Plans • OFFICE COPY VALIDITY OF PERMIT THE ISSUANCE OF A PERMIT BASED ON CONSTRUCTION S O L G EN DOCUMENTS AND OTHER POWER DATA SHALL NOT PREVENT THE CODE OFFICIAL FROM REQUIRING THE CORRECTION ��� I Cr-' February 15, 2021 OF ERRORS. ORSC 105.4 Subject: Proposed Solar Panel Installation Jamie Blackwood Residence, 16594 Southwest Autumnvale Lane,Tigard,OR 97223 To Whom it May Concern, Our engineering department has reviewed information, gathered by our field crews, related to the proposed solar panel installation at the above-referenced address. The purpose of our review was to determine the structural adequacy of the existing roof. Based on our review and analysis of the available information, and in accordance with governing building codes, it is our professional opinion that the existing structure is permitted to remain unaltered for the proposed solar installation. Approved plans Design Parameter Summary shall be on job sit .. Governing Building Code: 2019 Oregon Structural Specialty Code(2019 OSSC) Risk Category: II CITY OF TIG�IRD Design Wind Speed:96 mph (per ASCE 7-16) Ground Snow Load: 10 psf REVIEWED FO ODE COMPLIANCE Approved: Roof Information OTC: [ Roof Structure:2x4 Manufactured Trusses @ 24" O.C. '7 Roofing Material:Asphalt Shingles(1 layer) Permit #: 25 Roof Slope:25 degrees Address: tus T S1-) A-01-0mVe -- 'L Suite #: f Roof Connection Details By: Date: a/. 7 Z) Lag Screws:5/16"diameter min.,with min.2.5" embedment into frami . min,stagger ..d Locations per design drawings Note:Required embedment length excludes the tapered tip of the screw,and embedment into sheathing. Analysis The proposed installation - including weight of panels, racking, and mounts - will be approximately 2.57 psf. In the areas where panels are installed, roof live loads will not be present. The reduction of roof live load is adequate to fully or partially compensate for the addition of the panel installation. Because the member forces in the area of the solar panels are not increased by more than 5%,the stresses in the members are not increased by more than 5%, and so per section 3408.6.2 of the 2019 OSSC(IEBC Section 806.2),the structure need not be altered for gravity loading. The proposed installation will be 6" max. above the roof surface (flush mounted) and parallel to the roof surface. Therefore, any increase in wind loading on the building structure from the solar panel installation is expected to be negligible. Wind is the governing lateral load case. Because the increase in lateral loading is not increased by more than 10%, per section 3408.6.3 of the OSSC(IEBC 806.3),the structure need not be altered for lateral loading. Wind uplift on the panels has been calculated in accordance with the relevant provisions of ASCE 7-16. This loading has been used to verify the adequacy of the connection specified above. Connection locations should be in accordance with design drawings. LIABILITY The City of Tigard and its employees shall not be responsible for discrepancies which may appear herein.. a f ' ., Conclusion The roof structure need not be altered for either gravity or lateral loading. Therefore, the existing structure is permitted to remain unaltered. Connections to the roof must be made per the "Roof Connection Details" section above.Copies of all relevant calculations are enclosed. Limitations and Disclaimers The opinion expressed in this letter is made in reliance on the following assumptions:the existing structure is in good condition; the existing structure is free from defects in design or workmanship; and the existing structure was code-compliant at the time of its design and construction.These assumptions have not been independently verified, and we have relied on representations made by the property owner and his or her agents with respect to the foregoing.The undersigned has not inspected the structure