Margin : 13.320 150 140 130 P 120 R 110 r E 100 S 90 _ Cl C2 S80 7 - D2 U70 R 60 3 E 50 40 30 20 10 o D1 . ... . 200 400 600 800 1000 1200 1400 1600 1800 FLOW ( NA1.85 ) Computer Programs by Hydratec Inc. Revision: 50.54.4 Fittings Used Summary EXPRESS FIRE SYSTEMS Page 3 BROADWAY ROSE THEATRE Date Fitting Legend Abbrev. Name % ° 1 1'/0 1''/ 2 2% 3 3% 4 5 6 8 10 12 14 16 18 20 24 E NFPA 13 90'Standard Elbow 1 2 2 3 4 5 6 7 8 10 12 14 18 22 27 35 40 45 50 61 G NFPA 13 Gate Valve 0 0 0 0 0 1 1 1 1 2 2 3 4 5 6 7 8 10 11 13 Mfx Metraflex Loop Fitting generates a Fixed Loss Based on Flow T NFPA 13 90'Flow thru Tee 3 4 5 6 8 10 12 15 17 20 25 30 35 50 60 71 81 91 101 121 Zcd Colt C300 Horz Butt Fitting generates a Fixed Loss Based on Flow Units Summary Diameter Units Inches Length Units Feet Flow Units US Gallons per Minute Pressure Units Pounds per Square Inch Note: Fitting Legend provides equivalent pipe lengths for fittings types of various diameters. Equivalent lengths shown are standard for actual diameters of Sched 40 pipe and CFactors of 120 except as noted with *. The fittings marked with a * show equivalent lengths values supplied by manufacturers based on specific pipe diameters and CFactors and they require no adjustment. All values for fittings not marked with a *will be adjusted in the calculation for CFactors of other than 120 and diameters other than Sched 40 per NFPA. Computer Programs by Hydratec Inc. Revision: 50.54.4 ' Flow Summary - NFPA EXPRESS FIRE SYSTEMS Page 4 BROADWAY ROSE THEATRE Date SUPPLY ANALYSIS Node at Static Residual Available Source Pressure Pressure Flow Pressure Total Demand Required Pressure TEST 82.0 82 1394.0 82.0 287.6 68.68 NODE ANALYSIS Pressure Discharge Node Tag Elevation Node Type at Node at Node Notes DP01 10.0 5.6 7.0 14.82 0.1 72 EQ01 18.46 4.12 200 18.46 5.6 7.0 14.82 0.2 73 201 18.46 5.6 7.06 14.88 0.1 148 202 18.46 5.6 7.32 15.15 0.1 148 203 18.46 8.04 204 18.46 8.31 205 18.46 8.62 206 13.0 22.45 207 13.0 24.11 208 13.0 28.0 209 13.0 29.5 210 13.0 31.98 211 13.0 32.31 212 13.0 35.45 213 13.0 35.74 214 13.0 37.65 215 13.0 37.68 216 13.0 37.73 217 13.0 38.66 218 13.0 39.8 219 13.0 40.03 220 13.0 42.2 TOR 13.0 50.51 BOR 1.5 55.87 TUG 1.5 56.63 BUG -3.5 58.84 VO -3.5 60.66 CW -3.5 70.08 TEST 0.0 68.68 221 18.46 5.6 7.47 15.31 0.1 148 222 18.46 5.6 7.55 15.39 0.1 148 223 18.46 5.6 7.23 15.06 0.2 68 225 18.46 5.6 7.29 15.12 0.1 148 226 18.46 5.6 7.56 15.4 0.1 148 227 18.46 5.6 7.72 15.56 0.1 142 228 18.46 5.6 7.8 15.64 0.1 142 229 18.46 5.6 7.41 15.25 0.1 104 230 18.46 8.32 231 18.46 8.6 232 18.46 8.6 233 18.46 7.3 7.51 20.01 K=K @ EQ01 Computer Programs by Hydratec Inc. Revision: 50.54.4 ' Final Calculations : Hazen-Williams EXPRESS FIRE SYSTEMS