Correspondence MS 7-02. - COI 0 T.......12_9141 REC IVED 14845 SW 100th APR ` 202) i Storm Drainage Report CITY OF TIGARD / for BUILDING DIVISION theta- Addition to existing NARRATIVE: This property is a developed site with an existing house,taking access on SW 100th and sloping towards the street at less than 20%in the front.SW 100th is paved without curbs and has an asphalt path along the frontage.A catch basin on the southerly side of the access drive with a 12-inch concrete storm line flowing south.The existing roof has gutters and rain drains connected to an unknown underground system.An addition is proposed on the north and west side of the existing house with a calculated roof area of 1272 SF. No other improvements area proposed. Clean Water Services has provided a"Sensitive Area Pre-Screening Site Assessment" and determined this project will not significantly impact the existing or potentially sensitive areas found near the site. The USDA Web site finds this property to have 11C Cornelius and Kinton Silt barns.This carries a Hydrologic group C characteristic and is known for low infiltration rates, but site specific testing can show different results. Residential additions having new impervious areas greater than 1000 SF are subject to the storm water requirements of Clean Water Services to which the City of Tigard is a member. Infiltration test: A hand dug test pit was used to conduct an open pit infiltration test at the site.The test pit was 47" deep with organic soils found in the top two inches followed by silt loam to the bottom.After presoaking the rates was observed at 6 inches per hour. For design purposes a safety factor of 2 was applied for 3 inches per hour or 20 minutes per inch. REFERENCE: The King County Department of Public Works, Hydrographic Program,ver 4.21B Clean Water Services Stormwater Keith Abel Residential Design LLC ASSUMPTION: Using the 25-year event storm and infiltrate the entire new impervious area into the ground using a rain garden with 6" of free board, 6" of storage, 18" of growing medium and 3" of "choker" and 9" of drain rock.Void space medium 0.25, rock 0.4 depth Storage area 1.0 39.2 98 1.0 75.9 98 1.5 133.3 98 STORM OPTIONS: 1—S.C.S.TYPE-1A 2-7-DAY DESIGN STORM 3—STORM DATA FILE SPECIFY STORM OPTION: 1 S.C.S.TYPE 1-A RAINFALL DISTRIBUTION ENTER: FREQ(YEAR),DURATION(HOUR), PRECIP(INCHES) 25,24,3.9 Xxxxxxxxxxxxxxxxxxxxxxx S.C.S.TYPE-1A DISTRIBUTION xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx XXXXXXXXXXXX 25-YEAR 24-HOUR STORM xxxx 3.90"TOTAL PRECIP. Xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx ENTER:A(PERV),CN(PERV),A(IMPERV),CN(IMPERV),TC FOR BASIN NO. 1 0.0,86,0.029,98,5 DATA PRINT OUT: AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES) A CN A CN .0 .0 86.0 .0 98.0 5.0 PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT) .03 7.67 385 ENTER(d:](path]filename[.ext]FOR STORAGE OF COMPUTED HYDROGRAPH SPECIFY: C-CONTINUE, N-NEWSTORM, P-PRINT, S—STOP ENTER OPTION RESERVOIR ROUTING INFLOW/OUTFLOW ROUTINE SPECIFY (d:][path]filename[.ext) OF ROUTINE DATA) C:data100 DISPLAY ROUTING DATA(Y or N) Y ROUTING DATA: STAGE (FT) DISCHARGE(CFS) STORAGE(CU-FT) PERN-AREA(SQ-FT) .00 .00 .0 .0 1.00 .00 39.2 98.0 2.50 .00 75.9 98.0 3.00 .00 133.3 98.0 AVERAGE PERM-RATE: 20.0 MINUTES/INCH SATURATED PERM-RATE: 20.0 MINUTES/INCH GROUND STORAGE BEFORE SATURATION: .00 CU-FT/SQ-FT