Loading...
PFI2021-00162 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT = COMMUNITY DEVELOPMENT Permit#: PF12021-00162 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 05/11/2021 Parcel: SEG1905 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: Ziply 5501799 Project Description: SEG 1907/1905. Splice fiber in existing HHs&PEDs located N side and S side of Bull Mountain Road. Pull new fiber through existing conduit. Class of Work: FEES Type 1 - Utilities(gas, electric,data) Description Date Amount Total Owner: REQUIRED INSPECTIONS Call 503-639-4175 for the IVR inspection request line or visit the City of PHONE: Tigard website at www.tigard-or.pov to schedule inspections online. Contractor: NORTH SKY COMMUNICATIONS LLC 11818 SE MILL PLAIN BLVD SUITE 410 VANCOUVER, OR 98684 PHONE: 3602546920 Applicant: BREANNA HODGE 6074 N DISCOVERY WAY#125 BOISE, ID 83713 PHONE: 2085764031 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: See application Issued By: C �^ Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12021-00162 Tv pe: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes,etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways",U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services Association[ATSSA],and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area.Traffic control devices, flag persons,etc.,shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service.Obtain City approval of any access closures. PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080.Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 15- UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads,ditches, etc.)as may be necessary, as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>,to establish a preconstruction meeting. PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection,and after completing work covered by the permit. Contact Ken fisher at 503 816 6146 or kenny@tigard-or.gov PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector. PFI_Utilities 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 26- RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Utilities 27- PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI_Utilities 28-AS-BUILT DRAWING Applied Notice 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also,any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also,any improvement which may impact an existing public system or facility,shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also,any improvement which may impact an existing public system or facility,shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI_Utilities 31 -OTHER Applied Notice Other City of Tigard PFI #:2021-00162 ENGINEERING DEPARTMENT Public Facilities Improvement (PFI) Permit PROJECT INFORMATION TYPE OF WORK Project name: 5501799 ❑ TYPE 1—Franchise Utility Work Brief description of project: ZIPLY is proposing to splice fiber in existing performed by NWN,PGE, or utility icy HHs &PEDs located N side &S side of SW Bull Mountain Rd. ❑ TYPE 2—ROW Sidewalk/Driveway/Sewer Pulling new fiber through existing conduit. Work performed for the purpose of. Sidewalk installation or repair • Driveway approach installation and repair SITE INFORMATION • Sanitary sewer lateral installation and main line tap 12893 SW WAHKEENA CT. Location (address if available): ❑ TYPE 3—Full Scale Development Work SEG1907 / 1905 formed with land use approval pproval which includes any of the following. • Subdivisions or Partitions APPLICANT INFORMATION • Street widening Name: ZIPLY FIBER • Mainline installation for sanitary sewer, storm sewer, Tigard water, and Tigard Mailing address: 6074 N DISCOVERY WAY STE.125 water service area City/State: BOISE,ID Zip: 53713 ❑ TYPE 4—Small Cell Technology Phone: 208-5764031 /208-6-77-6348 El TYPE 