Page 6 BROADWAY ROSE THEATRE Date Node1 Elev1 K Qa Nom Fitting Pipe CFact Pt to or Ftngs Pe ******' Notes ****** Node2 Elev2 Fact Qt Act Egiv Len Total Pf/Ft Pf DP01 10 5.60 14.82 1 E 2.0 8.460 120 7.000 to 2.000 -3.664 EQ01 18.46 14.82 1.049 10.460 0.0747 0.781 Vel = 5.50 0.0 EQ01 14.82 4.117 K Factor= 7.30 200 18.46 5.60 14.82 1.5 8.220 120 7.000 to 0.0 201 18.46 14.82 1.682 8.220 0.0075 0.062 Vel = 2.14 201 18.46 5.60 14.88 1.5 9.650 120 7.062 to 0.0 202 18.46 29.7 1.682 9.650 0.0270 0.261 Vel = 4.29 202 18.46 5.60 15.15 1.5 T 9.9 2.480 120 7.323 to 9.900 0.0 203 18.46 44.85 1.682 12.380 0.0582 0.721 Vel = 6.48 203 18.46 30.70 2.5 15.310 120 8.044 to 0.0 204 18.46 75.55 2.635 15.310 0.0171 0.262 Vel = 4.44 204 18.46 76.79 2.5 4.960 120 8.306 to 0.0 205 18.46 152.34 2.635 4.960 0.0627 0.311 Vel = 8.96 205 18.46 35.26 2.5 2T 32.948 41.200 120 8.617 to 2E 16.474 49.422 5.470 * * Fixed Loss= 3.105 206 13 187.6 2.635 Mfx 0.0 90.622 0.0922 8.359 Vel = 11.04 206 13 0.0 2.5 18.080 120 22.446 to 0.0 207 13 187.6 2.635 18.080 0.0923 1.668 Vel = 11.04 207 13 0.0 2 T 12.307 3.580 120 24.114 to 12.307 0.0 208 13 187.6 2.157 15.887 0.2445 3.884 Vel = 16.47 208 13 -46.44 2 10.400 120 27.998 to 0.0 209 13 141.16 2.157 10.400 0.1444 1.502 Vel = 12.39 209 13 -40.05 2 2E 12.307 19.460 120 29.500 to 12.307 0.0 210 13 101.11 2.157 31.767 0.0779 2.476 Vel= 8.88 210 13 -32.88 2 8.910 120 31.976 to 0.0 211 13 68.23 2.157 8.910 0.0376 0.335 Vel = 5.99 211 13 -28.73 1.25 2E 6.0 20.020 120 32.311 to 6.000 0.0 212 13 39.5 1.38 26.020 0.1206 3.137 Vel = 8.47 212 13 -20.59 1.25 9.510 120 35.448 to 0.0 213 13 18.91 1.38 9.510 0.0308 0.293 Vel = 4.06 213 13 0.0 1.25 2T 12.0 49.890 120 35.741 to 12.000 0.0 214 13 18.91 1.38 61.890 0.0308 1.909 Vel = 4.06 214 13 0.0 2 9.510 120 37.650 to 0.0 215 13 18.91 2.157 9.510 0.0035 0.033 Vel = 1.66 Computer Programs by Hydratec Inc. Revision: 50.54.4 Final Calculations : Hazen-Williams EXPRESS FIRE SYSTEMS Page 7 BROADWAY ROSE THEATRE Date Node1 Elev1 K Qa Nom Fitting Pipe CFact Pt to or Ftngs Pe ******* Notes ****** Node2 Elev2 Fact Qt Act Egiv Len Total Pf/Ft Pf 215 13 20.59 2 3.580 120 37.683 to 0.0 216 13 39.5 2.157 3.580 0.0137 0.049 Vel= 3.47 216 13 0.0 1.25 2E 6.0 1.710 120 37.732 to 6.000 0.0 217 13 39.5 1.38 7.710 0.1206 0.930 Vel = 8.47 217 13 27.46 2 31.200 120 38.662 to 0.0 218 13 66.96 2.157 31.200 0.0363 1.134 Vel = 5.88 218 13 34.15 2 3.030 120 39.796 to 0.0 219 13 101.11 2.157 3.030 0.0779 0.236 Vel = 8.88 219 13 40.05 2 T 12.307 2.670 120 40.032 to 12.307 0.0 220 13 141.16 2.157 14.977 0.1445 2.164 Vel= 12.39 220 13 46.44 2.5 2T 32.948 40.770 120 42.196 to 2E 16.474 49.422 0.0 TOR 13 187.6 2.635 90.192 0.0922 8.319 Vel = 11.04 TOR 13 0.0 3 11.500 120 