Loading...
PFI2021-00202 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT = COMMUNITY DEVELOPMENT Permit#: PF12021-00202 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 06/07/2021 Parcel: SEG1295 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE Job#M3030636 Project Description: Replace pole on Genesis Loop Class of Work: FEES Type 1 -Utilities(gas, electric, data) Description Date Amount PFI Permit Fee 06/07/2021 $300.00 Total $300.00 Owner: REQUIRED INSPECTIONS Call 503-639-4175 for the IVR inspection request line or visit the City of PHONE: Tigard website atm ww.tigard-or.00v to schedule inspections online. Contractor: PHONE: Applicant: RICO SOLIS 2213 SW 153RD DR BEAVERTON, OR 97006 PHONE: 5036725417 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. PermitteelApplicant Signature: See application Issued By: Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12021-00202 Ty Do: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes,etc.shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA,current edition,American Traffic Safety Services Association [ATSSA],and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices,flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire& Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.) before initiation of construction work. PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service.Obtain City approval of any access closures. PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI Utilities 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Utilities 14- UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules,contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 15- UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>, to establish a preconstruction meeting. PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24) hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 21 - PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector. PFI_Utilities 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing, the names and 24 hour emergency telephone number of two(2) persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements,shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Utilities 27- PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s] from the owner for each private property disturbed by construction activity. PFI Utilities 28 -AS-BUILT DRAWING Applied Notice 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements,including any revision made to the previously approved construction plans and,also,any improvement which may impact an existing public system or facility,shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also,any improvement which may impact an existing public system or facility,shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance (Certificate of Compliance). One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also, any improvement which may impact an existing public system or facility,shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI—Utilities 31 -OTHER Applied Notice Other RECEIVED City of Tigard JUN 0 2 2021 PFI#: .2Q2/ —QOaOZ ENGINEERING DEPARTMENT CITY OF TIC-ARD • . Public Facilities Itl (PFI) Permit PROJECT INFORMATION TYPE OF WORK Project name: PGE Job # M3030636 B TYPE 1—Franchise Utility Work Brief description of project: Replace pole #80730 performed byNWN,PGE, or utility agency Pole 80730 is located on SW Genesis Loop ❑ TYPE 2-ROW SidewalkiDrivewayisewer Work performed for the purpose of • Sidewalk installation or repair • Driveway approach installation and repair SITE INFORMATION • Sanitary sewer lateral installation and 11270 SW Mor en Ct main line tap Location dress if available): g ❑ TYPE 3—Full Scale Development Work �. �TIGARD, OR 97223 performed with land use approval which includes any of the following: • Subdivisions or Partitions APPLICANT INFORMATION • Street widening Name: PGE [Submitted by April Neale for Nigel Khan] • Mainline installation for sanitary sewer, storm sewer, Tigard water, and Tigard Mailing address: 2213 SW 153rd Dr water service area City/State: Beaverton Zip: 97006 ❑ TYPE 4—Small Cell Technology Phone: 503-672-5459 O TYPE 5—Tigard Triangle Email: crewcoordination-westem@pgn.com Phone: NOTE: Type 1 and 2 applications may be Contact name: Rico Torres Solis cmailcd to rowpermitsQfigard-or.gov. Phone: 503-672-5417 Email: crewcoordination-western@pgn.com CONTRACTOR INFORMATION 121 Same as applicant Name: PGE CCB Number: Mailing address: City/State: "Lip: Phone: Email: ENGINEER INFORMATION Name: Mailing address: City/State: Zip: Phone: Email: ADDITIONAL INFORMATION Estimated value of work is required(if over$5,000):$ (within the public right-of-way) Is work related to a LAND USE DECISION? E]Yes E]No Case number: City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-orgov 503-718-2421 • Page 1 of 4 APPLICANTS NOTE: Person specified as"Applicant" shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.04.140. * With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application. I,the applicant,certify that: • To the best of my knowledge,all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. "'t')lil Nigel Khan 06-02-2021 Applicant's or ,uthorized agent's signature Print name Date Property owner's signature (if required) Print name Date STAFF USE ONLY Case No: �ermit fee: J"-PV Received by: Date: Z Z/ Approved by: 7.yOtil-0 Date: 6Pl7/Z&" Notified by: M— Date: (0 1 Cityof Tigard • 13125 5W Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 2 of 4 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI)Permit: INITIAL PFI PERMIT FEE Part 1: Required submittal fee is 10%of the Net PFI Permit Fee.See below for calculations.Minimum of$300. NET PFI PERMIT FEE Part 2: All non-water system improvements engineers estimate X 7%less the initial PFI Permit Fee). WATER LINE CONSTRUCTION FEE Part 3: All public water system improvements engineer's estimate X 12%. FOR ONLY • ONLY TYPE 4: SMALL WIRELESS FACILITY TYPE 1-3: DETAILED SUBMITTAL REQUIREMENTS CHECKLIST Does applicant have a right-of-way license? ❑Yes ❑No TYPE 1 AND TYPE 2-Must include a sketch showing: Under the wireless facilities standards,is the proposal ❑ Dimensions considered?(check all that apply): ❑Small Cell ❑Macro ❑ Street Name How many install sites are proposed as part of this permit ❑ Site Address application? TYPE 3-Must provide 4 sets of plans (sized 24 x 36 or 22 x 34) and an electronic version of all submittal The proposed equipment is located on which of the following: items. The plans must that include: ❑Public Right-of-Way ❑Private Property ❑ Cover—Site,Vicinity,Abbreviation,Legend If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc.) type&use: ❑ Street(Plan,Profile) ❑ Water,Storm and Sanitary(Plan Profile) ❑ Water Quality Facilities ❑ Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm, Sanitary,Water,Signage,Street Lights,etc.) ❑ Details ❑ Traffic Sight Distance ❑ Signing and Striping ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) ❑ Engineer's Construction Estimate Additional Submittals (per land use conditions,if applicable) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design ❑ Water Provider Approval Cityof Tigard 13125 SW Hall Blvd. Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 3 of 4 Edge of Pavement 4� Ditch ap n Streetlight I s•— —•.•—•—•.•.... I R. D..a, I I i i—propos d"S��rT'i'ne" i CUI �y I nl I Existing House Existing 1 i Driveway ul I UI I I rl o I CL I Jam' 1 f l I I c, 1 o I � Existing Shop � I � 1 Powerpole I I Q 1 �� a I I 95' Fire Hydrant(FH) I I I I Scale: '1"=30' I I I TYPE 1 ANUITYPE 2: MINTUM SKETCH REQUIREMENTS (PLft N/A if not applicable) I I I i � I North arrow Property lines&dimensions Existing utilities locations (sewer,storm,water) Street& street names All existing structures Proposed work Existing curb or edge of pavement Utility&street light poles Existing S/W or D/W apron Slope of property Trees City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www igard-or.gov • 503-718-2421 • Page 4 of 4 LIGHTING LEGEND REMOVEFACRmIES REPEACE HPS TOWN d COMMYLMHT B POLE WITH Vh 11200 33W LED TOWN 6 COUNTRYGLOSELESS LIGHT 112M ON NEW M'FIBERGLASS 2PC ON BLACK POLE CONNECT240 VOLTS U� zz 11\ O� 5� THINK SAFETY NYDEV/ATIONFROMTHIS DESIGN MUST FIRST �PPROVEDBYTHEPGEPRWECTMANAGER C10 CU DX 80725 _ VICINfI'1' 19855 u i ASS€T#94119TF irr'• �- `� i '� I y 1 Yui r,. _r,T t 201 ep 985 ! d S g 20A CUPCKALENS. INSTALL 30AMP FUSES IN SECONDARY PEDESTALS OR SECONDAR 2 PIECE FRIERGLA35(COAIPOSTM POLE PGE CONSTRUCTION DRAWING MUUST PHOTO- VAULTS(WHICHEVER/S ST IT POINT OF ATTACHMENT)FOR EACH AS-BUILT VERIFICATION , aq p �w�...�� rOrA M MNS CORRECTED COROLBYL1 T1NO ."^ STREETLIGHTPER T&O CONSTRUCTION STANDARD LC-11550 y� SNRNINGCUPCX .�.�„ I Foreman: Date. SIMULTANEOUSLY RIGHT-OF-WAY PERMIT NOTICE: GeneTaf Foreman: Date: HMO-. APERM/T FROM THE LOCAL JUB/SDICION/5 REQUIRED BEFORE ANY ® °`,'.�: �� S aNetl MFeb cwrsM1uctian WORK IN THE RIGHT-OF-WAY MAYBE PERFORMED. ONLYPGEAPPROVED SDPMENG REVIEW.' SBUILTBYDESIGNER: TWOOQL _ -- II CONTRACTORS AND CONTRACTORS WHO HAVE MADE OTHER SPECIAL L"TG" — AGREEMENTS WITH PGE WILL BE ALLOWED TO WORK UNDER PGE'S PERMIT. �`'` °�"" 51'1212021 tin l 40 ft U1070001 1000009106 M3030636 +AM -tl THECONTRACTOR MUST NOTIFY THE LOCAL JURISDICTION 48 HOURS U 11171EET B10l. 1 / lLt BEFORE WORK IS TO BEGIN. A COPYOF THE PERMITMU5TBE ONSITE. Ci Of Tigard PL#80730 ••z,5 ,1 / HOlIsI1D I LUIT 517E nON NEW - , / ATTENTION: CALL 811 BEFORE YO U DI °"'^"" ,,.•._.�„ /` TIGARD-13362 11x17 LABEL HERE 11 I OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOP TED �E LOCA �—/ BY THE OREGON UTILITY NOTIFICATION CENTER. 11270 SW Morgan CL TIGARD M05E RULES ARE SETFORTH IN OAR 952-001-0010 - / OESCRIPHON BOTIOMPIECEPOLEINSTALLATNM' ` Replace EOL P019/Flxlure,ConneGL 240V THROUGH 951-001INGTH YOU ORESOOBTAIN COPIES Ci COUNtt BECTONS WORK WITH SHEET THE RULES BY CALLING THE OREGON UTILITY WASHINGTON C2103 1OF1 NOTIFICATION CENTER ADMINISTRATION @(502-232-198)1 P� IUNYI YAlal9 be[ '"'•"° ee�vartrex DESIGNBY PHONE W3)DRAWN BY MLFMJEW ,fl! TO REQUEST UTILITY LOCATES CALL THE OREGON INfcRwanRn ,g SET SCREWSTl1' MAX POLE OD 3. UTILITY NOTIFICATION CENTER,823 AT LEAST Call Detoreyoudig. _ LUIS BLANCO 2 BUSINESS DAYS PRIOR TO EXCAVATIONEuvc ou oR now ®PORTLANDG N ELECTRIC CO.-ALL RIGHTS RESERVED www.invarion.coni Lane'„Glostare at Intersection wlth;�lagging `a 4Dagram'62,0 Diagram 620 covers work within an intersection when normal traffic control must be interrupted. Work vehicles may or may not be in the work space. 1. During flagging, traffic signals shall be turned off. Contact the road jurisdiction for approval and assistance (see Chapter 3). 