Loading...
Permit CITY OF TIGARD BUILDING PERMIT . 11 ': * COMMUNITY DEVELOPMENT Permit#: BUP2021-00075 Date Issued: 5/27/2021 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S102CB02700 Jurisdiction: Tigard Site address: 13050 SW PACIFIC HWY Project: Sanchez Taqueria Subdivision: None Lot: None Project Description: New awning for front entrance Contractor: OWNER Owner: WALTER,ANGELA D GUADALUPE SANCHEZ JERONIMO 2863 RIVERWALK LP 13050 SW PACIFIC HWY EUGENE, OR 97401 TIGARD, OR 97223 PHONE: PHONE: 503-887-5557 FAX: FEES Specifics: Date Amount Description Type of Use: COM Permit Fee-Additions,Alterations, 05/24/2021 $60.05 Class of Work: ALT Type of Const: VB Demolition Occupancy Grp: B Occupancy Load: 0 12%State Surcharge-Building 05/24/2021 $7.21 Dwelling Units: 0 Plan Review 04/01/2021 $39.03 Stories: 0 Height: 0 ft Info Process/Archiving-Sm$0.50(up to 05/24/2021 $1.50 Bedrooms: 0 Bathrooms: 0 11x17) Value: $670 Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $107.79 Required Items and Reports(Conditions) Required: Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503 232.1987 or 1.800.332.2344. Issued By: Z.....„/...e,..)07, 557----14rmittee Signature: Set .f9/Cif Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. City of Tigard COMMUNITY DEVELOPMENT DEPARTMENT i T►c n R n Building Permit Review — Commercial - With Land Use Building Permit #: BCfP202./-DU(275 Site Address: /Act, ,,)/,0 At f e bit Suite/Bldg#: Project Name: //' ` FL ���/,r�ra (Name of commercial business pying the space. If vacant,enter Spec Space.) Planning Review Proposal: i [/ d w. Verify site address/suite#exists and active in permit syste 'rtl�i'+vex Terrace Neighborhood: 0 Yes No 1r and Use Case #: iiL) /— Cry.)()Jj PlanyMatch Approved Land Use: Di Sit- Plan kl ;A dscape Plan er: I•l d rban Forestry Plan V Elevation Plan / FAB .ding Height: Maximum Height -C Actual Height 7 Alp`s ditions Met: ❑ Prior to Submittal 0 Prior to Permit Issuance Business Licen Exists: Yes I: No,applicant was provide a business license application � iic Facilities Improvement(PH)Permit: ����______ ^^^^^^Required: ❑ Yes,applicant was notified No Applied For: 0 Yes 0 No,stop intake Notes: Approved by Planning: C.- Date: 3/. (� 2/ Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved 0 Not Approved Revision 2: 0 Approved 0 Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: jJ/2�2D2I Site Plans: # 3 Building Plans: # Building Permit#: ®"'Enter building permit#above. Workflow Routing. Cam]--Planning CWEngineering [ Permit Coordinator El—Building Workflow Sign-off: [le-Sign-off for Planning(include notes from planning review) Route Application Documents: EyBuilding: original permit application,site plans,building plans, engineer and beam calculations and trust .-'. s,if applicable,etc. Notes: By Permit Technician: j ///4I:I' Date: 40d/�1/ I:ABuilding\Fonns\BldgPennitRvw_COM_WithlandUse_111819.docx Engineering Review C lope at building pad: 22, ErPFI Permit#: yj Ac E 'Conditions"Met"prior to issuance of building permit Jq itt, [ Easements (encroachments) per engineering conditions of approval and plat(not typical on SDR/CUP) '1/4-- a Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: 0 Yes Cf No Assess Water Quantity Fee in-lieu: 0 Yes Er No LIDA Facility on lot: 0 Yes E ' No ❑ NOT Approved by Engineering: Date Notes: Approved by Engineering: ,te�f d1.;XX et Date: 3/ $ /2-O j Revisions (after Building Submittal only) / Reviewer Date Revision 1: ❑ Approved 0 Not Approved Revision 2: ❑ Approved 0 Not Approved 1 Revision 3: 0 Approved ❑ Not Approved Permit Coordinator Review Conditions"Met"prior to issuance of building permit N3 Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: DC Fees Entered: Wash Co Trans Dev Tax: 0 Yes /A Tigard Trans SDC: 0 Yes /A 1/IParks SDC: ❑ Yes 11d N/A OK to Issue Permit :k Approved by Permit Coordinator: Date: ����/ I:\Building\Forms\B1dgPermitRvw_COM_W ithLandUse_111819.docx