50.515 to 4.981 BOR 1.5 187.6 3.26 11.500 0.0327 0.376 Vel = 7.21 BOR 1.5 0.0 3 2E 18.815 3.160 120 55.872 to G 1.344 20.159 0.0 TUG 1.5 187.6 3.26 23.319 0.0327 0.763 Vel = 7.21 TUG 1.5 0.0 4 5.000 120 56.635 to 2.166 BUG -3.5 187.6 4.26 5.000 0.0088 0.044 Vel = 4.22 BUG -3.5 0.0 4 5E 72.668 152.810 140 58.845 to 72.668 0.0 VO -3.5 187.6 4.1 225.478 0.0081 1.816 Vel = 4.56 VO -3.5 0.0 4 T 29.067 15.250 140 60.661 to Zcd 0.0 29.067 9.062 * * Fixed Loss = 9.062 CW -3.5 187.6 4.1 44.317 0.0080 0.356 Vel = 4.56 CW -3.5 100.00 6 47.720 140 70.079 to -1.516 TEST 0 287.6 6.16 47.720 0.0025 0.117 Vel = 3.10 0.0 TEST 287.60 68.680 K Factor= 34.70 221 18.46 5.60 15.31 1.5 9.650 120 7.474 to 0.0 1 222 18.46 15.31 1.682 9.650 0.0080 0.077 Vel = 2.21 222 18.46 5.60 15.39 1.5 T 9.9 7.170 120 7.551 to 9.900 0.0 203 18.46 30.7 1.682 17.070 0.0289 0.493 Vel = 4.43 0.0 203 30.70 8.044 K Factor= 10.82 223 18.46 5.60 15.06 1.5 8.340 120 7.230 to 0.0 225 18.46 15.06 1.682 8.340 0.0077 0.064 Vel = 2.17 Computer Programs by Hydratec Inc. Revision: 50.54.4 Final Calculations : Hazen-Williams EXPRESS FIRE SYSTEMS Page 8 BROADWAY ROSE THEATRE Date Node1 Elev1 K Qa Nom Fitting Pipe CFact Pt to or Ftngs Pe ******* Notes ****** Node2 Elev2 Fact Qt Act Eqiv Len Total Pf/Ft Pf 225 18.46 5.60 15.12 1.5 9.650 120 7.294 to 0.0 226 18.46 30.18 1.682 9.650 0.0280 0.270 Vel = 4.36 226 18.46 5.60 15.40 1.5 T 9.9 2.480 120 7.564 to 9.900 0.0 204 18.46 45.58 1.682 12.380 0.0599 0.742 Vel = 6.58 0.0 204 45.58 8.306 K Factor= 15.82 227 18.46 5.60 15.56 1.5 9.250 120 7.723 to 0.0 228 18.46 15.56 1.682 9.250 0.0082 0.076 Vel = 2.25 228 18.46 5.60 15.64 1.5 T 9.9 7.170 120 7.799 to 9.900 0.0 204 18.46 31.2 1.682 17.070 0.0297 0.507 Vel = 4.50 0.0 204 31.20 8.306 K Factor= 10.83 229 18.46 5.60 15.25 1 T 5.0 6.540 120 7.414 to 5.000 0.0 230 18.46 15.25 1.049 11.540 0.0788 0.909 Vel = 5.66 230 18.46 0.0 1.25 T 6.0 7.190 120 8.323 to 6.000 0.0 231 18.46 15.25 1.38 13.190 0.0207 0.273 Vel = 3.27 231 18.46 0.0 2.5 1.710 120 8.596 to 0.0 232 18.46 15.25 2.635 1.710 0.0006 0.001 Vel = 0.90 232 18.46 20.01 2.5 4.740 120 8.597 to 0.0 205 18.46 35.26 2.635 4.740 0.0042 0.020 Vel = 2.07 0.0 205 35.26 8.617 K Factor= 12.01 233 18.46 7.3 20.01 1 T 5.0 3.320 120 7.513 K= K @ EQ01 to 5.000 0.0 232 18.46 20.01 1.049 8.320 0.1303 1.084 Vel = 7.43 0.0 232 20.01 8.597 K Factor= 6.82 208 13 46.44 1.25 2T 12.0 67.310 120 27.998 to 2E 6.0 18.000 0.0 234 13 46.44 1.38 85.310 0.1626 13.872 Vel= 9.96 234 13 0.0 2 T 12.307 5.310 120 41.870 to 12.307 0.0 220 13 46.44 2.157 17.617 0.0185 0.326 Vel = 4.08 0.0 220 46.44 42.196 K Factor= 7.15 209 13 40.05 1.25 2T 12.0 67.160 120 29.500 to 2E 6.0 18.000 0.0 219 13 40.05 1.38 85.160 0.1237 10.532 Vel= 8.59 0.0 