Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Correspondence
Branden Taggart From: #Building Permit Technicians Sent: Tuesday, May 25, 2021 2:31 PM To: Josh Cook Cc: Adam Hands Subject: RE: 11410 SW 68TH PK Y: MEC2021-00241 11410 SW 68th Pkwy Attachments: Invoice.pdf Hi Josh, The Mechanical permit for PERS is ready to issue now. The balance due is$23,078.38, and I have attached an invoice above for you to reference. These fees can be paid online now at https://aca-prod.accela.com/TIGARD/Welcome.aspx by searching for the permit record number MEC2021-00241 under the Building tab. There is a 3%service fee for credit cards, but e-checks do not have a service fee. Once paid, please email the Permit Technicians at TigardBuilding•Permits@tigard-or.gov so that we may issue this permit and make it available for pick up. Thank you, Branden Taggart ■ City of Tigard ip Senior Permit Technician Community Development TR'AKt) 13125 SW Hall Blvd Tigard,OR 97223 (503)718-2449 brande nt©tigard-o r.gav From:Josh Cook<josh.cook@rlsm.net> Sent: Monday, May 10, 2021 11:35 AM To:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Cc: Adam Hands<adamh@rlsm.net> Subject: Re: 11410 SW 68TH PKWY Warning!This message was sent from outside your organization and we are unable to verify the sender. Hi, I was checking online to see about an ETA on my permit but the online system stops at 04/12/2021 what is the progress of the permit below Record MEC2021 -00241 : Commercial - Mechanical 1 rot Nit Pal! ie ;- 14 Application Submittal Due on 0411212021.assigned to TBD Marked as Route on 0411212021 by Edgardo Maldonado Revisions Engineering Review Permit Coordinator Review Building Review Due on 0411212021,assigned to TBD Marked as TED on TBD by TBD 'v Planning Review Due on 0411212021,assigned to TBD Marked as Approve on 0410812021 by Agnes Lindor Due on 04/12/2021,assigned to TB!) Marked as Approve on 04/08/2021 by Edgardo Maldonado Post Review Issue Permit Inspections C of 0 • I have equipment arriving soon and they will want an inspection at some point soon Thanks! Joshua Cook I Estimator Phone 503-838-3863'5014 I Fax 503-838-3964 I Josh.Cook(c�rIsm.net ROBERT LLOYD SHEET METAL Please consider the environment before printing On Tue,Apr 20, 2021 at 3:08 PM #Building Permit Technicians<TigardBuildingPermits(a)tigard-or.gov>wrote: Hi Josh, I am going to forward your email to our commercial plans examiner,Tom Hochstatter, to answer your question regarding the seismic anchorage calculations. -Tom, this is in regards to permit MEC2021-00241. 2 Thank you, Tina Escalera Permit Tech Assistant City of Tigard I Community Development 13125 SW Hall Blvd.Tigard, OR 97223 From:Josh Cook<losh.cook@rlsm.net> Sent: Monday,April 19, 2021 9:21 AM To:#Building Permit Technicians<TigardBuildingPermits@tgard-or.gov> Subject: Re: 11410 SW 68TH PKWY we have received approved seismic anchorage calculations for the equipment on this job, will we need to furnish a copy for this permit? PERS HVAC System ReplacementI11410 SW 68th Pkwy, Tigard, OR 97223MEC2021-00241 ' Joshua Cook I Estimator Phone 503-838-3863*5014 I Fax 503-838-3964 I Josh.Cookagismnet ROBERT LLOYD SHEET METAL Please consider the environment before printing On Thu, Apr 8, 2021 at 11:17 AM #Building Permit Technicians <TigardBuildingPermits@tigard-or.gov> wrote: Hi Josh, Thank you for your recent permit submittal. This submittal has met the requirements needed to begin plan review. We will contact you for payment of a plan review submittal fee, if applicable, or when the permit is ready to issue. Please allow 4-8 weeks for processing. 3 . i Thank you, Tina Escalera Permit Tech Assistant City of Tigard I Community Development 13125 SW Hall Blvd.Tigard, OR 97223 ii DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e- mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules "City General Records Retention Schedule." 4 City ©f Tigard January 1, 2017 Re: Mechanical Equipment Requirements To Whom It May Concern: When submitting for a permit to install mechanical equipment on a roof(RTU, split system condenser or air handler), the following must be provided: tir (2) copies of cut sheets showing weight, tonnage, size and capacities of unit to be installed. r t� If a new curb is being installed,provide (2) copies of the listing for that product. ",` dL Cr)) ✓Zx full size set of plans When trying to decide if engineering will be required for either lateral or vertical loads, the following guidelines shall be used: • If the new unit weighs more than 400 pounds, a lateral design and calculations are required from a registered design professional. Lateral design shall comply with Sec. 1613 of the Oregon Structural Specialty Code and ASCE 7-05. • If the unit is 400 pounds or less,lateral design will not be required, however a drawing showing adequate attachment to the curb and/or roof shall be shown on the plans specifying number and type of fasteners to be used. ,�1 • Mechanical fasteners shall be used to anchor any mechanical unit. (w ti ver-;. ), 0^ ,)6er • Vertical loads shall be designed when a new unit is installed that changes the size of the 'S nntL footprint of the unit in relation to an existing curb or if a new curb is installed. cal C5 • No design will be required if the footprint of the unit does not change and it fits on the existing curb (push/pull installations) and weighs the same or less than the original unit. NOVerification of the weights of the old and new units shall be submitted along with the permit application. _ Nam, i� ate- Acreas.4 ) e 6 4 e) Dan Nelson City of Tigard Senior Plans Examiner 503-718-2436 dann@tigard-or.gov 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.639.4171 TTY Relay: 503.684,2772 •, www.tigard-or.gov