11/19/2002 - Packet Intergovernmental Water Board Meeting
Serving Tigard, King City, Durham and Unincorporated Area
Tuesday, November 19, 2002
5:30 p.m.
1. Call to Order/Roll Call and Introductions
Motion to call meeting to order, staff to take roll call.
2. Approval of Minutes—August 14, 2002 and October 15, 2002
Motion from Board for minute approval.
3. Assistant PWDirector's Utility Report—Dennis Koellermeier(15 minutes)
a. Rate Study
b. CIP Update
4. Informational Items
Items will be discussed briefly if time allows—otherwise printed info will be distributed.
5. Public Comments
Call for any comments from public.
6. Non Agenda Items
Call for non-agenda items from Board. Neat meeting date Jan. 21, 2003, at Water Auditorium.
Z Adjournment—Approximate time 6:30 p.m.
Motion for adjournment.
Move to Town Hall for joint workshop meeting with Tigard City Council.
A light dinner will be provided.
Executive Session: The Intergovernmental Water Board may go into Executive Session under the provisions of ORS
192.660(1) (d), (e), (1)&(h)to discuss labor relations,real property transactions, current and pending litigation issues and
to consider records that are exempt by law from public inspection. All discussions within this session are confidential;
therefore nothing from this meeting may be disclosed by those present. Representatives of the news media are allowed to
attend this session, but must not disclose any information discussed during this session.
Intergovernmental Water Board
Meeting Minutes
August 14, 2002
Members Present: Bud Wilkinson, Patrick Carroll, Bill Scheiderich, Norm
Penner, and Joyce Patton
Staff Present: Ed Wegner, Dennis Koellermeier, Tom Imdieke, Kathy
Kaatz, and Richard Sattler
Visitors: Roel Lundquist, Paul Owen, Mrs. Wilkinson, and Brian
Moore
1. Call to Order, Roll Call and Introductions
The meeting was called to order at 5:30 p.m. Patrick Carroll arrived late at 5:45 p.m.
2. Approval of Minutes— July 10, 2002
Commissioner Joyce Patton requested editorial changes to the statements she made
regarding the Proposed Bull Run Drinking Water Agency in clarification of what was
intended. The changes begin in page 2 starting with the first full paragraph and are as
follows:
"Commissioner Joyce Patton continued by stating that there has been an underlying
concern to slow down the process, to be deliberative and not jump to conclusions. The
governance discussion would help create the process slow down. The PSC meeting had
lengthy discussions regarding the governance issue. For example, the representative
from the Tualatin Valley Water District had differing personal opinions from some other
TVWD Board members. Following a recess for TVWD to caucus, one motion was
proposed and failed, and a second motion was unanimously adopted to move forward
with an ORS-190 agreement as the focus of governance.
"Commissioner Saltzman has been placed in charge of the Portland Water Bureau instead
of Commissioner Sten and he attended the PSC meeting for the first time. He remained
neutral through most of the discussions, however did vote in favor of continuing. The
members are ready to move forward.
"Mr. Wegner added that Commissioner Saltzman was given this new appointment without
the benefit of orientation from Commissioner Sten and was somewhat uncomfortable
because of that. However, Commissioner Sten has since spent a lot of time bringing
Commissioner Saltzman up-to-date on the issues. Commissioner Saltzman has indicated
he is comfortable in proceeding with the timeline and is in favor of transferring all of the
Water Bureau, including the distribution functions. All indications show that momentum
will not slow down during the transition time."
Intergovernnmental Water Board 1 August 14,2002
DRAFT COPY
Commissioner Patton motioned to approve the minutes as changed for clarification and
Commissioner Norm Penner seconded the motion. The vote to accept minutes with the
changes presented was unanimous, with Bud Wilkinson abstaining.
Ed Wegner announced that Councilor Joyce Patton was moving to Beaverton and would
no longer be representing the City of Tigard at the IWB and regional water meetings. He
introduced Brian Moore as the new Tigard City Council liaison for water issues and he
would be the IWB representative. Commissioner Patton added that it was appropriate
for Brian Moore to serve as liaison as he has been on the Council for many years and is
familiar with Tigard's 'water woes'.
3. Document Review— Tom lmdieke/Dennis Koellermeier
Tom Imdieke introduced himself as Financial Operations Manager for the City of Tigard
and was there to explain the significant changes/revisions and updates to the Tigard
Municipal Code.
• Section 12.03.030 (e)—The existing practice is that if a customer does not pay a bill
by 10:00 a.m. on "shut-off day", the water will be shut off. Presently there is someone
on staff until 7:00 p.m. to answer the telephone if someone wants their water turned
back on after normal business hours and pays the additional $100.00 charge. If they
pay after 10:00 a.m. the charge is $50.00. There are 17,000 customers that generate
102,000 bills annually and of those, only 16 times have customers called after hours
to request their water service be turned back on. It is being recommended that the
practice be discontinued. The City has maintained the operating costs of staff time
after hours and Public Works staff is called in to turn on the water service after hours
at a time and a half rate. The majority of other jurisdictions surrounding us have also
discontinued the practice.
• Section 12.03.030 (f)—Meter Disconnection Charge— If a customer physically
disconnects their meter, there will be utility charges, water disconnection charges and
meter disconnection charges. This change is to clarify understanding within the code.
• Section 12.03.050 (b)— If repairs or replacements are required, the property owner
will be charged and not the initial purchaser.
• Section 12.03.060—Routine adjustments to accounts will be reported to the IWB each
month upon their request. Other changes to this section deal with raising the
authorization levels for administrative adjustments (miscalculations, reading errors,)
from $50.00 to $250.00 for the Finance Director, from $250.00 to$500.00 for the City
Manager, and anything above $500.00 would go before the IWB for review and
consideration.
• Other changes to clean up the wording by changing USA to Clean Water Services
and City Administrator to City Manager.
These changes are on the City Council's agenda for August 27th. Mr. Wegner added that
the Council would adopt these code changes based on the IWB's recommendations and
the changes would go into effect in all affected communities (King City, Durham).
