Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Plans (41)
PLM2O18 -00083 STANDARD PLUMBING ABBREVIATIONS PLUMBING SYMBOLS GENERAL NOTE41 (11-7- AD AREA DRAIN HT HEAT TRACE LTB THIS ISA STANDARD LEGEND SHEET, THEREFORE, SOME SYMBOLS MAY AFF ABQVE FINISHED FLOOR ID #NSIDE(QIAMETERIDIMENSION) THRUST BLOCK APPEAR ON THS SHEET THAT DO NOT APPEAR ON THE DRAWINGS. �` "-- AHP APPARATUS HOUSING PLENUM fE INVERT ELEVATION I CO CLEANOUT ALT ALTERNATIVE IN INCH(ES)ON CSI WCO WALL CLEANOUT ALP ALUMINUM INSUL JOCKEYIIPUMP ® FCO FLOOR CLEANOUT MISC. VALVES & COCKS WIN AP ACCESS PANEL APPROX APPROXIMATELY JS JANITOR SINK 8 CTG CLEANOUT TO GRADE �Q SHUT-OFF VALVE ARCH ARCHITECT(URAL)UTOMAKW KILOWATT El FD FLOOR DRAIN �Q GLOBE VALVE AUTO AUTOMATIC KWH KILOWATTAOOHOUR S BLDG BUILDING � AD AREA DRAIN �Q SHUT-OFF VALVE W/TAMPER SVVITGH�'� ;, CEJV L __...J BOP BOTTOM OF PIPE LB POUND CB CATCH BASIN TRIPLE DUTY VALVE BSMT BASEMENT LF LINEAR FEET © FS FLOOR SINK Tl CHECK VALVE FEB BTU BRITISH THERMAL UNIT MAX MAXIMUM ORD ROOF DRAIN 2018 BTUH BRITISH THERMAL UNITS PER HOUR MBH THOUSAND BTU PER HOUR 2-WAY CONTROL VALVE Crj-],�Fj'j�� 0 OD OVERFLOW DRAIN — R ► BV BALANCING VALVE MECH MECHANICAL TD TRENCH DRAIN '►' 3-WAY CONTROL VALVE BUILD BV CALL CALCULATION MIN MINIMFR MUM BALANCING VALVE CFH CUBIC FEET PER HOUR MISC MISCELLANEOUS 1FC FLOW CONTROL VALVE CFM CUBIC FEET PER MINUTE CLG CEILING OR COOLING MS MOP SINK SYMBOLS ►i SOLENOID VALVEea I B I CL CENTERLINE MTD MOUNTED NC NORMALLY CLOSED (A) ACCESS PANEL 0 CAP EXISTING /CAP FOR FUTURE AI 1 PRESSURE REDUCING VALVE CO CLEAN OUT NIC NOT IN CONTRACT MAV CONC CONCRETE 4 AIR VENT MANUAL CONN CONNECT(ION) NO NORMALLY OPEN BELOW GRADE/FLOOR RELOCATE EXISTING AAV 4 Dull Olson Weekes - IBI Group CONT CONTINUE(ED)(UATION) OC ON CENTER DISTANCE OD OVERFLOW DRAIN CONNECT TO EXISTING REMOVE EXISTING AIR VENT AUTOMATIC Architects, Inc. CP CIRCULATING PUMP OS&Y OUTSIDE SCREW& YOKE GATE VALVE � ANGLE RELIEF VALVE CI CAST IRON PD PLANTER DRAIN n EXISTING TO REMAIN \*/ NUMBERED NOTE CTG CLEANOUT TO GRADE 1 + STRAINER 907 SW Stark Street Portland OR 97205 USA P/FT PITCH PER FOOT tel tel 503 226 6950 fax 503 273 9192 CV CHECK VALVE PG PRESSURE GAUGE I STRAINER WITH BLOWDOWN 9 p www.ibigroup.com DF DRINKING FOUNTAIN PH PHASE A REVISION NUMBER www.dowa-ibi rou com www.ibi rou corn DFU DRAINAGE FIXTURE UNIT DV DRAIN VALVEPIV POST INDICATING VALVE / DI DEIONIZER PRV PRESSURE REDUCING VALVE HB HOSE BIBB DIA DIAMETER / DN DOWN PSI POUNDS PER SQUARE INCH ET-XXX > PSIG POUNDS PER SQUARE INCH (GAUGE) 1 1 L---- UNIT NUMBER /WH WALL HYDRANT DR DRAIN R (RAD) RADIUS DETAIL NUMBER SYSTEM TYPE ©GH GROUND HYDRANT DROP DROP (WITHIN FLOOR) FLOOR UNIT IS F&TIIB DWG DRAWING RISE RISE (WITHIN FLOOR) LOCATED ON DWG. SHEET NO. ® RISER NUMBER 0 STEAM TRAP IS-D P�OFFfJ, (E) EXISTING RD ROOF DRAIN EQUIPMENT TYPE w�� I �,F EDR EXPRESS DRAIN RISER REV REVISION PRESSURE GAUGE 8 2 RPM REVOLUTIONS PER MINUTE EQUIPMENT DETAIL CALLOUT RISER TAG ‘'' EFF EFFICIENCY SA SHOCK ABSORBER ELEC ELECTRIC(AL) PRESSUREITEMPERATURE TEST PLUG z �4 °N , i SAD SEE ARCHITECTURAL41 rc 'p►' ELEV ELEVATION SE SEWAGE EJECTOR THERMOMETER tia��s� L��� ENGRQENGINEERQMISC. FITTINGS & SYMBOLS p °° EQ EQUAL SECT SECTION EQUIP EQUIPMENT SF SQUARE FEET FLOW SWITCH I EXPIRES 12.31.19 ET EXPANSION TANK SH SHOWER ' DIRECTION OF FLOW 1;1TEMPERATURE TRANSMITTER EWC ELECTRIC WATER COOLER SIM SIMILAR ft.. DIRECTION OF SLOPE (SIZE) EWH ELECTRIC WATER HEATER SK SINK SHOCK ARRESTOR EXIST EXISTING SP STATIC PRESSURE PIPE SLEEVE VQ EXP EXPANSION SPEC SPECIFICATION REDUCER WFM VACUUM BREAKER F DEGREES FAHRENHEIT SS SERVICE SINK X ANCHOR RPBA WATER FLOW METER FCO FLOOR CLEANOUT SQ SQUARE REDUCED PRESSURE BACKFLOW ASSEMBLY ELBOW(90°) — DCVA DOUBLE CHECK VALVE ASSEMBLY Ai FD FLOOR DRAIN SQ IN SQUARE INCH(ES) ELBOW(45°) DCDA FDC FIRE DEPARTMNET CONNECTION STL STEEL DOUBLE CHECK DETECTOR ASSEMBLY FHC FIRE HOSE CABINET STRUCT STRUCTUR(E)(AL) 1— TEE BWV BACKWATER VALVE V FHV FIRE HOSE VALVETDH TOTAL DISCHARGE HEAD ÷ CROSS UG w FHVC FIRE HOSE VALVE CABINET UNDERGROUND GATE VALVE W/BOX U FILT FILTER TEMP TEMPERATURE PIV FL FLOOR TMV TEMPERATURE MIXING VALVE W PIPING CONNECTIONS UNDERGROUND GATE W/POST INDICATOR P' FLEX FLEXIBLE TOP TOP OF PIPE OUTSIDE SCREW&YOKE FP FIRE PUMP TPV TRAP PRIMER VALVE I JOINT OR COUPLING POINT FPD FLUID PRESSURE DROP TS TAMPER SWITCH �T� Y PATTERN BOILER BLOWDOWN VALVE V FPM FEET PER MINUTE TSP TOTAL STATIC PRESSURE III UNION II NON-RETURN STOP VALVE . TYP TYPICAL I 0 FLANGED CONNECTION FPS FEET PER SECOND UON UNLESS OTHERWISE NOTED QUICK OPENING BOILER BLOWDOWN VALVE L. .1.0 _I FS FLOW SWITCH CAP GAS COCK VALVE 0 cn FSK FLOOR SINK UP UP UR URN PENETRATES FLOOR SLAB) I I PLUG OR BLIND FLANGE __**II FT FEET/FOOT o RISER I RELIEF VALVE Q V VOLTS ►r� MIXING VALVE FU FIXTURE UNIT VB VOLUME BREAKERColl —o ELBOW UP FUT FUTURE PUMP co O VEL VELOCITY a ELBOW DOWN GA GAGE/GAUGE 0 GAL GALLON VERT VERTICAL a TEE UP �� GALV GALVANIZED VFD VARIABLE FREQUENCY DRIVE TEE DOWN PLUMBING PIPING ca o GPH GALLONS PER HOUR VTR VENT THROUGH ROOF - l e et 0) GPM GALLONS PER MINUTE W WIDTH HORIZONTAL TEE ‘.1 J 0 WC WATER CLOSET ® FLEXIBLE CONNECTION W WASTE (ABOVE GRADE OR FLOOR) GATE VALVE a H -2 H HEIGHT WOO WALL CLEANOUT C BALL JOINT — — — W— — W WASTE (BELOW GRADE OR FLOOR)) HB HOSE BIBB WFU WATER FIXTURE UNITS MC PV" PUMPED WASTE (ABOVE GRADE OR FLOOR) I . O HD HUB DRAIN WG WATER GAUGE IIMECHANICAL COUPLING SD STORM DRAIN (ABOVE GRADE OR FLOOR) COC:D I= HORIZ HORIZONTAL W/W/O WITHOUT HEAT TRACE — — SD— — SD STORM DRAIN (BELOW GRADE OR FLOOR) W (o Y HP HORSEPOWER ZONE ZONE $ PIPE CONTINUATION OD OVERFLOW DRAIN (ABOVE GRADE OR FLOOR) C = U —OD— — OD OVERFLOW DRAIN (BELOW GRADE OR FLOOR) 0 i_ -0 o 4- D DRAIN (CONDENSATE/INDIRECT) io I = 0 0 -- V VENT L. M cn CW COLD WATER d- d- - — -- - - - HW HOT WATERM ff RHW RECIRCULATING HOT WATER 0 • a 0 0 i1. I- 0, TV" TEMPERED WATER HTW 140° HOT WATER RHTW 140° RECIRCULATING HOT WATER RTW RECIRCULATING TEMPERED WATER G NATURAL GAS (LOW PRESSURE) MG NATURAL GAS (MEDIUM PRESSURE) - — — — GV — -- — - GV GAS VENT r •_, r I. CITY OF TIGARD Approved 24 Conditionally Approved. [ I See Letter to:Follow [ ] Attached Permit Number: P rAgoci- ,83 Addres : g50(.. 5.W. Mu* 4- Sf key plan By: 4 Date: '1-IP- 10 =n+.�r; la ?k.�W.-bpi i phase Bid & Permit Set date 02.09.18 I- E revisions a cz C/) a) ca Q C z w a CO u] project# 16054 CD CNI SYMBOLS, LEGENDS AND ABBREVIATIONS - 0_ PLUMBING a) ou- cp 43 , P P0 . 01 eri co-�_. O a� N c, NU PLUMBING DESIGN CRITERIA (OREGON) DOMESTIC WATER PIPING SYSTEM: BASIS OF DESIGN: 2017 OREGON PLUMBING SPECIALTY CODE, APPENDIX A'RECOMMENDED RULES FOR SIZING THE ....)(.3 WATER SUPPLY SYSTEM'. PIPING SIZED ON 4 PSI/100 FT. DROP, VELOCITIES NOT TO EXCEED 8 FT./SEC. (COLD WATER)... AND NOT TO EXCEED 5 FT./SEC. (HOT WATER). WASTE AND VENT PIPING SYSTEM: _ - - BASIS OF DESIGN: 2017 OREGON PLUMBING SPECIALTY CODE, CHAPTER 7, 'SANITARY DRAINAGE'. _ _ ALL WASTE PIPING SIZED AT 1/4"/FT. SLOPE UNLESS OTHERWISE NOTED. I YI.I!NCR 111111 N1 1111 ROOF DRAIN/STORM DRAIN PIPING SYSTEM: BASIS OF DESIGN: 2017 OREGON PLUMBING SPECIALTY CODE, CHAPTER 11, 'STORM DRAINAGE'. STORM DRAIN PIPING SIZED AT 1/8"/FT. SLOPE UNLESS OTHERWISE NOTED AND A RAINFALL RATE OF 1.3"/HR. NATURAL GAS SYSTEM: BASIS OF DESIGN: 2014 OREGON MECHANICAL SPECIALTY CODE, APPENDIX C, 'FUEL GAS', SECTION C402, 'PIPE SIZING'.... ==_ EQUIVALENT LENGTH OF PIPE: 150 FT. (MPG), 30 FT(G) -_._ - _....ii_ NATURAL GAS UTILITY LOADS TAG TAG GAS INPUT SIZE NUMBER DESCRIPTION (CFH) (IN) NOTESiiiiiiii...am--------F- -, -- — Y ' '--1 B-1 BOILER 1,999 1-1/2" MECH ROOM D111 B-1 BOILER 1,999 1-1/2" MECH ROOM D111 B-1 BOILER 1,999 1-1/2" MECH ROOM D111 GWH-101 GAS WATER HEATER 199 3/4" MECH ROOM D111 i i i I B I GWH-102 GAS WATER HEATER 199 3/4" MECH ROOM D111 .-4/Wir GWH-103 GAS WATER HEATER 199 3/4" MECH ROOM D111 i I MAU-1 KITCHEN MAKE-UP AIR UNIT 150 3/4" ON ROOF KITCHEN KITCHEN APPLIANCES 150 3/4" LOCATIONS VARY TOTAL 6,894 3" Dull Olson Weekes - IBI Group NATURAL GAS SYSTEM: Architects, Inc. BASIS OF DESIGN (OREGON): 2014 OREGON MECHANICAL SPECIALTY CODE, APPENDIX C, 'FUEL GAS', SECTION C402, 'PIPE SIZING'. EQUIVALENT LENGTH OF PIPE: 150 FT. (MPG), 30 FT(G) 907 SW Stark Street Portland OR 97205 USA tel 503 226 6950 fax 503 273 9192 GREASE INTERCEPTOR SIZING (GI-1 ) www•dowa-ibigroup.com www.ibigroup.com TAG TAG DFU DFU TRAP NUMBER DESCRIPTION EACH QUANTITY TOTAL SIZE/FLOW NOTES 7 MOP SINK 3 1 3 3" 15 HAND SINK 2 2 4 1-1/2" 37 HOT WELLS 3 1 3 2" FS 43 PREP SINK 2 1 2 3" FS 46 WORK TABLE SINK 2 1 2 1-1/2" PROF 66 DISHMACHINE 4 1 4 3" �� I Nor ‘::2 37 67 3 COMPARTMENT SINK 3 1 3 3" FS , w18 ° 71 SCRAP COLLECTOR 3 1 3 3" % ...4 9 TOTAL DFU 24 - j GENERAL NOTES: y ' GON �• A. PLUMBING FIXTURES NOT NOTED HERE ALL DISCHARGE INDIRECTLY TO THE FLOOR SINKS NOTED. 'n �'Q,- '1,4ctO • -0' `i REFER TO FOOD SERVICE DRAWINGS FOR FIXTURE AND EQUIPMENT TYPES, LOCATIONS AND QUANTITIES. '50z h �' ALL PLUMBING FIXTURES SERVING KITCHEN (PREP, SERVERY AND NUTRITION LAB) DISCHARGE INTO GREASE qS P. CO�� WASTE SYSTEM AND ARE ROUTED THROUGH THE GREASE INTERCEPTOR. IEXPIRES 12-31-19 MISCELLANEOUS PLUMBING EQUIPMENT SCHEDULE TAG NUMBER LOCATION DESCRIPTION ELECTRICAL NOTES MASTER MIXING VALVE 26 GPM FLOW RATE, WITH 20 PSI LOSS MMV-101 MECH D111 140°F INLET TEMPERATURE - 120°F OUTLET TEMPERATURE BASED ON: LEONARD TM HIGH-LOW SERIES EMERGENCY FIXTURE MIXING VALVE (FOR 1 EMERGENCY EYEWASH UNIT) 7 GPM FLOW RATE, WITH 5 PSI LOSS EFMV-101 MECH D111 140°F INLET TEMPERATURe - 90°F OUTLET TEMPERATURE BASED ON: LEONARD TM-300 SERIES RPBA-101 REDUCED PRESSURE BACKFLOW ASSEMBLY (HVAC MAKE- MECH D111 20 GPM @10 PSI HEAD LOSS - UP WATER) BASED ON: WATTS 1" ♦1i■a MECHANICAL TRAP PRIMER U TP-1 FD'S 1-4 OPENING MANIFOLD CALIBRATED FOR EQUAL WATER - . DISTRIBUTION, 3/4" INLET CONNECTION L. BASED ON: PRECISION PLUMBING PRODUCTS MECHANICAL TRAP PRIMER, PPP SERIES GREASE INTERCEPTORI,GI-101 EXTERIOR 100 GPM, 250LBS GREASE RETENTION 0 BASED ON: SCHIER GB-250 E CO) C 0 O PLUMBING FIXTURE SCHEDULE ...ccvCNI TAG ROUGH-IN SIZE (INCHES) ELEC. CU V a) NUMBER FIXTURE TYPE W V CW HW TW GPM/GPF CONNECTION DESCRIPTION NOTES E � O WC-1 WATER CLOSET 4 2 1-1/2 - - 1.28 N FLOOR MOUNTED, MANUAL FLUSH VALVE (1.28 GPF) WC-2 WATER CLOSET 4 2 1-1/2 - - 1.28 N FLOOR MOUNTED, MANUAL FLUSH VALVE (1.28 GPF), ADA Go/ i L-1 LAVATORY 2 1-1/2 1/2 1/2 - 0.5 N WALL HUNG, 20"X 18", MANUAL METERING FAUCET, ADAE .— cy, L-2 LAVATORY 2 1-1/2 1/2 1/2 - 0.5 N WALL HUNG, TROUGH TYPE (119.7"), MANUAL FAUCET, ADA �� S-1 SINK(CLASSROOM) 2 1-1/2 3/4 3/4 - 1.5 N COUNTERTOP, 22"X 19", ADA Qpa5P S-2 SINK(CLASSROOM) 2 1-1/2 3/4 3/4 - 1.5 N COUNTERTOP, 27"X 17", BUBBLER, ADA I -'-' S-3 SINK(BREAKROOM) 2 1-1/2 3/4 3/4 - 1.5 N COUNTERTOP, 22"X 19", PULL-DOWN SPRAY FAUCET,ADA �� CO S-4 SINK(MAKER SPACE) 2 1-1/2 3/4 3/4 - 2.2 N WALL HUNG, STAINLESS STEEL, 18-1/2"X 23", SERVICE FAUCET E U S-5 SINK(RESOURCE ROOM A132) 2 1-1/2 3/4 3/4 - 1.5 N DOUBLE COMPARTMENT, ADA 0 I— 0 MS-1 MOP SINK 3 2 3/4 3/4 - 2.2 N FLOOR/CORNER MOUNTED, 24"X 24", BUMPER GUARDS, WALL GUARDS,WALL BRACKET1011.0 1 ' SH-1 SHOWER 2 -1-1/2 3/4 3/4 - 1.5 N GELCOAT ENCLOSURE, 36x36-INCH ENCLOSURE, ADA, ADAPTABLE 42) d- b- . TD-1 TRENCH DRAIN 4 2 - - - - N r– ‘– EWC-1 DRINKING FOUNTAIN/BOTTLE... 2 1-1/4 1/2 - - - Y WALL HUNG, DUAL HEIGHT, ADA, BOTTLE FILLER 0. S. § ,b ESEW-1 EMERGENCY SHOWER/EYEWASH - - - - 3/4 - N WALL MOUNTED, SINGLE ACTION OPERATION I `V HB-1 HOSE BIBB - - 3/4 - - - - INSIDE USE, INTEGRAL VACUUM BREAKER, REMOVABLE KEY � E O cr, ,_, ....