Computer Programs by Hydratec Inc. Revision: 50.54.4 Final Calculations : Hazen-Williams EXPRESS FIRE SYSTEMS Page 9 BROADWAY ROSE THEATRE Date Nodel Elev1 K Qa Nom Fitting Pipe CFact Pt to or Ftngs Pe '" Notes ****** Node2 Elev2 Fact Qt Act Eqiv Len Total Pf/Ft Pf 219 40.05 40.032 K Factor= 6.33 210 13 32.88 1.25 2T 12.0 40.890 120 31.976 to 12.000 0.0 235 13 32.88 1.38 52.890 0.0858 4.540 Vel = 7.05 235 13 1.27 1.25 E 3.0 26.620 120 36.516 to T 6.0 9.000 0.0 218 13 34.15 1.38 35.620 0.0921 3.280 Vel = 7.33 0.0 218 34.15 39.796 K Factor= 5.41 211 13 28.73 1.25 2E 6.0 44.810 120 32.311 to 2T 12.0 18.000 0.0 236 13 28.73 1.38 62.810 0.0669 4.202 Vel = 6.16 236 13 -1.27 1.25 E 3.0 25.920 120 36.513 to T 6.0 9.000 0.0 217 13 27.46 1.38 34.920 0.0615 2.149 Vel = 5.89 0.0 217 27.46 38.662 K Factor= 4.42 236 13 1.27 1.25 12.840 120 36.513 to 0.0 235 13 1.27 1.38 12.840 0.0002 0.003 Vel = 0.27 0.0 235 1.27 36.516 K Factor= 0.21 212 13 20.59 1.25 2T 12.0 49.890 120 35.448 to 12.000 0.0 215 13 20.59 1.38 61.890 0.0361 2.235 Vel = 4.42 0.0 215 20.59 37.683 K Factor= 3.35 HOSE -3.5 H100 100.00 6 62.760 140 70.057 to 0.0 CW -3.5 100.0 6.16 62.760 0.0004 0.022 Vel= 1.08 0.0 CW 100.00 70.079 K Factor= 11.95 Computer Programs by Hydratec Inc. Revision: 50.54.4 TOLBraceTM Seismic Bracing Calculations Contractor: Express fire systems Project Address: BROADWAY ROSE THEATRE Address: 670 S 28th st.Washougal,WA 98671 =Ti N 12850 SW GRANT AVE Phone: 360-953-8432 f°""�r t7 4$esst ✓d""de TIGARD, OR License: EXPREFS895NS Job#S21-029 Calculations based on 2016 NFPA Pamphlet#13 Brace Information TOLCOTM Brace Components Maximum Brace Length 7'0' (2.134 m) TOLCOIM Component Listed Load Adjusted Load Diameter of Brace 1"Sch.40 Fig.4L Clamp 2015 lbs(914 kg) 1425 lbs(646 kg) Fig.980 Universal Swivel 2015 lbs(914 kg) 1425 lbs(646 kg) Type of Brace Sch 10 See Fastener Information 45° Min. *Calculation Based on CONCENTRIC Loading Angle of Brace _.._._..__._.____._.._....__..._.._._...._.__._.......__.-____. *Please Note:These calculations are for TOLCO"^components only.Use of any other components voids these calculations and the listing of the assembly. Least Rad.of Gyration 0.42°111 mm) Seismic Brace Assembly Detail L1R Value 200 Max Horizontal Load 1310 Ibs (594 k TOLCO FIG. 980 �)_....__.__. UNIVERSAL SWAY BRACE ATTACHMENT O j Fastener Information STEEL PIPE Orientation to Connecting Surface NFPA Type E Fastener �� Type La Screw TOLCO FIG. 4L ��-____ - PIPE CLAMP FOR G Diameter 1/2in. SWAY BRACING -- --- ----, Length 4-1/2in 0 ....i Maximum Load 400 lbs(181 k ru, Brace Identification on Plans 3"LONGTUDINAL Prying Factor N/A Brace Type Lateral[ I Longitudinal[X] 4-Way[ ] Sprinkler System Load Calculation (Fpw= CpWp) Cp= 