Mr. Imdieke continued with the Resolution amendment of fees and charges.
Intergovernmental Water Board 2 August 14,2002
DRAFT COPY
• Resolution 02-06—Exhibit A—Fire Hydrant Usage— Temporary- Rates have not
been formalized and this will include them in the fees and charges. The rate for fire
hydrant usage will be changed from the commercial rate to the higher irrigation rate,
which will more appropriately cover current costs. Meter Disconnection—Will now
include a 10% administrative cost. Meter Out-of-Order Test—This establishes the rate
for the first time and will include calibration, actual labor and material costs, and 10%
administrative costs. Water Main Extension—Designed and installed by others—This
formalizes the rate that has always been used at that level.
Dennis Koellermeier presented items that affect Public Works more than the financial
side of things. New language is used to align the code to current practices and also has
suggested deletions of things that are no longer done.
• Section 12.10.030—The meter size language was outdated and the plumbing division
now determines the size on a fixture count basis. This change aligns the code into
consistency with the plumbing code for the State of Oregon. This section also adds
the provision allowing the installation of water services by the developer as part of the
subdivision improvements.
• Section 12.10.040— Language changes and the creation of a new section to better
address master metering.
• Section 12.10.045—Master Metering - Typical applications are for condominiums on
private streets dealing with homeowner associations as the responsible party. The
new section allows for better flexibility keeping the costs down for Public Works and
the developer.
• Section 12.10.060—Service Pipe Standards and Maintenance—Changes to language
dealing with plumbing codes.
• Section 12.10.080—Jurisdiction—Clarification of Public Works operating facilities.
• Section 12.10.140—Temporary Discontinuance of Service—Language clarifications
dealing with fee changes.
• Section 12.10.160—Service Connection Maintenance—Added language clarifying the
right to access of meters by City staff, the City's liability and recovery of charges
related to clearing the area.
• Section 12.10.220—Fire Hydrants—This section was deleted as these practices are
no longer performed.
• Section 12.10.240—Illegal Use of Fire Hydrant or Meter—Cleaned up the language
and linked it into the civil infraction process.
Commissioner Bill Scheiderich requested clarification about the master meters. Mr.
Koellermeier explained that the concept of a master meter would be to add up all the small
users and size the meter accordingly. The homeowner's association could sub-meter to
deal with their equity of the meter. Different cases have varying scenarios but this section
assures that a responsible party covers costs.
Intergovernmental Water Board 3 August 14,2002
DRAFT COPY
Commissioner Scheiderich asked what type of emergency situation availability the City
had set up. Mr. Koellermeier explained that the City has trained Public Works staff
available 24-hours a day to deal with shut-off problems or any other emergency situation.
Ed Wegner requested a motion to approve the Resolution and two changes to the Tigard
Municipal Code.
Commissioner Patton motioned to approve the changes to the Municipal Code 12.10,
Resolution 02-06, and Ordinance 12.03, and Commissioner Norm Penner seconded the
motion. The vote to accept the motion was unanimous.
Dennis Koellermeier added that procedurally as follow up, changes to the Rules, Rates,
and Regulations would be brought back, mirroring the language for the effected Tigard
residents and represented water area.
4. Proposed Bull Run Drinking Water Agency— Ed Wegner/Joyce Patton
Ed Wegner reported that they received the Principles of Agreement at the last meeting
(that information was forwarded to IWB members) and was being reviewed by all
agencies. Any comments should be directed to Commissioner Joyce Patton. Dennis
Koellermeier and Commissioners Patton and Moore will be attending a public hearing
next week on Thursday to receive input.
By taking another month for review and deliberation of the Principles of Agreement, the
final report would not be adopted by the Policy Steering Committee (PSC) until
September, which will push back that report to the IWB into October.
Also during the last month, three public meetings were held in the cities of Gresham,
Tigard and Portland. Tigard's meeting received the most participation, but that was
primarily by staff and elected officials and about six interested members of the public.
There were very few questions asked at the meetings and to date, no comment cards
have been received from the open houses. Next week's Thursday meeting will be taped
by Multnomah County Cable TV who will be doing a feature story and they will hopefully
make that available to Clackamas County and Tualatin Valley Cable TV channels.
Members of the PSC and Technical Advisory Committee (TAC) attended the Water Spot
(Citizens for Safe Water) live television broadcast several weeks ago. Those who attended
thought it was a good experience.
Two of the technical memos have been approved by the TAC and are to be forwarded to
the PSC for consideration. The meetings have had a few heated discussions about
money, asset values, directions in voting, and what is to be included/excluded. The TAC
report will probably say that there are still unanswered questions, but it will also provide
the 13 participating agencies with good information to base decisions on for future
consideration of participation in the Proposed Bull Run Water Agency. More money will
be involved if it is decided to continue, appraisals of the assets may be required, and an
outside consultant may be brought in to analyze the pros and cons.
Commissioner Patton reported that Commissioner Saltzman and Eddie Campbell were
speaking with all the PSC members on an individual basis. She made it clear to them
about concerns regarding the financial issues, the change in Portland's Commission
Intergovernmental Water Board 4 August 14,2002
DRAFT COPY
representatives in mid-stream, and the need for getting the numbers out very soon. She
said some jurisdictions will make speedy decisions after receiving the report.
Mr. Wegner added that Portland provided some preliminary numbers on Monday, but
those numbers have not been analyzed yet. Attempts are being made to set up a meeting
to discuss the wholesale contract with the City of Portland on September le. It is
anticipated that some agencies will make decisions quickly and decide to stick with the
wholesale contract and not participate in the new agency as a partner. It will be very
costly to participate, but the value may be worth the money. The overall value needs to be
measured carefully and Tigard will have to look at all the options.
Commissioner Patrick Carroll said the wholesale contract should be available to compare
as an option.
