Plans •
OFFICE COPY VALIDITY OF PERMIT
THE ISSUANCE OF A PERMIT
BASED ON CONSTRUCTION
S O L G EN DOCUMENTS AND OTHER
POWER DATA SHALL NOT PREVENT
THE CODE OFFICIAL FROM
REQUIRING THE CORRECTION ��� I Cr-'
February 15, 2021 OF ERRORS. ORSC 105.4
Subject: Proposed Solar Panel Installation
Jamie Blackwood Residence, 16594 Southwest Autumnvale Lane,Tigard,OR 97223
To Whom it May Concern,
Our engineering department has reviewed information, gathered by our field crews, related to the proposed solar
panel installation at the above-referenced address. The purpose of our review was to determine the structural
adequacy of the existing roof. Based on our review and analysis of the available information, and in accordance with
governing building codes, it is our professional opinion that the existing structure is permitted to remain unaltered
for the proposed solar installation.
Approved plans
Design Parameter Summary shall be on job sit ..
Governing Building Code: 2019 Oregon Structural Specialty Code(2019 OSSC)
Risk Category: II CITY OF TIG�IRD
Design Wind Speed:96 mph (per ASCE 7-16)
Ground Snow Load: 10 psf REVIEWED FO ODE COMPLIANCE
Approved:
Roof Information OTC: [
Roof Structure:2x4 Manufactured Trusses @ 24" O.C. '7
Roofing Material:Asphalt Shingles(1 layer) Permit #: 25
Roof Slope:25 degrees Address: tus T S1-) A-01-0mVe -- 'L
Suite #: f
Roof Connection Details By: Date: a/. 7 Z)
Lag Screws:5/16"diameter min.,with min.2.5" embedment into frami . min,stagger ..d
Locations per design drawings
Note:Required embedment length excludes the tapered tip of the screw,and embedment into sheathing.
Analysis
The proposed installation - including weight of panels, racking, and mounts - will be approximately 2.57 psf. In the
areas where panels are installed, roof live loads will not be present. The reduction of roof live load is adequate to
fully or partially compensate for the addition of the panel installation. Because the member forces in the area of the
solar panels are not increased by more than 5%,the stresses in the members are not increased by more than 5%, and
so per section 3408.6.2 of the 2019 OSSC(IEBC Section 806.2),the structure need not be altered for gravity loading.
The proposed installation will be 6" max. above the roof surface (flush mounted) and parallel to the roof surface.
Therefore, any increase in wind loading on the building structure from the solar panel installation is expected to be
negligible. Wind is the governing lateral load case. Because the increase in lateral loading is not increased by more
than 10%, per section 3408.6.3 of the OSSC(IEBC 806.3),the structure need not be altered for lateral loading.
Wind uplift on the panels has been calculated in accordance with the relevant provisions of ASCE 7-16. This loading
has been used to verify the adequacy of the connection specified above. Connection locations should be in
accordance with design drawings. LIABILITY
The City of Tigard and its
employees shall not be
responsible for discrepancies
which may appear herein..
a
f ' .,
Conclusion
The roof structure need not be altered for either gravity or lateral loading. Therefore, the existing structure is
permitted to remain unaltered. Connections to the roof must be made per the "Roof Connection Details" section
above.Copies of all relevant calculations are enclosed.
Limitations and Disclaimers
The opinion expressed in this letter is made in reliance on the following assumptions:the existing structure is in good
condition; the existing structure is free from defects in design or workmanship; and the existing structure was
code-compliant at the time of its design and construction.These assumptions have not been independently verified,
and we have relied on representations made by the property owner and his or her agents with respect to the
foregoing.The undersigned has not inspected the structure for patent or latent defects.
Electrical engineering is beyond the scope of this analysis. Solar panels must be installed per manufacturer
specifications. Structural design and analysis of the adequacy of solar panels, racks, mounts, rails, and other
components is performed by each component's respective manufacturer and the undersigned makes no statement
of opinion regarding such components. This letter and the opinions expressed herein are rendered solely for the
benefit of the permitting authority (city or county building department), and may not be utilized or relied on by any
other party.
If you have any questions or concerns, please contact our office at (509)-931-1663, or email me directly at
Trevor.Jones@solgenpower.com.
Sincerely,
Trevor A.Jones, P.E.
4,p PROptis
4NEf
cr
\.\\,.,, .._
EXPIRES: 06/30/23
2/15/2021
SOLGEN
Po w ER Note: All calculations per ASCE 7
Load Comparison
This calculation justifies the additional solar load by comparing existing to proposed gravity loads
in the location of the solar panels.
Without Solar With Solar
Dead Load
Asphalt Shingles 3 3 psf
1/2" Plywood 1 1 psf
Framing 3 3 psf
Insulation 1 1 psf
1/2" Gypsum Ceiling 2 2 psf
M,E, & Misc 1.5 1.5 psf
Solar Panel 0 2.57 psf
Total Dead Load 11.5 14.07 psf
Snow Load
Ground Snow Load, Pg 10 psf
Exposure Factor, Ce 1
Thermal Factor, Ct 1.1
Importance Factor, IS 1
Flat Roof Snow Load
Slope 25 degrees
Unobstructed Slippery Surface?
Slope Factor, CS 1.00 1.00
Sloped Roof Snow Load 7.7 7.7 psf
Live Load
Roof Live Load 20 0 psf
Load Combination
D + Lr 31.5 14.1 psf
D+S 19.2 21.8 psf
Max. Load 31.5 21.8 psf
of original 69%
Result: Because the total forces are decreased, per the relevant code
provisions stated in the body of the letter, the existing roof
structure is permitted to remain unaltered.
