Loading...
Permit CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT Permit A: BUP2021-00106 Date Issued: 5/20/2021 TI G A R D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 1S135AB01003 Jurisdiction: Tigard Site address: 10300 SW GREENBURG RD 120 Project: Spec Space Subdivision: METZGER, TOWN OF Lot: 9 Project Description: Landlord work prior to TI: Demolition and new finishes. Contractor: RUSSELL CONSTRUCTION INC Owner: LINCOLN CENTER LLC 20915 SW 105TH AVE BY SHORENSTEIN PROPERTIES LLC TUALATIN, OR 97062 235 MONTGOMERY ST, 16TH FLOOR SAN FRANCISCO, CA 94104 PHONE: 503-692-9002 PHONE: FAX: 503-692-9008 FEES Specifics: Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: jg Permit Fee-Additions,Alterations, 05/19/2021 $164.96 Demolition Occupancy Grp: B Occupancy Load: 15 12%State Surcharge-Building 05/19/2021 $19.80 Dwelling Units: 0 Plan Review 05/05/2021 $107.22 Stories: 0 Height: 0 ft DC Provision Review,COM TI-Ping 05/19/2021 $103.00 Bedrooms: 0 Bathrooms: 0 Plan Review-Fire Life Safety 05/19/2021 $65.98 Value: $6,000 Info Process/Archiving-Lg$2.00(over 05/19/2021 $4.00 11x17) Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $464.96 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-009 You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: Permittee Signature: Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Ri'jlding Permit Application $- commercial R EC E IV E D FOR OFFICE USE ONLY City of Tigard O/ Re-iv-1D$/03/769/ '� PermitNe.:bUP2Q2-00I0G 14 _ rp Dan e 13125 SW Hall Blvd.,Tigard,OR 97223 T it ¢P Plan Review Phone: 503.718.2439 Fax: 503.598.1960 Date/By: S- .3- 2,1 Other Permit: Inspection Line: 503.639.4175 CITY OF TIGARD Date Ready/By: r J ® See Page 2 for T I G A R D Noti ethod: 1 applemental Ia rmation Internet: www.figard-or.gov BUILDING DIVISION. TYPE OF WORK REQUIRED D A:1- 2-FAMILY DWELLING ❑Demolition Permit fees*are based on the value of the work performed. ❑New construction Indicate the value(rounded to the nearest dollar)of all Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the work indicated on this application. CATEGORY OF CONSTRUCTION Valuation: $ ❑ 1-and 2-family dwelling ®Commercial/industrial Number of bedrooms: ❑Accessory building 0 Multi-family ❑Master builder D Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address:1 Lincoln-10300 SW Greenburg Road New dwelling area: square feet City/State/ZIP:Tigard,OR 97223 Garage/carport area: square feet Suite/bldg./apt.no.:120 Project name:Vacancy Space Prep Covered porch area: square feet Cross street/directions to job site:Project located north of SW Oak Street, Deck area: square feet south of SW Locust Street and east of Greenburg Road Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: I Lot no.: Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Tax map/parcel no.: equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Valuation: $$6,000.00 Work to include minor demolition and new finishes. Existing building area: 1481 square feet New building area: 1481 square feet L PROPERTY OWNER ❑ TENANT Number of stories: 1 Name:Shorenstein Type of construction: I-B Address:5335 Meadows Rd.,Suite 275 Occupancy groups: City/State/ZIP:Lake Oswego,OR 97035 Existing: B Phone:(503)412-4844 Fax:( ) New: B ❑ APPLICANT ® CONTACT PERSON BUILDING PERMIT FEES* (Please refer fa fee schedule) Business name:Mackenzie Structural plan review fee(or deposit): /D Contact name:Samantha Ruddy FLS plan review fee(if applicable): Address: 1515 SE Water Ave Suite 100 Total fees due upon application: City/State/ZIP:Portland,OR 97214 Amount received: Phone:(503)224-9560 Fax::(503)228-1285 PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* E-mail:sruddy®mcknze.com Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System. Business name:Russell Construction Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address:20915 SW 1051s Avenue Solar Installation Specialty Code checklist. Permit fee(includes plan review $180.00 City/State/ZIP:Tualatin,OR 97062 and administrative fees): Phone:(503)692-9002 Fax:( ) State surcharge(12%of permit fee): $21.60 CCB lic.:58918 Total fee due upon application: $201.60 uoeuyea.dws.n.mm•anM This permit application expires if a permit is not obtained Samantha Ruddy°"" acceptedco mplete. signature: m �.a�ao moo; within 180 days after it has been as com lete. Date:04/28/2021 * Fee methodology set by Tri-County Building Industry Print name:Samantha Ruddy Service Board. I:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(I 1/02/COM/WEB) $ IPIII s Building Division Accessibility: Barrier Removal Improvement Plan TIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS)447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per-cent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ 6000 MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ 1500 ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2] of Valuation Computation): $ I:\Building\Permits\B1JP-COM PemntApp.doc 03/03/2011 City of Tigard IIICOMMUNITY DEVELOPMENT DEPARTMENT Building Permit Review — Commercial - No Land Use TIGARD Building Permit #: 73UP2n21 -OD(0 ) Site Address: /O c O .2k) 9.ee ece Suite/Bldg#: /7 6 Project Name: 7Pec c (Naf(ic of commercial usiness occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: L 4d e0d12// — -1 .ee (- Z Ce Existing Business Activity: g9r.e Pro sed Business Activity: S��/ ea V fy site address/suite# exists and active in permit s st ver Terrace Neighborhood: ❑ Yes No om l ng: ki ./ emitted Use: E Yes ❑ No Spec Space Confirm no land use required. .) Business License: Exists: ❑ Yes ❑ No,applicant was provided a business license application Notes: Approved by Planning: �� Date: 4---941— Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved 0 Not Approved Revision 2: ❑ Approved 0 Not Approved Revision 3: ❑ Approved 0 Not Approved Building Permit Submittal,t1 1/ ! Original Submittal Date: �` �� Site Plans: # 3 Building Plans: # 3 Building Permit#: Ei--Enter building permit# above. Workflow Routing: a—Planning 0 Permit Coordinator l 'Building Workflow Sign-off: Er Sign-off for Planning(include notes from planning review) Route Application Documents: O'Building: original permit application, site plans,building plans,engineer and beam calculatio and trust details,if applicable,etc. Notes: 2,1 By Permit Technician: j Date: �y�j� I:\Building\Forms\BldgPennitRvw_COM_NolandUse_I 1 1819.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent t Applicant: Revision Notice 2: Date Sen o Applicant: Revision Notice 3: Date S-. t to Applicant: ❑ SDC Fees Entered: Was Co Trans Dev Tax: ❑ Yes ❑ N/A T_ard Trans SDC: ❑ Yes ❑ N/A "arks SDC: ❑ Yes ❑ N/A ❑ OK to Issue Permit Approved by Permit C ordinator: Date: 1:\Building\Forms\BldgPermitRvw_COM_NoLandUse_l 11819.docx