„ O O SB-1 SUPPLY BOX - - 1/2 - - - - METAL BOX COLD WATER SUPPLY FOR ICE MAKER I 4,) .. Le) L WM-1 WASHING MACHINE BOX 2 2 3/4 3/4 - - - METAL BOX WITH DRAIN CONNECTION, HOT AND COLD WATER HOSE CONNECTION/SHOCK I—.. . .4 ARRESTORS WB-1 WALL BOX HYDRANT - - 3/4 - - - - FREEZE PROOF, BOX/FLUSH TYPE w/LOCKING COVER, INTEGRAL VACUUM BREAKER j OD-1 OVERFLOW ROOF DRAIN - - - - - - - SUMP BODY WITH 2 INCH DAM, CAST IRON GRATE j RD-1 ROOF DRAIN - - - - - - - SUMP BODY, CAST IRON GRATE j RH-1 ROOF HYDRANT - - 3/4 - - - - FREEZE PROOF, DRAIN-DOWN TUBING, HOSE THREAD WATER HEATER SCHEDULE FUEL ELECTRICAL STORAGE RECOVERY INLET TAG CAPACITY @ 100F RISE PRESSURE FLOW NO. OF TOTAL kW PER VOLT/ MANUFACTURER NUMBER DESCRIPTION LOCATION SERVICE TYPE (GAL) (GAUHR) TYPE (IN WG) (CFH) ELEMENTS kW ELEMENT FLA PHASE &MODEL NOTES • GWH-101 GAS WATER HEATER MECH D111 DOMESTIC HOT WATER CONDENSING, HIGH EFFICIENCY 100 239 NAT. GAS 18 199 - - - 15 120/1 BRADFORD WHITE --1 EF SERIES - GWH-102 GAS WATER HEATER MECH D111 DOMESTIC HOT WATER CONDENSING, HIGH EFFICIENCY 100 239 NAT. GAS 18 199 - - - 15 120/1 BRADFORD WHITE r EF SERIES GWH-103 GAS WATER HEATER MECH D111 DOMESTIC HOT WATER CONDENSING, HIGH EFFICIENCY 100 239 NAT. GAS 18 199 - - - 15 120/1 BRADFORD WHITE EF SERIES PLUMBING PUMP SCHEDULEkey plan PERFORMANCE MOTOR – -11 –-:: 11 - 1 SUCTION DISCHARGE PUMP phase I Bid & Permit Set TAG FLUID FLUID FLOW HEAD PRESSURE PRESSURE EFFICIENCY VOLT/ MANUFACTURER NUMBER DESCRIPTION LOCATION SERVICE TYPE TYPE TEMP. (F) (GPM) (FT) (PSI) (PSI) NPSH % HP PHASE RPM VFD &MODEL NOTES -� RHWP-101 RECIRCULATING HOT WATER PUMP MECH D111 HW CIRCULATION IN-LINE DOMESTIC WATER 120 10 35 - - - 65 1 460/3 1750 NO TACO date 02.09.18 03 SP-101 SUMP PUMP ELEVATOR El SANITARY SEWER SUBMERSIBLE WATER 60 50 30 - - - - 1 208/1 1750 NO GRAINGER revisionsE m DWBP-101 BOOSTER PUMP (DUPLEX) RISER C112 DOMESTIC WATER MULTISTAGE DOMESTIC WATER 60 100 - 40 79 - - (2) 5 460/3 3500 YES FLOWTHERM SYSTEMS co a) co TANK SCHEDULE I SYSTEM TEMP. RANGE FILL MAX RELIEF MIN TANK MIN ACCEPTANCE INLET PIPE OUTLET PIPE ELECTRICAL i TAG PRESSURE PRESSURE VALVE VOLUME VOLUME SIZE SIZE NO. OF kW PER VOLT/ MANUFACTURER W NUMBER DESCRIPTION LOCATION SERVICE TYPE MIN (°F) MAX(°F) (PSIG) (PSIG) (PSIG) (GAL) (GAL) (IN) (IN) ELEMENTS TOTAL kW ELEMENT PHASE & MODEL NOTES U DET-101 DOMESTIC WATER EXPANSION TANK MECH D111 DOMESTIC WATER THERMAL EXPANSION -POTABLE 60 140 50 80 100 15 10.5 0.75 - - - - - AMTROL � co CL w HT-101 HYDROPNEUMATIC TANK RISER CI 12 BOOSTED DOMESTIC WATER BLADDER 40 60 30 125 - 79 - 1.5 - .. - - - FLOW THERM project# 16054 EQUIPMENT SCHEDULE - N 0) v— PLUMBING c0 C\I LE M V d'J 111° - 0 { .0:.=. .,_ ,, _ -TR ` - _____J ElNi - - : � � J/ i 0 1 .40 0 0 (4D 06 8 @C )9 10 10.50 0 0 Sel n n T I I , ! ! I I I I I I 1 ) \ IV I ! 1 L 11 I ! I I I I f I I I I I I I I 1 A - - 1 - - 1 QI � 1_ , (A) �1 I I I I 1 I 1 I I I I I ° I I 11 I � 11 ! I I ! I II I tIBI 1 1 1 , , 1 1 1 I I I I I I I 11 I I I ! Dull Olson Weekes - IBI Group I N —I I L J Architects, Inc. I 1 I I I I I I I H 1 L I L J --/I7 ��° S I ! I 907 SW Stark Street Portland OR 97205 USA �I T- T - - - - - - - - - � L L - - - - _— tel 503 226 6950 fax 503 273 9192 B� 1 I H 1 4 - B www.dowa-ibigroup.com www.ibigroup.corrl I r Ili I - 1 � ` ❑ ll I € I I I II ! 11 I I 1 I I CO , s_Lbt,_ _ El s iii _I 1 0 - - A —I —_ _ , - - - If__- - - - - -- I I �I� �, 14 I I I ,pl}ROFGr 1 R/ I ' 1 IL . El . I 1 o-r'- d 1 — r r .; I o \o I 1 171 II I -z- e.. _''l c,ov 1 1 il 1 E 41 .:. ',5,o°,-,,/„2,41.°). I '-d. ' - I - ® —1 I 1 • —. — COTT ° . d 1lrT I o o I - 1 t ,:_, _ _ _ _E - L- ,EXPIRES 12-31-19 I I I I I � 1 � ° --� �, 1 � -1 1 I I II, �`- I I4-- IIy a I I Cii-t- - 4I rn o �. .._ �. - • - - 1 - - - - - 0 •,: 1 F II 1 . r I I_ -I 1 , 11 I 0 I III I I 1 1 1 U I ! r 111• I I I -I �'� - - - - - - — HT- -- - --� � 11,1-- 1 1 7 IIo { - .MEM 0— —I I-- - .- 4- 1 CO L 11 Iif - - — - - - I ! a b o o—� I I I I I P-- Y-� I III I 1 I � bI 1 o [M- -- 1. . l I .Ir . 1 I -------- ------.__..._.. . ......._.._... 1 1 ` J I I 1 1 ! I ! I , -I 1--o LI 11 I I F _ • L _ — — — — I- I 1 - 1 I s�� I L — - 17-_t7-fl __ 0 0 I— I — — I I — I I I ! _LF — T i_r� fI — — � J - I I - - I - - I - -- 0 - L._ .... - 1 I 11 I I _1 1— 11 r I I I o Cf) I ! 0 "o I 11 1 I 1 11 I I - - JI I ti ! I ILI I 1 I 110 II I - _ _ - I i per - - - - - - - v -- - - L � LJI ❑ I _ cn o L _TI— 1 'I'l 11 1 i 1 L /s _ o g-. J.8 ....1., .I I "71- — — — 77---- — 1-7— — r 1 — I — ! I I I ! -{ I I J.8 2 ti CI J ] _ __1_ —I -P— Mb ___Ff- — — - I- -1 _.--iL _1 CO Ae-P ci) 6 of_ ---- 1 i w -i?: 1 1 � Io — 1 I ' I I I I I I I F � I I o� 1_ 1_.,,;91 —j r _° x01 I 1 1 1 — cz ....� 0 1 1 1 0_1 1 1I 11 r- T 111 II I° I 11 CD co 1- 1 I I ! II I —I , II 0 I 1I 1III W n I ---- -Ip — — — ' 0 1 1 I y / I I o to °1 ri Li I NC =II I / 1 � En —1.1-1 — —.` O HI) 1 1 F— o 0 ± i H/ L _ i t 0 - IF - I I - - - - I - - - - 1- - L - I L — - I—= — �- - - i -1- - - I - - 1 I - 0 tirt �t- o�-o o-0 11 ,. III I 1 I I I� E � 000 - — o Ln Ln IL4r 4; -- * I I ' o 1 1 ° L J 1--- F--- I - - - Ii If I I I 1 I I I III [1 -I ° 17 7 I I 1 11 1 � 1 I H - I I I ° - - - - L I I I o---1 1•/l ! II I I I I I � I I -I I I — — _ _ _ 1 0 0-- 0 1 �- I , / / I I Li L- - - - 7 � - - - - I- 1L � — � 1I - - I111 1 I I I I I I /� - � - - - - _ - 1 I I // / I -, ,-Ii II \ C A E. >� L 771 17 71 r-Di P. — — — — — — — — - — — / I I 1 11I 1 ! ! I ! 1 LIL I 1 I 1 ! I I I I I I I D Br Cc) 1 11 1 ,. _ _ I -_. -4± I I k e y plan 1 1 1 phase Bid & Permit Set 1- -1 1 - 1- 7 17 177 _ _ _ _ _ R - - 1- - - , I -1 LL 1 LJ LL LLJ I ! I I 1 - - 1 - 1 - - - ` R , date 02.09.18 co I I E revisions I I I I I I I ! I I I 1 cn coQ I I 1 g- / I I I I 1 I I 1 I ! I I W U a_ 0 1 .4 4 (6- 1iT 8.6C?D El 0� 10iKF Ei4� w 0 411) 0 , project# r 16054 UNDERGROUND PLAN cr) 0 UNDERGROUND PLAN OVERALL- PLUMBING OVERALL-1116" = 11-0" PLUMBING oi Cr) U J P 2 . 0 1 U ODS. EP � O-,W N c ti-- cti U 1 r- ' ---.....144) 0 1 .4 C-4). C6D (8_D 8.6 9 1010.50 12 0 , 14 . IN 1. I I I I i I I v i I f I I i I I I I 1 I I I I l I I i • l I I .. .- i L 0, • L- 1-1 - H ` - A eetiIBI , ,- I I • I } I I I I I 1 - I I I I_ i Dull Olson Weekes - IBI Group I II I I Architects, Inc, I I I I�I 1 I I f I I I I I I I I I I r 907 SW Stark Street Portland OR 97205 USA Alltel 503 226 6950 fax 503 273 9192 �' - I il I" I www.dowa-ibigroup.com www.ibigroup.com III ,k I I'' YY- a Y I'- S 1 I I i I i I I 1 I I I I I I IIr IRflftI I I 4:1 — ,../. . -— �I ' I ''- 10 I I I I I I i I I I ; I ! — i I 1 PR B._) B ) I li ���D OF0 s • -- 1. -� • - • 1 •, clA — �'— — -I — - - I — - — — — — — — ,T �.I 1 i+:,, 'Y� III I I • I I7 01. 1. - - - - I-n m - _ - - - - - p1 1 0- - - Tom — _ 1. ;7 i.�� YY 111r1 I —mo i° • i ,„! I I �� _ - �. - fl,- C� �qrc +�� s 70, l�1' -- I I I -I .1 r. . I I bi l� - [ ] I y��q h ���� _� . 1-7",..1 Its _ I . ./ -; I FA _iii -, I I' l „ .,, I , I I 9 I' , I `I I i EXPIRES 12-31-19 E!TI - Y�li r ■ 111 ----Il;:, I.Ejm I I � IT , �I 1:•' }.1� iL-S _ i ,�.b:-:1 /In 41.1- --*tt y I N 1 h . T_____ _ -rl - LL I �I '� ==__. I ; 1 G I' I 117) ® ..!,,:' IdI 1•17._ I Ii • 1JL1 Y JLILII _ W ,I - - - - I c-• .'- 1 i I l 1 1 b I I I Till E rrir z I i I ` i -� ' I I I I I s !-� I . ( „, _ _ _ t - ..� ! I �. -.. n,•� , , I .. '– 412111 — ___ II - It a - I iii JO 1,_— rn rn rI� rill rn rn II �� I 41. 41 I' K_: r7�i � 'i� ,�,■ •' I- LIJ I H LIJ LI LIJ LIJ I `- ell ,,,. . I ' .'6- E i t' II www. - i� - -„ I -[1LC1 I_ -I �� �_ �L I �' Il Mill pi . I r S S �, \ - - rill” .� Fid ��� ��� ��� FI FIS FIS ^ I I'J t_T. •• ` 1 J I �I '� ~ - 1 LIJ LIJ LIJ LIJ LII LIJ LIJ1 1 U ,1 1T4_ J W ' L' IL J 117 �. - - - — EH iL�l r� ii ,r`...`�I — - - — S www ) LIJ J lF//tel ., el - - - - - - - - - - I - 1-,,, ,,L,,ii - - - - 11.---1—- Y � .h - - - - - I- �-- � ! �- I E I I I--I 0 Q I 1 s I- • N F • • • —� cn 0 I I I i I h I I T-------1 I ► i .---..__--)j 1 j 1 may,1— ----F L — — J cam' • ....) • CC V • II A (I) 6 air' ill 11111 ii IMO I _ J.8 o- � 1 I J.8 I _ I I • Cn K — / cu = trrt E . _ .....„ — _ it — — CIO A + cu s 0 o I I • I �+ S I ..._ I8— -n— c I . Ii I Ii I I • I, Lit...1 I I I I �rii , I W CD up - �k� 1 4 1 I I !, O1— ,_ . .7,_ o I -. i ?,.L, • I 1 + � _ _ — o 0 _....l 1 , , , , , I - i ,___. _4._.-4, I SII I I I - I I • Y - _ - ki, E _ 1� I ......_, .• I I 1 0 0 0 � I _ _4 -1 i 1 -c-;,---- z....;-3- n i i, 0 "%_, w� SKY 1` i i; 111 0 ,„Iin . Li-i -Al 11111 , Ai „ Ill �, - -I I l 1 I, I I I I I I I I i i•I , . Y 1;._4 1 I I I Y _ I ;a I 1 • ' l 11 I i I I ` .Y i Y 1-i Y i♦`' I I I I I - i i 1 1 I l I 1 1 I 1 I I I I I I I I 1 I DI • E MIL C A ' c I ; I 1 - Mme: - - I - - - - - - - - - - - i— - - .11 - - - - - �N N o i I I I; I I i I I I ! I C 1 I' B 1 D _ 1 �; I I I r 1 (1:)_.) o r + 1 1 Iii I, I I I I I I �; I I I I I I _ I I I � , II I .1 (-- ) � , „,I (Q) — — — I i — — I — — I I i — — — I I I — — -- I — -- _� '► — — — — — iiiQII key plan 1 I 1 phase Bid & Permit Set 1 I I I I I', I I I I I I I I 17 I I 1 I I date 02.09.18 05 1 R J _ I- 1 - - _ - -0 1 — — — — — — I I ► -- — — 1 — 1 — I — I — revisions cri co CD I I CU Ji I I i I I I I I I I I i I I I 1 F- I I Z UI I i 1 I ICID I I 1 1 I ! I LLI K project# 16054 cz) 0 0 _ 0, 0140 0 7- ) C )06 S 8.6 9 10 10.51�11� GO GI El4� FIRST FLOOR PLAN D U OVERALL- PLUMBING rr 0_ Ii N� 0 FIRST FLOOR PLAN OVERALL - PLUMBING of 3 11116" = 11-0” P2 4J • 01 CO i..� r > CD N N CVO _... . .. . . ..... . _... (..-...)-- 0 1 . E4) ® @E,D @, ,,o.500 0 ( 4) I I I I I . I L __.. I I I ! I f ! I _ - / - eeci I B 1 I 4 I CLASSROOM CLASSROOM I I I Dull Olson Weekes - IBI Grou IA233 P STAIR A2341 i 1 Architects, Inc. 0,1 I I I I I I I S1 I I .HI1 I I 907 SW Stark Street Portland OR 97205 USA H LL tel 503 226 6950 fax 503 273 9192 ;7- I I 26{ I www.dowa-ibigroup.com www.ibigroup.com ! I I 1 I I 1El 1 1 I CD - - - - - - - - - - - - - - - _h: _ I_ • EXTENdED II - - - - - - - - - - CB3 LEARNT G CLASSROOM A22 I CLASSROOM 0 1 A232 A236 I I ! I I I I I f I I' I I I i,� I I I� ,s ����D tPROFi t- I 0 cor - - - - - - - - • - - __ -� I I I ! - - I �g- I , 9 @ Go N d. ,r_ r.. .. __--u0-----__H i �._._._ _ :-1! 224 , �II �-5- 1-0 '4'54 r A. l I—, —cell{ H I I , CUST & 'i o :'� 1 �4sACO\-\I ROOF 1� .° ° II ® 1, 1 I�F � I I � ., c I ,' � .� ► . I I I 1 'EXPIRES 12-31-19 1 !ice .7 �_ I III - — _ II - -...... LEC. -- 1 _ _ _ - I i1 - - - - CLASSROOM 228 $ CI - - - E[I , I ! ° . _ I A231 I V I I I \ , 1 r 41 IL _ 0 _ k 0 I A. , - Pi I -GIRLS = GP 0 ter t 1 7 L I I I I �I 6213 214 I k I ® ❑ > c� I ...t.7.4.71i., _ 4110 I 1 I CIf i _i : I I i I • •I _ \\ , ,, ,.I-. i , _ ' CLASSROOM I I ^ L 0 p y. .. ._., r.._ _ I,IIc B215 x cJfi4I � UNIiEXT . C `� I I a LIBRARY N 1 _ 'moi I • �, ❑ !- • L I I L- -214 1 1 I (� I A1211 i ., 1 1 ' VIII -� 0 I 11 /I I II ri-• • . P I EX NDE II • • I MINIM!, II I LE RNING -l 0 0 0 cal CLASSROOM I -----------__________;2009__________------" .Q I l CLASSROOM 200 O \ ! I - 10 I B216 - ;F I I N . - — — E — — — — — — - '� III — — — — — — 0 = N 1_ a �° ccs U 0' no �; • _ _ i • I BOYS T GIRLS T t+ r r tY - �� .M 22 22 I t 1 I I 'i 1 I . I-..... ..._.�m_._ ___ _. Ia- - B 5 B 6 I I J 8 _ _ I ,.. „ .,,.- ii - - CD - -- - . . �. HALL_ _.. - - - I RSSAEE - - - J - - - - .�.8 ' — y .�. �, �_ SAKE _ . 1 L CD GI CQ i— II • I 6202 s;: • I }r 0 c, I I I I ! I I I -_ =20 n �r I i r l � • 1� ill0 Y I CLASSROOM = = U ° CLASSROOM CLA-SRO M ,- TDF I —_ O 1� eau , 18227 1 0 O O I'16 B210 B20 I 22 1 sum ���1,= S.O. TOILET ` d0- iII M 11 B218 ll I HALLS -_ .Ii; I �11 H LL [ d�- CO,a L�1 �` B22 I I B222 �- I I , I E ( M 9 I1 I_-.. I 0) c=, c) I -. . �.y - , ..__. ... — — _ (14) V/ o v7 v? 0 ' N I EXTENDED L d7 ,4_,.; ..i n I I LEARNING I III CLASSROOM B22I,, CLASSROOM I1 I I I I I I 8231 I 4 r I 62281 ,1 I. 1 � ! 