ENTER [d:][path]filename[.ext] OF COMPUTED HYDROGRAPH: C:100th INFLOW/OUTFLOW ANALYSIS: PEAK-INFLOW(CFS) PEAK-OUTFLOW(CFS) OUTFLOW-VOL(CU-FT) .03 .00 0 INITIAL-STAGE(FT) TIME-OF-PEAK(HRS) PEAK-STAGE-ELEV(FT) .00 10.67 2.90 PEAK STORAGE: 120 CU-FT INFILTRATED VOLUME: 251 CU-FT ENTER [d] [path] filename [.ext] FOR STORAGE OF COMPUTED HYDROGRAPH The design was also run through the Presumptive Approach Calculator to verify both water quality and quantity.This design for total infiltration meets the Clean Water Services requirements for Water Quality, Hydromodification,and LID as identified in Chapter 4, Design and Construction Standards.Since the facility is designed for the 25-year event with a safety factor applied it is not anticipated that the facility would ever overflow. If overflow did occur it would drain directly in the right of way. Prepared By: Bruce D.Goldson, PE ,gy Ff Theta PRO � April 23, 2021 ite\jt-4o , err_ 7120 ) il 1, drititfP(, 4,j' 18. 9 50 C'F D GO‘-0 EXPIRES: / / /✓J/ SIGNATURE DATE: I 1 1 1 NEW IMPERVIOUS AREA= 1,272 S.F. / ADDITION 1 _ 1 T 1 CONNECT TO ROOF DRAW / I 1 -- 1 \ / I I EXISTING HOUSE \ / TO REMAIN \\\ _ I—� 1 t— `-`" —1—12'A1"TRAPPED — I CAT BASIN Lj� a WITHI1B"SOW _r--,-_ I L_I— iJ I 1 re EXISTING 1 1 AC DRIVEWAY I 1 1 1 RAIN GARDEN T-''1----„, Gamow- SEE SHEET 2 I 1 1 I BB' - / 1 ITEST PIT m 0 20 40 CATCH BASIN SW 100TH AVENUE / DITCH SCALE: 1"=20' �t_� ID < �„ 12"O STORM 2021-400 STORM DRAINAGE REPORT 'Z'1--1_ t - a 1 1 G 14845 SW 100th Avenue 1 ENGINEERING - SURVEYING - PLANNING Tigard, Oregon PO Box 1345 503-481-8822 2 Lake Oswego.Oregon 97D35 email: thetaeng@corrx;astnet / 20'FREEBOARD / / 1T / / 14' / ZONE B ocko 1 B"SQUARE SPLASH BLOCK OR 4"ROCK o j m a ZONE A --- z oN J \ f ZONE B 6"FREEBOARD 3:1 / 6"STORAGE 3:1 18"OF(3-WAY MBO MEDIUM 3"OF 1/4"OPEN GRADED AGGREGATE 9"OF 1 34"-3%a"WASHED DRAIN ROCK RAIN GARDEN SCALE: 1 " = 5' ZONE A PLANTING 115 PER 100 SQ.FT. = 113 @ 1"-0"0.C. 37 CAREX DEWEYANNA,DEWEY SEDGE 37 CAREX DENSA,DENSE SEDGE 39 DESCHAMPSIA CESPITOSA,TUFTED HAIR GRASS 7ONF R PLANING 26 POLYSTICHEM MUNITUM,SWORD FERN 2021-400 STORM DRAINAGE REPORT Z 1 c 14845 SW 100th Avenue 2 ENGINEERING - SURVEYING - PLANNING Tigard, Oregon PO Box 1345 503-481-8822 2 Lake Oswego,Oregon 97035 email: thetaeng@comcast.net A , =p Presumptive Approach Calculator ver. 1.2 Catchment Data 4 ' ;7) Catchment ID: A Project Name: 100th Date: 04/25/21 Project Address: 14845 SW 100th Permit Number: 0 Tigard, Oregon Run Time 4/24/2021 3:03:4D PM Designer: Goldson Company: theta Drainage Catchment Information Catchment ID IA Catchment Area Impervious Area 1,272 SF Impervious Area 0.03 ac Impervious Area Curve Number, CN;mo 98 Time of Concentration, Tc, minutes 5 min. Site Soils & Infiltration Testing Data Infiltration Testing Procedure: Open Pit Falling Head Native Soil Field Tested Infiltration Rate(It„,): 6 in/hr Bottom of Facility Meets Required Separation From High Groundwater Per BES SWMM Section 1.4: Yes Correction Factor Component CFtast(ranges from 1 to 3) 2 Design Infiltration Rates Idsgn for Native (lies,/CF,eJ,): 3.00 in/hr Idso„for Imported Growing Medium: 2.00 in/hr Execute SBUH SBUH Results Peak Rate Volume (cfs) cj,fl ---PR 0.005 66 0.0350 2-yr 0.018 230 0.0300 4- n 5-yr 0.022 283 1 i 0.0250 10-yr 0.026 336 0.0200 ' ‘ 25-yr 0.03 389 ,1 0.0150 • 0 0.0100 a: �.. 