0.501 _ Diameter Diameter Type Length Total Length Weight Per Unit Length Total Weight 3"(80 mm) Sch. 10 80 ft(24.4 m) 80 ft(24.4 m) 7.94 lb/ft(11.82 kg/m) 635 lbs(288 kg) Subtotal Weight 635 lbs(288 kg) Wp(incl. 15%) 730 lbs(331 kg) Main Size Type/Sch. Spacing(ft) I Total(Fpw) 366 lbs(166 kg) 3" Sch.10 80 Maximum Fpw per 9.3.5.5.2(if applicable) N/A fTOLBrace7'.Version 81 Use of TOLBraceTM is subject to terms and conditions per the end user license agreement TOLBraceTM Seismic Calculations BROADWAY ROSE THEATRE Job# 521-029 12850 SW GRANT AVE Fa l T 'N POitgnia7 M/rerncg illr(.Itldll2,de Brace Identification 3" LONGTUDINAL Brace Type(Per NFPA#13) NFPA Type E Braced Pipe(ft) 3"Sch.10 Steel Pipe Spacing of Brace 80'0"(24.38 m) Orientation of Brace Longitudinal Bracing Material 1"Sch.40 Maximum Brace Length 7'0"(2.13 m) Slenderness Ratio used for Load Calculation 200 True Angle of Brace for Calculation 45° Type of Fastener 1/2in.x 4-1/2in.Lag-Screw Length of Fastener 4-1/2in. Summary of Pipe within Zone of Influence 3"Sch.10 Steel Pipe(76.2 mm) 180 ft(24.4 m) G-Factor Used 0.501 Allowance for Heads and Fittings 15% Conclusions Total Adjusted Load of Pipe in Zone of Influence 366 lbs (166 kg) Material Capacity 1310 lbs(594 kg) Fastener Capacity 400 lbs (181 kg) Fig.4L Clamp 1425 lbs(646 kg) Fig.980 Universal Swivel 1425 lbs(646 kg) Structural Member WOOD BEAM Calculations prepared by MH The description of the Structural Member is for informational purposes only. TOLBrace"software calculates the brace assembly only,not the structure it is attached to. Calculated with TOLBrace'"8 Visit us at www.tolco.com TOLBraceTM Seismic Bracing Calculations Contractor: Express fire systems Project Address: BROADWAY ROSE THEATRE Address: 670 S 28th st. Washougal,WA 98671 .1 N 12850 SW GRANT AVE PowaririoBusiressWulow+de Phone: 360-953-8432 TIGARD, OR License: EXPREFS895NS Job#521-029 Calculations based on 2016 NFPA Pamphlet#13 Brace Information TOLCOTM Brace Components Maximum Brace Length T 0" 2.134 m TOLCOTM Component Listed Load Adjusted Load Diameter of Brace 1"Sch.40 Fig. 1001 Clamp 2015 lbs(914 kg) 1425 lbs(646 kg) Fig.980 Universal Swivel 2015 lbs(914 kg) 1425 lbs(646 kg) Type of Brace Sch 10 YP __.,.._ ... See Fastener Information 45° Min *Calculation Based on CONCENTRIC Loading Angle of Brace *Please Note:These calculations are for TOLCO components only.Use of any other components voids these calculations and the listing of the assembly. Least Rad.of Gyration 0.42'(11 mm) Seismic Brace Assembly Detail UR Value 200 Max Horizontal Load 1310 lbs 594 k TOLCO FIG. 980 ( g)._.