Mr. Wegner said the decision would be difficult because the comparison will be between
apples and oranges. There will be political and financial aspects to compare as well as
consideration as to where Tigard wants to be in the future with the water issue. The
decision will have to be made on the information available and will be a gamble no
matter what direction is chosen.
Commissioner Patton stated that the regional process has been good in that it has held
Portland accountable for providing information they have never been willing to discuss
until now, it has allowed the development of relationships with surrounding jurisdictions
and has strengthened and united the groups on the west side. Tigard will not be the first
to make their decision and will be able to observe the reactions to other's decisions.
It may be beneficial to continue our participation in the regional negotiations or combine
with our surrounding jurisdictions in order to formulate a unified strategy on how to
proceed. This process has shown that there is strength in numbers. The purpose of the
regional process has been to determine whether it is feasible to create the new agency.
Portland cannot afford to have a lot of negative public relations at this point. A lot of the
issues being brought to the table are from Portland citizens about Portland issues that
will have to be dealt with no matter which direction the regional agency takes.
The report will address issues that the City of Portland will have to respond to such as the
charter changes and legality of governance. On Monday Commissioner Saltzman stated
that Portland holds all the water rights and they will probably keep their name on the water
rights because of the congressional authority they were given with those rights. However,
he indicated they will proposed to assign, pledge, or give full rights and privileges to that
water to the new agency at no charge, with the understanding that the water rights
charges will be recuperated from the O & M costs and other costs associated with the
assets of the system. Mr. Wegner said he thought there would be a rather large
contingency of Portland citizens that will not want to give up their water system.
It has been questioned as to what Portland will do with the money they receive from the
participating entities and Portland has indicated they will put it into their distribution
system. Portland has stated they need $400 million worth of improvements to their
distribution system and they appear to be willing to sell part of their assets to pay for fixing
the distribution system.
Intergovernmental Water Board 5 August 14,2002
DRAFT COPY
Mr. Wegner reported briefly on the Tualatin River Basin Study and said that next month he
would be reporting in detail about it. He said that it would cost more money to proceed in
that direction. The progress reports are slow, but cohesive in that there are not the political
issues with the agencies involved and all the member agencies are working together to
accomplish a positive outcome. Due to federal issues dealing with security, the Bureau of
Reclamation (BOR) has had funding cutbacks and the support and commitment that was
hoped for from them has been slow in coming. It would cost Tigard an additional $80,000
to continue, but that would be worth it if the damn is built. Mr. Wegner will discuss the
additional funding proposal at the September IWB meeting. Technical reports will also
soon be ready for presentation. He reiterated that the progress has been slow, but
deliberate and cooperative in its coordination.
5. Assistant PW Director's Utility Report— Dennis Koellermeier
ASR—Water has been pumped from the well since July 5"'without any problems. The
well has been producing 700 gpm and even though we know it can produce more than that,
for good data-stream throughout the completion of the pilot program, we have been asked
to stay at that level. The summary report of the ASR project will be ready in October or
November and at that time a decision will need to be made as to how to proceed.
Beaverton Intertie —The piping work is completed and we are now in the testing phase.
Switches will be flipped in about 30 days.
Mr. Koellermeier said he would be presenting a revised CIP schedule next month
reflecting the necessary changes to accommodate the school district reservoir project.
The (RFP) Request for Proposal will go into process within the next few weeks.
Rich Sattler reported on the Summer Operation Plan. With the higher temperatures,
demand has also been up and that has stressed the system and required optimizing of the
system. There have been a few days that we have reached 12.5 mgd, which causes us to
be more vulnerable.
We have been utilizing the system more with storage that we have. The current water
supplies come from the City of Portland, Tualatin Valley Water District, and Beaverton and
today we started using the City of Tualatin connection. The ASR water has been very
productive and so has Well#2.
The conservation message still continues to promote the even/odd watering of one-inch
per week as well as the rebate program. The projected weather trend will allow us to get
the upper hand again.
6. Informational Items
Informational items were distributed for review by the Board Members. Mr. Wegner
encouraged Board Members to read the Regional Water Supply Plan newsletter update,
complete the conservation survey and mail it in.
7. Public Comments- None
8. Non Agenda Items- None
Intergovernmental Water Board 6 August 14,2002
DRAFT COPY
9. Adjournment
The next IWB meeting is scheduled for September 11"' and Mr. Wegner explained that
there are several memorial functions planned throughout the area that evening as well. It
was discussed and recommended that the IWB would still meet that evening but plan to
adjourn no later than 6:45 p.m.
Commissioner Patrick Carroll motioned to adjourn the meeting and Commissioner Joyce
Patton seconded the motion. The vote was unanimously carried and the meeting was
adjourned.
Intergovernmental Water Board 7 August 14,2002
DRAFT COPY
Intergovernmental Water Board
Meeting Minutes
October 15, 2002
Members Present. Patrick Carroll, Norm Penner, Brian Moore, Jan Drangsholt
and Bill Scheiderich
Staff Present: Ed Wegner, Kathy Kaatz and Richard Sattler
Visitors: Roel Lundquist, Paul Owen
1. Call to Order, Roll Call and Introductions
Commissioner Patrick Carroll called the meeting to order at 5:30 p.m. Commissioner Bill
Scheiderich arrived late at 5:40 p.m.
2. Approval of Minutes—August 14, 2002
Patrick Carroll requested that the minutes from the August 14, 2002, meeting, which
were distributed in the September packet, be distributed again for review and that
consideration for approval be addressed at the Intergovernmental Water Board meeting
in November.
3. Credit for Water Leak, Section 12.10.070— Rich Sattler
Rich Sattler indicated that this item was an "housekeeping" issue that was overlooked
when the Tigard Municipal Code was revised. The IWB is to set the amount that is used
for the credit relief form used by customers who have experienced a leak and request a
credit. Historically staff has set the amount in-house based on the highest rate that
Tigard pays for water. This year the amount is $.927 per ccf.