for patent or latent defects. Electrical engineering is beyond the scope of this analysis. Solar panels must be installed per manufacturer specifications. Structural design and analysis of the adequacy of solar panels, racks, mounts, rails, and other components is performed by each component's respective manufacturer and the undersigned makes no statement of opinion regarding such components. This letter and the opinions expressed herein are rendered solely for the benefit of the permitting authority (city or county building department), and may not be utilized or relied on by any other party. If you have any questions or concerns, please contact our office at (509)-931-1663, or email me directly at Trevor.Jones@solgenpower.com. Sincerely, Trevor A.Jones, P.E. 4,p PROptis 4NEf cr \.\\,.,, .._ EXPIRES: 06/30/23 2/15/2021 SOLGEN Po w ER Note: All calculations per ASCE 7 Load Comparison This calculation justifies the additional solar load by comparing existing to proposed gravity loads in the location of the solar panels. Without Solar With Solar Dead Load Asphalt Shingles 3 3 psf 1/2" Plywood 1 1 psf Framing 3 3 psf Insulation 1 1 psf 1/2" Gypsum Ceiling 2 2 psf M,E, & Misc 1.5 1.5 psf Solar Panel 0 2.57 psf Total Dead Load 11.5 14.07 psf Snow Load Ground Snow Load, Pg 10 psf Exposure Factor, Ce 1 Thermal Factor, Ct 1.1 Importance Factor, IS 1 Flat Roof Snow Load Slope 25 degrees Unobstructed Slippery Surface? Slope Factor, CS 1.00 1.00 Sloped Roof Snow Load 7.7 7.7 psf Live Load Roof Live Load 20 0 psf Load Combination D + Lr 31.5 14.1 psf D+S 19.2 21.8 psf Max. Load 31.5 21.8 psf of original 69% Result: Because the total forces are decreased, per the relevant code provisions stated in the body of the letter, the existing roof structure is permitted to remain unaltered. SOLGEN POWER Lag Screw Calculation (per ASCE 7-16 Ch. 30 and NDS) This calculation justifies the connection of the solar panels to existing roof members, by showing the connection capacity is equal to or greater than the uplift force demands. Connection Demand Spacing perpindicular to rail in 1/2 panel length Spacing parallel to rail in Max spacing Effective Wind Area on each connection 10.8 ft2 Roof Angle 25 degrees -_= Wind Speed 96 mph . . Exposure Coefficient, K, FA_Plial Topographic Factor, KZt Directionality Factor, Kd , g$>' 11 Elevation Factor, Ke Mell Velocity Pressure, q, 18.6 psf Prying Coefficient Zones 1, 2e Zones 2n, 2r, 3e Zone 3r s — , Wik — GCP (max) " Exposed Panels? (yE= 1.5) e igOram t ', Pressure Equalization Factor,ya 0.79 0.79 0.79 Uplift Force 22.0 55.0 79.1 psf Max. Uplift Force/Connection (0.6 WL) 142.9 357.2 514.3 lbs Solar Dead Load (0.6 DL) 16.7 16.7 16.7 lbs Max. Uplift Force (0.6 WL-0.6 DL) 126.2 340.5 497.6 lbs Connection Capacity Fastener Type Lag Screw Fastener Diameter � s3 in Embedment Length, min in Lumber Species & Grade DFL#2 (Assumed) Lumber Specific Gravity 0.5 Nominal Withdrawal Capacity, W 532.0 lbs NDS 12.2-1 #of Screws Load Duration Factor, Co 1.6 (Note:C,M=O=Ceg=1.0) Adjusted Withdrawal Capacity,W' 851.2 lbs Compare Adjusted Withdrawal Capacity to ASD Factored Demand Zone 1 Zone 2 Zone 3 O.K. O.K. O.K. A I B I C I D I E I F I G I H AERIAL VIEW ELECTRICAL NOTES GENERAL NOTES ..II• J L.J 1. WHERE ALL TERMINALS OF THE 1. PRIOR TO THE COMMENCEMENT OF ANY DISCONNECTING MEANS MAY BE WORK,THE CONTRACTOR SHALL NOTIFY ENERGIZED IN THE OPEN POSITION,A THE DESIGNER OF ANY DISCREPANCIES r 1. SIGN WILL BE PROVIDED WARNING OF WITH THE DESIGN IN ANY CAPACITY. THE HAZARDS.