__._.. UNIVERSAL SWAY BRACE �� ATTACH MENT Fastener Information STEEL PIPE .4, Orientation to Connecting Surface NFPA Type E Fastener !"' Type La -Screw :. Diameter 1/2in '>- / * Length 4-1/2in. 4� �� Maximum LoadTOLCO FIG. 1001 �� 4001bs(181 kg) FAST CLAMP 4 ' Brace Identification on Plans 3" LATERAL Prying Factor N/A Brace Type Lateral[X] Longitudinal[ ] 4-Way[ ] Sprinkler System Load Calculation (Fpw= CpWp) Cp= --0.501__,-- Diameter Type Length Total Length Weight Per Unit Length Total Weight 3"(80 mm) Sch. 10 30 ft(9.1 m) 30 ft(9.1 m) 7.94 lb/ft(11.82 kg/m) 238 lbs(108 kg) 2"(50 mm) Sch. 10 104 ft(31.7 m) 104 ft(31.7 m) 4.22 lb/ft(6.28 kg/m) 439 lbs(199 kg) Subtotal Weight 677 lbs(307 kg) Wp(incl. 15%) 779 lbs(353 kg) Main Size Type/Sch. Spacing(ft) I Total(Fpw) 390 lbs(177 kg) 3" Sch.10 30 Maximum Fpw per 9.3.5.5.2(if applicable) 633 lb(287 kg) {TOLBrace"Version 81 Use of TOLBraceTM is subject to terms and conditions per the end user license agreement TOLBraceTn" Seismic Calculations BROADWAY ROSE THEATRE Job#S21-029 12850 SW GRANT AVE E-T•N igNgrrry 9vsunesw W6rfAurds Brace Identification 3" LATERAL Brace Type(Per NFPA#13) NFPA Type E Braced Pipe(ft) 3"Sch.10 Steel Pipe Spacing of Brace 30'0"(9.14 m) Orientation of Brace Lateral Bracing Material 1"Sch.40 Maximum Brace Length 7'0"(2.13 m) Slenderness Ratio used for Load Calculation 200 True Angle of Brace for Calculation 45° Type of Fastener 1/2in.x 4-1/2in. Lag-Screw Length of Fastener 4-1/2in. Summary of Pipe within Zone of Influence 3'Sch.10 Steel Pipe(76.2 mm) 30 ft(9.1 m) 2'Sch.10 Steel Pipe(50.8 mm) 104 ft(31.7 m) G-Factor Used 0.501 Allowance for Heads and Fittings 15% Conclusions Total Adjusted Load of Pipe in Zone of Influence 390 lbs (177 kg) Material Capacity 1310 lbs (594 kg) Fastener Capacity 400 lbs (181 kg) Fig. 1001 Clamp 1425 lbs(646 kg) Fig.980 Universal Swivel 1425 lbs(646 kg) Structural Member WOOD BEAM Calculations prepared by MH *The description of the Structural Member is for informational purposes only. TOLBrac&°software calculates the brace assembly only,not the structure it is attached to. Calculated with TOLBrace'"8 Visit us at www.tolco.com TOLBraceTM Seismic Bracing Calculations Contractor: Express fire systems Project Address: BROADWAY ROSE THEATRE Address: 670 S 28th st Washougal,WA 98671 EA.AT•N 12850 SW GRANT AVE Pbwrina Rosiness Wcvldwrde Phone: 360-953-8432 TIGARD, OR License: EXPREFS895NS Job#S21-029 Calculations based on 2016 NFPA Pamphlet#13 Brace Information TOLCOTM Brace Components Maximum Brace Length ?'0"i2,,134 m) TOLCOTM Component Listed Load Adjusted Load Diameter of Brace 1"Sch.40 Fig.4L Clamp 2015 lbs (914 kg) 1425 lbs(646 kg) Fig.980 Universal Swivel 2015 lbs(914 kg) 1425 lbs(646 kg) Type of Brace Sch. 10 YP --- - --- See Fastener Information 45° Min. 'Calculation Based on CONCENTRIC Loading Angle of Brace ..._-.._. ..._.._.. ..