Commissioner Jan Drangsholt moved that the Intergovernmental Water Board establish
the rate of$.927 per ccf for the fiscal year 2002-03. Commissioner Norm Penner
seconded the motion. The vote was unanimous to accept the motion.
Ed Wegner indicated this motion would set up policy to be in compliance with the code.
4. Request for Credit— Scholls Car Wash — Rich Sattler
Mr. Wegner requested that this item be postponed for another month so that staff could
investigate the situation more fully. He and Rich Sattler have been reviewing the
circumstances with the water user to find answers to the problem.
Intergovernmental Water Board 1 October 15,2002
DRAFT COPY
5. PW Director's Utility Report- Ed Wegner
Schedule Revisions - Mr. Wegner reviewed the memorandum that Dennis Koellermeier
sent to IWB members about the changes in meetings scheduled for the next few months.
The IWB will be meeting in combined sessions with the Tigard City Council on the 3I
Tuesday of each month through February and possibly March. The IWB will briefly meet
prior to that joint meeting at 5:30 p.m. in the Water Auditorium and adjourn by 6:15 p.m. to
go to the Council meeting, which begins at 6:30 p.m. There were no objections from
members of the board to the suggested schedule changes.
Beaverton Intertie - Beaverton Intertie—The work has been completed on the Intertie
and Tigard has taken approximately 2 mgd from the Joint Water Commission connection.
The total costs are still being tabulated, but it appears to be near the budget estimate.
ASR—Water has been withdrawn from the aquifer since July 9 and 90 mg of water or
about 90% of the water placed in the aquifer has been removed to date. The
withdrawals will be discontinued next Monday, October 21. Monitoring will continue on
the well levels throughout that area and the final report from Montgomery Watson Harza
is due in mid-November.
There were no complaints from the water users during this test period. Samples of the
water were used in a taste test that Clackamas River Water District was conducting and
the results were very favorable. All in all the project has been successful. After
receiving the report, the next step will be to decide how to continue with the project.
Commissioner Carroll asked if a silt monitor was installed and Rich Sattler indicated that
it would be done prior to the next injection of water. Mr. Sattler also explained that there
was some fluctuation when putting the water in the ground as well as when taking it out,
however neither process has affected other's wells. He stated that it has been estimated
that the capacity of the aquifer is 4 billion gallons or about 1.5 year's worth of water.
Mr. Wegner said that the consultants will advise as to whether another well should be
drilled in the same general location or if another location should be looked at for a
second well. The two consultants that are reporting on the ASR project are
Groundwater Solutions and Montgomery Watson Harza, however a third opinion may
also be sought.
Commissioner Carroll asked what the pumping capacity was for injecting water into the
aquifer. Mr. Sattler said that there is the ability to inject 1000 gpm, however only about
700 gpm would be injected. The theory behind using the slower injection rate decreases
the probability of pushing particles further into the system.
Mr. Wegner stated that the consultants have also recommended that routine back flushing
be performed on the filtering system, which would ensure a higher level of efficiency. The
ASR has permitted Tigard to double the water capacity and allowed for .5 mgd that did not
have to be purchaseu.
Intergovernmental Water Board 2 October 15,2002
DRAFT COPY
Commissioner Scheiderich asked if Tigard was working on any joint ASR projects with
Beaverton and Mr. Wegner said that it was too soon for that, but possibly would look into
that for Wells 3 and 4.
Portland charges Tigard $.01 per hcf for the water injected into storage, then Tigard pays
them $.45 hcf to withdraw the water.
Conservation —A rebate program was initiated this year for conservation materials.
There were 22 people who participated in the program for a total refund of$626.78.
The conservation calendar contest was successful with the schools and 2003 calendars
have been distributed at schools again. Calendars are also available to anyone who
wants a calendar.
6. Informational Items
Informational items were distributed and briefly reviewed.
7. Public Comments— None
8. Non-Agenda Items
Commissioner Scheiderich asked for an update on the excess property at the Menlor
Reservoir (Clute Property). Mr. Wegner reported that the sale of the property was
executed at$290,000 and was purchased by one of the neighbors to that property. He
intended to build onto his residence and was going to talk with some of the other
neighbors about selling off part of the property to them if they wanted to make a park area.
Mr. Wegner said that the City Council and school board met last week about the Rider
school property. The school board anticipates having the school open in September 2004.
Changes to Tigard's CIP will be needed to get the reservoir project underway. Tigard will
not have all the money to finance the project and will need to get water service area bonds
for a few million dollars. The reservoir will store 3.5 mg of water. The preliminary design is
not available yet, but the conceptual drawing is. The next 18 months will involve the
reservoir construction project, which is anticipated to be completed in Spring 2004.
The school board will begin their construction project with the replacement schools on their
properties (C.F. Tigard, Metzger and Tualatin Elementary schools) before beginning Rider
School.
9. Adjournment
The meeting adjourned at 6:00 p.m. and the next Intergovernmental Water Board meeting
is scheduled for Tuesday, November 19, 2002.
Intergovernmental Water Board 3 October 15,2002
DRAFT COPY
Intergovernmental Water Board Meeting
Informational Items Supplement
November 19, 2002
• "Federal agency won't waive Bull Run treatment standard", October 4, 2002,
Oregonian article
• October 21. 2002, Ictt,?r to the ration's Office of Management and Budget
from United States Congressional Representative David Wu, Senator Ron
Wyden and Senator Gordon Smith regarding the water needs in the Tualatin
Basin area
• "USEPA denies LT2 waiver to Portland Water Bureau", article in AWWA
Waterweek, October 23, 2002
Press release from the City of Portland dated October 24, 2002, Fall Color in
Drinking Water
• Oregonian article, Three members quit board of utility watchdog
• 'Decision on water study flows to SW metro cities", October 31, 2002,
Oregonian article
• 2001-2002 Demand and Consumption Information and Wholesale Customer
Consumption Statistics from the City of Portland, Bureau of Water Works,
October 31, 2002
S
Page 1 of 2
V `` to w55e!