(PER ART.690.17) ESPECIALLY RECOMMENDATIONS,CODES, e 2. EACH UNGROUNDED CONDUCTOR OF OR REGULATIONS&RULES OF THE ' THE MULTIWIRE BRANCH CIRCUIT WILL AUTHORITY HAVING JURISDICTION,WHICH { e BE IDENTIFIED BY PHASE AND SYSTEM. SUPERSEDED THE NEC. — (PER ART,210.5) 2. ALL DIMENSIONS TO BE VERIFIED BY a 3. A NATIONALLY RECOGNIZED TESTING CONTRACTOR PRIOR TO COMMENCEMENT i LABORATORY SHALL LIST ALL OF WORK. EQUIPMENT IN COMPLIANCE WITH 3. CONTRACTOR IS RESPONSIBLE FOR ALL e' " ARTICLE 110.3. SAFETY PRECAUTIONS,OSHA N 4 i 4. ALL WIRES SHALL BE PROVIDED WITH REQUIREMENTS ETC.FOR THE SITE, ro - i d STRAIN RELIEF AT ALL ENTRY POINTS INCLUDING EXISTING SITE HAZARDS. i - INTO BOXES AS REQUIRED BY UL LISTING 4. SYSTEM IS GRID INTERACTIVEIINTERTIED I 5. MODULE FRAMES SHALL BE GROUNDED VIA A UL LISTED POWER-CONDITIONING AT THE UL-LISTED LOCATION PROVIDED INVERTER. , H. BY THE MANUFACTURER USING 5- SYSTEM HAS NO ENERGY STORAGE OF — L,. UL-LISTED GROUNDING HARDWARE. ANY KIND,OR UPS- • 6. MODULE FRAMES,RAIL,AND POSTS 6. ALL SOLAR MOUNTING FRAMEWORK TO SHALL BE BONDED WITH EQUIPMENT BE GROUNDED. u! I GROUND CONDUCTORS AND GROUNDED 7. FOLLOW MANUFACTURERS SUGGESTED - I' AT THE MAIN ELECTRICAL PANEL. INSTALLATION PRACTICES AND WIRING aii it,'. 7. THE DC GROUNDING ELECTRODE SPECIFICATIONS. w `" CONDUCTOR SHALL BE SIZED 8. ALL WORK TO BE IN COMPLIANCE WITH RESIDENCE PHOTO ACCORDING TO ARTICLE 250.16688 THE INTERNATIONAL BUILDING CODES. .�.: 690.47. (IBC) 9. ALL ELECTRICAL WORK TO BE IN 4..`"W48 1, COMPLIANCE WITH THE NATIONAL — �� SO ELECTRIC CODE(NEC). — • ,' Ad:... ,c,,p. -Gsr A. 7,77' % SrpNALEN 2/16/2021 ISTRUCTURAL ONLY' I , SHEET INDEX — `' . PV 1 COVER PAGE PV 5 MOUNTING DIAGRAM , b ' .. r PV 2 SITE PLAN PV 6 PLACARD I. a tg _ PV 3 ELECTRICAL DIAGRAM CUT SHEETS ATTACHED ti`=F;; PV 4 CHIKO MOUNTING DRAWN BY. DRAWING SCALE. CONFIDENTIAL-THE INFORMATION CONTAINED KCS CUSTOM IN THIS PACKET AND SUBSEQUENT CUTSHEETS Jamie Blackwood DATE: D`SMEN • SHALL NOT BE USED FOR THE BENEFIT OF SOLGEN POWER if ANYONE OUTSIDE SOLGEN POWER.NEITHER 5100 ELM RD, 2/15/2021 1 5 O L G C SHALL IT BE DISCLOSED TO OTHERS OUTSIDE PASCO.WA 99301 THE RECIPIENTSIWITHTH SALE ND USE OT FIN 16594 SW Autumnvale Lane, Tigard, OR, 97223 PAGE4 {� O W E R CONNECTION WITH THE SALE AND USE OF THE P.509-931-1683 RESPECTIVE EQUIPMENT,WITHOUT WRITTEN PV 1 CONSENT FROM SOLGEN POWER. A I B I C I D I E I F I G I H N INDEX: SYSTEM SIZE DC:9.30kW SYSTEM SIZE AC:7.5OkW TRUSS SPACING: 24"O.C. ►� — NUMBER OF MODULES:30 TRUSS SIZE: 2"x 4" W *Al!:X= E — MODULE TYPE:Zmhine IX A6-603101M 3 Q ❑ UTILITY OFFSET: 95% O ❑ INVERTER: Hoymiles Series n O N O / " ❑ MODULES O UTILITY METER 0 ❑ ° ❑ MAIN SERVICE O COMP.SHINGLE 0 ❑ ❑ i COMBINER BOX 4O Iv \\ ❑ ❑ %j AC DISCONNECT® �ye A. •\10/041°#•A 6NOR lOh _ \\ j/`l\ g0�WASHry Z \ /. O q' Pop2i ' .A- La CIRCUIT 1® 4SIONALENG 2/16/2021 CIRCUIT 2® STRUCTURAL ONLY DRAWN BY: SRAWND SCALE: CONFIDENTIAL-THE INFORMATION CONTAINED KCS 27/256"=1'-0' IN THIS PACKET AND SUBSEQUENT CUTSHEETS TKSIDN _ SHALL NOT BE USED FOR THE BENEFIT OF SOLGEN POWER Jamie Blackwood DATE: I A' ANYONE OUTSIDE SOLGEN POWER.NEITHER 5100 ELM RD, 2/15/2021 S O L C 1 , SHALL IT BE DISCLOSED TO OTHERS OUTSIDE PASCO,WA 99301 NECmR� pDUSFI POWER I CONrOW + �AN EXCEPT P:509-931-1683 16594 SW Autumnvale Lane, Tigard, OR, 97223 PAGE /� RESPECTIVE EQUIPMENT,WITHOUT WRITTEN �" CONSENT FROM SOLGEN POWER. V 2 A ' LOADCAlCO-TOTN.ALiO AVAILABLE C ' 0 ' E I MAX AC OPERATINGOJRREPrrcucs FOR Ml1 MAX AC OPFRATNO TOtAll H I)1!dT#� •OF MICROINYERTER9 MAX OJIWf CURRENT -- t LB1000 a210 iXl0 MTw3 11.3 1 IDEAL,_. YAN 2000 1 e IX « 4R 100 -IR Yt 060 MNOCO� _MV910 tk:0#aF®._ MA j-- WJ(ACOPEMTRq CURRENT CAWS RMI-CW GURRFM aRRENTF 23#A I%� a �.1 sm • toA TOTAL lIWm11t� r - .01A • pLC$FOR MI'L5a . Mk•i 10AA cROWVERT�n# •va Mac AC oP-w.TWD CURRENT 8t90A • M11A M#lBIOP. ROVAAERROF NORMAL •i TOTAL 1A1L . 5#A a IX TAM 6asA • NSM� YOWLS MCRON4>9fIBtB CURRENT TOTAL _ .- [b+D 3 _..X W1B0 1 PA1EL8�f:NC012A IX 136 • #OFM BRE/JOi118pBCNCO +9AOA 3 X� 1.01A 13.E\ A —T'� 1 10AXAC CPEN/9MO WNENI. - 11BM TOTAL _AIENE1 OCUJIt(talw 3 1 % tIM2lu • I. SLAM XI 1.0 I• 1Ma1A • �` P•1WRgRaa u s x uu • uAEA x 13e' t##u MOTES: 1. 200A UTILITY METER GLOBE ONLY.