SOLGEN
POWER
Lag Screw Calculation (per ASCE 7-16 Ch. 30 and NDS)
This calculation justifies the connection of the solar panels to existing roof members, by showing the
connection capacity is equal to or greater than the uplift force demands.
Connection Demand
Spacing perpindicular to rail in 1/2 panel length
Spacing parallel to rail in Max spacing
Effective Wind Area on each connection 10.8 ft2
Roof Angle 25 degrees -_=
Wind Speed 96 mph . .
Exposure Coefficient, K, FA_Plial
Topographic Factor, KZt
Directionality Factor, Kd , g$>'
11
Elevation Factor, Ke Mell
Velocity Pressure, q, 18.6 psf
Prying Coefficient
Zones 1, 2e Zones 2n, 2r, 3e Zone 3r
s — , Wik —
GCP (max) "
Exposed Panels? (yE= 1.5) e igOram t ',
Pressure Equalization Factor,ya 0.79 0.79 0.79
Uplift Force 22.0 55.0 79.1 psf
Max. Uplift Force/Connection (0.6 WL) 142.9 357.2 514.3 lbs
Solar Dead Load (0.6 DL) 16.7 16.7 16.7 lbs
Max. Uplift Force (0.6 WL-0.6 DL) 126.2 340.5 497.6 lbs
Connection Capacity
Fastener Type Lag Screw
Fastener Diameter � s3 in
Embedment Length, min in
Lumber Species & Grade DFL#2 (Assumed)
Lumber Specific Gravity 0.5
Nominal Withdrawal Capacity, W 532.0 lbs NDS 12.2-1
#of Screws
Load Duration Factor, Co 1.6
(Note:C,M=O=Ceg=1.0)
Adjusted Withdrawal Capacity,W' 851.2 lbs
Compare Adjusted Withdrawal Capacity to ASD Factored Demand
Zone 1 Zone 2 Zone 3
O.K. O.K. O.K.
A I B I C I D I E I F I G I H
AERIAL VIEW ELECTRICAL NOTES GENERAL NOTES
..II• J L.J 1. WHERE ALL TERMINALS OF THE 1. PRIOR TO THE COMMENCEMENT OF ANY
DISCONNECTING MEANS MAY BE WORK,THE CONTRACTOR SHALL NOTIFY
ENERGIZED IN THE OPEN POSITION,A THE DESIGNER OF ANY DISCREPANCIES
r 1. SIGN WILL BE PROVIDED WARNING OF WITH THE DESIGN IN ANY CAPACITY.
THE HAZARDS.(PER ART.690.17) ESPECIALLY RECOMMENDATIONS,CODES,
e 2. EACH UNGROUNDED CONDUCTOR OF OR REGULATIONS&RULES OF THE
' THE MULTIWIRE BRANCH CIRCUIT WILL AUTHORITY HAVING JURISDICTION,WHICH
{ e BE IDENTIFIED BY PHASE AND SYSTEM. SUPERSEDED THE NEC. —
(PER ART,210.5) 2. ALL DIMENSIONS TO BE VERIFIED BY
a 3. A NATIONALLY RECOGNIZED TESTING CONTRACTOR PRIOR TO COMMENCEMENT
i LABORATORY SHALL LIST ALL OF WORK.
EQUIPMENT IN COMPLIANCE WITH 3. CONTRACTOR IS RESPONSIBLE FOR ALL
e' " ARTICLE 110.3. SAFETY PRECAUTIONS,OSHA
N
4 i 4. ALL WIRES SHALL BE PROVIDED WITH REQUIREMENTS ETC.FOR THE SITE, ro
- i d STRAIN RELIEF AT ALL ENTRY POINTS INCLUDING EXISTING SITE HAZARDS.
i - INTO BOXES AS REQUIRED BY UL LISTING 4. SYSTEM IS GRID INTERACTIVEIINTERTIED
I 5. MODULE FRAMES SHALL BE GROUNDED VIA A UL LISTED POWER-CONDITIONING
AT THE UL-LISTED LOCATION PROVIDED INVERTER.
, H. BY THE MANUFACTURER USING 5- SYSTEM HAS NO ENERGY STORAGE OF
— L,. UL-LISTED GROUNDING HARDWARE. ANY KIND,OR UPS-
• 6. MODULE FRAMES,RAIL,AND POSTS 6. ALL SOLAR MOUNTING FRAMEWORK TO
SHALL BE BONDED WITH EQUIPMENT BE GROUNDED.
u! I GROUND CONDUCTORS AND GROUNDED 7. FOLLOW MANUFACTURERS SUGGESTED
- I' AT THE MAIN ELECTRICAL PANEL. INSTALLATION PRACTICES AND WIRING
aii it,'. 7. THE DC GROUNDING ELECTRODE SPECIFICATIONS. w
`" CONDUCTOR SHALL BE SIZED 8. ALL WORK TO BE IN COMPLIANCE WITH
RESIDENCE PHOTO ACCORDING TO ARTICLE 250.16688 THE INTERNATIONAL BUILDING CODES.
.�.: 690.47. (IBC)
9. ALL ELECTRICAL WORK TO BE IN
4..`"W48 1, COMPLIANCE WITH THE NATIONAL
— �� SO ELECTRIC CODE(NEC). —
• ,'
Ad:... ,c,,p. -Gsr
A.
7,77' % SrpNALEN 2/16/2021
ISTRUCTURAL ONLY' I , SHEET INDEX —
`' . PV 1 COVER PAGE PV 5 MOUNTING DIAGRAM
,
b ' .. r
PV 2 SITE PLAN PV 6 PLACARD
I.
a tg _ PV 3 ELECTRICAL DIAGRAM CUT SHEETS ATTACHED
ti`=F;; PV 4 CHIKO MOUNTING
DRAWN BY. DRAWING SCALE.