___ Please Note:These calculations are for TOLCO components only.Use of any other components voids these calculations and the listing of the assembly. Least Rad.of Gyration 0.42".11 mrrit ____.,_.__.m... Seismic Brace Assembly Detail L/R Value 200 Max Horizontal Load 1310 lbs 594 k TOLCO FIG. 980 �- -- �� UNIVERSAL SWAY . BRACE ATTACHMENT OA Fastener Information STEEL PIPE Orientation to Connecting Surface NFPA Type E Fastener /e' O.. Type Lag-Screw TOLCO FIG. 4L 9 PIPE CLAMP FOR R SWAY BRACING -—— 0 Diameter 1/2in. ; Length 4 1/2in 0 ) Maximum Load 400 lbs(181 kg) Brace Identification on Plans 2.5"LONGTUDINAL Prying Factor N/A Brace Type Lateral[ ] Longitudinal[X] 4-Way[ ] Sprinkler System Load Calculation (Fpw= CpWp) 0.501 Diameter Type Length Total Length Weight Per Unit Length Total Weight 2.5"(65 mm) Sch. 10 60 ft(18.3 m) 60 ft(18.3 m) 5.89 lb/ft(8.77 kg/m) 353 lbs(160 kg) Subtotal Weight 353 lbs(160 kg) Wp(incl. 15%) 406 lbs(184 kg) Main Size Type/Sch. Spacing(ft) I Total(Fpw) 203 lbs(92 kg) 2.5" Sch.10 6o Maximum Fpw per 9.3.5.5.2(if applicable) N/A fTOLBraceTM Version 81 Use of TOLBraceTM is subject to terms and conditions per the end user license agreement TOLBraceTM Seismic Calculations BROADWAY ROSE THEATRE Job#S21-029 12850 SW GRANT AVE IFI lT •N P041,1d79 A•J6L+4,as Wo•Ourt*e Brace Identification 2.5" LONGTUDINAL Brace Type(Per NFPA#13) NFPA Type E Braced Pipe(ft) 2.5"Sch.10 Steel Pipe Spacing of Brace 60'0"(18.29 m) Orientation of Brace Longitudinal Bracing Material 1"Sch.40 Maximum Brace Length 7'0"(2.13 m) Slenderness Ratio used for Load Calculation 200 True Angle of Brace for Calculation 45° Type of Fastener 1/2in.x 4-1/2in.Lag-Screw Length of Fastener 4-1/2in. Summary of Pipe within Zone of Influence 2.5"Sch.10 Steel Pipe(63.5 mm) 160 ft(18.3 m) G-Factor Used 0.501 Allowance for Heads and Fittings 15% Conclusions Total Adjusted Load of Pipe in Zone of Influence 204 lbs(93 kg) Material Capacity 1310 lbs(594 kg) Fastener Capacity 400 lbs(181 kg) Fig.4L Clamp 1425 lbs(646 kg) Fig.980 Universal Swivel 1425 lbs(646 kg) Structural Member WOOD BEAM Calculations prepared by MH The description of the Structural Member is for informational purposes only. TOLBrace'°software calculates the brace assembly only,not the structure it is attached to. Calculated with TOLBrace'"8 Visit us at www.tolco.com • TOLBraceTM Seismic Bracing Calculations Contractor: Express fire systems Project Address: BROADWAY ROSE THEATRE Address: 670 S 28th st. i Washougal,WA 98671 � 12850 SW GRANT AVE PowsviAy Business Wfrfdwide Phone: 360-953-8432 TIGARD, OR License: EXPREFS895NS Job#S21-029 Calculations based on 2016 NFPA Pamphlet#13 Brace Information TOLCOTM Brace