(EXISTING)— — 2. 225A LOAD CENTER.(EXISTING) 3. BOA RATED NON-FUSED AC DISCONNECT INSTALLED WITHIN tE OF UTILITY METER.(NEW) 4. 125A RATED COMBINER PANEL.(NEW) N co O NMYMEIER( CIRCUIT#1(1 of2)-3ZNSHINE DRCUIT#1(2 of 2)-12 ZNSHINE 0 0 \r0 vtxmZIC 6-00-310'M MODULES ZKM641P31MA MODULES MAIM1m1.1 WITH HOYMILES MI-2S0 MICRO WITH HOYMILES MI.1000 MICRO IIMAWO d MC INVERTERS INVERTERS 0 A11/ (OA (3-, r, r� r4� ra% rg i WOEO 0 CZ.� �+On awl+rp vrr�EL07 MOMS / • • • • • • op AWOE0C ,L/ _ = d d — CEICUIT#2(1 of 2)-3 ZNSHINE CIRCUIT#2(2 all)-12 ZNSHINE A. 23041380.910fA MODULES 27M1143631O4A MODULES WITH HOYMILES MI-2110 MICRO WITH HOYMILES MI.1000 MICRO INVERTERS INVERTERS O A (J, r�, (ice r4l (i1 r�l (�1 Aw°CPO I SOLAR OCPD On the end of Cm mein disconnect On m Gnber-NEC 105.12I6%3) • • • • • • %PAWO MC [Z ,171 — — Lo co DRAWN BY: DRAWING RCaI F. CONFIDENTIAL-THE INFORMATION CONTAINED KCS l'IOT TO SCALE IN THIS BET AND SUBSEQUENT CUTSHEETS Jamie Blackwood DATE: DESIGN SHALL NOT BE USED FOR THE BENEFIT OF SOLGEN POWER 2/15/202 ANYONE OUTSIDE SOLGEN POWER.NEITHER 5100 ELM RD, SOLGEN SHALL IT BE DISCLOSED TO OTHERS OUTSIDE PASO,WA 99301 POWER ONNECITIIONWWITHTTHE TS HEE SALE AND LISEOFIZATION,EXCEPT ITHE P:509-931-1663 16594 SW Autumnvale Lane, Tigard, OR, 97223 PAGEPV 3 RESPECTIVE EQUIPMENT,WITHOUT WRITTEN CONSENT FROM SOLGEN POWER. A I B I C I D I E I F I G I H _ 5.5 3.e' 3.3- D 67" I l SOLAR PANEL ROOFING — •• i L FEET — — n l - FLASHING /1 7#Kell N „� - — III IQ Ilk . ENNINEW OM i w m Mount to E2dsting Rafters STRUCTURAL NOTES: / 1. TOTAL WEIGHT(MODULE&RAIL):1336 LBS .42. RAIL WEIGHT:125 LBS 3. MODULE WEIGHT.1210 LBS Mid Clamp End Clamp � 1 rli 4. DISTRIBUTED WEIGHT:2.41 PSF / [Oil 4aar_• E�wasOR DN.. P of hiryF 4-7F, O1o2 4` II I "/ `• — - Grounding Lug 1 1 ,, 1,021114::8 C- I:... gFGrS PC,,. ` � ''SIoNALEN- 2/16/2021 STRUCTURAL ONLY DRAWN BY: DESIGN CONFIDENTIAL-THE INFORMATION CONTAINED KCS IN THIS PACKET AND SUBSEQUENT CUTSHEETS Jamie Blackwood_ DATE 1 SHALL NOT BE USED FOR THE BENEFITR. OF SOLGEN POWER 2/15/2021 II G I ANYONE OUTSIDE SOLGEN POWER.NEITHER 5100 ELM RD, J O ` C SHALL IT 9E DISCLOSED 7O OTHERS OUTSIDE PASCO,WA 99301 PAGE A THE RECIPIENTS ORGANIZATION,EXCEPT IN POWER CONNECTION WITH THE SALE AND USE OF THE P:509-931-1663 16594 SW Autumnvale Lane, Tigard, OR, 97223 PV 4 RESPECTIVE EQUIPMENT,WITHOUT WRITTEN CONSENT FROM SOLGEN POWER. 90 A I B 1 c 1 D I E I F G J H • ROOF I TILT:32°AZIMUT11:90° O Q _ SW N r.I O O PV MODULE li � MOUNTING FEET `" Alir,� CHIKO 97 RAIL mm ipi 2 MOUNTING DIAGRAM mhoA E:BDrroacue STRUCTURAL NOTES: 11. .. ', ii1. 45°MAX SPAN OF RAIL TO DISIBUTE WEIGHTIll...' .11.. ..�; OVER SUPPORT OF TRUSES .ILI11.I1. 1j'!p. 2. MOUNTING FEET ARE IN APPROXIMATE LOCATION.I ,-1■■I.,i- 3. MOUNTING FEET SHOULD BE STAGGERED AS A " ' ' '.u. '. !MIO I r SHOWN IN DIAGRAM111.1il1 11..11.I1 '.1 DR JO•I!�IMUISIIMS•1IIIS•'IN t, ' � ��`W�"y,S y oz I—_ __. --4c-r _ ROOF3 • '2011,:.. 7 TILT:25° a n ROOF 2 AZIMUTH:133° k'O ` 2/18/2021 TILT:32° AZIMUTH:13a• 1 MOUNTING DIAGRAM STRUCTURAL ONLY DRAWN BY: 'DRAINING SCALE: CONFIDENTIAL-THE INFORMATION CONTAINED KCS DESi °-1-0• 4 IN THIS PACKET AND SUBSEQUENT CUTSHEETS Jamie Blackwood DAM:• _ SHALL NOT BE USED FOR THE BENEFIT OF SOLGEN POWER 2/15/2021 ANYONE OUTSIDE SOLGEN POWER.NEITHER 5100 ELM RD, S O L G N SHALL IT BE DISCLOSED TO OTHERS OUTSIDE PASCO,WA 99301 P O W E R ICONNECTION THE W WITHTHESALEANDUSE OF INS ORGANIZATION,EXCEPT SOLGEN P:509-931-18133 16594 SW Autumnvale Lane, Tigard, OR, 97223 PAGE° RESPECTIVE EQUIPMENT,WITHOUT WRITTEN PV 5 j CONSENT FROM SOLGEN POWER. • A I B I C I D I E I F I G I H CAUTION Main Panel Enphase Combiner Soladeck&Junction Boxes AC Disconnect POWER TO THIS BUILDING IS SUPPLIED FROM THE ♦CAUTION _ PIOIOJOLTA.CPOWERSOURCE ACAUTION 4A&tL rNF 6Y51 EM CONNECTED FOLLOWING SOURCES WITH DISCONNECTS E0- oaEMTwxwoNNE _SOLARCRCUR LOCATED AS SHOWN: 1111111•11111` rMOPENVwce mrau:n- - 19394 SW MJUjWSWIB Lane.nr�b,OR,97229 _. ° .. SOIAR PVV IEV Conduit: Every 10' Et PPED1 N SOLAR PV ARRAY WITH „q`" „' ;y pulp SNU10�1 I MICROINVERTERS 7 :" CAUTION /^Ut 11111 ��,/, ROOF MOUNTED .' I C ��SYSTEM 1 R PANEL _ C IIT _ N I / mamckN¢xweec N F� �A -^' .. DO N07 ADD LOADS K' '�j 11, E `' wrw�, .