Permit CITY OF TIGARD BUILDING PERMIT
. 11
': * COMMUNITY DEVELOPMENT Permit#: BUP2021-00075
Date Issued: 5/27/2021
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S102CB02700
Jurisdiction: Tigard
Site address: 13050 SW PACIFIC HWY
Project: Sanchez Taqueria Subdivision: None Lot: None
Project Description: New awning for front entrance
Contractor: OWNER Owner: WALTER,ANGELA D
GUADALUPE SANCHEZ JERONIMO 2863 RIVERWALK LP
13050 SW PACIFIC HWY EUGENE, OR 97401
TIGARD, OR 97223
PHONE:
PHONE: 503-887-5557
FAX:
FEES
Specifics: Date Amount
Description
Type of Use: COM Permit Fee-Additions,Alterations, 05/24/2021 $60.05
Class of Work: ALT Type of Const: VB Demolition
Occupancy Grp: B Occupancy Load: 0 12%State Surcharge-Building 05/24/2021 $7.21
Dwelling Units: 0 Plan Review 04/01/2021 $39.03
Stories: 0 Height: 0 ft Info Process/Archiving-Sm$0.50(up to 05/24/2021 $1.50
Bedrooms: 0 Bathrooms: 0 11x17)
Value: $670
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $107.79
Required Items and Reports(Conditions)
Required:
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503 232.1987 or 1.800.332.2344.
Issued By: Z.....„/...e,..)07, 557----14rmittee
Signature: Set .f9/Cif
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
City of Tigard
COMMUNITY DEVELOPMENT DEPARTMENT
i
T►c n R n Building Permit Review — Commercial - With Land Use
Building Permit #: BCfP202./-DU(275
Site Address: /Act, ,,)/,0 At f e bit Suite/Bldg#:
Project Name: //' `
FL ���/,r�ra
(Name of commercial business pying the space. If vacant,enter Spec Space.)
Planning Review
Proposal: i [/ d w.
Verify site address/suite#exists and active in permit syste
'rtl�i'+vex Terrace Neighborhood: 0 Yes No
1r and Use Case #: iiL) /— Cry.)()Jj
PlanyMatch Approved Land Use:
Di Sit- Plan kl ;A dscape Plan er:
I•l d rban Forestry Plan V Elevation Plan /
FAB .ding Height: Maximum Height -C Actual Height 7
Alp`s ditions Met: ❑ Prior to Submittal 0 Prior to Permit Issuance
Business Licen
Exists: Yes I: No,applicant was provide a business license application
� iic Facilities Improvement(PH)Permit:
����______ ^^^^^^Required: ❑ Yes,applicant was notified No Applied For: 0 Yes 0 No,stop intake
Notes:
Approved by Planning: C.- Date: 3/. (� 2/
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved 0 Not Approved
Revision 2: 0 Approved 0 Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Building Permit Submittal
Original Submittal Date: jJ/2�2D2I
Site Plans: # 3
Building Plans: #
Building Permit#: ®"'Enter building permit#above.
Workflow Routing. Cam]--Planning CWEngineering [ Permit Coordinator El—Building
Workflow Sign-off: [le-Sign-off for Planning(include notes from planning review)
Route Application Documents: EyBuilding: original permit application,site plans,building plans, engineer and
beam calculations and trust .-'. s,if applicable,etc.
Notes:
By Permit Technician: j ///4I:I' Date: 40d/�1/
I:ABuilding\Fonns\BldgPennitRvw_COM_WithlandUse_111819.docx
Engineering Review
C lope at building pad: 22,
ErPFI Permit#: yj Ac
E 'Conditions"Met"prior to issuance of building permit Jq itt,
[ Easements (encroachments) per engineering conditions of approval and plat(not typical on SDR/CUP) '1/4--
a Water Quality/Quantity Facility:
Assess Water Quality Fee in-lieu: 0 Yes Cf No
Assess Water Quantity Fee in-lieu: 0 Yes Er No
LIDA Facility on lot: 0 Yes E ' No
❑ NOT Approved by Engineering: Date
Notes:
Approved by Engineering: ,te�f d1.;XX et Date: 3/ $ /2-O j
Revisions (after Building Submittal only) / Reviewer Date
Revision 1: ❑ Approved 0 Not Approved
Revision 2: ❑ Approved 0 Not Approved 1
Revision 3: 0 Approved ❑ Not Approved
Permit Coordinator Review
Conditions"Met"prior to issuance of building permit
N3
Approved,NOT Released: Date:
Notes:
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applicant:
Revision Notice 3: Date Sent to Applicant:
DC Fees Entered: Wash Co Trans Dev Tax: 0 Yes /A
Tigard Trans SDC: 0 Yes /A
1/IParks SDC: ❑ Yes 11d N/A
OK to Issue Permit
:k
Approved by Permit Coordinator: Date: ����/
I:\Building\Forms\B1dgPermitRvw_COM_W ithLandUse_111819.docx