CONFIDENTIAL-THE INFORMATION CONTAINED KCS CUSTOM
IN THIS PACKET AND SUBSEQUENT CUTSHEETS Jamie Blackwood DATE: D`SMEN •
SHALL NOT BE USED FOR THE BENEFIT OF SOLGEN POWER
if ANYONE OUTSIDE SOLGEN POWER.NEITHER 5100 ELM RD, 2/15/2021 1
5 O L G C SHALL IT BE DISCLOSED TO OTHERS OUTSIDE PASCO.WA 99301
THE RECIPIENTSIWITHTH SALE
ND USE
OT FIN 16594 SW Autumnvale Lane, Tigard, OR, 97223 PAGE4
{� O W E R CONNECTION WITH THE SALE AND USE OF THE P.509-931-1683
RESPECTIVE EQUIPMENT,WITHOUT WRITTEN PV 1
CONSENT FROM SOLGEN POWER.
A I B I C I D I E I F I G I H
N INDEX:
SYSTEM SIZE DC:9.30kW
SYSTEM SIZE AC:7.5OkW TRUSS SPACING: 24"O.C.
►� —
NUMBER OF MODULES:30 TRUSS SIZE: 2"x 4"
W *Al!:X= E —
MODULE TYPE:Zmhine IX A6-603101M
3 Q ❑ UTILITY OFFSET: 95%
O ❑ INVERTER: Hoymiles Series
n O N
O / " ❑ MODULES O
UTILITY METER 0
❑ ° ❑ MAIN SERVICE O
COMP.SHINGLE
0 ❑ ❑ i COMBINER BOX 4O
Iv
\\ ❑ ❑ %j AC DISCONNECT®
�ye A.
•\10/041°#•A
6NOR lOh _
\\ j/`l\ g0�WASHry Z
\ /.
O q'
Pop2i ' .A-
La CIRCUIT 1® 4SIONALENG 2/16/2021
CIRCUIT 2® STRUCTURAL ONLY
DRAWN BY: SRAWND SCALE:
CONFIDENTIAL-THE INFORMATION CONTAINED KCS 27/256"=1'-0'
IN THIS PACKET AND SUBSEQUENT CUTSHEETS TKSIDN
_ SHALL NOT BE USED FOR THE BENEFIT OF SOLGEN POWER
Jamie Blackwood DATE:
I A' ANYONE OUTSIDE SOLGEN POWER.NEITHER 5100 ELM RD, 2/15/2021
S O L C 1 , SHALL IT BE DISCLOSED TO OTHERS OUTSIDE PASCO,WA 99301
NECmR� pDUSFI POWER I CONrOW + �AN EXCEPT
P:509-931-1683 16594 SW Autumnvale Lane, Tigard, OR, 97223 PAGE /�
RESPECTIVE EQUIPMENT,WITHOUT WRITTEN �"
CONSENT FROM SOLGEN POWER. V 2
A ' LOADCAlCO-TOTN.ALiO AVAILABLE C ' 0 ' E I MAX AC OPERATINGOJRREPrrcucs FOR Ml1 MAX AC OPFRATNO TOtAll H
I)1!dT#� •OF MICROINYERTER9 MAX OJIWf CURRENT -- t LB1000 a210
iXl0 MTw3 11.3 1 IDEAL,_. YAN 2000 1 e IX « 4R 100 -IR Yt 060 MNOCO� _MV910
tk:0#aF®._ MA j-- WJ(ACOPEMTRq CURRENT CAWS
RMI-CW GURRFM aRRENTF
23#A I%� a �.1 sm • toA TOTAL lIWm11t� r -
.01A
• pLC$FOR MI'L5a
. Mk•i 10AA cROWVERT�n# •va Mac AC oP-w.TWD CURRENT 8t90A • M11A
M#lBIOP. ROVAAERROF NORMAL •i TOTAL 1A1L . 5#A a IX TAM 6asA • NSM�
YOWLS MCRON4>9fIBtB CURRENT TOTAL _
.- [b+D 3 _..X W1B0 1 PA1EL8�f:NC012A IX 136 • #OFM BRE/JOi118pBCNCO +9AOA
3 X� 1.01A 13.E\ A —T'� 1 10AXAC CPEN/9MO WNENI. - 11BM TOTAL _AIENE1
OCUJIt(talw 3 1 % tIM2lu • I. SLAM XI 1.0 I• 1Ma1A • �`
P•1WRgRaa u s x uu • uAEA x 13e' t##u
MOTES:
1. 200A UTILITY METER GLOBE ONLY.(EXISTING)— —
2. 225A LOAD CENTER.(EXISTING)
3. BOA RATED NON-FUSED AC DISCONNECT INSTALLED
WITHIN tE OF UTILITY METER.(NEW)
4. 125A RATED COMBINER PANEL.(NEW)
N
co
O
NMYMEIER(
CIRCUIT#1(1 of2)-3ZNSHINE DRCUIT#1(2 of 2)-12 ZNSHINE 0 0 \r0 vtxmZIC 6-00-310'M MODULES ZKM641P31MA MODULES MAIM1m1.1
WITH HOYMILES MI-2S0 MICRO WITH HOYMILES MI.1000 MICRO IIMAWO
d
MC
INVERTERS INVERTERS 0
A11/ (OA
(3-, r, r� r4� ra% rg i WOEO 0 CZ.� �+On awl+rp vrr�EL07
MOMS /
• • • • • • op AWOE0C ,L/ _
= d d —
CEICUIT#2(1 of 2)-3 ZNSHINE CIRCUIT#2(2 all)-12 ZNSHINE A.