» More From._The Oregonian
Portland News
Federal agency won't waive Bull Run treatment standard
10/04/02
City Commissioner Dan Saltzman had asked the U.S. Environmental Protection Agency in August whether a
In its exp,acted rule targeting the cryptosr--rir:1um
The parasite killed more than 100 people and sickened 400,000 in
Milwaukee, W is., in 1993. That prompted the push for increased •From Our Advertiser
federal regulation.
t happens next?
In June, a Bull Run treatment panel voted to endorse membrane whatha
filtration as the best way to remove microbes while filtering out mud
that periodically shuts down the system.
That option would cost $202 million, boosting city water bills by one
estimate from 12 percent to 30 percent. The panel chose the $202
million option over ultraviolet light treatment, which would cost$55
million. anticipate your financial future -
Dissent on the panel came from Jay Formick, a member of the find the tools at vdww.1 sttech.cam
Portland Utilities Review Board. Other review board members said
cryptosporidium is rare in the two Bull Run reservoirs and that first Tech
LttOUMbk
treatment would bring little or no health benefit.
"The risk is not even measurable in my opinion as a
microbiologist," board member Scott Fernandez said Thursday. "I
don't think the issue is over by any means. You're going to be
hearing from people who are concerned about the cost of
treatment of water that's next in purity to rainwater."
The review board had urged the city to seek a waiver from the regulations.
Saltzman, who oversees the city Water Bureau, heard back this week that the federal agency will not grant
waivers. The agency does not think it possible to adequately measure the microbe in drinking water. Without
that capability, the agency said, it can't determine whether Bull Run meets national standards.
"I do not believe it is practical or prudent to argue this point with the EPA,"Saltzman wrote colleagues on the
City Council.
Saltzman, who has not decided which treatment method he favors, wants to holds a council work session this
winter to discuss treatment options.
10/21/2002 12:10 FAX REED SMITH U002
10/21/2002 11:12 FAIL Q002
(gMTgrFsr. of fpji� C*fat o
�� � SOI 2t1�1.n
October 21,2002
The Honorable Mitchell Daniels
Director
Office ofManagement and Budget
Washington,DC 20503
Dear Director Daniels:
We are writing to seek your support in addressing a problem of great 1=4)ortance to the Portland
metropolitan region—limited water resources in fe Tualatin Basial_ The need for adequate
an ter"in our region is critical to the economic and euviroutnental health of our communities. To
this and,-we request flat the FY 2004 Bumat:of Rcclamatiom(DOR)lrn6ge inalude$2.9
million to f and an Environmental Impact Statement/Planning Report(EIS)for the Tvalattin Basin
Water Supply Parmersbip.The total cost to prepare the EIS is$635 million,of which a total of --
$2.9 million is requested fromthefedeirat'govcramcn�-Thi majon�y of the funds willbe"
provided by the local partners.
The daamds for the water in the Tualatin Basin will soon outdistance the ewrent supply. The
Tualatin River watershed contains the rapidly growing urban portion of Washington County,
which includes the cities of Beaverton,Banks, Cornelius,Forest Grove,Hillsboro,North plains,
Sherwood,Tigard and Tualatin. This area,home to approximately 450,000 people,almost
doubled in population during the last 20 years, and this trend is expected to continue.
It is estimated that by the year 2050,the water needs of the Tualatin'Basin will double. Water
suppliers will be unable to meet public water supply needs unless additional sources are available
by 2012. Additional water will be needed to accommodate changes in local agriculture and to
restore fish habitat as a result of the Endangered Species Act(ESA).Because the Tualatin River
and its ttbutaries are considered water quality-limitrA under the federal Clean Water Act,
additional supply is needed to restore river flow and improve water quality.
Responding to a severe water shortage in the Tualatin Basin in 2001,the cities in the basin,as
well as the Tualatin Valley Water District and Clean Water Services pooled$734,000 to fn>m the
TValatin Water Supply Feasibility Study Partnership. This study centers on finding an additional
50,000 aeric-feet of water for the Tualatin River Basin and identifies the expansion of Hagg Lata
as Qne of the potentially feasible alternatives_ Developed in 1975,Hagg Lake has been a major
source of water supply in the Tualatin basin for municipal and industrial needs,irrigation,fish
habitat and river flow restoration,but its capacity(53,000 acre-feet)is no longer sufficient.
With S2.9 million in the President's FY 2004 Budget to fund this EIS,the Portland Region can
take the critical first steps in resolving the water resource challenges we are facing.
Thank you in advance for your consideration.
Sincerely,
RON WYDEN GORDON SMITH D WU
United States Senator United Stags Senator Representative
PPoNTEL'ON RECYCLED PAPER
. rllu!`Wt IVAI.hs
.4Y3
USEPA denies LT2 waiver
to Portland Water Bureau
USEPA has denied a waiver to the city of Portland
(Ore.)Water Bureau(PWB)regarding treatment of its
unfiltered Bull Run water supply for the forthcoming
Long Term 2 Enhanced Surface Water Treatment Rule
(LT2)<www.epa.gov/safewaterA[2/st2eswir.html>.
USEPA expects to propose the new rule by mid-2003 and
finalize it a year after that.
Rosemary Menard, PWB water resources director,
said the waiver was requested after a citizens'panel,
which was convened nearly two years ago to look at
different treatment options for the LT2
<www.bullrun.ci.portland.or.us>,recommended such
action."Our panel was generally underwhelmed by the
evidence that Cryptosporidium was a significant health
risk," Menard said."Some panel members and others on
the city's Utilities Review Board recommended that we
pursue a waiver from the requirements."
In looking at the available treatment technologies, the
panel considered four options: ultraviolet(UV)light,
ozone,direct filtration and membrane filtration,
ultimately deciding on membrane filtration.A new 250-
mgd membrane filtration plant would cost$202 million
and increase water bills by one estimate from 12 percent
to 30 percent.
USEPA's explanation for the waiver denial, Menard
said,was that no waivers for the forthcoming rule are
being considered for any water system.