��row 0l1J 1;',"V: raorima�owr�'^. �1 , I'i ��� M5!i�luO�IM 3 [D , emw1mu�r[w� '. UTILITY METER �.".eMm - - PVDISCONNEcr "r "'`"^" f WARNING A 11.11 MAIN SERVICE PANEL gOupyyyyy>� AC MICRO DP/FRIERS EOIiPEO1MM I0CATEC ON ROOF PV SYSTEM kWh Meter RAPOSMROOIRI _. UNDER MOCI-ES PHOTOVOLTAIC SYSTEM w m —_ kVJn METER ._ ELECTRIC SMOCK FNTNB] 'MT"M9WirI.wrm. TEIOIRYL80N i9ELPENA ...;.�.� �Wit.0.��., LPNSIOE O MAY FC MERGED — R iME OPEN o031TI0k Inside Panel BOOR P/BENER I 6DO NO0166.610.60 SOLGEN °° '°"°C- a 7 POWER o - 6"x6" - u, DRAWN BY; JESION CONFIDENTIAL-THE INFORMATION CONTAINEC KCS IIN THIS PACKET AND SUBSEQUENT CUTSHEETS S O L G c N SHALL NOT BE USED FOR THE BENEFIT OF 2/15/2021 1 ANYONE OUTSIDE SOLGEN POWER.NEITHER SOLGEN POWER 5100 ELM RD, Jamie Blackwood DATE' J SHALL IT BE DISCLOSED TO OTHERS OUTSIDE PASCO,WA 99301 EAOt° P W E R THE RECIPIENT'S ORGANIZATION,EXCEPT IN CONNECTION WITH THESALEAND USEOFTHE P'S09-931-1663 16594 SW Autumnvale Lane, Tigard, OR, 97223PV 6 RESPECTIVE EQUIPMENT,WITHOUT WRITTEN CONSENT FROM SOLGEN POWER. ZXM6-60-B Series q ZNSHINESOtAR . Znshinesolar Monocrystalline P .,k. Mono 295W I 300W I 305W I 310W I 315W Made with selected materials and components to grant quality,dura- tion, efficiency and through outputs, the ZXM6-60 monocrystalline modules by ZNSHINE SOLAR represent a highly flexible solution for diverse installation types, from industrial rooftop plants to small home PV systems or large ground surfaces. This allows you to produce clean energy while reducing your energy bill. ZNSHINE SOLAR' S ZXM6-60 monocrystalline solar modules are tested and approved by international acknowledged laboratories, so that we can offer our customers a reliable and price-quality optimized product. The linear warranty on product outputs further ensures increased security and return on investments over time. 10 years workmanship warranty/25 years output warranty 0.68%Annual Degradation over 25 years Znshine's Standard i-i 10096 Industry Standard 97% 7 e a O m 3 g 90% a) m io 80.68% _ ( 3 1 5 10 15 25 Years I I I Tier 1 & Bankable High Efficiency 5BBWell known trade mark in China; Graphene coating can increase about 2W of the module Tier 1 bankable brand globally efficiency by rising around 0.5%u of the light transmission Anti PID Improved Aesthetics PID Limited power degradation of ZXM6-60 module Compared to conventional modules,this full black caused by PID effect is guaranteed under strict testing modules have a more uniform appearance condition for mass production and superior aesthetics. Certified to withstand the most Customerization Grahpene Coating 10 challenging environmental conditions Graphene coating modules can increase power generation 5400 Pa snow load and self-leaning,also can save maintainance cost 2400 Pa wind load T 0 „, , l ta' c Sus ® � 1 PV�y E de'a .� �' ZNShine PV-Tech Co.,LTD,founded in 1988, is a world-leading high-performance PV module manufacturer,PV power station developer,EPC and power station operator.With its state-of-the-art production lines,the company boasts module output of 5GW.Bloomberg has listed ZNShine as a global Tier 1 PV manufacturer and Top 4 reliable PV supplier. www.znshinesolar.com ZXM6-60-8 Series Znshinesolar 5BB Black Monocrystalline Module IIle INSHINESOLAR ELECTRICAL PROPERTIES I SIC* E 1 ZX295 ZXM0- O-3 5- O 310- ZXM6- i< 60-L9�M 60-300M 60-305M 60310M 60315M 295 300 305 310 315 Power Output Tolerance Pmax 0-+3 0--+3 0-+3 0-+3 -3-+3 32.2 32.4 32.7 32.9 33.1 I' a 9.17 9.26 9.33 9.43 9.52 Open Circuit Voltage Voc(V) 39.5 39.7 39.9 40.1 40.2 Short CircuitCurrentlsc(A) 9.67 9.75 9.85 9.95. 