Loading...
Permit CITY OF TIGARD MECHANICAL PERMIT I. COMMUNITY DEVELOPMENT Permit#: MEC2021-00284 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 5/24/2021 TIGARD 9 Parcel: 2S110DCO2300 Jurisdiction: Tigard Site address: 11525 SW DURHAM RD D Project: Willowbrook Subdivision: 1998-128 PARTITION PLAT Lot: 1 Project Description: Removal of(8)RTU during re-roof and replace(4)of the(8)during re-roof Contractor: OREGON AIRE INC Owner: HIP WILLOWBROOK LLC 7715 NE 33RD DR STE A BY HARSCH INVESTMENT CORP PORTLAND, OR 97211 PO BOX 2708 PORTLAND, OR 97208 PHONE: 503-335-2222 PHONE: FAX: 360-423-1978 FEES Specifics: Description Date Amount Type of Use: COM Permit Fee 05/19/2021 $1,488.21 Class of Work: ALT Type of Const: VB Plan Review 05/19/2021 $372.05 Occupancy Grp: R-2 Occupancy Load: 12%State Surcharge-Mechanical 05/19/2021 $178.59 Stories: Info Process/Archiving-Sm$0.50(up to 05/19/2021 $62.50 Project Valuation: 11x17) $55,000.00 Fuel Air Handlers Fuel Types: Natural Gas Units< 10000 cfm: Gas Pressure: Units>10000 cfm: Furnaces Boilers&Compressors Furnaces< 100K BTU: 0-3 HP: Furnaces>= 100K BTU: 3-15 HP: Floor Furnaces: 15-30 HP: Unit Heaters: 30-50 HP: Vents w/o Appliances: 50 or Greater HP: Air Conditioning: Heat Pump: Appliances Vent Fans: Vent Systems: Total $2,101.35 Hoods: Comm Incinerators: Required Items and Reports(Conditions) Woodstoves: Gas Fireplaces: Clothes Dryers: Other Mech Units: Gas Outlets: Other Desc: Duct Work: Fire/Smoke Dampers: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: }lathy VarliDe/WP. Q Permittee Signature: Applalcallern Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. ,— s• T3- 4126 2i Mechanical Permit Applicatinft-I1 CEIVE City of Tigard y DatvBea 65 63/Z02/ tvt a/-002 Pemri[No.: r 1111 13125 SW Hall Blvd.,Tigard,OR 97223 If• Plan Review 7.- Phone: 503.718.2439 Fax: 503.598.1960 -�� `-J�' Date/By: S�f a^ -.3 f 4 Other Permit: TIGAILD Inspection Line: 503.639.4175 DeteRe yiBy: Ions. 0 See Page 2for Internet: www.tigard-or.gov CITY OF TIGARDp ND etho /t' ) r'a' Supplemental Information A f/ L TYPE OF WORK CO C FEE* SCHEDULE -USE CHECKLIST Mechanical permit fees*are based on the value of the work ❑New construction 0 Addition/alteration/replacement performed.Indicate the value(rounded to the nearest dollar)of all 0 Demolition 0 Other: mechanical materials,equipment,labor,overhead,and profit. Value:$55,000.00 CATEGORY OF CONSTRUCTION RESIDENTIAL EQUIPMENT/SYSTEMS FEES* ❑ 1-and 2-family dwelling 0 Commercial/industrial ❑Accessory building For special information use checklist. ❑Multi-family 0 Master builder ❑Other: Description Qty. Ea. Total //S�' , SITE INFORMATION AND LOCATION Heating/cooling: Air conditioning 46.75 Job site address:1 5 SW Durham Road Furnace 100,000 BTU(ducts/vents) 46.75 City/State/ZIP:Tigard/Oregon 197224 Furnace 100,000+BTU(ducts/vents) 54.91 Heat pump 61.06 Suite/bldg./apt.no.: I Project name:Willowbrook-Bldg. D-Re Roof Ductwork 23.32 Cross street/directions to job site: Hydronic hot water system 23.32 Residential boiler(radiator or hydronic) 23.32 Unit heaters(fuel-type,not electric), I in-wall,in-duct,suspended,etc. 46.75 Flue/vent for any of above 23.32 Subdivision: I Lot no.: Other: 23.32 Other fuel appliances: Tax map/parcel no.: Water heater 23.32 DESCRIPTION OF WORK - Gas fireplace/insert 33.39 Flue vent for water heater or gas Removal of 8 rooftop units during re-roof. fireplace 23.32 Replacing 4 of the 8 rooftop units during re-roof. Log lighter(gas) 23.32 1 Wood/pellet stove 33.39 Wood fireplace/insert 23.32 Chimney/liner/flue/vent 23.32 ® PROPERTY OWNER I . 