1 4 1 1I ! 1 l I i I 1 �4 1 I ' ! HALL I j13223I . ...... II( 111 Lr T 1, A 0 I I ,i, ! • I• • I 1 I I ! 1 STAIR ' I I is , 1 S3 1 B - " - - _ _ - - - _ - _ _ _ _ _ I iCLASSROOM- CLASSROOM - - - ! ! I I I i 1 I 1 II B230 I 1 I B229 I Q6) J ! I I I I I I I I r E i k e y p I a n I I phase Bid & Permit Set l I I I I I I I I I I I ! c) i I date 02.09.18 co E R - - I_ ! - - I ! _ ► - - - I- - 1 - I 1 - - ! I - I - - I - - - R revisions cn cu �� I I w U I I I I co � I I ' w project# 16054 c) 0CV C3) 0 14 4 0 6-)0 8.6� 10 '10.50 41) 14 SECOND FLOOR PLAN • 0 � OVERALL - PLUMBING o_ 6 0 To-Er SECOND FLOOR PLAN OVERALL - PLUMBING 6i co 1116" = 1'-0" CO U J P2 • 02 ..._. � 7 O N NU 0 C2) 6 8 8.6 9 0 0 4)0,-Th I I I I I I I I - I I I I I I I I I I I I I - I - - — — — — — — — — - - q II :1, _ iiii-: : I I 1I I I I 1 _ L ------- 1 1 I / I IBI r I I I 1 1 I I 1 I �1 r Dull Olson Weekes - IBI Group ° ' Architects, Inc. I I 1 1 o I I I I I — I — �1� — I — I H I — — — — — — — — _ — 907 SW Stark Street Portland OR 97205 USA B tel 503 226 6950 fax 503 273 9192 www.dowa-ibigroup.com www.ibigroup.com r -- -----�---- – 41131 _ ), r---1 1 K N. I I I2 \ C• I D F o ,,.,-� d \ I ) ' I \ D �`��`p PROF�Ssi �� ► 1 \ wl8 2''�� 9 0 kt\L I / I - I I I ' e. , ,,t),4•---4 1 ..z. 4. 0 CO ,..c,, 0 •1 .0.0 , 0 ..:. -5-0 ibiidin E• El I 1 EXPIRES 12-31-19 I 00 I I \ 1 C] 0 1). i I , \ � I I CO - \ I- - - - E j — — — — — — ' \ — - - — — — — — — — I \ � ' I I \ \\\�\\\\\\\\\\\ I ` \\\ ---r. I \ \ \,•:' , �\ I \�\ \\\\\\\�\ -\ -..i El I I . • E ' i \ , \ ,--,--\\ ,\;,„ !I . 1 s I \• : . \ \ I - . \\\\\\\\\\\\\\\ .\`' 0 1 f l & , \ I I .4_0 I I — — — \ — I; — , — — — — — — — — — — — I .C.2 . 4 . I \ 1 \ 4-0 \ , 1 �.� 11 II 1 I 1 I 1 0 C •0 - I r i iii NC a 1 \ I 1 CO 0 -�- II o I \ I I ; I All .\\ p_ J.8 CCS x-vE:\:\T It / 0 II 1 I I = 0 \\\\\\ ' 1 I ' 1 I \ "Ei:,,, 1 I E as.4= sad I _\ \' 1 1 I I I MIN= ....65, ,4..j.. \ iI \ I I I I I ; I 1 W I I O ti \ \ I I 0z3 I \I I — t - - -i0 W \ M M I f E CN3 ui .—, ..--.. M M 1 /i\ \ w .... CD 1-0 ar) ; I I I II I I I I I 1 ...1 - 0 . - - �I Ii • 'I`IIs o u T_ I 1 1 A P - — — - - .W. t . - - k - - !} - I E 1 I I I 1 I I I I I 1 \1 I 1 I B I I L.__ _ I _ D .1. _ Q) — — I I I I I II I I I I I I I I key plan I phase Bid & Permit Set ORD — — — — — I — — I I — I I I I I I date 02.09.18 co I EI I I I I I I I revisions 1i co 1 I cn a)i I CO JI I I I I I 1 z I v 1 � 1111) I (1 .4) 2.5 0 4 7 8.6 (9) 10 10.5 4CI 14 LLI project# 16054 O ROOF PLAN OVERALL - ` N 6 PLUMBING r of 1 THIRD FLOOR PLAN OVERALL - PLUMBING d' U '• .. 1-_i -------- 2 . 03 . CO r- CD ib CNI Et NU . _�_a=ter- =_= C 0 C-6-- 0 8 8.6 C9) 0,9) 10.5 0 (00.........-[ n // I 1 1 ! I I I I I \ W I I I I I ! IL __..a I I I — — I I __-_-._ — ___. I A-) j --1_ (-A) r I I k I I 1 I I I 1 2"W } GENERAL NOTES: ' ea pA. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THEI B I WORK WTH THAT OF ALL OTHER TRADES, INCLUDING BUT NOT LIMITED TO: i i I I I I I I 1 I ELECTRICAL, HVAC, FIRE PROTECTION, PLUMBING, STRUCTURAL AND GENERAL ARCHITECTURE. Dull Olson Weekes - IBI Group B. ALL PLUMBING EQUIPMENT, PIPING, INSULATION, ETC,, INSTALLED IN HVAC Architects, Inc. 13" W--\, I II PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND COMBUSTIBILITY. 907 SW Stark Street Portland OR 97205 USA C. VERIFY EXACT SIZES, LOCATIONS, INVERTS AND ELEVATIONS PRIOR TO RUNNING tel 503 226 6950 fax 503 273 9192 I DSB-1 (TYP) ©O 4"STORM DRAIN I I ANY PIPING. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS OF ALL www.dowa-ibigroup.com www.ibigroup.com P5.01 @1% SLOPE FIXTURES AND EQUIPMENT. REFER TO KITCHEN LAYOUT DRAWINGS FOR EXACT I I ! �I� I I I 1 I I LOCATIONS AND ROUGH-IN REQUIREMENTS OF ALL KITCHEN AND EQUIPMENT. \ 1 1 (4532 SF @ 4.14 GFS)n L_ N 1I I P I I 7 –I I [12F'1AL I 3:. ,c5a PROF r 1 iii0 . ./. ki- ''''i 8 2( ji-7 e If - 1 _ - I I I I 1 L � 1- -1 I® MN Co � maoir . 'CB I II 1 1 I I I I �� I I EXPIRES 12-31-19 3"STORM DRAIN 1 1 I L _I I I r @1% SLOPE I "' n NOTES: I IE=264.5' I I ! I I I III I ! 1) 1. SEE CIVIL SITE PLAN FOR CONTINUATION. ---] r- 1 2. PROVIDE DOWNSPOUT BOOT CONNEGTION AT STORM DRAIN. L.._..._°` / SF@OM2CFS - _J 0 � _ - L I - I - I - LIQ1I C — — — - L I Lr I I fill - � 1 O 3" STORMDRAIN 1 I- -1 - _ 3''W UP @1%SLOPE 11 1 j_ 4"IW TO WCO IE=264.5' --1 I I L �I �T� I I I (p_y� - - - - - - K7,..,- (1586 SF @ 0.05 GFS)- - --F - - 1 1 I - - - - - - - CD) .1 Jo I A L —� 1 2,"W J I \ 3" SD - - - i 1 4.,I– — –1 ‘3"W L 3"W UP I i 4 � r i 3 L II 1 1 � TOFp I ,IW 4"W UP Ar S2 I TOWCO . _ ► LT L 2"W UP 111-0 - 41, II W o CI' Y YI I 31"SDOII - - - - � V2V-TNI"\ --1—. 1t 4"W �•1 , EW O . _ 13U W 1 L- � - - - - 2W • h 2 Q GI L 3WUPTOFD � � 4" SD O2 C.)0 1 3 STORM DRAIN I 2 W I • �. . . - � I O N ► @1% SLOPE 2" PW I 4" STORM DRAIN 4"W N ► 2"V 1 2 V { @1% SLOPE a) IE=264.5 4"W - - 2",W CSP-101 lV (750 SF @ 0.02 CFS) - ii::Ii:I �° 1 L n IE-257.5 3"W UP TO FD co A W I I /4" 7 (3,600 SF @ 0.11CFS)1 4"W I = `'' O 3 W U P 1" ° ,W I WCD TO FD 1- 7 4WUP 3WUP V r✓ ► TO WCO r TO WCO 1 E -_ a, -I-+ \ TV 2W 3"W UP TO FD 1 411W& 4"W 1 I I 1 0 CO H FI - - - - - - � 7 - - I _ _ - __I -�2VUP „ted - � � � . - I W c j r r� 2",W 2„W L4,. CO(21 I0 O o 8 ti 2,.W 1 ,oW 1 = o 0 I 1 I I I I I I I W -0 2 ,LE c:;7_ 743 411 , 14, P� Il E o co o _ 2"W In Lr) I I- I I I I ,�,� — o 0 H- �. - —per - - - - -- - - -_ CO 07 --% I 31A/ 2"W — — — — — — — — — — — •` 3"W 4„W 4"W 3"W I I 2„W 10-- ------ �. I 1 ic ► "W I3 W 4"W SLOPE = 1% FHI-L0_ �� - I ► -;w I I I I I -� III i "W 1,W 3”W 2"W 1�W III C A 2"W I I I I 1 4"W I I I --- �- 1 1 1 I 4"'W UP I I11 J I I TO WCO 1------..... ....„.,,,,.=1„. - -I u - — P O Br I I 4 STORM DRAIN I IIIil \ I I @1%SLOPE — IE=261.5' 4"SD O I IZ - - 5548 SF@0.17 CFS) I T H� - - - - - - - I I 1 -1 - - -I - - - + __J - , 1- - - I k e y p I a n ► I F 1 i II 1 11r- -1 phase Bid & Permit Set 1 1 1 (� 111 I � � � L-I i111 I 1 . II I 4I I 11U4 I I I - - - L _J date 02.09.18 ri 7 cri ! + � I 1 I — — — —06 4111 — — — — _ I I I 0 — — — — revisions P r I I - � il ►ca. � 4" STORM DRAIN I e _ Ii _ L _ _j 1 11 1 a I I I - - - - -J I I I I t ► O @1 /° SLOPE r o� 1I k IE=261.5' I I I (2,941 SF @ 0.09 CFS) I I....il IIL 1. 1 ill SEIM I -1 1 L , A I_ _ __ii— —1_ I z w I I I I I 1 1 I o project# 16054 (NJ 1 I I I I I I UNDERGROUND PLAN _ SECTOR A - PLUMBING cis a) I- C0 0 O 1�.6 9 00) (10. ,� 4 . P2 . 10 __, co c) -5 1 UNDERGROUND PLAN SECTOR A - PLUMBING • `�0! 1/8" = I-0" a C6 7 8 '1 86 / C9) 10 10.5 CI I) (.......)(..3 n 1 I I I I I I € GENERAL NOTES: 111 A. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THE I I I I I I I WORK WITH THAT OF ALL OTHER TRADES, INCLUDING BUT NOT LIMITED TO: ELECTRICAL, HVAC, FIRE PROTECTION, PLUMBING, STRUCTURAL AND GENERALL _.. WB-1 OO ARCHITECTURE. 314" CW& 314" HW 00 B. ALL PLUMBING EQUIPMENT, PIPING, INSULATION, ETC., INSTALLED IN HVAC I I I I WCO , , 2"W&2"V �3 I 1 PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND (A) - - - - - - - - - r ��� • •� ACOMBUSTIBILITY. \\_.,s_ F—. S-2 ICI r- .;' 111 } S-2 C. VERIFY EXACT SIZES, LOCATIONS, INVERTS AND ELEVATIONS PRIOR TO I I I I I I I RUNNING ANY PIPING. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT _ LOCATIONS OF ALL FIXTURES AND EQUIPMENT. REFER TO KITCHEN LAYOUT [ I I — DRAWINGS FOR EXACT LOCATIONS AND ROUGH-IN REQUIREMENTS OF ALL o 1 j - KITCHEN AND EQUIPMENT. / / I B I I I I I I ! I I I I ` CLASSROOM -- - CLASSROOM 1 A1331 I A1341 r 6 Dull Olson Weekes - IBI Group \1 I I — — - Architects, Inc. I I O II I I I I k 1 ' 1 II I ' 907 SW Stark Street Portland OR 97205 USA \ ,, I L tel 503 226 6950 fax 503 273 9192 _ _ - www.dowa-ibigroup.com www.ibigroup.com i I I I I I I I -amu.--—r_ii ., - -vf 2"W& f WCO I I r 2"VI Q -, � 4"SD ,. r O© I I I I ! I3/4"CW : - - - - - - �, L.f" 3/4" Hwoo - ffi� STAIR — I I I I °' ii r r S1 I H ', Li! l I I I— i, -- ���� PROFfJJ, I I ri�j y' --- -- -- \� G 1 NF's O ! I I 1 I I 1 1 r 1 1 I I 1 1 I I r 1 r I I I S-2 / 1 1 1 1 1 1 1 r r l l l l l f 1 1 `II WLOB 9 `'� - - - - - - - - - I I I I I I-I-I I I ! I I 1 I I I — ON I ,r1-- -7 1 11c I I I I EXTENDED I CLASSROOM I '1,Tp Co\ LEARNINGA135 I j- 1. 1 o EXPERE5 123119 Mg I- - RESOURCE CLASSROOM r I 1 , HII11 I I A132 I 1 I I I 0 NOTES: 1 '-'7°--1 I 1 I 1. SEE CIVIL SITE PLAN FOR CONTINUATION. 110 3"SD 3"SD I o g 0/ 0 o a 1 1 2. PROVIDE VALVES WITH ACCESS PANEL. CO - - - - II : , - . WCO - °-I. WCO - . - 1 "a IIGI- - - IF3. WASTE AND VENT RISERS. 1 - 2" CW&314"HW WC-1 3"SD 3" DN-1 II 4. ROUTE PUMPED WASTE DISCHARGE FROM SUMP PUMP TO INDIRECT 30D WCO I 1 " I I I I I / ,, 1 3" FD-1 DISCHARGE AT MOP SINK. ® i, i i:.l EL LTAHs- ,_,--- 1 I J D 5. WATER RISERS . l WCO 1_ 1_ 1 LJ_ _I 314CW1HWI '��'r 3"SD i ° — U I I HALL - =� r WC-2 6. PROVIDE SHUT OFF VALVES WITH ACCESS AND ROUTE 1/2"CW - - WB-10 -- I I I 1A1241 l 1 L-BOYS ' I AND 1/2" HW PIPING IN CABINET SPACE TO CLASSROOM SINKS. }� I i CONF PRINCIPAL RECEPTION I OFFICE ----'-''''-• If - 3" FD-1 ' 37 J 7. PROVIDE 314"SHUT OFF VALVE IN CABINET SPACE FOR EXTERIOR 1 I A104 = A103 I A102 A139 r U ISE WCO I I I I 1 I I I `I 1A13 1 GI " LS ? „ WALL HYDRANT. „ ., I II ! o As 1 SH-1 � , LL^2 I�1,11, �' AJ138 Sh- 3 FD-1 o .(n r 1 r MOBILITY 1__1 1 18. •ROUTE HOT AND COLD WATER DOWN AND ROUTE IN WALL T I_ _i - I 1 _,� 7� T: I FD-1 :. � 2„V I' WG-2 _ �m a �� I _ _ A131 FO-1 i. TO FIXTURES. PROVIDE ACCESS PANEL WITH Q -� - � •�I 1 7 � � I -4” � & ISOLATION SHUT OFF VALVES. _ HALL WC-2 0 WC-2 Q - - - - - — - _ — -0© '_ • ES. T - 0 ] - I- r k .,. 2"V(TYP 5) © �" __ ___ � � _ L - - E2" PU - VEST. i___y.. - - 'L� ' - - - 1 '14 --- 1��{� I m i r 8� WHA A WC-1 9. ROUT PUMPED WASTE UP FROM ELEVATOR SUMP PUMP AND O N E I -mato I v WC-2 I TUTORIAL �Ir' wwr, -- J j -- -- WCO _ ` DISCHARGE AT 4 INCH WASTE LINE IN RES. T A130. N I A100 1 A1271 I V- - 3 W 4„SD 0) WCO I A106 -1 - -/ -22--4-.------ !- - UP 10. ROUTE 1-112 CW AND 314 HW DOWN IN WALL AND PROVIDE SHUT CU 0 1 112”CWI -- 1-FD-1 HEALTH V I I I 2"W �`= �,I�h _J ��,� - ' 1 OFF VALVES. ROUTE WATER PIPING IN CEILING TO FIXTURES 11 i I � I&2 V r1`� i1 2 p J -\ I I I I DOWNSTREAM OF VALVES = 0 TP-1 I �,�i Q ..� WM-1 ROOM 2"W&2"V � 2"V U P WHA � IIS � � A107 WCO - - • LE , I I TO CUST.A142 AND RES. T A130. � � 1 lig' 1/2"HW 2 PW { -- - -_ --- TP-1 (I,© „ 3 I E i= a 2"VTR 7-o AlA10:� S_1 WCO "- WHA A ; 4 W&2V _ I _ L-1 1: - �� ,:.:jt ` T -- --- I FD-1 MS-1 } 1-112"CW i--r Q© r IE I I I as ~ IliT --- 2"W&2'V - 1 CUST. illiiiii . .. . I i-_-=-err II I I I I I I I -14- i Iii I 0 LLi cu u) U I 4—m -I i a • . I o I ( ! 1111 II 111111lllllll I = 0- - s - o � o � I i -- -- HALO I ! 314"CW1HW ( 1 1 1 1 1 1 I I 1 1 1 1 1 1 I 1 1 1 II I I I I }P 1 1 1 A101 --! ;,I___ ��--AI1 .4-1-J_:_� 3 I I CD I ; , O© I I L_ - -- - 1I I i I 1 M M F c 1 41 C17 c--e)- cg- - II411) - r VVC-2 L II r ! r I I I 11'7_ I I I Q� O a) C) 1 1 0 H -_• ; 2"W& 1-112"V El L 0 I }' `~ ,,_, i, � � (TYP 4} � I HALL I17fl I FD-1 I I r� I ! [ T1 III I ITI ITP ITI ITI I I I I TYP 4 ' I I I I I I I I I I I I I I I 1 I I A123 O ' - --® In ' i ;; U FAMILY ' , Y j�..j1(1kTCOOM I I I I I I I I I I r I I I I I 1 I I 1 1 I I1I WHA _ � ���!' RESOURCE rl�l`1 L1J LIJ L1J LI L1J L1J I ID TP-1 �► r3 CI _� I �1i• ; 2"VTR A113 1 A114 _ i I I boo amol o0 1" HW ! I - " V J FT - ET1 ET1 r T1 I T FT -1 rT1 I - I �I _ 2GWQ© ��� I �' r .. 11 I I I 112"CW/HW :i 1 c r r-i`1 i i i I I I I I I I III I I I I I I I I I _ I I I I /II I 1d1i I- _ (TYP 4) I " C 2"W&2"V TYP4 � A I F- -EH 1- + -1 I- + -1 I- + -1 1- + � 1- + -I I- + -1 1 11 314 H '' ) L LIBRARY III III I I I 1 , 1 III ill 1 I 1 ,i,� ,1 U • 1 1 I III III 1 1 III III I III 1 I ,,� C A L-1 .1 1/1 - 1A1211 LiJ1 LIJ L1J LIJ L1W LiJ I I Q+ IIr - , I I r T 1 r r. ^-` _. 