5—Tigard Triangle Email: PERNIYMNG@MOUNTAINLTD.COMPhone: NOTE: Type ] and 2 applications may be Contact name: Breanna Hodge OSP Facility Engineer I emailed to rowpennits9.tig ra d-or.eov. Phone: Email: CONTRACTOR INFORMATION ❑ Same as applicant Name: NORTH SKY COMMUNICATIONS CCB Number: 208747 Mailingaddress: 11818 SE Mill Plain Blvd,ste.410 City/State: VANCOUVER,VIA Zip. 98684 Phone: 503-206-4550 Email: dmatton@nonhskymmm.com ENGINEER INFORMATION Name: RUSS WELLS Mailing address: 4155 SW Cedar Hills Blvd City/State: BEAVERTON,OR Zip: 97005 Phone: 503-643-1001 Email: msse1lwel1s@ziply.com ADDITIONAL INFORMATION Estimated value of work is required(if over$5,000):$ (within the public right-of-way) Is work related to a LAND USE DECISION? ❑Yes ❑No Case number: City of Tigard • 13125 SW Hall Blvd. • Tigard Oregon 97223 • www..tigard-or.gov 503-718-2421 • Page 1 of 4 APPLICANTS NOTE: Person specified as`Applicant"shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.04.140. * With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application. I, the applicant,certify that: • To the best of my knowledge,all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. gt4a44a, Barg Breanna Hodge 05/07/2021 Applicant's or authored agent's signature Print name Date Property owner's signature (if required) Print name Date STAFF USE ONLY PF12021-00162 --r�- Received by: AL Date:5/7/2021 Case No: Permit fee: Approved by: 1� ,�[5 jVZ- Date:,moi '- l I ' ZCD-z ! Notified by: bk�7 Date: 5llt City of Tigard • 13125 SSW'Hall Blvd. • Tigard,Oregon 97223 • www.dgard-or.gov • 503-718-2421 Page 2 of 4 waLt1 1�5 �.eEc� t,tia� E-etJw Jtvts,a, DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI)Permit: INITIAL PFI PERMIT FEE Part 1: Required submittal fee is 10%of the Net PFI Permit Fee See below for calculations.Minimum of$300. NET PFI PERMIT FEE Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PFI Permit Fee). WATER LINE CONSTRUCTION FEE Part 3: All public water system improvements engineer's estimate X 12%. FOR STAFF USE ONLY 7 O. STAFF USE ONLY WIRELESSTYPE 4: SMALL CHECKLIST REQUIREMENTS Does applicant have a right-of-way license? ❑Yes ❑No TYPE 1 AND TYPE 2-Must include a sketch showing: Under the wireless facilities standards,is the proposal ❑ Dimensions considered?(check all that apply): ❑Small Cell ❑Macro ❑ Street Name How many install sites are proposed as part of this permit ❑ Site Address application? TYPE 3-Must provide 4 sets of plans (sized 24 x 36 or 22 x 34) and an electronic version of all submittal The proposed equipment is located on which of the following: items. The plans must that include: ❑Public Right-of-Way ❑Private Property ❑ Cover—Site,Vicinity,Abbreviation,Legend If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc.) type&use: ❑ Street(Plan,Profile) ❑ Water,Storm and Sanitary(Plan Profile) ❑ Water Quality Facilities ❑ Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm, Sanitary,Water,Signage,Street Lights,etc.) ❑ Details ❑ Traffic Sight Distance ❑ Signing and Striping ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) ❑ Engineet s Construction Estimate Additional Submittals (per land use conditions,if applicable) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design ❑ Water Provider Approval Cityof Tigard 13125 SW Hall Blvd. Tigard,Oregon 97223 • www.dgard-or.gov • 503-718-2421 • Page 3 of 4 C', l Edge of Pavement I `'- Ditch Streetlight I , — —•—•— —•--- —r—•— 'f% I I I c'14> Existing House I 1,51 i Existing Driveway iI 1 I v I L a I fl I I VA 1 bi I Existing Shop i Powerpo7e I o I Q 1 I I� 95' I i �------�ropeZiyL�ne—-—-—-—-—- I o fI AAA i ( J I Fire HyGranl(FH) I I I Scale 1*=30' � I I TYPE 1 AND TYPE 2: MINIUM SKETCH I I I I i i REQUIREMENTS (Put N/A if not applicable) North arrow property lines&dimensions Existing utilities locations (sewer,storm,water) Street&street names All existing structures Proposed work Existing curb or edge of pavement Utility&street light poles Existing S/W or D/W apron Slope of property Trees Cite of Tigard • 13125 SW Hall Blvd. Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 4 of 4 CONSTRUCTION NOTE 1-THIS WO IS DEVELOPER DRIVEN WORK JOINT POLE NOTE SW FORAN HILLS CT =U'�LALLO�ToHQURS_ ORDER- -PGE WO M2879553 "JOB SITE 2-CITYINGARD PERMIT BY DEVELOPER-CONDUITCITY OF TIGARD-ZIPLY FIBER-FIBER CABLE WASH COUNTY PERMIT-ZIPLY FIBER CABLE `:9 ZIPLY FIBER TRAFFIC CONTROL CONTRACTOR TO ...., uv. nnxe xoxr. aen o e PREPARE TRAFFIC CONTROL PLANS AND SUBMIT ""JOB SITE TO CITY OF TIGARD AND WASHINGTON COUNTY 3-DEVELOPER CONDUIT- reP°+POI' ZIPLY FIBER OSP WORK PRINT p`p o�`ono=x m.x 51351-5501799 ZIPLY FIBER OSP ;5 ELIZABETH PRICE PARK - WORK PRINT-CONDUIT - ZIPLY FIBER OSP FIBER CABLE 51351-5501799.1 C011 MCTIOR M. CONSTRUCTION CONTACTSe DAVID CARNLEY-971-940.9000 oxvu•° aR,x,=X, JAMES STAATS-50375&3119 NOTE-RON HAYHURST INSPECTED SW BULL MOUNTAIN RD SCHEDULING CONTACT CONDUIT PORTION-51351-5501799 RYAN ROBERTS-50349&3713 ^ccLeu='-'+ arrnaNm ceuLn FACILITIES CONTACT NOTE51351-5501799-DEVELOPER NTS X•Xa re/iasrnv LAUREL KIELTY 4252614006 CONDUIT SHEET 1 OF 3 O oenvao ixax ecmxen 51351-5501799.1-ZIPLY FIBER NORTH O xo eeP+ux P<wvPm INSPECTION CONTACT FIBER CABLE4=IBER TERMINALS ,ronrt erns RON HAYHURST SOS-282-3345 :rx/x.nus ]!H/PT1119 I ENGINEERING CONTACT axeM Pep�evse RUSS WELLS 503372-7530 �•` OxP O 0 ed1EP OO O inwieeeP "`"'OSP WORK ORDER`-- roxRe or CURfAcr RUf8 NEL18 MATERIAL REQUIREMENTSLABOR HOURS 51351-5501799Px-+oo+ PACIFIC CREST LLC IC,=U`Io ZIPLY FIBER SUPPLIED SPLICE-C-20/M-8-X-0 3115 SW STEPHENSON RD eiu'rie eo .++ MATERIALS X38 HANDHOLES CREW-C40/M-OM.0 PORTLAND, OR 97218 GR exoxe xo ZIPLY FIBERCONTRACT neLoeo a- v _ OUNDRINSPECTOR4 HRS LCON-TECH ENGINEERING 5-FLOWER POTS OTS SONICOM FLAGGING-24 MRS PO BOX 80433 "2-6 PORT 500 TAIL NORTHSKYTO PLACE"D"8"E" PORTLAND OR 97280 51351-5501799.1 f ziplyfiber "1-8 PORT 200'TAIL 503-819-6494 TGRDORXPJFIB CA ADD-FORAN "1-8 PORT 50'TAIL HILL6 15 SFUSW FOR HILLS CT 2800'OF 48 FIBER vxuee. co. R wnwnure 4011 i PusP veL ice, w.e" ue o o z SEE F SHEET 3 RISER 11 E 2422.201-NEW' I 500502008 K 9105.2008 500'48 FIBER 4 PORT PIGTAIL 6 PORT EAN TAIL i XDD 1-38+ TGRDORXA,H5013.193+ TGRDORXA p TGRDORXA 115013,279-288 X0,2.4 H5013,209214 F 2421.201 I 300'48 FIBERNEW" J 162005.2006 XDD,1.38+ 46 FIBER L 07.2005 RISER TGRDORXA H5013,279288 TGRDORXA 788 PORT FC2042,577-000. / ELIZABETH PRICE PARK G 2422.201 "NEW" XD00 ,25-48 TGRDORXA 1 20 48 FIBER H5013,201-205+ XDD,1-38+ XDA TGRDORXA H5013,279288 M 05.2005 - TGRDO2RXA 45013 48 FIBER \ TGRDORXA FC2042, I �w TGRDORXA 577-582+583585+ LL H5013,189-192+ \ \ G XD,10-48 IN I I W XD,25-28 \ TGRDORXA \\ \ H6013,1-28BOUT I �� HRDOR99215 \\\ G I _-___ -_ NTS - - - - - __ _ SHEET OF I P I IK I���M J NORTH O N 9 CO LL SW BULL MOUNTAIN RD w w O N 1000 05.2006 w P 1342 04.2008 4 PORT E/W TAIL 216 FIBER TGRDORXA TGRDORXA H5013,1-72+ 15013,194187 277-278+159188+ XD,145-216 } ziplyfiber O 71805.2008 0546052008 TGRDORXA/FIB CA ADDFORAN 72 FIBER 12 FIBER HILLS-15 SFU-SW FORAN HIL T TGRDORXA H6013,1-62+ TGRDORXA H5013,6968+ °� '"`'` 51351-5501789.1 XD,83-72 XD,744 R'/nE �SMCf 0 tlp A 2422.201 N BBFTP FDT 570807 E"A" E 2422.201 —NEW 8 PORT ENV 500'TAIL 500'48 FIBER TGRDORXA H5013,279-281♦ XDD 1-38+ XD,48 TGRDORXA H5013,279-288 NTS SHEET 3OF3 B 2422201NEW R TGRDORXA HH 3251 NORTH BBFTP FDT 570903 8 PORT ENV500'TAIL S TGRDORXA HH 3253 TGRDORXA H5013,282-284+ XD,4-B T TGRDORXA HH 3252 C 2422.201 -NEW- BBFTP NEWBBFTP FDT 570804 8 PORT ENV200'TAIL U TGRDORXA HH 3254 TGRDORXA H5013,285288+ XD,343 D 2422.201 "NEW NOTE-TGRDORXA HH(R-U) BBFTP FDT 570905 PLACED BY DEVELOPER 