1109
QORT'^Na Dan Saltzman, Commissioner
CITY OF Morteza Anoushiravani, P.E., Administrator
z 1120 S.W. 5th Avenue
PORTLAND, OREGON Portland, Oregon 97204
Information(503)823-7404
Fax(503)823-6133
BUREAU OF WATER WORKS TDD (503)823-6868
1861
For more information, contact
Ross Walker: 503-823-7500
October 24, 2002
Fall Color in Drinking Water
City of Portland water customers may have noticed a slight color change in the drinking water at
their tap in the last few days. This change in color is typical for the Bull Run supply during the
fall. This is a normal, seasonal variation in our unfiltered water supply.
The pale tint is due to the seasonal lowering of reservoirs in Bull Run. We start each summer
with the reservoirs brim-full, and then use from this stored supply until the rains come again in
the fall.
As a result, the two large lakes that are the Bull Run reservoirs are lower in the fall than at other
times of the year. Streams flowing into the reservoirs travel farther along the creek beds to reach
the reservoirs, running through sediments that are not exposed in other seasons. This can add
color to the water.
Current reservoir levels are normal for October.
"We get a few calls about color every fall," acknowledges Mort Anoushiravani, Water Bureau
Administrator, "but the color only afrects the appearance of the water, it does not affect the taste
or the quality. Our water continues to meet all state and federal standards for safe drinking water.
We monitor routinely for all water quality standards. It's likely we will continue to see some
color in the water until the rains refill our reservoirs in the coming weeks. As fall progresses, we
will monitor the reservoirs closely and make operational adjustments to minimize the color."
An Equal 0ppor- tunitY Employer
's
s<�NWf41N�+a.-. _. _. ... ..1vLUYlti.'RnW/ .. ......... ....... . ..,. .... . .. .. .... .,.. .. .. .... .... ..
PORTLAND
tc do
� watchdog
of utThree metuberquit board
.
pursuing narrow interests, though Ai is a strategic move to force City Hall to take this come to grips eventually with citi-
each gave differing reasons for issue u We were just s0 -castrated and none of us zen reaction to rate increases,'
The departure of the P• J'`"
their decisions. Gleason said. "I would hop to se,
chairman and two others, wanted to be left alone to deal with this situation." something with more clout
Each said the resignations emerge."
Who cite ft-castration, leaves should touch off overdue discus-
the panel Without a quorum sion about the board's future as an JAY FO Reasons for the board
PORTEND UTILITIES REVVIEWIEW BOARD
advisory body to the City Council. OARD h[EMBER
Water Bureau director Mort
By HENRY STERN - Anoushiravani said he does not
THE OREGONIAN "It's a strategic move to force want the board to die.
City Hall to take this issue up,"For-
John Wish and Scott Fernandez, lette Rossi strongly disputed any
The chairman and two mem- mick said. "We were just so fins- "There's a legitimate reason to
bers of the board that watchdogs trated, and none of us wanted to say weighing in strongly on broad- characterization that the board is reviews
er topics is a must-do role to en- dysfunctional. Both said Monday have an advisory body that.
Portland's utility rates resigned be left alone to deal with this situa- g rates and advises council,"he said.
Monday in frustration over the � sure ratepayers aren't beim that differences should be ex-
y tion.' ected on an board. "What they do and how they do it
panel's direction and personality gouged. p y matters."
conflicts. "I sure don't want to be the ring- "When we were formed, we
master,"Gleason said. Board members in recent Sten and Commissioner Dan
b chairman months have taken vocal stances were to be an advisory group for
The resignations
y The volunteer board, created in on billing problems that emerged City Council," Rossi said. 'Over Saltzman said the mayor and
Jim Abrahamson,vice chairman g p g e council need to step in.
time,we saw ourselves beccme th
Chuck Gleason and member Jay 1994, has been split for some time at the Water Bureau under Com- ratepayers' advocate. I think it's e
Forn ick reduce the Portland Utili- over its role on ratepayers behalf. missioner Erik Sten.Members alsoSaltzman,who now over ees the
ties Review Board to less than the Some members,including Abra- have raised questions about possi- wonderful thing. bureaus the board watchdogs, de-
eighi members needed for a quo- hamson, think that the advisory ble regionalization of Portland's Gleason said the board needs a scribed the boards evolution as
FUM. board has gone beyond a core mis- Bull Run water supply and the stronger role in rate-making rather mission creep.'He said thi coun-
sion of anal water,sewer and need for safety treatment of that than just giving advice on already cil needs to screen appointees bet-
Unfilled vacancies had already solid-waste rates. watef. reached rate decisions. ter.
reduced the 15-person board to 10Sten said the board has become
before Monday's announcements. Some say board dysfunctional Abrahamson said the board He also said the advisory board's
cannot go on paralyzed by person- work goes for naught with City more political and less credible.
Mayor Vera Katz said she was Top officials with city bureaus ality conflicts. Council and utility bureaus. He "If I were mayor, I would shut it
disappointed by the resignations say the board has become dys- thinks the citydoes not want a
and would fill the slots as soon as functional and bogged staff down "We've got some individuals down and redo ay " Sten said. 'have
possible.The mayor appoints, and with information requests.Former that are pursuing more of a per strong board and has severely un- the end of the day they don't have
q derstaffed the panel. a clear mission."
the City Council confirms, mem- board chairman Douglas Morgan somal agenda than acting as ahigh-
bers to the board. has urged the board to stick to its level advisory board to the coup- The city's annual cost to provide
knitting. cil,"Abrahamson said. staff support is$36,810.