1 . I I I I �r –i I I I ` .� I �� ' ~ '` OFF. 1 + 1 ii L� ,Il I 4"WCO iti co, O 314 CW r A120 _ � I 1 1 I 1� �I I _ �II I I I I I UP TO RH-1 1 1 I I - JI ` - ' r - L---- --• -_ - - - 0t I I _COUN. Vk$T. , 3 I L. ,.._ , _, 1 ` t. ——_ V —_ r j I imin p 1 _.im----j--r—,IMIPI=0 41111 MEM ri I il :i S-3 �`_ 0 key plan 1 I CUST 11/2"VTR V I1 1 1 I I WORKRM COUN. OFF 1 ,I STAFF ROOM I I I 1 I I I I phase Bid & Permit Set I A116 A118 A119 I . I _ , K IHW-1 > _1 I . . .- c) 4 SD I 4 OD I date 02.09.18 CD ! I WCO :".----Nli4"SD i I o I I L=1 I I I I cti 1 _,„ revisions i 1 ! i 1 1 I — — — — — — — — ! — — — — I � _ — — 1 1 ' 4"DN-1 ��WB-1 O I a} /I HAL ti 1 _ co C10 I I I I I FCO I I ' G _ I- I I I I J zI II U I I I I FD-1 I I I I o_ Lu project# 16054 N I I I I I I I I ! FIRST FLOOR PLAN - PLUMBING • a.) C r 4-0 5 6--) 7 8 8.6 9 El9) 10.5 411) J ID FIRST FLOOR PLAN SECTOR A - PLUMBING . P2 ■ I 0 o� 118" = 1'-O" N ct -2r U 0.. (------) -n .. ... 0 • 4 I I IL Q I I 1 I C C 1 I . 4"UP _� f-- - - - - - - --+ i_. 1-- - .. .. .. _. O WCO — �— _ —� - I GENERAL NOTES: — I— — — — — — 1 — — . — — — I -- -- —L 1. IT SMALL 13E THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE I L_ _i I. I I THE WORK WITH THAT OF ALL OTHER TRADES, INCLUDING BUT NOT LIMITED 1111111111111111111111111111111111111111 14'WI 1 — 1,11— 4"W I TO: ELECTRICAL, HVAC, FIRE PROTECTION, PLUMBING, STRUCTURAL AND I 1 I I I I I I I I I GENERAL ARCHITECTURE. (tect I B I ITIN I i2.3"W ALL PLUMBING EQUIPMENT, PIPING, INSULATION, ETC., INSTALLED IN I 1 I -00-1--r- HVAC PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE ' AND COMBUSTIBILITY. 1::_r —� --Im- -m---- (•-I- -.-� 4""W I I ( I I 1 I C Dull Olson Weekes - IBI Group 4"W 1 I 3.VERIFY EXACT SIZES, LOCATIONS, INVERTS AND ELEVATIONS PRIOR TO Architects, Inc. 4"W RUNNING ANY PIPING. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS OF ALL FIXTURES AND EQUIPMENT. REFER TO KITCHEN LAYOUT I I II I 3'W - r_.....------{"1--- I i — _ I 1 6"SANITARY SEWER I I DRAWINGS FOR EXACT LOCATIONS AND ROUGH-IN REQUIREMENTS OF ALL 907 SW Stark Street Portland OR 97205 USA F12"W @ 1%SLOPE KITCHEN AND EQUIPMENT. WI ° 226 �° 503 273� � www.dowa-ibigroup.com om www-ibigroup.com - - - I I — 1E453.24' - - o - - ] — -6"W 283 DFUI105 GPM PEAK FLOW 11111111111111111111111111111111111111111111 I 1 -I C C SLOPE= 1% -- - -tr. -, i I 6,11/41: n - -r1 _ _ _ - - -i ... i i i� i .. .r i ow wird i i i i i iiia i evil 1 L ` - - �...... .W.w.... - - 2"'W -�_ 1� � � - - �- _ - - I I I I f 4W T 1 I I I .-0PROF��' I 1 1 �1 `'��c, 1 „t,', —12 1 II IIt_ _, kj I I I 1et e - I 1 I Iii, ,N CI � LII I C I ���r � i4 I L - - I— I " I I 4'fW UP I 2„W I i— 14 . 11 1 I I a4 I I I I EXPIRES 12-31-1 0 L 1_1 TO WCO I I I I L - - I w II 4'fW �- _ -i� 1 I QNOTES: 1 - - - - � I '� , I I III I I I I0 I W 1 1. SEE CIVIL SITE PLAN FOR CONTINUATION. I 1 I I I I /4 - 4”STORM DRAIN pi L @ 1°/oSLOPE @ 0.35 CFS 2. PROVIDE DOWNSPOUT BOOT CONNECTION AT STORM DRAIN. I— - I — r- -z _ - _ 1 IE=252.©' .r.. �,..,..,,.�,.�, �.�.,�...._..._.. — 11633 SF I I I I I � 3"W UP I I _ . r.1.o-.., ,_ — i 1 , I I J N �.- ...-... ..../ TO FD I I 6"SD I I 4"W 0 _ 12"W 1 fi _ 1 I ® C IL — J —� _ — __ IIIIi I I I 4" - - -r - - - — ! I "t I 2nypi TO WCO 2"W 3"W a 4" 4'W YY .... I 3"w .f,.... I I I — it I I ! I I 4"W I I fi 1 4"W UP TO WCO .0 — + q I 4W I L L I I J -- — — — - "wL4"W V iii -� _� L I-11 � , � I r-c\___1\_ 4"'W 3 W3nW0 I IL\-kI 2"W 3"W I ; I Q I I II I 4 L4,-- 2'V►II 2 W c O "W I__, i II II 1- 0 -A- 1 I " 1/ I tI t I I I I �' 3"W 11 I I I 3 � \ � 4" n W I 1 ] re% co a"" ..0 P! — - - - _ .....,,.. L - - - - ' �"W I-4"w 1._ 3,fyN I I 1 / I I I I I C- 4�"W UP I r ! ___ _ _ — `� ► -_,..=, i 1 / To WC0 4 W I J- - -•—• -t {I 3" UPTO I_ _ - - _ - 0 a I I_ ___1 --i_ _ _...... t_c I I I I I I 1 11111.1.111 76 ..ir I 1 3°W UP To Woo F 2 8 aTo WCo LI— , 1 = o p I I l " I I I z .,,..-').- E { , , co I I I I I I I — F-- 1— cy) ..; 4_, i'- pIp 1 I 1 1 I I I I I I I I C I I I I ` En I I I / ' - LI — 3n W I —f - J I I I /1 I I I 3n W I I I a _ C // / L I- - �-- I- __ I - __II L _.1 I I I L._.... _ 1 / 1 C � L — J I I I / / 3"W UP - -- D , B / To WCo - I - / I- -I 1 4"SD 0 P5.01 �P) _ - I 1 1 / / I _J � L I � / I-I I o / / I I / / I I I I I I W I — 4"SoORM DRAIN key pIan / 4,—T@1/°SLOPE @0.10CFS �/ I ,3005E.5 3phase Bid & Permit Set 3,3005 1 I I I I I 1 I I I I I date 02.09.18 CiS WC g TO O I I revisions Li c� I I Q I . w - t.. co C 1 I I I I 1 I I I FL ' project# 16054 UNDERGROUND PLAN 7 cm (.15 0 8 80 9 10 10.E 0 SECTOR B - PLUMBING rLt is UNDERGROUND PLAN SECTOR B - PLUMBING ilo P2 ■ 1 1 LI.... ,0 _ 118" = 1'-0" r'� N . ... s cNC-7 __ -T 0 C8) 6 (9-) 10 10.5 00 -..__/ (1_3 14 // GENERAL NOTES: ` Er A. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THE WORK WITH THAT OF ALL OTHER TRADES, INCLUDING BUT NOT LIMITED TO: I I I I I I I I I ELECTRICAL, HVAC, FIRE PROTECTION, PLUMBING, STRUCTURAL AND GENERALL III ARCHITECTURE. B.ALL PLUMBING EQUIPMENT, PIPING, INSULATION, ETC., INSTALLED IN HVAC WC-2 �1 © II WC-� I PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND -4- - - - - - - 2"V&4"W 0 I O© 2 V&4 W 0 _� I COMBUSTIBILITY. 1- _, r 2 . C.VERIFY EXACT SIZES, LOCATIONS, INVERTS AND ELEVATIONS PRIOR TO 1-1/2"CW WCO=�IA f SCO 0�./ 1-1/2"CW �, ti l� - - - - - - - - - - - - - - - " RUNNING ANY PIPING. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT FD-1/ - 11/2" '+ ' - - FD-1 I I I LOCATIONS OF ALL FIXTURES AND EQUIPMENT. REFER TO KITCHEN LAYOUT i u \AL .-- DRAWINGS FOR EXACT LOCATIONS AND ROUGH-IN REQUIREMENTS OF ALL GIRLS T BOYS T KITCHEN AND EQUIPMENT. / / I_ B I 2"V&4"W B113 - B1141 0� WC-1 J„ 1 la - CLASSROOM !' 1 1 1-1/2"CW ,;"''2i W - °I 2"V&4"WO3 I I B115 I I Fo-1 - 1-1/2"CW P Dull Olson Weekes - IBI Group Architects, Inc. ITCHEN AN WHA 0© I I 00 '-,4,...1_, i 1-112"CW p 2„CW© - WC-2 o - 2 V&4 W 907 SW Stark Street Portland OR 97205 USA tel 503 226 6950 fax 503 273 9192 III www.dowa-ibigroup.com www.ibigroup.com . r lilt 111/2”W I S-2 WORKRM & I I I - r 1 0 OFF. I L-2 0 I WCO n I B103 ---F1411_ 'i, -- 1 _ - r___ 0 _ Tiv ; - - 6101 2"V&2"W O I- I II I I I i l �``\ 3/4"HW Q© a I 1 314°cw© 2v& - - - - - - - - - 0 GI N t,����D PROFFs�i n . I I S2 � 2WO I CLASSROOM w18 2"�� I O© IDF = I I I6116I I z e� ON J /aQ �o 6108( T T gJ yoq�h•�'�r�'\� I iQi 1 S P. C 0\- J_ CONF. ELEC. I I 'NI 0 I I I 1 I 1 EXPIRES 12-31-19 8109 WCO r L-1 0 0 - 1 -HI6104) - - - - - - - - - - - - - - - - - - - - - - - - 4"W&2"V We-2 / 2"W&2"v 140 � I 1 -- •' I I ® 0 NOTES: r I I I' 1_'•-'1" � - : 1. SEE CIVIL SITE PLAN FOR CONTINUATION. MATERIALS L_.a■ ,�' / STO: ° L_ _J 1-1/4"CW B1051 161071 6100 2. PROVIDE VALVES WITH ACCESS PANEL. r 1 II 1 I ® I . 00 I I r1 ,,..,, J .. I I 3. WASTE AND VENT RISERS. a - 1 2"V& -- - -- :- L 4"W WC-2 W3-:-1 4. WATER RISER(S). 3/4"CW: --- 1- B102 © (TYP 3) 2"V&4"W 3 .'- ] I �. I- I - 1 EEWS-1 00 �_ O 5. PROVIDE SHUT OFF VALVE WITH ACCESS AND ROUTE 1/2"CW AND 0 II - - - 11 - - c--- 1_ i - '" �� - - - 1/2" HW PIPING IN CABINET SPACE TO CLASSROOM SINKS. 3/4HW I 2"W 2"V 1 , MAKERSPACE S_4 1 19 314"CW u"a�' 1-1/2 CW J © 1 2 W © �,� 16117 �'Ft ,' -FD-1 (TYP 2) ' 6. PROVIDE 3/4 SHUT OFF VALVE WITH ACCESS PANEL FOR EXTEI 1 I I I WCO I 1-112"CW - ,, • S T GIRL WCO WALLRHOYDRANT. V --it 2"V&2"W © t CLASSROOM . _ ® ` ® .+0:1 r S_3 I` (J = 16126 I Q� �� WC- (TYP 2) 18127 ///y!- 7. ROUTE 3/4"HOT AND COLD WATER DOWN AND ROUTE IN WALL �.+ , , CLASSROOM CLASSRO MI I I I 00 I _ 'N'tI _ 1-1/2"CW TO FIXTURES. PROVIDE ACCESS PANEL WITH ISOLATION SHUT OFF Cl) B110 B111 2 W VALVES. I I I I I I 2V&2W © L 0 0 = I I ; KILN 1FFD-1 00 - 2"V&4 W 1 KILN 2"V&4"W WHA O© 8. PROVIDE 1/2" COLD WATER WITH SHUT OFF VALVE IN ACCESS V 1 _ _ I 1 -� Q© I LL....UNIEX T PANEL. ROUTE TRAP PRIMER SUPPLIES TO FLOOR DRAINS. CO 0 1 1 MAKERV&2W03 4 - 24 0� 1-112"CW I 1 I li I 9. OFFSET PIPING TO AVOID OTHER ELEMENTS AS NEEDED. 0 N - - O 2"W I© STORAGE S=2 -J - - 2"V&4"W uIu}S cam"_ I. 4"W 3 B119 2"V ,-------r--1-1--`21'-- I_ ' „ ® a) - - 2"CW, 3/4"HW 41 L_2 2 V UP 1 S-24 2:V& U � _ O0 Cn o I 2V& - WCO I I _ lei —__ _-- -- - - =_ � � \ - -- _ -- \_ __- -- - 314"CW& = © 2"W [l I I I I �noi 3/4"HW E - ca S2 - _ ,, S-2 _, I B120 I WCO 1-114"CW, 3/4"HW 4O HA,\ ....�L.. L.... I.......... .I L I_ �© Q' CZ f� I� / Ii B122 1,. 00 _ 1 � It:: C I n I - , I wco L1J 0 M — — - -- r_. ;� — - — — wco- - - — — — — — r1 co 3/4"CW&3/4"HW O© WB-1 60 `� II o — LJ I — — — = le.= o 4- 1 s EXTENDEDI ® l }-i 1 = o O CLASSROOM I LEARNING CLASSROOM 0 " d- 1 IB131 ( / L I 16121 B128 / ?.0 CZ I o :I ILc,I-1 1 417 j A r I01',----„. I I I I , , I I - I , . . , r I I I IJ. :, , r. I HALL � mo i i l i i i i i i i e i i i fls2 ' --- -__:-..- 1 _ o , F o C q 3? 11 i i i i i i i i i i i i i i i i i l I I I I 1314"HW �, I I ,, _ 71-i-:- ' , , i i I 00 wco I ISI -- =- - _ 1 ___ B O 2"v& I I o I 12��W© I a I CLASSROOM 1 CLASSROOM 1B1301 i B129 I Io I 11 I = � I I I key plan 1 I I - - I 1 1 i phase Bid & Permit Set � L 1 I I I I ! I - - I I N r ^ - II - date 02.09.18 g W 11 Eli revisions I I I I I r I I co I -, I \ s 2Nl S-2 1.a)co / , - - I- j ; IF\ E_:_-.0 --7—. , - I - ____- - - I© \ WB-106 U 3/4"CW&3/4"HW 00 I c2 I I I I I I I I I o_ w project# 16054 0 FIRST FLOOR PLAN co 0_ 0 SECTOR B - PLUMBING d- Ci Tt �J 0 0 0 8 8.6 9 El-CD (1,_.0.50 14 1 1 P2 . 11 �� C-1) FIRST FLOOR PLAN SECTOR B - PLUMBING i` 1/8" = 1'-0" cNU • (0........)0 . n u..iron 11111.,.. GENERAL NOTES: A. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THE _ =_-_ WORK WITH THAT OF ALL OTHER TRADES, INCLUDING BUT NOT LIMITED TO: ----,:-.,,. __Ati ELECTRICAL, HVAC, FIRE PROTECTION, PLUMBING, STRUCTURAL AND GENERAL ARCHITECTURE. . B.ALL PLUMBING EQUIPMENT, PIPING, INSULATION, ETC., INSTALLED IN HVAC PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND COMBUSTIBILITY. - 7—- --y- C.VERIFY EXACT SIZES, LOCATIONS, INVERTS AND ELEVATIONS PRIOR TO RUNNING I 1 ANY PIPING. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS OF ALL , - = I FIXTURES AND EQUIPMENT. REFER TO KITCHEN LAYOUT DRAWINGS FOR EXACT LOCATIONS AND ROUGH-IN REQUIREMENTS OF ALL KITCHEN AND EQUIPMENT. II I =-=- D. PLUMBING CONTRACTOR IS RESPONSIBLE FOR EXTENDING ALL REGULATOR VENTS TO ATMOSPHERE. REGULATORS ARE PART OF EQUIPMENT GAS TRAIN. Dull Olson Weekes - IBI Group 0 (....._1 E. WATER HEATERS SHALL BE INSTALLED WITH DRAIN PANS UNDER HEATERS. ROUTE Architects, Inc. U,4 3 4 DRAINS TO NEAREST FLOOR DRAIN. 907 SW Stark Street Portland OR 97205 USA tel 503 226 6950 fax 503 273 9192 www.dowa-ibigroup.com www.ibigroup.com Y I I I I I I NOTES: r--__�- --_--- _-:' --------._ n., 1. SEE CIVIL SITE PLAN FOR CONTINUATION. I I I I I I 2. PROVIDE DOWNSPOUT BOOT CONNECTION AT STORM DRAIN. 4"STORM DRAIN �� �'� �R�� j @ 1%SLOPE @ 0.08 CFS i ' w18 2N'.4,,,p9 IE=264.5 I I 2,616 Sr I I L I _ I I I 1 C — — — — — — — — E — — — — — — — _ _ _ — _ — — _ ( C .' GON T- I i -- - - - .1 %yoah°r ��, ' 0� 4 SD � 2"V 1 qs p CQLti P5.01 I ( I 3„W 1 EXPIRES 12-31-19 1 \10\---%/, - - (6) I ii I I 1 1 l i 1 ii 1 1 1 i 1 I I I 1 I I iI I I 1 1 1 I i i - L -I I I ii I 2„W I ( I 1111111111111111 0 ....., .. 1,1 1 2mom 'LIMN P4.01 (I I 'II1 I __` I ..• I fa.)E3 CCS _ _0 - II CO O — KI I it I I I—). O A 3„W as C� a) E i . 0 1 I L- - - - -I•- - - - - - - - - - II I I I 0) -[ 10 = -2 E :4=i; a II i I I I cp Co i= jI I II!I I [- I - I I� I ! W co uminies u) L — — — - 11 11 I c 0 I-- mor.. i I tit — —J I i SLOPE= 1% --► I L •NIW CD "CY 4„ I1 _ 4.,W--r— Cl. riN .-- ...;:t .T.t. E jI o o c� •� O V7 V7 Io .... ts... 17,11,, VVV'VVV'PVV`A"OVW—A'V PPV NO-PP VVV-V 4,11,—%.4,,,,N.,PPV"TON,V"VPVV WV,*V-0-0.V Y. 46...11...0.41...6....A.