0.0000 ++N++++-4+H4i4 0 0 0 O 0 0 O O O O0 0 O -0.0050 N N i� v $ s (0 0) O Time (min.) Printed: 4/24/2021 3:06 PM Facility Des Data r-• Presumptive Approach Calculator ver. 1.2 Catchment ID: A �,--� Run Time 4/24/2021 3:08.48 PM Project Name: 100th Catchment ID: A Date: 4/28/2021 Instructions: 1.Identify which Stormwater Hierarchy Category the facility. 2.Select Facility Type. 3.Identify facility shape of surface facility to more accurately estimate surface volume,except for Swaim and sloped planters that use the PAC Sloped Facility Wodtsheet to enter data. 4.Select type of Moiety configuration. 5.Complete data entry for all highlighted cells. } Catchment facility will meet Hierarchy Category: 1 ^ r aw i Goal Summary: Vv{ +Cd� REM ILTT box below needs to display... A Ilkrarch>n %N'hlbl Requirement v wagn Pnd.. 10.yr(cite disposal)m a Reduction m (.+.site infitmoon with a surface inatnmion fa.ii l PASS PARS Facility Type e Basin ° Fac1IIt . h e ReetanglalSquare Facility Configuration: B p orege D •Ih I PLAN 1tR..—I—I„.eASIN/SWALE Facility Bottom "' Storage Depth I Area .� Focally cM D at Bottom Area t - ;tAAi;3t Jg —__� �'�-�%JI Side e y ``•, \ \ x •1 GROWING MEDIUM —O lIow '."�. . dr w^.. sd<'> .: - •. ROCK I l� Calculation Wdl �� Rock St a IIwwtfi Guide ectton Rock eollom Are9 on29 �r Max.RoCk Star. DATA FOR ABOVE GRADE STORAGE COMPONENT BELOW GRADE STORAGE BD1 Area Facility Bottom Area• 08 sf Rock Storage Bottom Area• 268 of <Warning 1 4 SF Bottom Width= 8.0 ft Rock Storage Depth= 12 In Facility Side Slope• 3 to 1 Rock Void Ratio= 0.3 1 Storage Depth 1• S In '. Growing Medium Depth= 18 In Freeboard Depth= N/A in Surface Capacity at Depth 1= Se cf Rock Storage Capacity= 77 cf Infiltration Area at 7S%Depthl= 148 SF GM Design Infiltration Rate= 2.00 In/hr Native Design Infiltration Rate• 3.00 Inthr Infiltration Capacity= 0.007 cfs Infiltration Capacity= 0.018 cfs Overflow RESULTS Volume Pollution ldrn PAC Reduction PASS 0 CF 0% Surf.Cap.Used 0% Rock Cap.Used 10-yr PASS 0 CF 68% Surf.Cap.Used 0y. Rock Cap.Used FACILITY FACTS Total Facility Area Including Freeboard= *VALUE! Sizing Ratio(Total Facility Area/Catchment Area)= ',VALUE! Printed:4/24/2021 3:10 PM C1eanWater``Services SENSITIVE AREA PRE-SCREENING SITE ASSESSMENT Clean Water Services File Number 21-000795 1. Jurisdiction: Tigard 2. Property Information(example: 1S234A801400) 3. Owner Information Tax lot ID(s): 2S111 CB02200 Name: Brad and Cassandra Barton Company: Address: 14845 SW 100th Ave OR Site Address: 14845 SW 100th Avenue City,State,Zip: Tigard, OR,97224 City,State,Zip: Tigard,OR,97224 Phone/fax: 503-577-9358 Nearest cross street: Email: cassandra.neumann@gmail.com 4. Applicant Information 4. Development Activity(check all that apply) IgI Addition to single family residence(rooms,deck,garage) Name: Marianne Wilson Stein ❑ Lot line adjustment 0 Minor land partition Company: LS Panes and Associates ❑ Residential condominium ❑ Commercial condominium Address: 16722 Boones Ferry Road ❑ Residential subdivision 0 Commercial subdivision City,State,Zip: Lake Oswego,OR, 97035 ❑ Single lot commercial 0 Multi lot commercial Phone/fax: 360-521-5455 Other Email: marianne@Ispanas.com 6. Will the project involve any off-site work? ❑Yes 0 No 0 Unknown Location and description of off-site work: 7. Additional comments or information that may be needed to understand your project This project is an addition to an existing