0 TENANT Other: 23.32 Environmental exhaust and ventilation: Name:Harsch Investment Properties Range hood/other kitchen equipment 33.39 Address:1121 SW Salmon St I #400 Clothes dryer exhaust 33.39 • City/State/ZIP:Portland I Oregon/97205 Single-duct exhaust(bathrooms, toilet compartments,utility rooms) 23.32 Phone:(503)242-2900 Fax:( ) Attic/crawlspace fans 23.32 IN APPLICANT 0 CONTACT PERSON Other: 23.32 Fuel piping: Business name:Oregon-Alre Inc. $14.15 for first four;$4.03 for each additional Contact name:Ian McDonald Furnace,etc. Gas heat pump Address:7715 NE 33rd Drive I Suite A Wall/suspended/unit heater City/State/ZIP:Portland/Oregon/97211 Water heater Phone:(503) 335-2222 Fax::( ) n/a Fireplace Range E-mail:permits@oregon-aire.com Barbecue CONTRACTOR Clothes dryer(gas) Other: Business name:Oregon-Aire Inc. MECHANICAL PERMIT FEES* Address:7715 NE 33rd Drive I Suite A subtotal City/State/ZIP:Portland/Oregon/97211 - Minimum permit fee($90.00) Plan review(25%of permit fee) Phone:(503 )335-2222 Fax:( ) n/a State surcharge(12%of permit fee) CCB lie.:64235 • TOTAL PERMIT FEE This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Authorized signature: da o,„,„Ji.4/, * Fee methodology set by Tri-County Building Industry Service Board Print name:Ian McDonald Date:4/19/21 I:1Bu ldinglYermils\MEC_PemutApp_040113.doo 440-46171'(1 I/0a/COM/WEB) _All t Mechanical Permit Application - City of Tigard Page 2 - Supplemental Information Commercial & Multi-Family Fee Schedule: Total Valuation: Permit Fee: $0.00 to$500.00 Minimum fee$69.06 $500.01 to$5,000.00 $69.06 for the first$500.00 and $3.07 for each additional$100.00 or fraction thereof,to and including $5,000.00. $5,000.01 to$10,000.00 $207.21 for the first$5,000.00 and $2.81 for each additional$100.00 or fraction thereof,to and including $10,000.00. $10,000.01 to$50,000.00 $347.71 for the first$10,000.00 and $2.54 for each additional$100.00 or fraction thereof,to and including $50,000.00. $50,000.01 to$100,000.00 $1,363.71 for the first$50,000.00 and $2.49 for each additional$100.00 or fraction thereof,to and including $100,000.00. $100,000.01 and up $2,608.71 for the first$100,000.00 and $2.92 for each additional$100.00 or fraction thereof. Note: All new commercial buildings require 2 sets of plans. I:1Building\Permits\MEC_PermitApp_040113.doc 2 City of Tigard 1111 ® COMMUNITY DEVELOPMENT DEPARTMENT TIGARD Building Permit Review — Commercial - No Land Use Building Permit #: M EGZO Z.( --OCR ZBZ1 Site Address: //c2 C Airkoi Pi Suite/Bldg#: Project Name: /'VI//0/thr1 L (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review ,,p� "" /J ] J� Proposal: ps (/NNJ✓C JP�Jd Existing Business Activity: AJ Pro sed Business Activity: g13,4�j VJ V -'fy site address/suite # exists and active in permit system. 11111,s'.ver Terrace Neighborhood: E Yes CI No II Z.ning: (1-) ' II0 jP ermitted Use: ❑ Yes 0 No ❑ Spec Space 1Y Confirm no land use required. siness License: u\ Exists: ❑ Yes ❑ No,applicant was provided a business license application Notes: Approved by Planning: `�— — Date: 2 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved 0 Not Approved Building Permit Submittal Original Submittal Date: ..20Z/ Site Plans: # Building Plans: # Building Permit#: 12—Enter building permit# above. Workflow Routing: ED—Planning ❑ Permit Coordinator ®--Building Workflow Sign-off: 11Sign-off for Planning(include notes from planning review) Route Application Documents: [I-Building: original permit application, site plans,building plans, engineer and beam calculations and trust details,if applicable, etc. Notes: / / By Permit Technician: .. 'firffr Date: plj/t /J12( l:1 Building\Forms\BldgPermitRvw_COM_NoLandUse_111819.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to App ant: Revision Notice 2: Date Sent to A..licant: Revision Notice 3: Date Sent to pplicant: ❑ SDC Fees Entered: Wash Co Frans Dev Tax: ❑ Yes ❑ N/A Tigard 'rans SDC: ❑ Yes ❑ N/A Park DC: ❑ Yes ❑ N/A ❑ OK to Issue Permit Approved by Permit Coor.,nator: Date: I:\Building\Forms\B1dgPermitRvw_COM_NoLandUse_111819.docx