23041380.910fA MODULES 27M1143631O4A MODULES
WITH HOYMILES MI-2110 MICRO WITH HOYMILES MI.1000 MICRO
INVERTERS INVERTERS
O A
(J, r�, (ice r4l (i1 r�l (�1 Aw°CPO
I SOLAR OCPD
On the
end of Cm mein disconnect
On m Gnber-NEC 105.12I6%3)
• • • • • • %PAWO MC
[Z ,171 — —
Lo co
DRAWN BY: DRAWING RCaI F.
CONFIDENTIAL-THE INFORMATION CONTAINED KCS l'IOT TO SCALE
IN THIS BET AND SUBSEQUENT CUTSHEETS Jamie Blackwood DATE: DESIGN
SHALL NOT BE USED FOR THE BENEFIT OF SOLGEN POWER 2/15/202
ANYONE OUTSIDE SOLGEN POWER.NEITHER 5100 ELM RD,
SOLGEN SHALL IT BE DISCLOSED TO OTHERS OUTSIDE PASO,WA 99301
POWER ONNECITIIONWWITHTTHE TS HEE SALE AND LISEOFIZATION,EXCEPT ITHE P:509-931-1663 16594 SW Autumnvale Lane, Tigard, OR, 97223 PAGEPV 3
RESPECTIVE EQUIPMENT,WITHOUT WRITTEN
CONSENT FROM SOLGEN POWER.
A I B I C I D I E I F I G I H
_ 5.5 3.e'
3.3- D 67" I
l
SOLAR PANEL
ROOFING — •• i
L FEET —
— n
l -
FLASHING /1 7#Kell
N „� - — III IQ
Ilk .
ENNINEW
OM i
w
m
Mount to E2dsting Rafters
STRUCTURAL NOTES:
/
1. TOTAL WEIGHT(MODULE&RAIL):1336 LBS
.42. RAIL WEIGHT:125 LBS
3. MODULE WEIGHT.1210 LBS Mid Clamp End Clamp
� 1
rli
4. DISTRIBUTED WEIGHT:2.41 PSF /
[Oil 4aar_•
E�wasOR DN..
P of hiryF
4-7F, O1o2 4` II I
"/ `• — - Grounding Lug 1 1
,, 1,021114::8 C- I:...
gFGrS PC,,.
` �
''SIoNALEN- 2/16/2021
STRUCTURAL ONLY
DRAWN BY: DESIGN
CONFIDENTIAL-THE INFORMATION CONTAINED KCS
IN THIS PACKET AND SUBSEQUENT CUTSHEETS Jamie Blackwood_ DATE 1
SHALL NOT BE USED FOR THE BENEFITR. OF SOLGEN POWER 2/15/2021
II G I ANYONE OUTSIDE SOLGEN POWER.NEITHER 5100 ELM RD,
J O ` C SHALL IT 9E DISCLOSED 7O OTHERS OUTSIDE PASCO,WA 99301 PAGE A
THE RECIPIENTS ORGANIZATION,EXCEPT IN
POWER CONNECTION WITH THE SALE AND USE OF THE P:509-931-1663 16594 SW Autumnvale Lane, Tigard, OR, 97223 PV 4
RESPECTIVE EQUIPMENT,WITHOUT WRITTEN
CONSENT FROM SOLGEN POWER.
90
A I B 1 c 1 D I E I F G J H
•
ROOF I
TILT:32°AZIMUT11:90° O Q _
SW
N
r.I
O O
PV MODULE li
� MOUNTING FEET `"
Alir,� CHIKO 97 RAIL
mm ipi 2 MOUNTING DIAGRAM
mhoA E:BDrroacue
STRUCTURAL NOTES:
11. .. ', ii1. 45°MAX SPAN OF RAIL TO DISIBUTE WEIGHTIll...'
.11.. ..�; OVER SUPPORT OF TRUSES
.ILI11.I1. 1j'!p.
2. MOUNTING FEET ARE IN APPROXIMATE LOCATION.I ,-1■■I.,i- 3. MOUNTING FEET SHOULD BE STAGGERED AS
A " ' ' '.u. '.
!MIO I r SHOWN IN DIAGRAM111.1il1 11..11.I1 '.1 DR JO•I!�IMUISIIMS•1IIIS•'IN t, ' � ��`W�"y,S
y oz
I—_ __. --4c-r _ ROOF3 • '2011,:.. 7
TILT:25° a
n ROOF 2 AZIMUTH:133° k'O ` 2/18/2021
TILT:32°
AZIMUTH:13a•
1 MOUNTING DIAGRAM STRUCTURAL ONLY
DRAWN BY: 'DRAINING SCALE:
CONFIDENTIAL-THE INFORMATION CONTAINED KCS DESi °-1-0•
4
IN THIS PACKET AND SUBSEQUENT CUTSHEETS Jamie Blackwood DAM:• _ SHALL NOT BE USED FOR THE BENEFIT OF SOLGEN POWER 2/15/2021
ANYONE OUTSIDE SOLGEN POWER.NEITHER 5100 ELM RD,
S O L G N SHALL IT BE DISCLOSED TO OTHERS OUTSIDE PASCO,WA 99301
P O W E R ICONNECTION THE W WITHTHESALEANDUSE OF INS ORGANIZATION,EXCEPT SOLGEN
P:509-931-18133 16594 SW Autumnvale Lane, Tigard, OR, 97223 PAGE°
RESPECTIVE EQUIPMENT,WITHOUT WRITTEN PV 5
j CONSENT FROM SOLGEN POWER.