8 PORT EM!50'TAIL ZIPLY PROVIDED ON TGRDORXA H5013,287-288+ CONDUIT JOB 51351.5501799 61351-5501799.1 XD,3.6 1 I 1 2 3 4 g 5 6 1 P — - } zi yfiber D 8 TGRDORX VFIB CA ADD-FORAN E pgIILLS-158FUSW FORAN HILLS CT 15 1 1 1 U K."P SEE 9 SHEET2 5WFORAN HILLS CT 70 scue. _ r"xwemcr v� oLiwE' vMs --------------------------- c Single Flagger Operation e asa �>S� s � sNo m for Low Volumes (Optional) o a (ADT<aoo) S h S s BE 7 PREPARED ONELANE A TO STOP AHF D r 3 - - - - - • ROAD ~ WORK 8 8 «�� dt 49 � 6 a\ n AHEAD VN O O S O N N i A B `---------------------------i 1 mile 71 -- -- men_ --"� �' 01 — —• • • r-• • • — to • • • Fin ••• 7 m K K K K �c B BSA Br BLAter \, Protection Vehicle ROAD . - w!TMA(both Optionelt WORK I7�r■,+ See Chapter 4 0 AHEAD BE � ONE LANE n ROAD PREPARED Two Flagger Operation m v AHEAD TO STOP y m W m �, (Optional) O N Page 106 2011 Edition Diversion into a Continuous Left Turn Lane Diagram 430 Diagram 430 shows work in the travel lane(s) next to a continuous two-way left turn lane with one direction of traffic diverted into the continuous two-way left turn lane. 1. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3—Lights and Lighted Signs for exceptions. 2. For added visibility, a truck-mounted arrow board or PCMS in caution mode may be used. 3. When two or more travel lanes are reduced to a single lane before the diversion, each lane shall be closed separately. Layout traffic control according to ODOT Standard Drawing TM 852 for 5-lane sections. 4. A shifting taper (L/2) may be added in the diverted traffic direction across the continuous two-way left turn lane (as shown). This option is recommended when the speed is 45 mph or greater. Sign Spacing and Buffer Lengths(feetl Posted Spacing Between Signs "Buffer" Speed ' A B C Space 20 So 25 100 100 100 75 30 100 40 35 350 350 350 1550 45 180 50 500 Soo Soo 210 55 250 60 285 65 700 700 700 325 70 365 Chapter 5 September 2016 2011 Edition Page 107 Diversion into a Continuous Left Turn Lane Diagram 430 A ROAD WORN T AHEAD, B llylt < > cwn:A � UtE (XGem AIEAO A II U2 :I • .Buffer 1 Protection Vehicle w/TMA(both Optional) See Chapter 4 Buffer • • U2 ' • • JU2 I• I A lyt B ROAD AHEAD WORK4September 2016 Chapter 5 Page 118 2011 Edition Lane Closure at Intersection with Flagging Diagram 620 Diagram 620 covers work within an intersection when normal traffic control must be interrupted. Work vehicles may or may not be in the work space. 1. During flagging, traffic signals shall be turned off. Contact the road jurisdiction for approval and assistance (see Chapter 3). 2. For multi-lane facilities, traffic approaching the intersection shall be reduced to a single lane on each approach. See Chapter 3 for information on flagging through intersections. 3. There should be one flagger for each approach. One flagger may control two adjacent approaches if sight distance, low volumes on side roads, and flagger position allows for safe operation and clear direction to motorists. For low traffic volume intersections (fewer than 400 entering vehicles per day), one flagger may be used. 4. The"ONE LANE ROAD AHEAD" (W20-4)sign is optional and should be considered on high volume or high speed roads, or when extended queues may be expected. Sign Spacing and Buffer Lengths(feed Posted Spacing Between Signs "Buffer" Speed A B C Space 20 50 25 100 100 100 7S 30 100 35 350 350 350 125 40 150 45 ]80 50 S00 500 S00 210 55 250 60 285 65 700 700 700 325 70 355 Chapter 5 September 2016 FLAGGING ON FAR LEFT LANE 2011 Edition Page 119 Lane Closure at Intersection with Flagging Diagram 620 HD•D AHWD t t B PH® TO STOP B A win • I1Wt MOc ' PNEPAIE HOLD1 •• e B C Buft • , H 4— ' loot V.tII C B B A HOLD •E MNRK PHEPAHED TO sroP loot•w. It IIT + loP�+«wn 11 A B W PA — TO Woe, B (Da.a.n 1 t c September 2016 Chapter 5