2. For multi-lane facilities, traffic approaching the intersection shall.be reduced to a single lane on each approach. See Chapter 3 for information on flagging through intersections. 3. There should be one flagger for each approach. One flagger may control two adjacent approaches if sight distance, low volumes on side roads, and flagger position allows for safe operation and clear direction to motorists. For low traffic volume intersections (fewer than 400 entering vehicles per day), one flagger may be used. 4. The "ONE LANE ROAD AHEAD” (W20-4) sign is optional and should be considered on high volume or high speed roads, or when extended queues may be expected. Sign Spacing and Buffer Lengths (feet) P.ts`sted "{ Sacing Betqwei3n $tgn&; ' f Buffdr' 1 p ERRATA: 20 50 25 100 100 100 75 Supplement Table 30 100 35 350 350 350 125 updated:February 12, 40 150 2016 45 180 By:ODOTTraffic•Raodway 50 500 500 500 210 Section 55 250 Signs Spacing and Buffer Lengths (feet) Supplement Ni.j• -i ' °ris.0.;hxsls i'`rN.,'+C•'c,it"a�.Y °'J.'f�r^ eR�e[r 5',4.s.'.'.y�l.Z5gi`'v 4e7d sl'uwxs.,Cr;L fy,'a,l3$'YT��'�WMW Wang 1ZT �N , �Ii`s� Y• 1 r .�.�'-S^.�y�I s/h�r ^.'�,�,SYG��'Y3� 60 285 65 700 700 700 325 70 365 www.invarion.com k,"91,0—bee of I, O` -gectiQn ' biagr�a�; 620 ,. ROAD WORK AHEAD Q ONELANE (Optional) ROAD M AHEAD B BE PREPARED TO STOP B A 0 0 100 fill..Max. 0 Buffer 0 O 0000 O t�Q p ° K ° � rr ° 100 Fl.h1az.� C B B q ROAD ° BE WORK T AHEAD PREPARED • 0° 100 ft.Max. 70 STOP p ONE LANE RD p lflfy OA ANEADIt (Optional) A B BE PREPARED 70 STOP B (Optional) ONE LANE l T ROAD AHEAD C ROAD WORK AHFAD Page 54 2011 Edition Pedestrian Accommodation Diagrams See Diagrams 5-7 and 5-8, below, for pedestrian accommodations in work zones. Pedestrian Accommodation Principles: 1. If the work impacts the sidewalk or pedestrian facility, provide a safe, accessible path, where practical, in accordance with the requirements of the ADA. 2. If not practical to match the width of the existing pedestrian facilities, maintain a 4-ft minimum width. 3. Unless a reasonably safe route can be provided through the work space, pedestrians should be appropriately directed with advance signing to cross the road. Do not divert pedestrians into travel lanes. 4. Install pedestrian closure or detour signing on Type II barricades. Make every practical effort to satisfy the following: If work closes a sidewalk or sidewalk ramp, close sidewalks at a point where an alternate crossing point or route can be provided. Minimize the amount of out-of-direction travel for pedestrians. • Use a combination of"SIDEWALK CLOSED" (R9-9), "SIDEWALK CLOSED USE OTHER SIDE" (R9-10), "SIDEWALK CLOSED AHEAD CROSS HERE" (R9-11), and "SIDEWALK CLOSED CROSS HERE" (R9-11 a) signing to direct pedestrians to an alternate facility. • Where there are business destinations between the nearest crosswalk and the work area, close the sidewalk at the business access nearest the work area, where practical using the SIDEWALK CLOSED sign. Include the SIDEWALK CLOSED AHEAD CROSS HERE sign at the nearest crosswalk prior to the closure. Chapter 5 December 2011 2011 Edition Page 55 Pedestrian Accommodation, Mid-Block Diagram 5-7 The sidewalk should be closed at the nearest intersection on each side of the work area when a safe,ADA-compliant path through the work area of is not available. sioEwuxcwsEo sioEwxxcwsm OR083 HEgE or NEM CR05.4 HERE 24x12 Type"W124x18 ----- --- (Mount on B(II)L) Type'W1" I SIDEWALK CLOSED 24x12 Type"W1- (Mount on B(II)LR) (2 Reqd.) \ sioEwaxa�Eo sioEw GSED Or A H MOSS XERE CROSS MERE 24X12 Type"W1 Type'24X18 (Mount on B(II)1) December 2011 Chapter 5