•
A I B I C I D I E I F I G I H
CAUTION Main Panel Enphase Combiner Soladeck&Junction Boxes AC Disconnect
POWER TO THIS BUILDING IS SUPPLIED FROM THE ♦CAUTION _ PIOIOJOLTA.CPOWERSOURCE ACAUTION
4A&tL rNF 6Y51 EM CONNECTED
FOLLOWING SOURCES WITH DISCONNECTS E0- oaEMTwxwoNNE _SOLARCRCUR
LOCATED AS SHOWN: 1111111•11111`
rMOPENVwce mrau:n-
- 19394 SW MJUjWSWIB Lane.nr�b,OR,97229 _. ° .. SOIAR PVV IEV
Conduit: Every 10' Et PPED1
N SOLAR PV ARRAY WITH „q`" „' ;y pulp SNU10�1
I MICROINVERTERS 7 :" CAUTION /^Ut
11111
��,/, ROOF MOUNTED .' I C ��SYSTEM 1 R PANEL _ C IIT _ N
I / mamckN¢xweec
N F� �A -^' .. DO N07 ADD LOADS
K' '�j 11, E `' wrw�, .��row 0l1J 1;',"V: raorima�owr�'^.
�1 , I'i ��� M5!i�luO�IM
3 [D , emw1mu�r[w� '.
UTILITY METER �.".eMm -
- PVDISCONNEcr "r "'`"^" f WARNING A 11.11
MAIN SERVICE PANEL gOupyyyyy>� AC MICRO DP/FRIERS
EOIiPEO1MM I0CATEC ON ROOF PV SYSTEM kWh Meter
RAPOSMROOIRI _. UNDER MOCI-ES PHOTOVOLTAIC SYSTEM w
m —_ kVJn METER ._
ELECTRIC SMOCK FNTNB]
'MT"M9WirI.wrm. TEIOIRYL80N i9ELPENA
...;.�.� �Wit.0.��., LPNSIOE O MAY FC MERGED
—
R iME OPEN o031TI0k
Inside Panel
BOOR P/BENER
I 6DO NO0166.610.60
SOLGEN °° '°"°C-
a 7 POWER o
- 6"x6" -
u,
DRAWN BY; JESION
CONFIDENTIAL-THE INFORMATION CONTAINEC KCS
IIN THIS PACKET AND SUBSEQUENT CUTSHEETS
S O L G c N SHALL NOT BE USED FOR THE BENEFIT OF 2/15/2021 1
ANYONE OUTSIDE SOLGEN POWER.NEITHER SOLGEN POWER
5100 ELM RD, Jamie Blackwood DATE'
J SHALL IT BE DISCLOSED TO OTHERS OUTSIDE PASCO,WA 99301 EAOt°
P W E R THE RECIPIENT'S ORGANIZATION,EXCEPT IN
CONNECTION WITH THESALEAND USEOFTHE P'S09-931-1663 16594 SW Autumnvale Lane, Tigard, OR, 97223PV 6
RESPECTIVE EQUIPMENT,WITHOUT WRITTEN
CONSENT FROM SOLGEN POWER.
ZXM6-60-B Series q ZNSHINESOtAR .
Znshinesolar Monocrystalline P .,k.
Mono
295W I 300W I 305W I 310W I 315W
Made with selected materials and components to grant quality,dura-
tion, efficiency and through outputs, the ZXM6-60 monocrystalline
modules by ZNSHINE SOLAR represent a highly flexible solution for
diverse installation types, from industrial rooftop plants to small
home PV systems or large ground surfaces. This allows you to
produce clean energy while reducing your energy bill.
ZNSHINE SOLAR' S ZXM6-60 monocrystalline solar modules are
tested and approved by international acknowledged laboratories, so
that we can offer our customers a reliable and price-quality optimized
product. The linear warranty on product outputs further ensures
increased security and return on investments over time.
10 years workmanship warranty/25 years output warranty
0.68%Annual Degradation over 25 years
Znshine's Standard
i-i
10096 Industry Standard
97% 7
e
a
O
m
3
g 90%
a)
m
io 80.68% _ (
3
1 5 10 15 25
Years
I I I Tier 1 & Bankable High Efficiency
5BBWell known trade mark in China; Graphene coating can increase about 2W of the module
Tier 1 bankable brand globally efficiency by rising around 0.5%u of the light transmission
Anti PID Improved Aesthetics
PID Limited power degradation of ZXM6-60 module Compared to conventional modules,this full black
caused by PID effect is guaranteed under strict testing modules have a more uniform appearance
condition for mass production and superior aesthetics.