—........A LA_a A.d6AA.4JA ALA 6.6.41\A.LA........./..."..A....A-66............A.— — — �...- 1 I I I I I — L _ _ I I I I „W I ( I I __. .. A L 1 I I I , - 1 1 .. _ 1 D B 11 it W 0- 1 1 1 1 I o I I I key0 — — — I 0 plan I I r-1 t-- --1 T 41111110 I I a LL phase Bid & Permit Set I ` 1 i....j ! I I __ __ __-_- .__ _ __-. _-- - -- -- _-_._ __ -- --._.- _._.- __-- -- _ _____. _ -- _-- _- dal 02.09.18 J.8 - - - - - = e I ; I ' I I I1 1 . - ..- �. ,� _ -_ ��. � �.._ . ��-. .-,_ . � � _ revisions co co l v as Ji I I I I I I Z Ili 0 I I I I I I ccs a_ w project# 16054 N CD CI (14) PLAN 1. 2,___ 5 C3) 4 SECTOR C - PLUMBING ccoo•� III UNDERGROUND PLAN SECTOR C - PLUMBING oma-- 1/8” = 1'-0" 43. P2 a 12 tati _ co__ E..)--(T, UL.,----,----_,_-----,------____-=_,_,=,_=_„ „-ii n_j- 1iit s =__ // (........ 1 n GENERAL NOTES: Ilif A. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THE WORK WITH THAT OF ALL OTHER TRADES, INCLUDING BUT NOT LIMITED TO: ELECTRICAL, HVAC, FIRE PROTECTION, PLUMBING, STRUCTURAL AND GENERALL _....,,, ARCHITECTURE. B. ALL PLUMBING EQUIPMENT, PIPING, INSULATION, ETC., INSTALLED IN HVAC PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND COMBUSTIBILITY. C. VERIFY EXACT SIZES, LOCATIONS. INVERTS AND ELEVATIONS PRIOR TO RUNNING ANY PIPING. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS OF ALL FIXTURES AND EQUIPMENT. REFER TO KITCHEN LAYOUT DRAWINGS FOR EXACT LOCATIONS AND ROUGH-IN REQUIREMENTS OF ALL KITCHEN AND EQUIPMENT. 1 1 D. PLUMBING CONTRACTOR IS RESPONSIBLE FOR EXTENDING ALL REGULATOR VENTS ea I B I TO ATMOSPHERE. REGULATORS ARE PART OF EQUIPMENT GAS TRAIN. 1 1 1 1 .4 2 2.5 3 C4) E. WATER HEATERS SHALL BE INSTALLED WITH DRAIN PANS UNDER HEATERS. ROUTE DRAINS TO NEAREST FLOOR DRAIN. Dull Olson Weekes - IBI Group Architects, Inc. I I I I I II 907 SW Stark Street Portland OR 97205 USA I tel 503 226 6950 fax 503 273 9192 www.dowa-ibigroup.com www.ibigroup.com I I I I I I 1 I 1 I I I I ° I ° WB-1 I PROF 0 — — r=2/Y- r CII 3"GAS METER CUST. MS-1 X „GIN.6,.6, 4 c 18 2�/1 9,698 CFH @ 150 TDL C104 - oN I I I ( �• Fill 1 3/4" CW , - 2I,VTR ! 3"�W 2��V ?C 4, _L: '�1°,c° 0 i — t.... _ . IIMP imoMMo MI ammo am 4mEns lo ammo OM 411111101 IMI II IMI ... 0 N�� 314" HW '4S P. CC IAFFT TABLE (0- :- 4 I I I STORAGE / 11 I I I 1 EXPIRES 12-31-19 I L J 06 1 0105 I - . / 11 1 I / I ' BDF II / I T� O NOTES. P6.04 ! i 1\ j��� i i /C r J ` I Cl 031 * II II -__— I " I . I \ �� F CAFETERIA I 1. PROVIDE SHUT OFF VALVE(S)WITH ACCESS PANEL. SIN I C101 I i III !_ 2. ROUTE 3/4" COLD WATER UP TO ROOF HYDRANT. �� KITCHEN/ ® I I I C107 I/ ��© , 3. PROVIDE 314" COLD WATER WITH SHUT OFF VALVE IN ACCESS To I I-,r I I - PANEL FOR EXTERIOR WALL HYDRANT. I ,/—Ig El I , I 1 it T ,_� � I I I 4 74 I I I I L � II I \ / RECOR I E " I 1 2 �� (41 — r �1 I 1C102 I ♦ , I t ( \4.01 P4.01 ,11,1 fi I /rrr� �- J II V_ 1 . .I DISH WAS �X\ I / 0 I t ' 7 -\ - - 108 - EWC-101 �l - \ 4 ..------ I C.OLE ; F REEZk I4 0 u) 00_IO Q i., ' C110 C1091 _ - I __ _ c4 I I I ..= cj, ..._ r--- I MEM >< i ' III 0 N II 1 �� .,.ter..-� RUN 1► ! I I I I ' ti G cs)V --� � IRL T � — — — — i — — — — - - - G A-Cti0V = P: [ ri I ] / C _ I . - 0 0 0 \ , ca, I r Q E - n�� �� 1 1 4. / J 00 I [ c 0c � � U \ 1 II HALL I I I W Y DRY STOR. I BOYS T - I � L �! _ i STAGE C10011 I o ti C111 I I C114 I 314" CW I C116 I .� 0 0 w -c) RISER �—� , _ - _ . . .1� . . amoo � 4o � � � .— ` 4F1 ram — M M C112 SEE P4.01 F �, LL L OR ' 15 - _L__ II E ci) CD M ,c,:'„) CONTINUATION LI_ I 00. Thi _ __2 1 I I 1 G L 1 , 1 r 11— I— cy) _i_; ...; -p 1 ° 1 i a 1 I I iii I I HALL I , I C117 1 I II = 3" CW MUSIC - C120 1 1/2" HW I T � � � � ' 1 - ' I I I 17-3/4" RHW I T I I STAGE F - ELEC. I I 1 1 C A STOR. C119 1 C118 - I \ I ' IyIi I II F 0 7----3- 2"VTR D , I © iWi � - I 0 I WCO HA I I ti ' „„,. I LL i. ,, i ,,. in I 1 1 a MS-1 21/2" MPG - _ - ` '� _ - -- - — - -- _ , - — 7 1...,..--.11... CUST. , 1 ," I I " key plan 3/4" RHW • I D1081 -2" HW phase Bid & Permit Set -1- ) — — — — — — — CWS - - I date 02.09.18 c E 3" MPG revisions Cii I I I I I m aI CO ci Ji Q I I I I I I CLF— = w 1 1 .4 (2D 2.5 (3--) i 4 project# 16054 N FIRST FLOOR PLAN a) SECTOR C - PLUMBING O ;7---11.3) Ca P2 1 2 ,,j-J U c0}_. O tifr 1 FIRST FLOOR PLAN SECTOR C - PLUMBING //' _ n GENERAL NOTES: - L ::I A. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE = THE WORK WITH THAT OF ALL OTHER TRADES, INCLUDING BUT NOT LIMITED TO: ELECTRICAL, HVAC, FIRE PROTECTION, PLUMBING, STRUCTURAL AND GENERAL ARCHITECTURE. 1110 B.ALL PLUMBING EQUIPMENT, PIPING, INSULATION, ETC., INSTALLED IN HVAC 1.4 4 PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND 0 0 CI COMBUSTIBILITY. 1,": ,_,..adi-_- __ 4"STORM C.VERIFY EXACT SIZES, LOCATIONS, INVERTS AND ELEVATIONS PRIOR TO DRAIN @ I 1 i 1 RUNNING ANY PIPING. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT 1%SLOPE @ LOCATIONS OF ALL FIXTURES AND EQUIPMENT. REFER TO KITCHEN LAYOUT _ _ 1 i 0 09 CFS DRAWINGS FOR EXACT LOCATIONS AND ROUGH-IN REQUIREMENTS OF ALL ' l IE=257.5 I I I �� _ I B I KITCHEN AND EQUIPMENT. 2,936 SF I 40 ©I_!._ � - I II I I D. PLUMBING CONTRACTOR IS RESPONSIBLE FOR EXTENDING ALL L 4 4"W i REGULATOR VENTS TO ATMOSPHERE. REGULATORS ARE PART OF EQUIPMENT 3"SD 0 ( I 4"W UP —I I--- __ ( ( GAS TRAIN. Dull Olson Weekes - IBI Group TO FCO 11 I I I Architects, Inc. III I I F I I I I I I I I E.WATER HEATERS SHALL BE INSTALLED WITH DRAIN PANS UNDER HEATERS. I _„ I. "t'" 1 I -1 I I I ROUTE DRAINS TO NEAREST FLOOR DRAIN. I I M 907 SW Stark Street Portland OR 97205 USA < I k L I I-- -- — _ tel 503 226 6950 fax 503 273 9192 J 8$ I - - L - - - —1 - I - _ _ J F$ www.dowa-ibigraup.com www.ibigroup.com 3"STORM Q 1 4" D '' 4"W I I � DRAIN @ S-- S 4 4 STORM 1%SLOPE @ � �• .7.-4"W D%RSI 0 E@ I 0.01 CFS �d' IE=257.5 I I I I 0.09 CFS 1 1 I 430 SF I 4" I IE=259.5 L I 7 6,�p PRO/- 2,793 I SF � x N E d ( ' I '18 2•' -7 I I 4" I I F 1 4"SD \I I W-7— a ' 19 // . LAA/...O..AAAAA 04.4//u.AAAA A.A.A AAA AAAI.+AAAAA--I ?9 ogsP. CC\'\- I I —I I I I I I— • I- I EXPIRES 12-31-19 I 3"STORM '.l 13"SD W P� 4„w jf1 .01 DRAIN @ S--- I I I I I 1 I 4"STORM I 1 0 NOTES: 1%SLOPE @ DRAIN @ 0.01 CFS L_ I L 1%SLOPE @ 1. SEE CIVIL SITE PLAN FOR CONTINUATION. IE=257.5 t F 0.09 CFS DOWNSPOUTCONNECTION STORMDRAIN. 430 SF I I Tf(TYP 4'W 2"W IE=258.5 I 2. PROVIDE BOOT CONN C ION AT RA N I I 1 3,129 SF I I I 3) f(TYP 4) 1 I I -i 3. PROVIDE 2-1/2"NATURAL GAS SUPPLY PIPE I _ ® I 4"SD L WITH REGULATOR TO REDUCE DOWN TO 0.5 PSI PRESSURE. o-o o-o--o-- ROUTE SUPPLY PIPE OUT TO EMERGENCY GENERATOR BELOW GRADE. I I I I ( I I I VERIFY EXACT LOCATION AND REQUIREMENTS FOR EMERGENCY I- - 4'W T __._ I GENERATOR WITH ELECTRICAL PLANS. @',- ® I I ! I- -I4"STORM I I I 4"SD 1 1 I I �I_"r3A -I--+ DRAIN @ I0 1%SLOPE @ L + -. 0.03 CFS I IE=257.5 1,076 SF I fI �.—.- -•—' - -�. I ~- I � I I I .� "W 1 a _ - II I I ' LIICO 0 0 N 4W 2W ___A 4W 0pc.... • l CCS f� W I 1 I 1 I i I vJ I - - - -0 I 1 L I - - - - I - - - -I - - I E I 11 I - N E -......-z. „, CD WC� i— I co = = U e' or- 1I = oo I 1 ( — 3"SD 2 — I I 11 —I '� 7 d- d- itwv.„ I ,... § 4., _i — I --I _ EP) CO cii ..--.. ..--.. LI — J Lo J L — J L _ gi, 0) o 0 0I I I I tj -— o Vin, 1 3"STORM DRAIN@ 1%SLOPE @ I I 0.01 CFS I I I I IE=257.5 330 SF I I I I I I C A I 1 1 1 1 1 1 I -, I I " D B r 3 SD 0 I I I I [ 4"STORM DRAIN@ I I 1%SLOPE @ I I 1 0.10 CFS 1E457.5k e y P i a n 3,321 SF - -1 r - - "1 r - - -I Z'Ii [ lEl I • i1- 1phase Bid-') — I — -- I — — — I I — II — I 11— I —I — — _1 J L - - J co date 1 02.09.18 g 1 1 I 1 1 I revisions cti co as ca I I 1 I I I ( I o_ J W 1 .40 GI CI (4D. I � U - FR W project# 16054 cp (-NI0 UNDERGROUND PLAN SECTOR D - PLUMBING UNDERGROUND PLAN cb 1/8" = 1'-0" SECTOR D - PLUMBING N L.L N--76 4- 6-3 P2 . 1 3 U J Op . O CD _ GENERAL NOTES: WP A. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THE WORK WTH THAT OF ALL OTHER TRADES, INCLUDING BUT NOT LIMITED TO: ELECTRICAL, HVAC, FIRE PROTECTION, PLUMBING, STRUCTURAL AND GENERALL 111 ARCHITECTURE. ii-;i: � J c-,-,-. B. ALL PLUMBING EQUIPMENT, PIPING, INSULATION, ETC., INSTALLED IN HVAC PLENUM 0 SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND COMBUSTIBILITY. � T T C. VERIFY EXACT SIZES, LOCATIONS, INVERTS AND ELEVATIONS PRIOR TO RUNNING ANY PIPING. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS OF ALL I I I I I I FIXTURES AND EQUIPMENT. REFER TO KITCHEN LAYOUT DRAWINGS FOR EXACT LOCATIONS AND ROUGH-IN REQUIREMENTS OF ALL KITCHEN AND EQUIPMENT. I D. PLUMBING CONTRACTOR 1S RESPONSIBLE FOR EXTENDING ALL REGULATOR VENTS I 1_ 1BBI I TO ATMOSPHERE. REGULATORS ARE PART OF EQUIPMENT GAS TRAIN. I I I I 1 HALL 1 Imo! I E. WATER HEATERS SHALL BE INSTALLED WITH DRAIN PANS UNDER HEATERS. ROUTE I DRAINS TO NEAREST FLOOR DRAIN. Dull Olson Weekes Group --..w...r.w.■ - - - �������.i.� .i�..�.rrM� — ---- ----I���i i�� ..I�..i. Architects, Inc. rc, I I CUST. 11 — , RAMP r: 0108 D109IF s F, 907 SW Stark Street Portland OR 97205 USA I I- — — -f . I — J.8 www.dowa-ibigroup.com p.cam www.ibigroup.com L tel 503 22 fax 2 (J. 0) - - - - - m I I � � , �� Il ° = i n ri II n II II � ti \� I7Y O IF - k w1n n n il [—1 n i , A 982" I I 1— J) /'.) 1 b x a d I - . I I EXPIRES 12-31-19 I STOR. 2"V UP 1 LI u u u - L 1D1051 �_C4"W UP 7/1 . ° HB-1 314"RHW UP 1 u u u .� O NOTES. TYP 2 CM -- 1. PROVIDE 314" SHUT OFF VALVE WTH ACCESS PANEL FOR EXTERIOR u WALL HYDRANT. - / IRLS T •III I I 2. ROUTE 3/4" HOT AND/OR COLD WATER DOWN AND ROUTE IN WALL 2"CW O© FD-1 r D107 I 1 GYM TO FIXTURES. PROVIDE ACCESS PANEL WITH ISOLATION SHUT OFF I 0----- VALVES AND WATER HAMMER ARRESTOR AT FLUSH VALVES. ® C I I D101 ' I � 9 l WCO • _�� f I , EWC-102 I 3. PROVIDE 1/2"COLD WATER WITH SHUT OFF VALVE IN ACCESS ', W .,_ � . 0 PANEL. ROUTE TRAP PRIMER SUPPLIES TO FLOOR DRAINS. . . it, 1 .itI,... - ,•P WC-2 . I L \I (TYP 2) .7. ' FD-11 ;. L BOY T \ - D106 L1 I 1 N_ 314"CWIHVI p© U r 0 (TYP 6) I I - — L. i _ _ : . +-a 4 SD UP/DN 1 I PE STOR. • (- : Q 3/4"CW/HW DN ©103 I I TP-1/WHA ; Colll -- I n n n n n I I n i n H CO 0 T � 'v� __ S _ ISH-1 a! _ „______11. 111 PE SHOWER 1-112"CVV} I `FU-1 ` 2'V = .;,� co r0^ Ct I 1102: -\ °WCO I _ _ . I C VJ 0 • '1 r '� rte. 2'v&4°W C'I�_:_._ I u I u u ' u u u u w LI u �N -�+ [01 LL Fy �' ' WC-2 L �112"CWIHW ` ,,-' ! W C 2"V UP I� U PE OFFICE o ti WB-100 0102A 0 = o0 0 4. .' I_ I 43) d- [ . -0 IN' r-p cp. S. § ?.5 74 u K } E cy) . 2 2 1 1 9 CD LO L.r) I 1 ; I I I COVERED C A F I PLAY 100 D B I 1 I I ; I I I I I I 11 1 key plan phase Bid & Permit Set ® - - —43- 0_ o - -o— oI® date 02.09.18 I 3 I I I I revisions c.6 L m I COCD I I I I I i Q JI i w 0 1 .4 0 • 0 4 oNE project # 16054 - Si : P ;► C • : 1 - P u►. : LOWER FLOOR PLAN 1/8" = 1'-0" SECTOR D - PLUMBING N- ‘ 1-. o P2 . 13 J 1 3O � 7 Q) NOf ti-- U E-1). .____I6 � 8 8.6 9� 10 X0.5 0 1.11-41Y3n I I I I I I I I GENERAL NOTES: 11, A. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THE WORK WITH THAT OF ALL OTHER TRADES, INCLUDING BUT NOT LIMITED TO: ELECTRICAL, HVAC, FIRE PROTECTION, PLUMBING. STRUCTURAL AND GENERALL __.. I 1 I I I I I ARCHITECTURE. B. ALL PLUMBING EQUIPMENT, PIPING. INSULATION, ETC., INSTALLED IN HVAC 3!4"CW& 314"HW PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND ©� COMBUSTIBILITY. I I I I I 2"VTR - 2"W& 2"V 1O - U i ,' 1 CI I P9 i ___[ 11 S�2 ss=2 I I I I I I I I IBI , , 1 el , I I CLASSROOMI I CLASSROOM I Dull Olson Weekes - IBI Group A233 — 1A234] Architects, Inc. r I 907 SW Stark Street Portland OR 97205 USA I I I I I I I I I tel 503 226 6950 fax 503 273 9192 I I www.dowa-ibigroup.com www.ibigroup.com I I I I I I I I Al---11 IU II I7 2"W&2"V 1O o - I I I ,1=--y I I HALL I 314" HW&CW �� ,J/ �� aF ' STAIR ,� � 9El Ell I I I I I e.., ec,:,, /� I I I I -Ir , , . i , , , I I S20 2..VTR --E-=, o�ch,' .