The three resigning members all Henry Stern:503 294-5988;
said thev are tir�i of colleagues Other board members, such as Wish and board member Pau- "The city is going to have to henrystern@news.oregoniait.coin
J'
$ 3M SW-T THE OREGONIAN s THURSDAY_OCTOBER 3?_002
Decision on ---- � �--- . _ _
Water'.* Next ste takes cities financial contributions
water studyp
Continued from Page 1 decisions that need to be made by off any options,Scheckla said. to what well spend, but 1 don't said."But asking me to pay to get it ity.
flows to SW
April 2004. "1Ne're not ready to commit to know how much that is.Until we to your customers is quite anoth- "People obviously need to keep
sources include enhancing facili- Tigard any one water source yet,"he said. get there,well move forward." ec" their options open," he said.
metro cities ties at Hagg Lake and,even longer- the ion run, Tigard mi "Our only goals here are to get Tualatin now receives most of its Mark Knudson, the Portland "There are a lot of questions f)oat-
term, siphoning water from two g g might long-term assurances of water at water through a long-term whole- Water Bureau's operations and mg around out there.Our job now
Coat Range rivers,the Wilson and have the most to gain from Sten's the best price we can." sale contract with Portland. is to get people the infomnation so
the Trask- proposal in terms of reliability of Tualatin maintenance director, said he theycan start toanswer them"
Tigard and Tualatin,and be
Approval now means participat-to help 11- mosPtl complet completely oncity relies al-purchasesof In Mayor Lou Ogden's vision, Sherwood, for reasons, is worked out hopes all as eissues partic participants
g ance the plan's nons ext phase.That water from Portland to augment its the planning now will result in a not among the participants in the ahead to the third and final phase Dana Timm:503-294-5973;
�na�y6e S_herWpodla er be P P
" " y includes an in-depth examination meager wells. very different landscape for region- current planning process. of creating a regional water author- danarinu@newm.oregon an.com
parhlerS WItl1 Portland Ina of ibe regions water concept and Council members have already wide water supply in decades The first is its size. With only
held one workshop on the propcs- ahead.
regional Water system sets out the next steps,estimated about 13,500 residents,the city n
costs and a schedule to make the al.Another is scheduled for chain-
"Somewhere down the road— too small in terms of population
agency a reality. p.m.Nov.19 in the council chain- and it may take 50 or(i0 years—I and bud et capabilities to join the
By DANA TIMS g cY tY• g P 1
rtre oaecorttnrt ! The projected to term costs bars at City Hall Another is ex- think you'll see at feat two major study group.
T?(iPRn—Darin its 5rst cenhry s a ares peri Portland long-term
sus Pied in January,with a final deci- water sources serving the area, •he second reason, a plentiful
soTIGARurcO dr skirt Bits Btt'Rratiny as
rPautaan n s the tem :;il ;ion,,h dule-1for'reb.:rnry. OgBeu said."MayL•.even t~aee if supply of its own water,wriotmts
g Y Councilor Ken Schecida,whose the technology is developed to deal to a I otherparticipants don't
Portland's thirst a the city grew from a need nearly half a billion dollars' term ends in December,predicted with the Willamette River." luxury
modest riverfront enclave to prominent ! worth of improvements in coming that Tigard would follow Beaver- For now Tualatin,like Tigard,is have. Sherwood's wells pump
West Coast hub. decades.That price tag will top the ton's lead in agreeing to chip-in prepared to participate in Port- enough water to meet roughly 85
Now,with a second hundred years on list of what area cities address as $25,000 to keep the study alive. land's and the Tualatin Valley percent of local needs, Mayor
the horizon,crunch time is approaching they ponder whether to move "That's just my opinion," he Water District'sefforts to expand Mark Cottle said.
or Tigard,Tualatin,Sherwood and other ahead with the groundbreaking said."But I think that within a year their sources,he said. He supports ongoing planning
rrbtrrban "We're going to move forward efforts but vigorously opposes the
cities considering whether to proposal. to 18 months,we'll see something
loin Portland as full partners in operating Here's a brief look at how issues finalized." with this study until it becomes notion that Bull Run can do it all in
Bull Run as a regional water source. are shaping up for southwest sub- Tigard,like many other partici- economically unfeasible for us to terms of the region's water needs.
Beaverton,one of 13 cities and agen- urban cities as they move toward pating cities,doesn't want to shut do so,"Ogden said."There's a limit "It sits next to a volcano,whose
cies studying the plan's feasibility,took neighbor has already blown up
an important first step last week when its once in recent years,"he said."We
City Council agreed to contribute don't know if it's five years away or
$25,000 to help finance the study group's 100,but we know Mount Hood is
next and final phase. going to erupt again sooner or lat-
Other jurisdictions,if they want to re- er.That's not the basket you want
main in the planning process,will be ex- to put all of your eggs into."
pected to contribute a like amount He also questions suggestions
At stake is the possible formation of an that Portland's new partners would
agency that would supersede the Port- have to share in the sky-high bill
land Water Bureau in overseeing collec- for renovating Bull Run's distribu-
tion and distribution of water from the tion system.
Bull run Rese.ve,locat d about 30 miles "If you want me to help pay for
east ofPottland near Mount Hood. new darns to increase storage ca-
I&.Sten,a Portland city commission- pacity, that's one thing," Cottle
er,first floated the idea in March 2001.
Creation of such an agency would allow
potential partners essentially to trade in
the 25-year wholesale water-supply
agreements they hold with Portland.
In return,new partners would get the
say and certainty in regional water policy
that many have long advocated.