Certified to withstand the most Customerization Grahpene Coating
10 challenging environmental conditions
Graphene coating modules can increase power generation
5400 Pa snow load and self-leaning,also can save maintainance cost
2400 Pa wind load
T 0 „, , l ta' c Sus ® � 1 PV�y E de'a .� �'
ZNShine PV-Tech Co.,LTD,founded in 1988, is a world-leading high-performance PV module manufacturer,PV power station developer,EPC and power station
operator.With its state-of-the-art production lines,the company boasts module output of 5GW.Bloomberg has listed ZNShine as a global Tier 1 PV manufacturer and
Top 4 reliable PV supplier. www.znshinesolar.com
ZXM6-60-8 Series Znshinesolar 5BB Black
Monocrystalline Module IIle INSHINESOLAR
ELECTRICAL PROPERTIES I SIC*
E 1 ZX295 ZXM0- O-3 5- O 310- ZXM6- i<
60-L9�M 60-300M 60-305M 60310M 60315M
295 300 305 310 315
Power Output Tolerance Pmax 0-+3 0--+3 0-+3 0-+3 -3-+3
32.2 32.4 32.7 32.9 33.1
I' a 9.17 9.26 9.33 9.43 9.52
Open Circuit Voltage Voc(V) 39.5 39.7 39.9 40.1 40.2
Short CircuitCurrentlsc(A) 9.67 9.75 9.85 9.95. 10.05
Module Efficiency(%) 18.02 18.33 18.63 18.94 19.25
STC(Standard Test Condition):Irradiance 10005V/af,Malik Temperature WC.AM 1.5
`TM deta oboes is for reference only and the actual data Is In accordance with the pra0osl tesdng
ELECTRICAL PROPETIES I NMOT'
Maximum Power Pmax(Wp) 219.0 222.3 225.8 229.3 232.8
Maximum Power Voltage Vmpp(V) 29.8 30.2 30.4 30.6 30.8
Maximum Power Current Impp(A) 7.34 7.36 7.42 7.49 7.56
36.6 36.7 36.9 37.1 37.3
7.74 7.81 7.88 7.96 8.04
'NMOT(Nominal module operating temperature):Irradiance 800W/nf,Ambient Temperature M[AM IS,Wlnd Speed 1m/s
'The data above is for reference only and the actual data is in accordance with the pradcal testing
TEMPERATURE RATINGS MECHANICAL DATA
NMOT 45'C±2°C Solar cells Mono 156.75k156.75 mm
Temperature coefficient ofPmax. -0.39%/K Cells orientation 60 (6x10)
Temperature coefficient ofVoc -0.29%/K Module dimension 1650x992a35 mm
Temperature coefficient of lu 0.05%/K Weight 18.5 kg
Glass High transparency,low iron,tempered
WORKING CONDITIONS Glass 3.2 mm(AR-coating)
Maximum system voltage 1000/1500 V DC Junction box IP 68, 3 diodes
Operating temperature -40'C-+85°C Cables 4mm2,900mm
Maximum series fuse 15 A ey k MC4-compatible
Maximum load(snow/wind) 5400 Pa/2400 Pa
PACKAI,ING INrGRMA'Ili.-
DIMENSION OF THE PV MODULE (mm) Packing Type 40' HQ
Piece/Box 30
anode i
Piece/Container 840
11:10I
I 1-V CURVES OF THE PV MODULE
e m.lm -r.®WMO
r 25e EEE
III 1 is
. __ 3Na
II
1 1m imwma
o s la 15 20 25 sa 35 w
Voltage (V)
Add:11a,Zhixi Indtrstdal Zone, lintanliangsu 213251, P.R.China Remark please read safety and installation instructions before using the product I Subject
Tel: +86 519 6822 0233 E-mail: irdo51mshinesolarcom to change without prior notice 0 ZNSHINE SOLAR 2019 I Version:ZXM6-b0-B 1908E
•
�hoymiies 05 06 H hoymiles
E..
Microinverter r'c'd.I MiI1. 'MI-120C
4 in 1 unit Inputoata(o)
Recommended i"p•pone:fo Up la 31013801SIn018 psnelf
Peak pawn MFPT voltage ranee M 27-4E132-48
Start-up vdtageM 22
Qpe:adlg voltage range M 16-60
Maamum ma varape M 00
• Winn rout current IAI 10.5A0
• Output Data AC) 41206V AC 011240V AC S430V AC
l Reed crow pr f 1000n200 100))l200 10p3l1200
X. ) Ratedrnn{xt current(A) 4.8215.76 4.16/5 4-35152x
Nori,59 thaw!votive/range NI20611833-250 zealzl t-261 2301180-275
Nantna Irooue/cyAange O Iz] 60/59.3-50.5 80593 50.5 sw45 55
>0.99
Power recto' >0.99 >0.99
Wad76 txn curt."?Immure 081050n <3% <3% <3%
v..� Matlmm u unis par 20A t9a Ch 313 4/3 4t3
Efficiency
• err!` CEC Peak efficency 9E50%
CEC wegPwed etfic ency 96.00%
4 Ndrnval PAPP1 eft-parry 99.8096
_• Night lime power o3F'orrpad ln Ir "/1 <50
Mmharvcal Data
Ambient temperature range PC1 -40-•65
°Aerating tenveraase range('C) -40-.85
Dimrcnsans(w•H•D nsni 280•176•33
tAtogni 661 3.76)i cludbg 1.999 AC cable] I
MI-1000 I MI-1200 Ercb1urerallog NEMA6(8167)
Cuffing Nah:ral convacten-Na fans
'The Worid'S Fast Single-Phase MipSnverter"designed for 4 sc4.-r panels with dual MPPT,w4611aMe DC Loading Quantity
input operating voltage range(16-60V)and low s1aA-up voltage 122V only). Container 1X20'GP 1X40'GPflt40'HQ
Palm No. 10 22
Canal No. 360 756
Hoymiles 4 in 1 miaonverter MI-1000IMI-1200 Is"The Best Power Density Micronverta"ever in the rota paltry 1800 3760
Solar industry earth extremely light weigh)-only 3.75kG including integrated DC&AC ca64e5:3-phase other Features
storing makes a easy to be configured by Hoymies 4 In 1 microinveder for MW we Commercial PV power Commurna%al Wye1e23
Design afahme >25 years
stations(one of the wald's biggest mlcrolnverter projects configured by Hoymies minchtveder Is 3.6MW). Standard Compliance
EA1C EN510o0-e-320o7M12011EN5il'Ae{-22.%TiEN8I Wb-3-Y2014
EN61000-3-32013
Highlights Safety EN62109 2010E".62109-2i'V%IIEC 62109`1 E0 IrOEC 62109-2 Ed 1A
Ut.Sod Na 1 ref-Second Edb16N 50E29
• Maximum output power up to 1000/1200W:Adapted to 60&72 cells PV panels Co-Grid ASa42547rr3:2018V0E-01-N410012a11-0bitN v ME v 0126-r-1rA1:201202
IE06172712004EN5043182013M8sI1EEE 1547.11EC621162011LTE.0 15-712-1:2010-07
• Peak efficiency 96.5%:CEC weightev efficiency 96,0% M1320114•7d13
•Static MPPT efficiency 99.8%:Dynamic MPPT efficiency 99.76%In overcast weather /,►
• High reliability:NEMA6(1P67)enclosure;6000V surge Pram-Dan0' fa� C E ! F I I G83
c ic pL's
Gam I .....co.