�� s 1. 1 1In_ -1 1 — — S P. C g - - - - - - - - - - - - _ - - J T 1 EXPIRES 12-31.19 I I 1 1 I I [ - - CLASSROOM (\ NOTES: - — � CLASSROOM A235 1. WASTE AND VENT RISERS. I I OI 1A232 1 i EXTENDED 2. PROVIDE VALVE(S) WITH ACCESS PANEL. LEARNING o A225 3. WATER RISER(S). ��11 I I I® 0 I „ 0 — — _ I _ — 0 4. ROUTE 1!2 HOT AND COLD WATER TO SINK(S) IN CABINET SPACE. • ® 2" HW, WC-1 l „ 5. ROUTE 3/4" HOT AND COLD WATER IN WALL TO LAVATORY FAUCETS. 2"W&2"V Q 3!4 CW I 1:)) --'J '-113-117 —0 3!4"CW& S�2 I QQ I 6. PROVIDE 3/4" COLD WATER TO ROOF FOR ROOFTOP HYDRANT. �� [i © 44,'_----. 11 . — -- — (SD) � \� 4"W&2"V\/ - _ I �i �z1 I I I I IJ •� v' '4D-1 B�� IWC-2 I! 2"VTR — HALL 2"W& 2"V 0 iv= �--+ FD-1 11 1 A224 I NMI TA237 Q _ Cn� : S-2 L-2-� I I o WHA& TP-102�.� QJ r CUST & I GI - = . I I I I ,, ROOF - WC-2 I FD-1 . --- ,I CLASSROOM ��- I'.. _.. A231 ACCESS I CO 0 — . -, — 1 1 2 V 0 .- A230 L— — �' II WC-2 0 N (E) — — — — — - -r— — — — I — — TP-1 I _ ..... ...En . . { 0ti o7 — — — — , . 314"CWIHW I® FD-1 8 3"VTRJ SWC-1Ct M5-1 4" W&2"V 1O � O 1, — 2"VTR _1L_ . 0 NI( - - -- I I IE - - ca yu I 2"V 0 CO _� ELEC. . LE • �, === A228 I W U3 o f ___ - « I i ,". H I I I I 8oII. i - Tf____ — Via. T - - 0 0- 7 r--.. 1.. 1 I , � r •71-71- --- --- i + Cf-) C) , .7,- S11 - I I I I HALL I1 I co , ,- L ' , , : __� _ -_ - - ----.- _ --- IA223 0 0 0 I W - — o Lr) Ln II I F I rn -; II0 .-. ; : f_ I I I ! I ci i _ 04 : : , P I I _ -- �I 1 o - I I - 1 I l I I , { I 1 I - o el. I I I I I .__ _ _0_,__ __, I I I C F 1 A _ . LIBRARY I i I A121 - I I i I I 1 � I f L ___._._ I I I B li I O IIEl-- 1 i I I I II 'II I I I I C'- , IIcl �>_� �� �� rr.+�i� ammo key111 plan I I � ,T � �' H� - - - 1- — — — — — I — — — I — — — —I-._. _ I _ _ L 1 I — 1m cz r p0hase Bid & Permit Set 1 I 1 I I E I I I 1 1 I — I I I II I I I date 102.09.18 co E I revisions 1 cti co I ®� I I Icn I I I I I I ! I a.)1 0 o co 0 I2C i I I I I I I I ! ! Z L1.1 CT_ I I I I I I I I I project# 16054 N SECOND FLOOR PLAN O7 (6I I I I I I 1 I I I SECTOR A - PLUMBING 2r 0_ cow cou- ..‘s-7) (02 0 .,,_ C) SECOND FLOOR PLAN SECTOR A -PLUMBING (5Th i 8 g.�� (10- , .511 I ■ oo}. 118" = 1'-0" \-____I1 � 1 El.-c, c--Ni- (NI(=.5 V(NIU 0 8 8.6 910 10.. 0 • • c-k-i) n n I I I I 0 GENERAL NOTES: IN i A. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THE WORK WITH THAT OF ALL OTHER TRADES. INCLUDING BUT NOT LIMITED TO: LI ELECTRICAL. HVAC: FIRE PROTECTION, PLUMBING, STRUCTURAL AND GENERAL I I I 1 I I I ARCHITECTURE. I B. ALL PLUMBING EQUIPMENT, PIPING, INSULATION, ETC., INSTALLED IN HVAC PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND .4.,MM.III iii MililiM 10 Illt 11 I I IiTh I r WC-2 (TYP 3) FD-1 (TYP 3) I I MBU TIBILITY. K__G - - - - - tj -i --T- ii JdL -�� - - - - - - - - - - - - C. VERIFY EXACT SIZES. LOCATIONS, INVERTS AND ELEVATIONS PRIOR TO -17- RUNNING ANY PIPING. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT (1 IRLS T BOYS T 4"W& 4'"W& B213 B214 LOCATIONS OF ALL FIXTURES AND EQUIPMENT. REFER TO KITCHEN LAYOUT 1 1 I I I I 1 I I 1 i 1 2 V 1O I . I DRAWINGS FOR EXACT LOCATIONS AND ROUGH-IN REQUIREMENTS OF ALL 2V 0 1�-�, . - -1 r I I 13 li TP-1 ,' 'I 1- WHA00 CLASSROOM KITCHEN AND EQUIPMENT �1 B215 1 - 11.I. 1 I 1 Dull Olson Weekes - IBI Group 4"W& 3"VTR j— Architects, Inc. 2"V 1 �, J 1 JNISEX T 4"W& 1 I I 8212 2"V I 907 sw stark street Portland OR 97205 USA I 1 tel 5032266950 fax 503 273 9192 ' www.dowa-ibigroup.com www.ibigroup com 2" CW& 1 - - . - 3!4" HW 0 r I9 2"W&2"V0 .1111111111111111.17 I I I 2"V& I 5-2 I O© i L-2 2"W 2"V& 2"W 1 ' 314"CW& HALL U 1 I I I T....7,...Il I.�...1,.. 1 3/4"HW © !B201 I I I1 1 1 f I- _ - - - - 3!4"CWIHW ®� 0 ,\' I v f L,1 S=20 2"VTR X18 2•'�r j f CLASSROOM - 9 ON I: '/� I I i ! 1132161 1 �4r+ # 1 ..-I CLASSROOM EXTENDED I I i I I �] NOTES: I I EXPIRPS 12 31 19 11 LEARNING - I o I C n B209 0 I 62001 iiiq- ,_ 0 1. WASTE AND VENT RISERS. '1 1 • 2. PROVIDE VALVE(S) WITH ACCESS PANEL. { E I 1 I I ! _� i ' • 3. WATER RISER(S). � �r 4. ROUTE 1/2" HOT AND COLD WATER TO SINK(S) 1N CABINET SPACE. r -,I i� I l -��f �� 1 4"W& WC-2 (TYP 3) FD-1 (TYP 3) 5. ROUTE 3/4" HOT AND COLD WATER IN WALL TO LAVATORY FAUCETS. 1 ------,1 S=2 , 2vTRI �� 2"V DN HALL 2"V (1 ir 0 ,�I • A 1 1 i_ ' .. ____, B202 I I _ — - - 2"W& "V DNee;>we� ...._..- --.easEe�: 1 10 , ..W= 111. 1; I., ,.Arzei= , . r' 3/4"CW/HW © i, � ! 2"V DN � :lm= s �° 1 4"W& DF-1 ���.��� TP-1 _=1 :: 2""/ 2"W& 2"V I 2 VTR 1 �© r ..;..:i :� :: h 1 V 0 , I � �- _ WC-1 RAST �� t " 314"CW 4'IW: r' I' LI _Li2�IV al 13228 1 (TYP 2) CLASSROOM CLASSRO M 0 , -11B/2.6:1,,__ . .. r - WHA ` O 1-114 CW �'� O . . I B210 I 1B2111 IDF ELECT 2"W& 2 V IDN -' Iv -'�, '° 3 VTR I I - _ .0. TOILET 4W& -- - - -J V — I B207 I B206 I � � B218 2 V _ .1 HALL L-1 r. I --UE' IT' ZIP&,__, CLASSROOM Cn 0 �- I B220 _ 1 , �„ 2 CW& 8224 ,.-- I B227 I I I I I ! I in 2VTR 314 HW It l O N _ - WC-2 • 2., CW& 00 in Es„�! 314" HW 03 R _ 2'v DN �2I 2"W&2"V - ‘C,„______`%•--___ . { I _ _ I I I 2 V& LIZ HAL 2"V& 2"W 1 -_.= a 4"W& "V WHA 2"W 0 O Q I I i �� �© 314 GW& 8222 � (a � S-2 - S=2 314 HW © L! I _ I I 0 _ �. -_ I I r - � f-J �J S_2 _--314"CWIHW ©� 0 o i • j9=11 , "11 0 i Be 2 VTR 2"W&2"V 0 ® �I = 0 0 2 VTR CD ! 314"CWIHW 00 1 I L1 I EXTENDED I " i M M CO , ' LEARNING - L CLASSROOM E . � M c'7 IR 8221 I B228 _o) o o O ® _ ri- l'i I— o - rn I I I I I I CLASSROOM ia 162311 1 I 1 I 1 i I I eT u 1 r -, i 2W&2"V 0 1 I I I li I - ---�-U ! 1 1 1 1-- i i J 1 I 5-2 HALL � I I I C A 314 CWIHW ©p \ 8223 - } I I I I 2"VTR � .. I I T - - 1 I f" ..__d s i , _,. ., I B D ,,_ I I I I I I I •1_,1 ,1 ll____.• CLASSROOM CLASSROOM 162301 B229 I I I I I I I , , i key plan I - - i phase Bid & Permit Set 1 I I I I I - - date 02.09.18 grevisions cci1 I I I I - ' I 1 1- - 2"W& 2"V 1O V'iS=2 , S_2 a) /A-711Ifik QI I I I •.-r t ---- �, T . 1 . . . 7 - - - - - - - - - - C(--) 2"VTR U314"CWIHW 00 co 1 1 I I 1 I I I Y_ I project # 16054 cp SECOND FLOOR PLAN N I I I I I 1 07 I 1 SECTOR B - PLUMBING --7..- o_ q) CD o (8---.6 C9) 10 10.5 -.1:3 0 _____I ---. P 2 . 2 1 (14i 0 GI 0 .0_, Nct 1 SECOND FLOOR PLAN SECTOR B - PLUMBING Na ` ) 1/8 - 1 -0 @ 0 i'" GENERAL NOTES: W El I I I A. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THE T-flsr • • WORK WITH THAT OF ALL OTHER TRADES, INCLUDING BUT NOT LIMITED TO: ° ELECTRICAL, HVAC, FIRE PROTECTION, PLUMBING. STRUCTURAL AND GENERAL ARCHITECTURE. I ° I I L _... ° B. ALL PLUMBING EQUIPMENT, PIPING. INSULATION, ETC., INSTALLED IN HVAC PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND COMBUSTIBILITY. ° C. VERIFY EXACT SIZES, LOCATIONS. INVERTS AND ELEVATIONS PRIOR TO RUNNING 0 / 4ANY PIPING. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS OF ALL FIXTURES AND EQUIPMENT. REFER TO KITCHEN LAYOUT DRAWINGS FOR EXACT - - - - - EED LOCATIONS AND ROUGH-IN REQUIREMENTS OF ALL KITCHEN AND EQUIPMENT. lo II /I I D. PLUMBING CONTRACTOR IS RESPONSIBLE FOR EXTENDING ALL REGULATOR VENTS I I B I USIC /I C120 TO ATMOSPHERE REGULATORS ARE PART OF EQUIPMENT GAS TRAIN. II _ _____ _ __ E - 1 E. WATER HEATERS SHALL BE INSTALLED WITH DRAIN PANS UNDER HEATERS. ROUTE DRAINS TO NEAREST FLOOR DRAIN. Dull Olson Weekes - IBI Group I Architects, Inc. '\ /3 1 1 0 907 SW Stark Street Portland OR 97205 USA — — — — 0 tei 503 226 6950 fax 503 273 9192 0 I -1 www.dowa-ibigroup.com www.ibigroup.com L 3 ^ rJI z 11z'F MPG - - 0 NOTES: I I �`. 1. SEE CIVIL SITE PLAN FOR CONTINUATION. MAIN ELE ,1,,..:,.,.L.,,,4" DN-1 . D112 2. PROVIDE DOWNSPOUT BOOT CONNECTION AT STORM DRAIN. .wi ; l N Ci--1- I ;' r I r �•� DOWNOTIO 0.5 PSI P ESSURE ROUTE SUPPLY PIPE OU TO EMERGEENC REDUCE w�� ,.�,rN I 18 2 ..,,,, .y °I' GENERATOR BELOW GRADE. VERIFY EXACT LOCATION AND REQUIREMENTS9 2; 1')-7' t FOR EMERGENCY GENERATOR WITH ELECTRICAL PLANS. z . oNr ,.,?:t fi ,4 1. 1 G 4" SD UP - B 1 I /- 3"VTR ��/ y °~�h •��°� `' b I I —3" FS-1 '41 P. c 1 .. 3" FS-1 /�/ I 11 EXPIRES 12-31-19 I } a v .E I RHWP-101 fi x. ' 4" OD UP — L I B-2 I ECr I(4 1 is1 B-3 l y � 0 - (-1 • —�� 5T0� TD-1 1 O I 2-1 . DET-101 L - - � U . ": 314"RHW -6 1-112"HW }f 2"CW U = _ 2"V L 4"DN-1 -\ 0 cn I.[3_, 0 V — to 4"SDUP O ' o N ;A) BUILDING R I 4"SD DN f coTOR. 0 <,\_ D110 Et = V J o a) 4'OD = _ ca w co i= 2"VTR - W 70 -(7';‘Irv-[ C U 0 I— -2 8 4 I _ -1.1 I c> c:, v- 2"V CD -0 " 0 . 0 § Cir ;,-- E as il3 C 7 M I4 4,) .� 0 L. Lo i— I— 2 , , I I c.,-0 4 __ C A 1 1 .4 ® • UPPER FLOOR PLAN SECTOR D - PLUMBING B .__118" = 1'-0" D r I-- key plan phase Bid & Permit Set date 02.09.18 coco revisions ctictswI czsQ C z w U co Ci: project # 16054 0 UPPER FLOOR PLAN rn ETR D - PLUMBING cbLo -:I- U J P2 • 23 - r O � CU CVcL 1----- (-NI a -----h!U T. c5) ce.) o.3__)---N (1..3-_:_o-- ,(9) 11 __(..--.)- r--- - --) ! I ! I 1 GENERAL NOTES: WP 1 I I I A. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THE 1 WORK WITH THAT OF ALL OTHER TRADES, INCLUDING BUT NOT LIMITED TO: ELECTRICAL, HVAC, FIRE PROTECTION, PLUMBING, STRUCTURAL AND GENERAL ARCHITECTURE. I I 1 1 _ L __. B. ALL PLUMBING EQUIPMENT, PIPING, INSULATION, ETC., INSTALLED IN HVAC L� — I / — K_A PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND COMBUSTIBILITY. I I I 2"VTR I 1 E I I I 1 IBI 0 0 o I 4 1 Dull Olson Weekes - IBI Group I I I Architects, Inc. 907 SW Stark Street Portland OR 97205 USA I I 1 tel 503 226 6950 fax 503 273 9192 www.dowa-ibigroup.com www.ibigroup.com M 0 I 1 I ! 1 7 2 VTR 1 C%. PROF � `' 1 ,w2 ,f N.:,,....,47, I /,,i.- ® P., -IN , , ... ,,,,0 ,--. „ I I II I I z o '--0,, ' 'e gi. I o o o -- <�S P. CO�\ 4 4 I EXPIRES 12-31-19 I 1 1 1 I I I I Li c- 1 1 ! r. . - I - - I < .,___.)`-a I ' RH-1 1 \ c I E.] 10) I-- . /— c --L I 1 I I 4" OD-1 4" RD-1 /2IIVTR / N n r }r U 0 0 _2 I I }+ I 3"VTR 0 ci =0 0 — — — 1 — , - - Vci, —. _ . 6 . o (7,1", — cJ 1 j l rrU^^ c 2"VTR= WI 0 2 VTR Ci)\-- L10 CD 1 II I E - + a 003 0 — — — — — — — - - - — — — ___ � - — — W _ sU O 1— � © 4 = � � .....�_ O ,_ m M11 a) , ,.. CO 41 E.... — I , - - I — — — — — 1 _ cy) c,) 23 2 " VTR —\ I f 2 I I ! I 1 , „ _ ,. ,.. i I 0 0 0 0 I ---- -,...., I F I ,--' - - \ 1 C A " I I I R i - V D I I I r n/ n n r. / V v v v I RH-1 7 -- 11 1 1 112"VTR I I key plan 0 0 I ! phase Bid & Permit Set __—� 4" OD-14" RD-1 I x 1 I I I 1 co �, date 02.09.18 g 0 4- - - _ - - - - revisions ezi in I I I 1 I f Q _1 UMW I!!MEL 1r!I III Q I— I I I I I z UJ U a. w 1 I I project # 16054 2 ROOF PLAN SECTOR A - N PLUMBING c _. 0 0 .6 9 J o N 76 t# U P2 . 3 oOS. ROOF FLOOR PLAN SECTOR A - PLUMBING cNict o 118" = 1-O" cchl U (--Y):---) 0 8.6 0 �� _I GO GENERAL NOTES: 111 A. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THE WORK WITH THAT OF ALL OTHER TRADES, INCLUDING BUT NOT LIMITED TO: I I ELECTRICAL, HVAC, FIRE PROTECTION, PLUMBING, STRUCTURAL AND GENERAL ARCHITECTURE. J B. ALL PLUMBING EQUIPMENT, PIPING, INSULATION, ETC., INSTALLED IN HVAC PLENUM I I I SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND COMBUSTIBILITY. i—i-•••- .....s...i a C. VERIFY EXACT SIZES, LOCATIONS, INVERTS AND ELEVATIONS PRIOR TO RUNNING ANY PIPING. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS OF ALL 0 G I - - - - - - i Ir-- — — — -- - - - - - _ - - FIXTURES AND EQUIPMENT. REFER TO KITCHEN LAYOUT DRAWINGS FOR EXACT LOCATIONS AND ROUGH-IN REQUIREMENTS OF ALL KITCHEN AND EQUIPMENT, I 1 II D. PLUMBING CONTRACTOR IS RESPONSIBLE FOR EXTENDING ALL REGULATOR VENTS i I B I I I I I TO ATMOSPHERE, REGULATORS ARE PART OF EQUIPMENT GAS TRAIN. li I I E. WATER HEATERS SHALL BE INSTALLED WITH DRAIN PANS UNDER HEATERS. ROUTE 3"VTR DRAINS TO NEAREST FLOOR DRAIN. Dull Olson Weekes - IBI Group I 0 I Architects, Inc. 0 O O O O I I Ij 907 SW Stark Street Portland OR 97205 USA -- ---. __, ] tel 503 226 6950 fax 503 273 9192 www.dowa-ibigroup.com www.ibigroup.com 11 I 111011111111 — -- I � � j j �� i �D PROF0 r - - [[[['''' z — — — — — __ 0 2" VTR X18 2•' 't . I I `�� c I,--__-, Q • N i_. ,5, /-0A.