Permit CITY OF TIGARD BUILDING PERMIT
11 ' COMMUNITY DEVELOPMENT Permit#: BUP2021-00049
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 3/15/2021
Parcel: 1 S136DC00300
Jurisdiction: Tigard
Site address: 11600 SW 72ND AVE
Project: 72nd&Baylor Apartments Subdivision: Lot: 19
Project Description: A new roof mounted solar photovoltaic system.
Contractor: COMPETITIVE COMMERCIAL ROOFING INC Owner: CDP DEVELOPERS LLC
PO BOX 495 ATTN PAINE, ERIC
HOOD RIVER, OR 97031 126 NE ALBERTA ST STE 202
PORTLAND, OR 97211
PHONE: 541-386-7663 PHONE: 347-218-0242
FAX:
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: NEW Type of Const: I IB Permit Fee-Additions,Alterations, 03/08/2021 $880.05
Occupancy Grp: U Occupancy Load: 0 Demolition
12%State Surcharge-Building 03/08/2021 $105.61
Dwelling Units: Plan Review 02/22/2021 $572.03
Stories: Height: ft Plan Review-Fire Life Safety 03/08/2021 $352.02
Bedrooms: Bathrooms: Info Process/Archiving-Lg$2.00(over 03/08/2021 $10.00
Value: $69,250 11x17)
Info Process/Archiving-Sm$0.50(up to 03/08/2021 $17.50
11x17)
Floor Areas:
Total Area:
Accessory Struct:
Basement:
Carport:
Covered Porch:
Deck:
Garage:
Mezzanine:
Total $1,937.21
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking:
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issued By: Permittee Signature: !
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept In a conspicuous place on the Job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
FOR OFFICE USE ONLY—SITE ADDRESS:
This form is recognized by most building departments in the Tri-County area for transmitting information.
Please complete this form when submitting information for plan review responses and revisions.
This form and the information it provides helps the review process and response toyour project.
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
1 _ Transmittal Letter
I ,;,•I: r\ 13125 SW Hall Blvd. •Tigard, Oregon 97223 • 503.718.2439• www.tigard-or.gov
TO: TOM HOCHSTATTER DATE RECEIVED:
DEPT: BUILDING DIVISION
FROM: Randy Feldhaus RECEIVED
COMPANY: Competitive Commercial Roofing JAN 2 6 2021
PHONE: 503-803-5537 CITY OF TIG ViD
1�UILDING DIVISION
EMAIL: randy@bestroofusa.com
RE: 1(600SitedSW)72nd Ave. eti/�,r)v_„Lob,/
ess (Permit Number)
The Viewfinder(Formerly Tigard Triangle)
(Project name or subdivision name and lot number)
ATTACHED ARE THE FOLLOWING ITEMS:
Copies: Description: Copies: Description:
Additional set(s)of plans. Revisions:
Cross section(s)and details. Wall bracing and/or lateral analysis.
Floor/roof framing. Basement and retaining walls.
Beam calculations. Engineer's calculations.
2 Other(explain):Deferred submittal for solar standoffs and racking
REMARKS: Drawings and stamped engineering calculations to add solar standoffs and racking on roof.
FOR OFFICE USE ONLY 1
Routed to Permit Technician: Date: ,D,,' •—a4\ Initiats)
Fees Due: ❑Yes�31 No Fee Descri do : Amount Due:
$
$
Special
Instructions:
Reprint Permit(per PE): ❑Yes I'bV No 0 Done
Applicant Notified: Date: '��j�/}l Initials: (7/) 6,, e:7--)
I:\auiIding\Forms\Transmittan.etter-Revisions 073120.doc
Submittal Documents required for Prescriptive Installations
Show the location of the PV system in relation to buildings, structures,
property lines, and, as applicable, flood hazard areas.
Site Plan Details must be clear and easy to read.
Minimum size of the plan is 8.5 x 11 inches.
Attach a simple structural plan showing the roof framing(rafter size,type, and
spacing) and PV module system racking attachment.
System must be shown in sufficient detail and clarity to assess whether it
Structural Plan meets the prescriptive construction requirements as listed earlier above in the
matrix.
Minimum size of the plan is 8.5 x 11 inches.
PV Modules
Manufacturer: HANWHA Q CELLS
Model Number: Q. PEAK DUO LG-5.3 395
Listing Agency: I EC AND U L
4
I:Buildi ng/Form s/PhotoVoltaic-Checkl ist02-01-11.docx