wwwloyu9l.e0m
k hoymiles 09 10 N hoymiles
Microinverter I,,r>:1.11 r l 3Ullsl
Single unit Input1 (OC)
kmonln inert ache oormr 1W) VD to 310r380
Peak pOA&MPPT vccage range iVl 27-48129.48
..•ffietaRi1Jl, Stsrt-up vdlage(v} 22
..,, Dee Ming votve range MI 16-60
,� • a MaNmum kolll%O&ape(y) 60
M01mum koul curre;IAI 10.5/11.5
-� i Output Data lAC) BP209V AC 0240V AC 14230V AC
iiiReed woe 4 farr_r(W) 250(300 2501300 2501300
z Ramo output cun'ant WI 120f 7 44 1,041.25 I A9/1.30
f ti Nomine cumin vo4noerange IVl 205'103-250 240/211.264 230/160-2T5
Nominal frequeneWrange Mel 60/591-60.5 130/59.3.50.5 50/45-55
Pinar law >0.99 >0.99 >0.99
• Wale court mimetic dsavcn <3% <3% <3%
Myamun unds per 20A wench 13112 14f12 1 dell
E peak
1aym CECEC peak effcancy 96.7%
CEC vregtled efficiency 96.5%
4e::g1 Nominal MPP1 efficiency 99.6%
Niohl lime Dow!sno./rlg66n(ny/I <So
ea Mechanical Data
--- Amtield narperaneu range(t) -X0-.56
Dooming vensporaffiro range CC1 -400"ELS
DimEnl Yens(WHxD mint 1783053x28
Weir IkG) 198(nrL ng lm AC cadet
MI-250 / MI-300 Enclosure rating N£k40.60P67)
Cooing Naive!conve049n-No fans
'The Worid's Fest Daisy-Chain Single Unit Micro inverter"wM extremely wide DC input Operating voltage Loading Quantity
range(16-60V1 and bow Stan-tW voltage(22V only). Ca-tiara; 1x20 GP 1x40'GPr 1100'HO
Patel NO. 10 22
Canon No. 600 1260
Hoymiles single unit microinvener MI-250/MI-300 is Inc perfect selection for PV system With uneven T01t1 Quay, 3000 6300
number of panel numbers with wodd's No.1 CEC weighted efficiency-96.5%(peak efficiency-96.7%)In 2015. Other Peakres
Cpn•nunk4lion %MIMI
Design Innene >25 Wars
Standard Compliance
EMC EN61010-6-3:"e00(-A1:2011EN610005-2200604ai000-3-22214
E861 Wo3-32013
Highlights Sal EH62109.1:207nENE2109.220111EC 52109'Ed 1.0EC 67109-2 Ed 1,0
UL04I Nn1711-Second E0Io0EN 60529
• Maximum output power up to 250/300W;Adapted to 72 cells 11'V panels
On-Grid AVN25477/I:2015YDE-AlaN41o5rar1 NON V WE.V d1;0.,1,UM:2o12A2
• Peak effltaency 96.7%;CEC weigt1le0 efficiency 96.5% ECM i27,2004EN50•062013ANSIrEEE 15031EC621162011UIE C 15-712-112010-07
• Static MPPT efficiency 99.8% Dynamic MPPT efficiency 99,76%In overcast weather
• High reliability:NEMA6(IP671 enclosure;6000V surge protection �,�'� T
c�b5 ' 1 I F__. c E.c C G83
•m„r.noymiles.com
C1 K® www.chikolar.com/www.chikosolar.com
Solar Mounting Solutions
PRODUCT LINE
Item Product Name
CK-FTH-211 CHIKO AL Roof Hook 211
TECHNICAL DATA
Main Material 6005-T5 & SUS304
Uplift P N*Fv (N=3)
Wind Load Up to 60 M/S
Snow Load 1 .4 KM/M2
Hook Spacing Up to 2000mm
Installation Site Roman Tile Roof
AL Roof Hook 019 0
co
CHIKO L Feet matching to the
Flashing,supplying the best waterproofing
solution for Asphalt Shingles Roofs. 22s
ADVANTAGES COMPONENT LIST WARRANTY
• Enables simple, fast and cost-effective MATERIAL QTY
installation. AL Flashing 01 p0 „Y 6,01
• High class anodized aluminium. AL L Feet 01 ,
• Fasteners and rail nut configurated to 050 Nut 01
SUS Bolt M8*25 01
save extra parts purchasing. SUS M8 Wahser 02
• 100% water proofing. Wooden Screw M8*90 01
Silicon Rubber 01
UL LISTED
'' ORDERING SPECIFICS
C `J L US (TIp us Standard Packaging 16PCS/CTN
Dimensions 34X25X7CM
LISTED Intertek IPV MOUNTING SYSTEM] Weight 6KG5010190
E483644 Conforms tn uY STD NO.2703
Phone:86-21-59972267-801 Fax 86-21-59972938
CFl 1140 www.chikolar.com/www.chikosolar.corn
Solar Mounting Solutions
PRODUCT LINE
Item Product Name
IIINS CK-7R-2100 CHIKO 7 RAIL 2100MM
CK-7R-3200 CHIKO 7 RAIL 3200MM
CK-7R-4200 CHIKO 7 RAIL 4200MM
TECHNICAL DATA
Main Material AL 6005-T5
Wind Velocity Up to 60 M/S
1 :
Xi=31918,082 mm4
IWO
Yi=81501 .592 mm4
7 RAIL
CHIKO 7R aluminium rail is designed for
roof mounting system, it could applied on
all roof mount system.