(0 ) - -4- ..ORH-1 I oqs P co\-\�� I , II I EXPIRES 12-31-19 1 I U 7 (+ I e1 /1 n n e � I Ii I I O /,"J • o2"VTR I - I - - - - - - - - / - - — -i—r . o2"VTR V I/ 0 _ }+ 0 Cr) I o 0 3'VTR o (f, 0 O N -C rci CZ'ail e U i 02"VTR = n O CD 0 0 0 0 c� E -_,7_,- CD CU ir- 2"VTR I I W - g ,Lo 22"VTR o = O o r`- - - — _ �— - + — °— 0 F— -2 -7I- A-0I 0. s. Cir F71,2 E E o) cz,. 0 0 RH-1 I I' I— 2 o-, I I r I CA1 0 0 0 o2"VTRo BI o I 1 , I 4114 ,410%,,,,t, key plan phase Bid & Permit Set 2 I I1 date 02.09.18 L E I I revisions 6 cri O O O C/) I 3 I I I - - J, — — — — — — — — —i — — — — — — iQ� z 0I 0_ Lu project# 16054 CV ROOF PLAN SECTOR B - co PLUMBING J-Tu (0. 1 El 3 X14 3 1 ,,_ .,.., P2 . 31 co,,,. o ,. 1 ROOF FLOOR PLAN SECTOR B - PLUMBING P.--.----- 1/8" = 1-0" c�U GENERAL NOTES: ii. A. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THE WORK WITH THAT OF ALL OTHER TRADES, INCLUDING BUT NOT LIMITED TO: ELECTRICAL, HVAC, FIRE PROTECTION, PLUMBING, STRUCTURAL AND GENERALL -ail ARCHITECTURE. 410 0 Gil 0 B. ALL PLUMBING EQUIPMENT, PIPING. INSULATION, ETC., INSTALLED IN HVAC �4� PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND COMBUSTIBILITY. I C. VERIFY EXACT SIZES, LOCATIONS. INVERTS AND ELEVATIONS PRIOR TO i I I I I RUNNING ANY PIPING. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS OF ALL FIXTURES AND EQUIPMENT. REFER TO KITCHEN LAYOUT t 1 I I DRAWINGS FOR EXACT LOCATIONS AND ROUGH-IN REQUIREMENTS OF ALL KITCHEN AND EQUIPMENT. ea I B I I- 1 1 I D. PLUMBING CONTRACTOR IS RESPONSIBLE FOR EXTENDING ALL REGULATOR IVENTS TO ATMOSPHERE. REGULATORS ARE PART OF EQUIPMENT GAS TRAIN. Dull Olson Weekes - 1131 Group IE. WATER HEATERS SHALL BE INSTALLED WITH DRAIN PANS UNDER HEATERS. Architects, Inc. I I I ROUTE DRAINS TO NEAREST FLOOR DRAIN. CIO 14– - ell 907 SW Stark Street Portland OR 97205 USA tel 503 226 6950 fax 503 273 9192 www.dowa-ibigroup.com www.ibigroup.com I * I I I I I I I 2"VTR I I i �p PROFF `-) G ' NA, O fw182"1 /��I , 4 ., GON yor�hA ., oc . 0 3"VTR I I I, ; Is p CO\-\' I : I EXPIRES 12-31-19 11 1" MPG I , u t, I I I ; I : O y 0 > i L I RD-1 RH-1 OD-11 – u I I I I [ ! 0h 2"VTR Ii' d I fl _ I ! GI . — U f II 0 t1) 0 0I s i ;n " RH-1 , ° ° ..,..... L J IC.) V V V iV CO 0 ' 3°VTR 0 N c CO –C cij v a) f i Cf) O r—rI ' c W E - — vo i a--+ 0-, i= ° 1 1 c 1 1 I' (� Loll CO u) 0 P O O ti ° II °I I 0 ° r r a " 4. E CTS u; ° I I , I o0 0 0 Lo Lo I I— I I I I I 2"VTR 1 I I I I 1 - rri I t 1 C A i _,1 J.8 - - - - - - - - - I - - I - - I - I' - - - J.8 D B I I I I I key plan I 1 I I I phase Bid & Permit Set --- 1----0 1 .4GO 0 date 02.09.18 revisions crico Q.)I �I z w C L7_ W project# 16054 CD CV ROOF PLAN SECTOR C - 07 PLUMBING COr0 DDrL.L[131 P2 • 32 _, ROOF FLOOR PLAN SECTOR C - PLUMBING o 118" = 11-0" NU GENERAL NOTES: ff. A. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THE WORK WITH THAT OF ALL OTHER TRADES, INCLUDING BUT NOT LIMITED TO: ELECTRICAL, HVAC, FIRE PROTECTION, PLUMBING. STRUCTURAL AND GENERALL _... ARCHITECTURE. B. ALL PLUMBING EQUIPMENT, PIPING. INSULATION, ETC., INSTALLED IN HVAC PLENUM 0 1 .4 cz-i-. SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND COMBUSTIBILITY. C. VERIFY EXACT SIZES, LOCATIONS. INVERTS AND ELEVATIONS PRIOR TO RUNNING ANY PIPING. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS OF ALL I ! I I ! FIXTURES AND EQUIPMENT. REFER TO KITCHEN LAYOUT DRAWINGS FOR EXACT ILOCATIONS AND ROUGH-IN REQUIREMENTS OF ALL KITCHEN AND EQUIPMENT. 1 1 D. PLUMBING CONTRACTOR IS RESPONSIBLE FOR EXTENDING ALL REGULATOR VENTS /MrI B ITO ATMOSPHERE. REGULATORS ARE PART OF EQUIPMENT GAS TRAIN. N y f I I II E. WATER HEATERS SHALL BE INSTALLED WITH DRAIN PANS UNDER HEATERS. ROUTE DRAINS TO NEAREST FLOOR DRAIN. Dull Olson Weekes - IBI Group ,mmiiii ii i iiiii !iii�•.ii- i ii iii ii ii ii1.1___ Architects, Inc. f I I , : 907 SW Stark Street Portland OR 97205 USA tel 503 226 6950 fax 503 273 9192 J.8 - T - - - - - - - - _ - _ - - _ F- - - - �!,n www dowa-ibigroup com www ibigroup_com I I I � 0 4. I I I I 0D -1 17 V V V a) 1PROF �i a \I \ o3"VTR k w18 2•' ,�' \ I I I `�� • •' . IN Z k- f5 I / (if I f I a / RH-1 I EXPIRES 12-31-19 1 / f / Io I n r. I 1 I I I I I RIP —NI I ! I I V , - 00-1 0 }+ 1 I I I ( I 0 (/) 0 0 v I I I I CO O O LI% —C N N- N 2"VTR ,: U^ � r � o . — I .1—. E I 1 II I I00 W o 0 0 U o 1— 2o � I ! I I I I = c) c) IC' - - - - - o - - 4 - - - - ' I - - - - pCL- E M I- I 1 ! 1 I I ! I I I I C A I k I I I I _1 D Br I I I I I I I I I I I key plan phase Bid & Permit Set R I , - - -� - - I - { - - - R 12 U date 02.09.18 co I I f I I g revisions c cn I ca I I I I CI w 0 11110 CI oc co E: project# 16054 CN Q ROOF PLAN SECTOR D - rn ROOF FLOOR PLAN SECTOR D - PLUMBING cb 1/8" = 11-o" PLUMBING NL.L N To 71: 3 P2 . 33 "--7 O N CSV iry- N- (NIU GENERAL NOTES: o NOTES: r....)(:) A. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THE 1. ROUTE GREASE WASTE AND GREASE VENT OUT TO INTERCEPTOR ON SITE. WORK WITH THAT OF ALL OTHER TRADES, INCLUDING BUT NOT LIMITED TO: SEE CIVIL SITE PLAN FOR EXACT LOCATION OF INTERCEPTOR. ELECTRICAL, HVAC, FIRE PROTECTION, PLUMBING, STRUCTURAL AND GENERAL ARCHITECTURE. 2. PROVIDE DRAIN AT KITCHEN EQUIPMENT AND DISCHARGE WITH AIR GAP AT FLOOR SINK. IV B.ALL PLUMBING EQUIPMENT, PIPING, INSULATION, ETC., INSTALLED IN HVAC PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND 3. ROUTE 3/4" HOT AND/OR COLD WATER PIPING DOWN AND MANIFOLD COMBUSTIBILITY. IN WALL TO FIXTURES/EQUIPMENT. C. VERIFY EXACT SIZES, LOCATIONS, INVERTS AND ELEVATIONS PRIOR TO 4. SEE CIVIL SITE PLAN FOR CONTINUATION. RUNNING ANY PIPING. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT L __.. LOCATIONS OF ALL FIXTURES AND EQUIPMENT. REFER TO KITCHEN LAYOUT 5. PROVIDE SHUT OFF VALVE(S) WITH ACCESS PANEL BELOW SINK. MANIFOLD DRAWINGS FOR EXACT LOCATIONS AND ROUGH-IN REQUIREMENTS OF ALL COLD WATER PIPING IN WALL TO FIXTURES. KITCHEN AND EQUIPMENT. 6. PROVIDE TRAP PRIMER AND WATER HAMMER ARRESTOR WITH ACCESS D. PLUMBING CONTRACTOR IS RESPONSIBLE FOR EXTENDING ALL REGULATOR PANEL. VENTS TO ATMOSPHERE. REGULATORS ARE PART OF EQUIPMENT GAS TRAIN. 7. PROVIDE PIPE SLEEVE FOR CONDENSATE DRAIN THROUGH COOLER WALL. I it E. WATER HEATERS WITH DRAIN PANS UNDER HEATERS. ROUTE DRAINS TO NEAREST FLOOR DRAIN. 8. ROUTE 3/4" COLD WATER UP TO ROOF HYDRANT. PROVIDE SHUT OFFea I B 1 VALVE WITH ACCESS. 1 I F.VERIFY ALL KITCHEN EQUIPIMENT PIPE CONNECTION SIZES AND REQUIREMENTS WITH KITCHEN CONSULTANT'S DRAWINGS. 9. PROVIDE PRESSURE REDUCING VALVE AND CONNECTION TO EMERGENCY GAS SHUT OFF SYSTEM AT HOOD. VERIFY REQUIREMENTS WITH EQUIPMENT SUPPLIER. Dull Olson Weekes - IBI Group Architects, Inc. 0 i---- 1 1 .4C29 1 •4 2 907 SW Stark Street Portland OR 97205 USA tel 503 226 6950 fax 503 273 9192 www.dowa-ibigroup.com www.ibigroup.com . 111=1.1.11.111.11M111111 I I I I I I 2„W&2'11o a. - 4"W UP 2"W UP 3"GW UP 1 NEW 3" GAS METER 3J4 HWJGW TO WCO TO WM-1 I TO WCO I 6,984 CFH @ 150 FT I 4"W UVB-1 I ��� PROFF . .& 1C6DEVELOPED LENGTH WM-1 - - c��,� 1 E J/� - - - - - - ED` �, 182!' 4"W f ‘ . . _ J- 1I I I 'IWGO z � �' G0 � L' , WC-2 2'VTR -pyo o,ch .�. SFlc--- , F:1- Le TABLE P. CO I 2'W ,I = l Cl 06 STORAGE EXPIRES 12-31-19 I4, -3" GW I -o-� C105 � 1" MPG z--- i2 GW I arh 16 < SOV-101 3"GW 'u 2"V I I 3"GW- 3"GW UP 0 I �i= - - 1 2G � II hI' AoffTOWCO II , � - �r I I __r-:r..._.. - : �© n 1 ��11 1 ! 1 ••; I � __ 0 3 -911>,:;e17° G / 17:::11, I -- -1=- -J I �_ / )(\ II) 36 I1%1 A �i ♦ ♦ FS- ' 2"-------H V 1I Ill1 I �. Iil I 3GWUP hi 1L J Y1 I /� ! 4 GW UP 3„ GW I I t -3"GW TO FS 00 L a I , � :I � -- - -- V. � / \ j oil TO CTG3" GW 0 r4j1 l - r - - - IE=263.5' I - 4 -tT --- --- I�/ ,I_i_ „ 4"GWUPdWCO _ _ I 2 CW ® FD-1 'r 1 GW I GW I GI KITCHE TO FCO "GW \ 3"GW UP CTG 30 .-3"VTR I I i C107 4" Grrill \r I- - - - TO FD ®FD-1 °; I 3"FS-1 C I 1 �e ___-L I - U -- - - I - - - �31 - - 2,.V - - 3„GW- 3"GW UP - - - - _ - I - - - - - - - 0J L7 4_ - - I TO FD TO FS 1 WC�'- - - ; �3" MPG I I IIGO L . — 0 11 "W@2% SLOPE � - 3„V - `- --- -- - KA liii _ 2'VUP - - L ; 2'V UP I - 3„GW UPII . ®® '- s , �� Q GW I - - - II =4GWUP I I ! TO FS4f.' 3” 2V 0 '� CO TO CTG 461_. -- I -FS-1 -_a Co 0 IE=262.8' I 3"GW UP I I I- - - - TO WCO 3"GW UP 1 I I L — — _ =-- 0 N k.:"W@2°/° SLOPE - TO FD I s _J ® I = 4 W I I T ,W FD � U �O IC GCO48O 71_2 f I \ [3"MPG ri ©„ 3"GW UP (------ 3GW I6( :SD I I rl' TO GIG _ci TO WCO 1 0 I i__ I 1"MPG � _ 1 TP-1 6 E �-+ � , WCO UP TO MAU 0 ' © o H O CTG © �� ISO t. i Lil co U7 6"SD @ 1% SLOPE 6„SD UP72 3„G 1 �� - L_.�_ .�_ 16 v .,: 0DISH WASH . 1 �i = = o 6,244 SF, 0.19 CFS, I I TO FDUP 6"SD ~$ �� I o ~ I L o IE=264.0' - - - - - - -TFOwCO - - „ - - - - - - - 1 - - - - +C ~�a .W 1 = o 0 FD-1 3 GW UP0 I rt o _ 0 �' 3 GW TO WCO 4 ' I O = I ANCO I o 0 r I 1 6„OD = I I r.. I -- ® - L § 7) c� • Fl'a CD I COOLER FREEZER L---_T_,60"v - — 0 0 0 i I I 3 3"GWUP = = 1C110] 1C1091 1 ,� I 4-.4 I. Le, }: . G 3J4 H W 67 < TO FS = I < L _ 8�... F 1 3J4” CW l 2"VTR , l 3 GW�9' _ (f 'FS-1- ---- < I 1 3"GW UP I I - _ I _ FS-1 < I _ OD - ....._....... . < TO FS 0 1 ,I i �---� li_Lb_10„J7 T 1 II\E_ 1i1 :1: I i p i 1 _ 4A1 itli - ie. . F I ! - 1I I a eoo i = Q __IF _ J ii 3J4" D-111L I A = C 3"GW UP 2"W f 0 I _ TO WCO 2'CW& I WCO ll 66 000 -, I53 I 3J4„HW I I L T ' 66 1 I I 3"W UP 1 0 - 00 I GI D B TO FDNib FD-1NT=Nii I i 3 1 -----DI L_1 p < i 1 4"W UP 4"W UP I I WC-2 O g WC-1 C WC-1 0 < I „ TO WC l - I (TYP 3) < W@1% SLOPE TO WC 2'v UP � I T — 4 �- < „W 1 2„V UP ”W rl IliJil �- 4 I 4"W UP 1 I /' 1 b LJ I L o �' 1 key plan TO WCO I/: 1 " I WB-1 WCO TP-1 I I o 0 2VUP n o 2"V o oIlphase Bid & Permit Set 4"W UP 4"W UP 4"W UP 2"W UP I o - r _ _ - SWC-2 UVC-1E WC-1 C L-1 2"V UP41 _ TO FD TO WC TO WC TO LAV �t �� ! ; - - - 1 3"VTR FD-1 (TYP 3)L \ 4„wThr I - li 4 1 I 3/4" RHW 6 DN 1 t4 FD-1 I ! BOYS T HW....... date 02.09.18 3"W UP DRY STOR. �I Q,� � ___.. \ \ TO FD 6"OD I HT-101 C114 _ '�i SEE FLOOR 3" C111 ---I p 1► < if11/2" —� EDOMESTIC COLD WATERI „ i i ® - - - _ PLANS FOR revisions ai 311 WSFU @ 110 GPM 41 ` SLOPE-1% 1 FCO I ( I 1CONTINUATION I I I 3" CW, 5 co ( �. � - - � 3CW- c)o a)1 _ 4"VU I 3" MPG co 07\• =- 7 4"W UP Cl-I r TO FCO RISER u o [_I 3"CW UP I 1 1C112 ` III i oN 3„ CW \--‹ D -1 , Z HALL Lu I I 1 C115 i U co I I I I I I LT_ project# 16054 ENLARGED PLANS - N PLUMBING T - N ro .t' O P4 • O1 ENLARGED UNDERGROUND KITCHEN PLAN - PLUMBING ENLARGED KITCHEN PLAN - PLUMBING � Cjr, ,5 114 = 1 -O" 114 = 1 -0n N r- U THERMOMETER AIR INTAKE0- (TYP) (TYP) 1-4.1. n EXHAUST n SEE FLOOR iff (TYP) -- -_ -- __ t PLAN AND RISER DIAGRAMS FOR 1 - __ __ ' I - - �1� ' PIPE SIZES . 1 Ni '1144Lizie::AMP I F1207 : ASME TEMP/ IL g,...... TEL, -----;:,,, PRESSURE { 1 RELIEF VALVE I 1 (TYP) I I IFD1II 1 ‘14TO FLOOR CD DRAIN 1 i1 -111-61111.1—Till II11 I MV-101 > ' 1 (TYP) T T F-�i A `r I._ THERMOSTATIC tea I I MIXING VALVE EXTERIOR WALL ASSEMBLY IN i 1 - CONNECT I 1 I � I LOCKING CABINET SHUT RHWP-101 Dull Olson Weekes - IBI Group `WI TRANSITION SEISMIC > COUPLING RESTRAINT 0 OFF Architects, Inc. (TYP) (TYP) _r I GLOBE VALVE TO I 907 SW Stark Street Portland OR 97205 USA �`- < GW-I-101 > SYSTEMS tel 503 226 6950 fax 503 273 9192 DOWNSPOUT — ACID < GWH-102) < GWH-103 > I www.dowa-ibigroup.com www.ibigroup.com (SEE ARCHITECTURAL - /BALANCE DWGS.) - NEUTRALIZER © — licks, — - WALL CLEANOUT - - 4"HUB PIPE 0 Q„__ `i. < DET-101 �� Pi FDS - ' - I 1114>< IL _ ,‘...1><-1 I 1CHECK VALVE(TYP) T !mg I I �� - DIELECTRIC UNION (TYP) ����.