10.05 Module Efficiency(%) 18.02 18.33 18.63 18.94 19.25 STC(Standard Test Condition):Irradiance 10005V/af,Malik Temperature WC.AM 1.5 `TM deta oboes is for reference only and the actual data Is In accordance with the pra0osl tesdng ELECTRICAL PROPETIES I NMOT' Maximum Power Pmax(Wp) 219.0 222.3 225.8 229.3 232.8 Maximum Power Voltage Vmpp(V) 29.8 30.2 30.4 30.6 30.8 Maximum Power Current Impp(A) 7.34 7.36 7.42 7.49 7.56 36.6 36.7 36.9 37.1 37.3 7.74 7.81 7.88 7.96 8.04 'NMOT(Nominal module operating temperature):Irradiance 800W/nf,Ambient Temperature M[AM IS,Wlnd Speed 1m/s 'The data above is for reference only and the actual data is in accordance with the pradcal testing TEMPERATURE RATINGS MECHANICAL DATA NMOT 45'C±2°C Solar cells Mono 156.75k156.75 mm Temperature coefficient ofPmax. -0.39%/K Cells orientation 60 (6x10) Temperature coefficient ofVoc -0.29%/K Module dimension 1650x992a35 mm Temperature coefficient of lu 0.05%/K Weight 18.5 kg Glass High transparency,low iron,tempered WORKING CONDITIONS Glass 3.2 mm(AR-coating) Maximum system voltage 1000/1500 V DC Junction box IP 68, 3 diodes Operating temperature -40'C-+85°C Cables 4mm2,900mm Maximum series fuse 15 A ey k MC4-compatible Maximum load(snow/wind) 5400 Pa/2400 Pa PACKAI,ING INrGRMA'Ili.- DIMENSION OF THE PV MODULE (mm) Packing Type 40' HQ Piece/Box 30 anode i Piece/Container 840 11:10I I 1-V CURVES OF THE PV MODULE e m.lm -r.®WMO r 25e EEE III 1 is . __ 3Na II 1 1m imwma o s la 15 20 25 sa 35 w Voltage (V) Add:11a,Zhixi Indtrstdal Zone, lintanliangsu 213251, P.R.China Remark please read safety and installation instructions before using the product I Subject Tel: +86 519 6822 0233 E-mail: irdo51mshinesolarcom to change without prior notice 0 ZNSHINE SOLAR 2019 I Version:ZXM6-b0-B 1908E • �hoymiies 05 06 H hoymiles E.. Microinverter r'c'd.I MiI1. 'MI-120C 4 in 1 unit Inputoata(o) Recommended i"p•pone:fo Up la 31013801SIn018 psnelf Peak pawn MFPT voltage ranee M 27-4E132-48 Start-up vdtageM 22 Qpe:adlg voltage range M 16-60 Maamum ma varape M 00 • Winn rout current IAI 10.5A0 • Output Data AC) 41206V AC 011240V AC S430V AC l Reed crow pr f 1000n200 100))l200 10p3l1200 X. ) Ratedrnn{xt current(A) 4.8215.76 4.16/5 4-35152x Nori,59 thaw!votive/range NI20611833-250 zealzl t-261 2301180-275 Nantna Irooue/cyAange O Iz] 60/59.3-50.5 80593 50.5 sw45 55 >0.99 Power recto' >0.99 >0.99 Wad76 txn curt."?Immure 081050n <3% <3% <3% v..� Matlmm u unis par 20A t9a Ch 313 4/3 4t3 Efficiency • err!` CEC Peak efficency 9E50% CEC wegPwed etfic ency 96.00% 4 Ndrnval PAPP1 eft-parry 99.8096 _• Night lime power o3F'orrpad ln Ir "/1 <50 Mmharvcal Data Ambient temperature range PC1 -40-•65 °Aerating tenveraase range('C) -40-.85 Dimrcnsans(w•H•D nsni 280•176•33 tAtogni 661 3.76)i cludbg 1.999 AC cable] I MI-1000 I MI-1200 Ercb1urerallog NEMA6(8167) Cuffing Nah:ral convacten-Na fans 'The Worid'S Fast Single-Phase MipSnverter"designed for 4 sc4.-r panels with dual MPPT,w4611aMe DC Loading Quantity input operating voltage range(16-60V)and low s1aA-up voltage 122V only). Container 1X20'GP 1X40'GPflt40'HQ Palm No. 10 22 Canal No. 360 756 Hoymiles 4 in 1 miaonverter MI-1000IMI-1200 Is"The Best Power Density Micronverta"ever in the rota paltry 1800 3760 Solar industry earth extremely light weigh)-only 3.75kG including integrated DC&AC ca64e5:3-phase other Features storing makes a easy to be configured by Hoymies 4 In 1 microinveder for MW we Commercial PV power Commurna%al Wye1e23 Design afahme >25 years stations(one of the wald's biggest mlcrolnverter projects configured by Hoymies minchtveder Is 3.6MW). Standard Compliance EA1C EN510o0-e-320o7M12011EN5il'Ae{-22.