I
MENCIIMMli
ADVANTAGES COMPONENT LIST WARRANTY
• Easy installation MATERIAL Qom' i�,ist,co
• Highclass anodized Aluminium Rail 01 e "
• Tilt- in nut S
• Universal on roof mount system
lioNINIA
UL LISTED ORDERING SPECIFICS
Standard Packaging 8 PCS/PKG
O
Dimensions 2100/3200/4200mm
us Weight 15/22.8/30KG
LISTED Intertek
MY MOUNTING SYSTEM] 5010190
E483644 Conforms to UL S CD S0.2701
Phone:86-21-59972267-801 Fax:86-21-59972938
G ! KO www.chikolar.com/www.chikosolar.com
Solar Mounting Solutions
PRODUCT LINE
Item Product Name
CK-FT-SKA CHIKO 7 Rail Splice Kit
0 TECHNICAL DATA
Main Material AL 6005-T5
Wind Load Up to 60 M/S
Snow Load 1 .4 KM/M2
7 RAIL SPLICE KIT vocc\c' 457mm
40
CHIKO 7R aluminium rail splice kit is �
designed for 7R rail connection from back
to position. The most simple and handy
installation.way.
kple
ADVANTAGES COMPONENT LIST WARRANTY
■ Easy installation MATERIAL QTh' rite/
■ Highclass anodized Aluminium Rail Splice Kit 01
SUS304 Bolt M8*25 02 z�
Star Washer 02 16.1.1.110
UL LISTED ORDERING SPECIFICS
Standard Packaging 200 PCS/PKG
C PL US us Dimensions 51X38X22CM
Weight 30KG
LISTED Intertek
(PG MOUNTING SYSTEM] 5010190
E483i644 Conforms to UL SIP NO2703
Phone:86-21-59972267-801 Fax:86.21-59972938
V 11 1 KO www,chikolar,com/www,chikousa.com
Solar Mounting Solutions
PRODUCT LINE
Item Product Name
CK-FTM-K30 CHIKO Intergated Grounding Mid Clamp 30mm
CK-FTM-K33 CHIKO Intergated Grounding Mid Clamp 33mm
CK-FTM-K35 CHIKO Intergated Grounding Mid Clamp 35mm
CK-FTM-K38 CHIKO Intergated Grounding Mid Clamp 38mm
CK-FTM-K40 CHIKO Intergated Grounding Mid Clamp 40mm
TECHNICAL DATA
Main Material AL 6005-T5
Intergated Grounding
Mid Clamp
T
CHIKO end clamps is designed base on `�
7R rail to fix module on the end of rail, have D=30/33/35/38/40/45/50
founction of intergated grounding, 30mm I � ,
to 50 mm thickness module are available. 1 4 ��
a,
ADVANTAGES COMPONENT LIST WARRANTY
• Intergated Grounding MATERIAL OTY
Mid Clamp " `�Y `6'`'
• Easy installation 01 SS 4'' '9
• High class anodized SUS304 Bolt M8 01 eliospai' Q 1I
■ Tilt- in nut 050 SUS304 Nut 01
Rivet 02
UL LISTED
ORDERING SPECIFICS
C4421 US Standard Packaging 100 PCS/BOX 400PCS/CTN
ET I Us Dimensions 50X38X20CM
4ma
LISTED Intertek Weight 26.8/27.5/28/28.6KG
]PV MOUNTING SYSTEM] 5010190
E483644 to UL 577,NO.2703
Phone:86-21-59972267-801 Fax:86-21 -5997293E
CH ' K® www.chikolar.com/www.chikousa.com
Solar Mounting Solutions
PRODUCT LINE
—
Item Product Name
CK-FTE-K30 CHIKO Intergated Grounding End Clamp 30mm
CK-FTE-K33 CHIKO Intergated Grounding End Clamp 33mm
ae. CK FTE K35 CHIKO Intergated Grounding End Clamp 35mm
CK-FTE-K38 CHIKO Intergated Grounding End Clamp 38mm
CK-FTE-K40 CHIKO Intergated Grounding End Clamp 40mm
TECHNICAL DATA
Main Material AL 6005-T5
Intergated Grounding CD
End Clamp
���� D=30/33/35/38/40/45/50
CHIKO end clamps is designed base on
7R rail to fix module on the end of rail, have `�
founction of intergated grounding, 30mm
to 50mm thickness module are available. _„�,
ADVANTAGES COMPONENT LIST WARRANTY
• Intergated Grounding MATERIAL Qom'
7Y
• Easy installation End Clamp 01 p° o l
• High class anodized SUS304 Bolt M8'25 011 ;
' 1
SUS304 Washer M8 01
■ Tilt- in nut '
050 SUS304 Nut 01 ....., ,.
Rivet 01
UL LISTED
ORDERING SPECIFICS
Ci th. US (Iii us Standard Packaging 100 PCS/BOX 400PCS/CTN
Dimensions 50X38X20CM
LISTED Int`ertek Weight 22/24.5/25.5/26KG
WY MOUNTING SYSTEM] 5010190
E483644 s,,,NO.E40J
Phone:86-21-59972267-801 Fax:86-21-59972938