Components Maximum Brace Length T 0"(2.134 m) TOLCOTM Component Listed Load Adjusted Load Diameter of Brace 1"Sch.40 Fig. 1001 Clamp 2015 lbs(914 kg) 1425 lbs(646 kg) Fiq.980 Universal Swivel 2015 lbs(914 kg) 1425 lbs(646 kg) Type of Brace Sch. 10 See Fastener Information Angle of Brace 45° Min `Calculation Based on CONCENTRIC Loading "Please Note:These calculations are for TOLCOT"'components only.Use of any other components voids these calculations and the listing of the assembly. Least Rad.of Gyration 0.42"(11 mm)__ Seismic Brace Assembly Detail L/R Value 200 Max Horizontal Load 1310 lbs(594 kg) TOLCO FIG. 980 UNIVERSAL SWAY BRACE ��I ATTACHMENT Fastener Information STEEL PIPE Orientation to Connecting Surface NFPA Type E Fastener ' Type Lag-Screw % ��� Diameter 1/2in. 4/ 41 Length 41/21n TOLCO FIG. 1001 Maximum Load 400_Ibs�81 k�) FAST CLAMP ' Brace Identification on Plans 2.5"LATERAL Prying Factor N/A Brace Type Lateral[X] Longitudinal[ ] 4-Way[ ] Sprinkler System Load Calculation (Fpw= CpWp) Cp = 0.501 Diameter Type Length Total Length Weight Per Unit Length Total Weight 2.5"(65 mm) Sch. 10 30 ft(9.1 m) 30 ft(9.1 m) 5.89 lb/ft(8.77 kg/m) 177 lbs(80 kg) 1.5"(40 mm) Sch. 10 76 ft(23.2 m) 76 ft(23.2 m) 3.04 lb/ft(4.52 kg/m) 231 lbs(105 kg) Subtotal Weight 408 lbs (185 kg) Wp(incl. 15%) 469 lbs(213 kg) Main Size Type/Sch. Spacing(ft) I Total(Fpw) 235 lbs (107 kg) z.s Sch.10 30 Maximum Fpw per 9.3.5.5.2(if applicable) 420 lb(190 kg) frOLBrace"Version 8) Use of TOLBrace"is subject to terms and conditions per the end user license agreement TOLBraceT" Seismic Calculations BROADWAY ROSE THEATRE Job#S21-029 12850 SW GRANT AVE F T•N Brace Identification 2.5" LATERAL Brace Type(Per NFPA#13) NFPA Type E Braced Pipe(ft) 2.5" Sch.10 Steel Pipe Spacing of Brace 30'0" (9.14 m) Orientation of Brace Lateral Bracing Material 1" Sch.40 Maximum Brace Length 7'0"(2.13 m) Slenderness Ratio used for Load Calculation 200 True Angle of Brace for Calculation 45° Type of Fastener 1/2in.x 4-1/2in.Lag-Screw Length of Fastener 4-1/2in. Summary of Pipe within Zone of Influence 2.5"Sch.10 Steel Pipe(63.5 mm) 30 ft(9.1 m) 1.5"Sch.10 Steel Pipe(38.1 mm) 76 ft(23.2 m) G-Factor Used 0.501 Allowance for Heads and Fittings 15% Conclusions Total Adjusted Load of Pipe in Zone of Influence 235 lbs(107 kg) Material Capacity 1310 lbs(594 kg) Fastener Capacity 400 lbs(181 kg) Fig. 1001 Clamp 1425 lbs(646 kg) Fig.980 Universal Swivel - 1425 lbs(646 kg) Structural Member WOOD BEAM Calculations prepared by MH •The description of the Structural Member is for informational purposes only. TOL8racem software calculates the brace assembly only,not the structure it is attached to. Calculated with TOLBraceTM 8 Visit us at wnw.tolco.com