%TiEN8I Wb-3-Y2014 EN61000-3-32013 Highlights Safety EN62109 2010E".62109-2i'V%IIEC 62109`1 E0 IrOEC 62109-2 Ed 1A Ut.Sod Na 1 ref-Second Edb16N 50E29 • Maximum output power up to 1000/1200W:Adapted to 60&72 cells PV panels Co-Grid ASa42547rr3:2018V0E-01-N410012a11-0bitN v ME v 0126-r-1rA1:201202 IE06172712004EN5043182013M8sI1EEE 1547.11EC621162011LTE.0 15-712-1:2010-07 • Peak efficiency 96.5%:CEC weightev efficiency 96,0% M1320114•7d13 •Static MPPT efficiency 99.8%:Dynamic MPPT efficiency 99.76%In overcast weather /,► • High reliability:NEMA6(1P67)enclosure;6000V surge Pram-Dan0' fa� C E ! F I I G83 c ic pL's Gam I .....co. wwwloyu9l.e0m k hoymiles 09 10 N hoymiles Microinverter I,,r>:1.11 r l 3Ullsl Single unit Input1 (OC) kmonln inert ache oormr 1W) VD to 310r380 Peak pOA&MPPT vccage range iVl 27-48129.48 ..•ffietaRi1Jl, Stsrt-up vdlage(v} 22 ..,, Dee Ming votve range MI 16-60 ,� • a MaNmum kolll%O&ape(y) 60 M01mum koul curre;IAI 10.5/11.5 -� i Output Data lAC) BP209V AC 0240V AC 14230V AC iiiReed woe 4 farr_r(W) 250(300 2501300 2501300 z Ramo output cun'ant WI 120f 7 44 1,041.25 I A9/1.30 f ti Nomine cumin vo4noerange IVl 205'103-250 240/211.264 230/160-2T5 Nominal frequeneWrange Mel 60/591-60.5 130/59.3.50.5 50/45-55 Pinar law >0.99 >0.99 >0.99 • Wale court mimetic dsavcn <3% <3% <3% Myamun unds per 20A wench 13112 14f12 1 dell E peak 1aym CECEC peak effcancy 96.7% CEC vregtled efficiency 96.5% 4e::g1 Nominal MPP1 efficiency 99.6% Niohl lime Dow!sno./rlg66n(ny/I <So ea Mechanical Data --- Amtield narperaneu range(t) -X0-.56 Dooming vensporaffiro range CC1 -400"ELS DimEnl Yens(WHxD mint 1783053x28 Weir IkG) 198(nrL ng lm AC cadet MI-250 / MI-300 Enclosure rating N£k40.60P67) Cooing Naive!conve049n-No fans 'The Worid's Fest Daisy-Chain Single Unit Micro inverter"wM extremely wide DC input Operating voltage Loading Quantity range(16-60V1 and bow Stan-tW voltage(22V only). Ca-tiara; 1x20 GP 1x40'GPr 1100'HO Patel NO. 10 22 Canon No. 600 1260 Hoymiles single unit microinvener MI-250/MI-300 is Inc perfect selection for PV system With uneven T01t1 Quay, 3000 6300 number of panel numbers with wodd's No.1 CEC weighted efficiency-96.5%(peak efficiency-96.7%)In 2015. Other Peakres Cpn•nunk4lion %MIMI Design Innene >25 Wars Standard Compliance EMC EN61010-6-3:"e00(-A1:2011EN610005-2200604ai000-3-22214 E861 Wo3-32013 Highlights Sal EH62109.1:207nENE2109.220111EC 52109'Ed 1.0EC 67109-2 Ed 1,0 UL04I Nn1711-Second E0Io0EN 60529 • Maximum output power up to 250/300W;Adapted to 72 cells 11'V panels On-Grid AVN25477/I:2015YDE-AlaN41o5rar1 NON V WE.V d1;0.,1,UM:2o12A2 • Peak effltaency 96.7%;CEC weigt1le0 efficiency 96.5% ECM i27,2004EN50•062013ANSIrEEE 15031EC621162011UIE C 15-712-112010-07 • Static MPPT efficiency 99.8% Dynamic MPPT efficiency 99,76%In overcast weather • High reliability:NEMA6(IP671 enclosure;6000V surge protection �,�'� T c�b5 ' 1 I F__. c E.c C G83 •m„r.noymiles.com C1 K® www.chikolar.com/www.chikosolar.com Solar Mounting Solutions PRODUCT LINE Item Product Name CK-FTH-211 CHIKO AL Roof Hook 211 TECHNICAL DATA Main Material 6005-T5 & SUS304 Uplift P N*Fv (N=3) Wind Load Up to 60 M/S Snow Load 1 .4 KM/M2 Hook Spacing Up to 2000mm Installation Site Roman Tile Roof AL Roof Hook 019 0 co CHIKO L Feet matching to the Flashing,supplying the best waterproofing solution for Asphalt Shingles Roofs. 22s ADVANTAGES COMPONENT LIST WARRANTY • Enables simple, fast and cost-effective MATERIAL QTY installation. AL Flashing 01 p0 „Y 6,01 • High class anodized aluminium. AL L Feet 01 , • Fasteners and rail nut configurated to 050 Nut 01 SUS Bolt M8*25 01 save extra parts purchasing. SUS M8 Wahser 02 • 100% water proofing. Wooden Screw M8*90 01 Silicon Rubber 01 UL LISTED '' ORDERING SPECIFICS C `J L US (TIp us Standard Packaging 16PCS/CTN Dimensions 34X25X7CM LISTED Intertek IPV MOUNTING SYSTEM] Weight 6KG5010190 E483644 Conforms tn uY STD NO.2703 Phone:86-21-59972267-801 Fax 86-21-59972938 CFl 1140 www.chikolar.com/www.chikosolar.corn