Complicating,their decisions are on-
going efforts,led by the Tualadn Val.!y
Water District and Clean Water Services,
to expand and develop water supplies on
the west side of the region. Potential
Please see WATER,Page 8
2001-2002 Demand and Consumption Information
Portland Water Bureau
SYSTEM PRODUCTION DATA 01-02 00-01 99-00 98-99 97-98
Winter Flow Average 87 MGD 89 MGD 91 MGD 98 MGD 100 MGD
(November through March)
Summer Flow Average 144 MGD 150 MGD 144 MGD 149 MGD 144 MGD
(June through September)
Peak Day Flow 187 MG 193 MG 202 MG 204 MG 206 MGD
Date of peak flow 08/08/01 07/31/00 6/27/00 7/29/98 8/11/97
Average Annual Production 108 MGD 112 MGD 114 MGD 117 MGD 115 MGD
SYSTEMWIDE DATA
Total anraal system consumption(a) 38.2 BG 38.-BG 39.2 LG 39.3 BG 39.5 BG
Total people served (b) 831,300 789,500 773,000 795,000 794,000
Per capita annual consumption- 46,000 48,800 50,700 G 49,400 G 49,800 G
Per capita daily.consumption 126 G 134 G 139 G 135 G 136 G
TOTAL RETAIL CUSTOMERS
Total annual consumption(a) 21.2 BG 21.5 BG 22.5 BG 22.4 BG 23.3 BG
#of services(a) 162,600 160,900 159,800 158,900 157,800
Average daily consumption per 357 G 367 G 385 G 397 G 405G
service
Retail Population(b) 481,300 474,500 456,000 454,000 461,000
SMALL METER 5/8" &3/4" RESIDENTIAL CUSTOMERS-RETAIL
Total annual consumption(a) 8.7 BG 8.8 BG 9.1 BG 9.0 BG 8.9 BG
#of services(a) 133,900 132,900 132,000 131,200 130,400
Average daily consumption per 178 G 181 G 189 G 188 G 187 G
service ____
Per ca ita dail consumption(c) 69 G 70 G 73 G 72 G 72 G
LARGE METER RESIDENTIAL CUSTOMERS- RETAIL
Total annual consumption(a) 3.3 BG 3.3 BG 3.3 BG 3.3 BG 3.2 BG
#of services(a) 9,850 9,800 9,700 9,600 9,500
COMMERCIAL, INDUSTRIAL, INSTITUTIONAL ACCOUNTS- RETAIL
Total annual consumption(a) 9.2 BG 9.4 BG 10.1 BG 10.1 BG 11.1 BG
#of services(a) _ 18,850 18,200 18,100 18,100 18,000___
Average daily consumption per 1,775 G 1,905 G 2,040 G 2,040 G 2,270 G
service(adjusted to exclude services
with minimal usage)
TOTAL WHOLESALE CUSTOMERS
Total annual consumption(b) 17.2 BG 17.0 BG 16.7 BG 16.9 BG 16.2 BG
Wholesale consumption 45.0% 44.0% 43.0% 43.0% 41%
(as a%of total consumption)
Population served (d) 350,000 314,500 317,000 341,000 333,000
Average daily per capita consumption 134 G 148 G 144 G 136 G 133 G
Sources and notes:
Populations figures from 97-98 and 98-99 were based on demand studies and information from the PSU Research Census
Center.The Bureau has changed the standard for population figures as noted below.
(a) Dated based on billing system reports on July 1.
(b) Retail population figures are based on Metro's population forecasts and PSU Population and Research Center estimates updated
from the current census. Between 1999 and 2000 wholesale population served decreased due to shift to other water sources. In 2001
Metro refin; d its population estirrates.
(c) Customer Profile Benchmark data in 1996 and 1997 identified 2.6 people per household.
(d) Wholesale population is adjusted to reflect the percent of total water purchased by wholesale customer from alternative source,.
+ w
s
Wholesale Customer Consumption Statistics
As of June 30, 2001
Service population(b)
Consumption Active Regular Conditional Contract
in 100 cubic Revenue Services Wholesale Wholesale Expires
Distributor feet (a)
Service Area 1 -
Connections to supply conduits
GNR Corporation 2,625 1,701 25 8 2007
Green Val?;I_Water Company257 _ 2_12_( 3 10 2007
-Gresham,City of 3,352,303 12,106,972 15,004 58,068 2007
Hideaway Hills Water Company 1,862 1,221 14 6 2007
Lorna Water District 8,158 5,368 89 233 2007
Lusted Water District 77,239 50,531 391 912 2007
Pleasant Home Water District 85,449 53735 497 1,434 2007
Powell Valley Road Water District c) d) 1,144,384 693,094 10,549 24,346 2005
Rockwood Water District c 3,782,045 2,284,833 12,604 50,431 13,609 2005
Sk view Acres Water Company 16,175 10,211 73 1 41 2007
Subtotal Area 1 8,470,497 5,207,878 39,249 135,489 13,609
Service Area 2-
Connections to gravity transmission
Burlington Water District c) 33,944 27,652 109 403 2004
Palatine Hill Water District(c) 18,381 144,023 585 1,984 2007
Subtotal Area 2 52,325 171,675 694 2,387 0
Service Area 3-
Connections to pumped transmission
Lake Grove Water District(d) 14,933 128,776 1,185 1,385 1385 2007
Tualatin Valley Water District 621,045 0 Note 3 0 2007
Tigard,City of(d) 1,529,132 1268,920 16,067 43,996 6574 2007
Valley View Water District(c) 64,152 58,035 364 1,151 2007
West Slone Water District(c) _ 661,230 599,210 3,378 13,824 _ _ _2007
Subtotal Area 3 '~ 3,017,492 2,054,941- 20,994 60,356 7,959
Service Area 5-
Connections to Washington County
gravity supply
Raleigh Water District(c) 306,871 197,307 965 4,949 2007
Tualatin,City of 2,060,694 1,320,268 5,796 23,461 2007
Tualatin Valley Water District(c)(d) 8,644,643 6,062,411 50,689 122.880 44,297 2007
Subtotal Area 5 11 012,208 7,579,986 57,450 151.290 44.297
TOTAL 22,717,322 15,014,480 118,387 349,522 65,866
Notes
(a) From distributors'reports of active services as of June 30, 2002.
(b) Population estimates are based on Metro's population forecasts.The Portland Water Bureau serves the population
listed under"conditional wholesale"under certain circumstances as determined by contract.
(c) Consumption and revenue figures are adjusted for water sales to City customers.
(d) These water districts have water sources in addition to the City of Portland.
(e) Revenue and active service data for Tualatin Valley Water District is reported in Service Area 5.
Sign-in Sheet for
Intergovernmental Water Board Meeting
November 19, 2002
Name (Please Print) Would you like to speak to the Board?