home. This application does NOT replace Grading and Erosion Control Permits, Connection Permits,Building Permits,Site Development Permits,DEQ 1200-C Permit or other permits as issued by the Department of Environmental Quality, Department of State Lands and/or Department of the Army COE. AB required permits and approvals must be obtairt*d and completed under applicable local,state,and federal law. By signing this form, the Owner or Owner's authorized agent or representative, acknowledges and agrees that employees of Clean Water Services have authority to enter the project site at all reasonable times for the purpose of inspecting project site conditions and gathering information related to the project site. I certify that I am familiar with the information contained in this document,and to the best of my knowledge and belief,this information is true,complete,and accurate. Print/type name Marianne Wilson Stein Print/type title Design Manager Signature ONLINE SUBMITTAL Date 3/11/2021 FOR DISTRICT USE ONLY O Sensitive areas potentially exist on site or within 200'of the site.THE APPLICANT MUST PERFORM A SITE ASSESSMENT PRIOR TO ISSUANCE OF A SERVICE PROVIDER LETTER. If Sensitive Areas exist on the site or within 200 feet on adjacent properties,aNatural Resources Assessment Report may also be required. ❑ Based on review of the submitted materials and best available information sensitive areas do not appear to exist on site or within 2 0'of the site.This Sensitive Area Pre-Screening Site Assessment does NOT eliminate the need to evaluate and protect water quality sensitive reas if they are subsequently discovered.This document will serve as your Service Provider Letter as required by Resolution and Order 19- ,Section 3.02.1,as amended by Resolution and Order 19-22.All required permits and approvals must be obtained and completed under a licable local,State and federal law. X[ Based on review of the submitted materials and best available information the above referenced project will not significantly impa the existing or potentially sensitive area(s)found near the site. this Sensitive Area r're-screening site Assessment does NOT eliminate th- need to evaluate and protect additional water quality sensitive areas if they are subsequently discovered.This document will serve as your S•rvice Provider Letter as required by Resolution and Order 19-5,Section 3.02.1,as amended by Resolution and Order 19-22.All required ••rmits and approvals must be obtained and completed under applicable local,state and federal law. ❑ THIS SERVICE PROVIDER LETTER IS NOT VALID UNLESS CWS APPROVED SITE PLAN(S)ARE ATTACHED. ❑ The proposed activity does not meet the definition of development or the lot was platted after 9/9/95 ORS 92.040(2). NO SITE , SESSMENT OR SERVICE PROVI ER LETTER IS REQUIRED./ � Reviewed by i� � 4^- Date 3/26/21 Once complete,email to:SPLReview5lcleanwaterservices.org • Fax: (503)681.4439 OR mail to: SPL Review, Clean Water Services,2550 SW Hillsboro Highway,Hillsboro,Oregon 97123 Main Office • 2550 SW Hillsboro Highway • Hillsboro. Oregon 97123 • p: 503.681.3600 f: 503.681,3603 • cleanwaterservices.org Washington County, Oregon (OR067) Washington County, Oregon (OR067) Map Unit Acres Percent of Symbol Map Unit Name in AOI AOI Pa• 11C Cornelius and 0.4 100.0% Kinton silt loams, 7 to 12 percent slopes Totals for Area of 0.4 100.0% Interest