Solar Mounting Solutions PRODUCT LINE Item Product Name IIINS CK-7R-2100 CHIKO 7 RAIL 2100MM CK-7R-3200 CHIKO 7 RAIL 3200MM CK-7R-4200 CHIKO 7 RAIL 4200MM TECHNICAL DATA Main Material AL 6005-T5 Wind Velocity Up to 60 M/S 1 : Xi=31918,082 mm4 IWO Yi=81501 .592 mm4 7 RAIL CHIKO 7R aluminium rail is designed for roof mounting system, it could applied on all roof mount system. I MENCIIMMli ADVANTAGES COMPONENT LIST WARRANTY • Easy installation MATERIAL Qom' i�,ist,co • Highclass anodized Aluminium Rail 01 e " • Tilt- in nut S • Universal on roof mount system lioNINIA UL LISTED ORDERING SPECIFICS Standard Packaging 8 PCS/PKG O Dimensions 2100/3200/4200mm us Weight 15/22.8/30KG LISTED Intertek MY MOUNTING SYSTEM] 5010190 E483644 Conforms to UL S CD S0.2701 Phone:86-21-59972267-801 Fax:86-21-59972938 G ! KO www.chikolar.com/www.chikosolar.com Solar Mounting Solutions PRODUCT LINE Item Product Name CK-FT-SKA CHIKO 7 Rail Splice Kit 0 TECHNICAL DATA Main Material AL 6005-T5 Wind Load Up to 60 M/S Snow Load 1 .4 KM/M2 7 RAIL SPLICE KIT vocc\c' 457mm 40 CHIKO 7R aluminium rail splice kit is � designed for 7R rail connection from back to position. The most simple and handy installation.way. kple ADVANTAGES COMPONENT LIST WARRANTY ■ Easy installation MATERIAL QTh' rite/ ■ Highclass anodized Aluminium Rail Splice Kit 01 SUS304 Bolt M8*25 02 z� Star Washer 02 16.1.1.110 UL LISTED ORDERING SPECIFICS Standard Packaging 200 PCS/PKG C PL US us Dimensions 51X38X22CM Weight 30KG LISTED Intertek (PG MOUNTING SYSTEM] 5010190 E483i644 Conforms to UL SIP NO2703 Phone:86-21-59972267-801 Fax:86.21-59972938 V 11 1 KO www,chikolar,com/www,chikousa.com Solar Mounting Solutions PRODUCT LINE Item Product Name CK-FTM-K30 CHIKO Intergated Grounding Mid Clamp 30mm CK-FTM-K33 CHIKO Intergated Grounding Mid Clamp 33mm CK-FTM-K35 CHIKO Intergated Grounding Mid Clamp 35mm CK-FTM-K38 CHIKO Intergated Grounding Mid Clamp 38mm CK-FTM-K40 CHIKO Intergated Grounding Mid Clamp 40mm TECHNICAL DATA Main Material AL 6005-T5 Intergated Grounding Mid Clamp T CHIKO end clamps is designed base on `� 7R rail to fix module on the end of rail, have D=30/33/35/38/40/45/50 founction of intergated grounding, 30mm I � , to 50 mm thickness module are available. 1 4 �� a, ADVANTAGES COMPONENT LIST WARRANTY • Intergated Grounding MATERIAL OTY Mid Clamp " `�Y `6'`' • Easy installation 01 SS 4'' '9 • High class anodized SUS304 Bolt M8 01 eliospai' Q 1I ■ Tilt- in nut 050 SUS304 Nut 01 Rivet 02 UL LISTED ORDERING SPECIFICS C4421 US Standard Packaging 100 PCS/BOX 400PCS/CTN ET I Us Dimensions 50X38X20CM 4ma LISTED Intertek Weight 26.8/27.5/28/28.6KG ]PV MOUNTING SYSTEM] 5010190 E483644 to UL 577,NO.2703 Phone:86-21-59972267-801 Fax:86-21 -5997293E CH ' K® www.chikolar.com/www.chikousa.com Solar Mounting Solutions PRODUCT LINE — Item Product Name CK-FTE-K30 CHIKO Intergated Grounding End Clamp 30mm CK-FTE-K33 CHIKO Intergated Grounding End Clamp 33mm ae. CK FTE K35 CHIKO Intergated Grounding End Clamp 35mm CK-FTE-K38 CHIKO Intergated Grounding End Clamp 38mm CK-FTE-K40 CHIKO Intergated Grounding End Clamp 40mm TECHNICAL DATA Main Material AL 6005-T5 Intergated Grounding CD End Clamp ���� D=30/33/35/38/40/45/50 CHIKO end clamps is designed base on 7R rail to fix module on the end of rail, have `� founction of intergated grounding, 30mm to 50mm thickness module are available. _„�, ADVANTAGES COMPONENT LIST WARRANTY • Intergated Grounding MATERIAL Qom' 7Y • Easy installation End Clamp 01 p° o l • High class anodized SUS304 Bolt M8'25 011 ; ' 1 SUS304 Washer M8 01 ■ Tilt- in nut ' 050 SUS304 Nut 01 ....., ,. Rivet 01 UL LISTED ORDERING SPECIFICS Ci th. US (Iii us Standard Packaging 100 PCS/BOX 400PCS/CTN Dimensions 50X38X20CM LISTED Int`ertek Weight 22/24.5/25.5/26KG WY MOUNTING SYSTEM] 5010190 E483644 s,,,NO.E40J Phone:86-21-59972267-801 Fax:86-21-59972938