� 1PROF1 NO-HUB A r A 4 4 4 DRAIN VALVE (TYP) c- w1S 2 ��COUPLING(TYP.) 1 4 + a * a 0 a i 4 4� i fa •, y -.a. e ''' II ,--�Y PROVIDE VENTLESS ' °iN CONCRETE PAD ? , REGULATOR (TYP) "byo°r,/,A.40 + I. '4S P, CO\-\, NOTES: 4" NO-HUB I EXPIRES 12-31-19 I 1/8TH BEND 1. SEE SPECIFICATION FOR SEISMIC RESTRAINT REQUIREMENTS CONNECTION TO CIVIL STORM DRAINAGE SYSTEM 2. PROVIDE CONDENSATE DRAIN ACID NEUTRALIZER ON EXHAUST PIPE 0 DOWNSPOUT CONNECTION GAS WATER HEATER 0 NONE NONE ie.__-- 9" 3„ OUTSIDE FACE OF WALL - . ! PW 1. . WALL SLEEVE AND SEAL \ }0 ,\ L. ELEVATOR 'CEILING CARRIER 0 - PANEL PIPE ' Erf-SHAFTCONTROLQ V) Q 0 LOCATED =/— HIGH LEVEL WATER ( ) V FLOAT/SWITCH. 2"PW CO O O d FLOOR INSULATION /\// N y . i co 0 a) EXTERNAL JACKET \\ ‘5 (f) 6 UNION - L GRATE ' — SHUTOFF VALVE 4" WASTE LINK SEAL -_=. -Pi irk SPRING CHECK VALVE MINIMUM CD CO I- 0 WALL PENETRATION DETAIL "� Td ("5 FLOAT SWITCH Q I• UMP PUMP 1 NONE W SUMP S O = = U O o o l4 .4-• I = Qc .J. 51-011 NOTES: r - �, CARRIER PIPE co 10 PROVIDE LOCAL DISCONNECT FOR PUMP WITHIN c,3 --- ELEVATOR SHAFT. SEE DIV.26 FOR REQUIREMENTS. E 0 0 0 EXTERIOR FLOOR SLEEVE AND SEAL l'iI- � in in 0 PROVIDE CURRENT TRANSFORMER AND DIGITAL INPUT WALL w, rn • INTO BUILDING AUTOMATION SYSTEM. N 11_011 4 SUMP PUMP DETAIL GRADExA/.\_ FIN. FLR. NONE --AK ANCHOR \�\�\�\ /\N' %\' \> 51-0" C-E PLATE /\\�\\��\\�� \\�� •�\\��\ ---1 c:' \EXTERNAL JACKET '� a•J 90%%127/0127 ELBOW r i WALL SLEEVE AND SEAL CONCRETE ANCHOR FOUNDATION BLOCK key plan 0 BUILDING RISER ELEVATION NONE phase Bid & Permit Set date 02.09.18 ciaE revisions cri ccn I m I a- JI Z w I C I Lu project# 16054 DETAILS - PLUMBING N 6) a_ N _ �11- U �� P5 . 01 'Ft co,Or � N N, NU SECTOR B �— 2"VTR 2"VTR 3"VTR 2"VTRNrb 2"VTRNib 2"VTR :1:C 2"VTR 3"VTR 2"VTR 21VTR div (-93 III III III , I ill 1 1 ROOF Ili 2„ SII 3„ III //�� 3„ I I IiI I I 2„ i1i 3„ ��i 3„ 2„ 1 I ;Ii 2„ rim....4 ---.....1 -�� 3,I I I f I ____ f -- __ - III 1I t 1 2„ I—r 2., 2" r�y_ 2.. r 2,. I 2" � �- 2„ -r-f- 2„ -� I � „ 7 �-- ->� r „ rtr �-�-....�, I I ��- �/- 1 2 2 -3 2 2" I I I li. — r-1 I 1 I I---I ---T ---f r-- r-- 1 1 1 2„ 12" I 2" 2"(TYP) 1-112" IThie 2" 1 2" 1 2" I 2" 1-112„ I 2„ y_ I' r LE S-2 S-2 5_2 L-2 L-2 S-2 S-2 S-2 S-2 L-2 L_1 S_2 S-2 WC-2 WC-2 WC-1 WC-1 WC-2 WC-2 2 WC-2 WC-1 WC-1 WC-2 i— , 3"FD-1 3"FD-1 )-- -_ 3"FD-1 -_ I )-- )--- SECOND FLOOR � 3"FD-1 3"FD-1 I B I r"'ZJ Ln l V l I "--wc4"-1 / I V I \ I L__ LI- __^-_ __- --- -- -- -- ---� �_— I -- I Dull Olson Weekes - IBI Group I I 1 Architects, Inc. 2" 2" 41- I I �, " „ „ „ 907 SW Stark Street Portland OR 97205 USA � 24 �44 � 4 4/-4 `r2 2 22„ `�4 �2 444 � 4 4,� i-2” tel 503 226 6950 fax 5032733192 www.dowa-ibigroup-com www.ibigroup.com I I I I I I I I I S=2 S_2 L-1 LL-2L=2 S=2 I S=2 I S-2 S=2 I 3-2 L-2 EEWS-1 S_4 S-33 S-2 S_2 3-2 I-0 ( -� /--u )--ti )—ii )--u we o WC-24WC-2 WC-2 WC-1 WC-1 WC-2 WC-2 WC `AiC WC WC-2 WC-1 WC-1 WC-2 P OFFf �I l wC 0 / I 'C�)�I l 3"FD-1 �� ''tiNC n l ;�4 r� 3"FD-1 3"FD-1 3"FD-1 WE l WCC i *CC /AI /- l /-I )-- 3"FD-1 3"FD-1 -- k /�l ' r'C n l WC 0 FIRST FLOOR ��.D v F O L— ii--\ /--u u----s, L —\ LJ—N. 1S• \-CTG 19 `�� 2"I— i- 4„ 3" 4" 2„ „ „ „ „ „ „ „ „ tic „ „ „ isr „ „ „ „ „ „ „ „ „J ? � 3 � 4 i4 3r3 4 4 � 3 � 4 2 - 3 4 2 4 4 4 74 -4 .r 3 74 4 2 52' 2 2 r2 . 2 ?y �0,-,64 4N cd As p. CO i N \ \ N 4„ 3” 3” 3" 4n4EXPIRES 1z-31.19 N i " N. N i N. \ \ \( i \ \ i- 4 4 u4" -‘,4 N r3 4" 6„ 6„ r \ 1 6" TO SECTION AL ` 1 4" i-4" 6) TO CIVIL UNDERGROUND 0 WASTE AND VENT DIAGRAM - EAST NONE SECTOR A V r�� 21V TR 2"VTR 2"VTR 2"VTR 2"VTR 2"VTR 3"VTR 2"VTR 3"VTR r`L fr"..- 11 I� I� I I I I O C I I I I I I I II I III III III I I III ROOF 0 •5 I I I I 1 1Ill 2„ III III 2,+ 3„ JLc21, 4--X--, t- 4 --t _i- Li -,C II II I 2 2" l 2" r it O I ---4 ---4 --- �---- -- 4--- ----1 ii-� N 2„ 2" 3" -C Ir` r-- U � Cn o CD a -F-11* -,=, a CD co 1-7- S=2 S_2 S-2 S-2 L-2 LLL_2 W l� � CO cn lJ �L.��� _ 0o o Iti WC-2 WC-2 WC-1 WC-1 WC-2 0 3"FD-1 3"FD-1 -, 3"FD-1 � 3"FD-1 MS-1 SECOND FLOORI = C) ' U-A)--ki in- --- - --t---� r 1 rt + �.`�" L--- ' -.1 . I--- I-- --- I-- Ir-__ I -+ r �_-- A� tt -1---- --- --- I I I I I r-- —� `V 0 Fe...;. „......„,_. I 1I 1 I 1 I I 2,. I 1 I I I I I I I ' -. o L. Co I I ! I I I I I I I 1 1 I Le) }: ..�: ir 2" 2" 1-112" 2" ii/I 1-112" 1-1/2" 1-1/2" 2" 2" 1-1/2" -10I I 1-112" I 1 I 1-112" 1-1/2" 2" 2" 2" 2" \ik 2" I 2" 2" 4 3 i- 2" 2" 2" r 4" 4" 4" /- 4" r 4" 2" ,I- 2" 2" 2" 2" 2„ 7- 3" r l I .1 .,,1 .i j d/'i a 1 1 1 I I 1 I I I I I I I I 1 L-1 WM-1 )-0 S`1 L1 L:1 I-;1 i L;1 S=2 5_2 I S-2 I S_2 L3jf LL_2 I L_2L=1 )-I l utir�;n I—LI 1 �lJ �l� ,i—LJ I.J \J-LJ l — - 3„ WC-2 WC-2 WC-2 WC-2 WC-2 WC-2 WC-2 WC-1 WC-1 WC-2 WC n WC-2 1.- MS-1 )- 3"FD-1 �� 3"FD-1 3"FD-1 \T \T 3"FD-1 3"FD-1 pi 1 . ,-I' *CO ,-I l WC O' ,-I l WCC 3"FD-1 3"FD-1 -k 3"FD-1 � l I\ SH-1 3"FD-1 MS-1 3"FD-1 /-I I ''+ `" /-I' ''''r'� FIRST FLOOR LI , I—L.) �) "---LJ �V lr\ /-0 U� L, \ lam. LA Lr U & lr /- 2" 2" 2„ 4" 4„ i--4., 3„ 4„ 4„ 3„ 4" 2" 2" 3" 3" „ 2" „ „ 4I� /f .1 4) J 4. r� � 2 4 � 3 IJ � 31- �„� 4 i- 31' 1 3" 4" 4 3" 2" 2" 2" 2" 2„ 3" 3„ 4" 4„ f 3„ 2„ 3„ sr 4 .( q) ..r ‘-- 2" 1 .\...c\ 3„ ,\_. 1.' \ 1._1(\ r �c 3' 4„ \ { „ key plan 4 4" 3" 4" 3" 3" 4" \ 1 r 1 J 3" 1 1 1 1 \ Ai- ( A( phase Bid & Permit Set TO SECTION C \ 1 1 1 14' 6" .;__\ 12 TO SECTION B date 02.09.1 a co UNDERGROUND revisions cd co cnI E;) WASTE AND VENT DIAGRAM - CENTRAL NONE co o_ _1I W U I CD II project# 16054 RISER DIAGRAMS - N 07 PLUMBING (� N ria "Cr. 3 P6 . 01 r") O � N_ct (Nib 2"VTR 3"VTR (...3 YI `�I SECTOR C H n q �/� SECTOR D 2"VTR72"VTR 2"VTR I IN AI . . ... i_! 1I1 F ,OOF s 1 I I III I I I , , 2" 3" r I II __I_____ L __... 2" 2" I 2" cfr r_I I 2" 2" 2" tea IBI I i 4"FS-1 4"TD-1 4"FS-1 SECOND FLOORDulI Olson Weekes - IBI Group --1---- --- —2" L —2 — _— --- 2„ 2" _2" _-- U-4 �• /—lj Architects, Inc. r fi -1- r I I4- -tI -t , r -r t- 7 -r J I I I I I I I I 907 SW Stark Street Portland OR 97205 USA I I I I I tel 503 226 6950 fax 503 273 9192 www.dowa-ibigroup.com www.ibigroup.com 2" c 1-112" r 2" 2" 2" 2" c 1-112" r 1-112" I 1-112" 2" 2" 2" c 1-112" 2" 2" 2"Tht 2" mb 1-112"� 1-1I2"� 1-112"� 1-112" tic ���o PROT L-1 L-1 L-1 L-1 L-1 L-1 L-1 EWC-101 L-1 L_1 L-1 L-1 L-1 L_1 L_1 L-1 EVVC-102 �� C 1 NT R f4 )-Li 1)—\a/----U WC-2 �""� WC-2 WC-2 WC-1 WC-1 WC-1 WC-1 - - - J .4--, -, w18 2•' WCO WC-2 WC-2 WC-2 WC-1 WC-1 VVC-1 WC-1 I- -NZ— -N.,/- +`ham �/1 FD-1 SH-1" IWCO 3"FD-1 3"FD-1 9 d• '° 1 CTG FCO 4"FD-1 I VVCO — � � —\/-3"FD-1 3"FD-1 � FD-1 MS-1 /-I I VVCO ci I UVCO 3 FIRST FLOOR �, qr )-U U--\. lam\ 1�\- /-U /-U )-lJ u--\ u-x N rs �s ' coV\-�� 4„ 4" 4" 3" 3" .-.1 3" i 3" I EXPIRES 12-31-19 I TO GREASE \ '- INTERCEPTOR r 3"Th7-3" f 4" 3" 2" 2" 4" /--4" 4" 2" 2" r 2" 2" /- 4" r 4" r 4" 4„ 4„ 4„ 4„ 4„ 4" ea? J ,a a) a4 ,) 2" 2" 2" 2" II 4" p • • ` • • 4 4 4 4" \ r,, t • [ ) yr \ • • • • • • t N. N N, N N ,< „ 3” 4 V t 4„ N N. L \i- 3t) TO SECTION A UNDERGROUND 40 WASTE AND VENT DIAGRAM -WEST •�1 NONE U r�r O U) O Mie.5 7 2"VTR 3"VTR 0 ROOF i I KITCHEN III 0 cv T i- 2" ----�-r- r r r r 1 r--r-1-1- STAFFC106 0 (3) 2„ r 1 _i2c 2„ ES J CD ca 2" 2" 2" cir 2., 2„ tv_ 2„ I I I _r 2" y- 2" c 2" 3" mt. cr-2" CD CO I 4(-- W — asCD O I— 12 O O f` . 10 410 411, 67411. CO a t.,F„, ): M WC 66 /-0 67 /�) /--� CIO /—'0 ,n 36 46 n GREASE INTERCEPTOR Uj WCO WC -, s�. , WC WC,0 ��(,., cY7 M I IAlC 0 I IWC 0 I I V-I I I AT BUILDING EXTERIOR p p p FIRST FLOOR /'� FS-1 F5-1 FD-1 /-I I FS-1 FCO /-I FD-1 FS-1 FD-1 FS-1 FD-1 /-I CTG a) o L L v ,—U /--u /-l1 /--t) /- /-U /-1.1 /--U /-lJ Ems. ai .� . 3" 3" 2" 3" 3" 2" di- t N GW Il N c 3' 3" 4" 2" 2" (- 3„ 3" 3„ 3" IP 3" N GW GI-1 ç31' \ r N -• ‘ i 4" 4" 4" 4" TO SECTOR C N ‘ f GW ` I - r UNDERGROUND 2 GREASE WASTE SYSTEM RISER NONE key plan phase Bid & Permit Set date 02.09.18 Co revisions Co as I us a)' co 0_ _Ji F Z I c E.. w project# 16054 2 o RISER DIAGRAMS - N c) PLUMBING .--`7- 0_ a 1LE UP6 • 02 J OO}. � 7 O c N{:K %U SECTOR B 2" ROOF (00......)0 , 2" I 21- I42.11_ 1 ill I i I 1 1 l :_.:1 11 11 ' 11 I I I 1 , ;_,:i=!:_i--_-,E,,,,--,,,: „:____:,:--,,,,,,,::,:::,,-,- i 1 i 1 1 , ,� , „.,,,,:, :,:. _, :,.._,..., I 3/4 -t+h�, I 3/4"-§ .., j-1-1/4" f1-1/4" 1-1/4"�-1-1/4" �--1-1/4" 1 , ,.-1-1I4" r1-1/4"./-1-1/4"(1-1/4"(-1-1/4" 1 0 il 4 4 e e 1 0 [-:i 4 i. I ._ =,_: 1 1 + 1 I I I '---- : tii �;j,c S 2 S-2 S-2 S-2 S-2 S-2 DF-1 I I WC-2 S-2 S-2 S 2.j_l , 3/4" S-2 S-2 C\ 1 L .._li IL _ii L i L A _„...,„_, •— 314 2 CW 3/4 CW I L-22 WC-1 WC-2 WC-2 WC-1 WC-2 .- I L-2 WC-1 WC-2 WC-2 WC-1 WC-2 2"CW - - 2" CW ''- ir, 3/4" IP) IA „ �, T....-..._. 1 2" CW 3/4" 1/2" 2" HW 3/4 2" HW SET @ 1-1/4" CW 3!4" HW IT SET @ 2" HW SET @ 3/4" HW I 2"CW 3/4" y '" SET @ (TYP 4) 3/4" RHW I I 3/4" RHW 0.5 GPM i - I I I 0.5 GPM 3/4" RHW 0.5 GPM 3/4" RHW - 0.5 GPM I SECOND FLOOR TO BUILDING A I I I , (TYP 4) 1 I I-_-__ict . . t__ .I I r-___i__. , , . ...... ----,"- - - :....._. _ _ _ ... _ - AMP MEM NMI 2„ 2„ 1-1/2" if -- I_'-� I -'" = - _ 2„_ _ 2„ 1-1/2„ -- ---- I j �- r \\7- ' ' I - - — ; , 1 _ 2 HW I __�.__ _-l-�-_ j _ 1 IT , I I I I f_ r' ”— �� , i; . • 1 3/4" RHW 1 - _ = - 1I_- . .;4 ` ___ _ I I ! Dull Olson Weekes - IBl Group 2„ CW 314" I 1 I 1 , ", f, ! i �t 1 A A 1-11/4 , I I , 1 I I 1 Architects, Inc. 1 HW SET @ 1 I 1-1/4" 1-114" 1-1/4" 1-1/4" 1-1/4" 1 /4 CW SET @ I 3/4 CW 3/4 CW 2 GW 2 GW 1-1/4 „ "1 "" "" ", t" 3/4 RHW 0.5 GPM 1 3/4 _ 0 3/4 HW 0.5 GPM 1-1/4 1/2 3/4 0 314 HW 314 0 3/4 HW 3/4 I 3/4 HW 1-1/4 HW 3/4 3/4 il- b 1/4 314 i-1-1/4" �--1-114�1-114 1-114 © 314IF „ i !! t4 !7tt 1 ”" „ , 11IlHt,3/4" I ( el I i r 3/4" RHW „ 3/4" RHW 3/4" RHW 1 L3/4" CW 3/4" RHW 3/4" RHW 111/2 f 907 SW Stark Street Portland OR 97205 USA • M 3/4 CW I 1 1-1/2 CW / r 1 OA 3/4" HW q 1 I ! 1 , _ -I I I I 1 _ � tel 503 226 6950 fax 503 273 9192 0 I 1 1 I A S.2 I S-2 314" HW 314" HW S_2 1 i 5-2 WB-1 5=2 1 S-2 WB-1 S-2 F 314"' RHW 5-2 S-3 S-4 t SEWS I I I 1 S^2 I ' ; S-2 www.dowa-ibigroup.com www.ibigroup.com -' [!{ 3/4" RHW 3/4" RHW ' - - - L IL I 0 1/2" r IL�...J 1L _J1 I 3► „ T1 -'Di''1 1_ 3/4 � _(TYP 4) L_ J-2 W 1 VVC-2 WC-2 Vy -1 WC-2 _1 1 + _ 1/2" W -2 W -2 W -2 W -2 WC-2 WB-1 (TYP 4) FIRST FLOOR 0 NONE DOMESTIC WATER RISER DIAGRAM - EAST ��G '2°'4, , SECTOR A 18e RH-1 9.' Garr - /2," ROOF marGh , �44 ° -.. ► o, AS P. CO\, Ir OMNI 41! iI i i EXPIRES 12-31-19 I I 1 ll 1 I 1 1 1 1 I I 1 3/4"-N iI r1-1/4" 1-1/4"`-1-1/4"f•1-1/4" r1-1/4" 3/4" 4 q q III ; � � I I I I 1 SS-22 S-22 MS-1 SS-22 s--2 Si2 I 0 1 1 II - III _ 3/4" 0 3"CW 3"CW 2"CW 3/4"1, IL_2 WC-1 WC-2 WC-2 WC-1 WC-2 2" HW 2" HW 2" HW I I I SET I 2" CW 3/4 "(TYP 4) I 3/4" RHW I 3/4" RHW 3/4" RHW I I 1 0.5 GPM-\ SECOND FLOOR TO BUILDING C _ _ - _ _ _ _ _ _ cld_ _ _ _ _ I I _ _ _ _ - _ TO BUILDING B _ 1•10 OM l4" 1i;40.' _ F, , I „A A3/4F"CW q 2„GW 1 A I i 21,CW -i _ fil _ _ 1 _ 0 2 HW .� -S._T., 0 1 _ d0 1 HW ^I MLR__ -1 - -- _ a°aa— I 112” RHW i 1 --� 1�tea, , -- �1_ -- - t -T i �-- _�-•- t- - 2", 2" 1-1/21F 3/4" RHW Q` o b �� ' 314"Htzfi " , nn1 , „ f_ i i _ "' .�. .�.- 3/4 CW 1-1/2 CW 112 HW , 3/4 CW „ - 1d -2 CW\-2 CW - I '�.,,�-3/4" I 3/4" 3/4" 3/4" 3/4" ! 3/4" SET @ 1-1/ SET @ 314" HW SET @ '" - 314" HW "'i . 0 '� { 314 "� 3/4 I 3/4"CW 3/4"CW 3I4" HW 314" HW 3/4 ! r. 1/2" ! I 1 I I I 1 I C2 I 0.5 GPM 1-1/4" = 314" I I 3/4 I , 0.5 GPM 112 RHW 0.5 GPM ! 1 , ! , 1 1/2 RHW i 3/4"HW 3I4" HW 3I4" RHW 1-1/4" 1 1-1/4" CO0 � I WC-2 WC-2 WC-2 WC-2 ;;O II L_1 WM-1 1 3/4" A 1 i S_2 WB-1 3/4" 1 1/2" 1 L-11 WC-2 S-2 I; , S-2 S-2 ; ; 1/2" RHW 3/4" RHW0 ' fl-1/4"r1-1/4"1-1-1/4" 0 N , l, Q 314" ti LLA lel_ l l ___.�� _� .� 03 U �' VVH-1 581 L_1 ti 0 ti L -2 TP-1 —11 S-1 S -1 --- 0 - 1/2"(TYP 4) L- WC-2 WC-2 WC-2 WC-2 W -2 5 c J O FIRST FLOOR : _7, a co i- 0 DOMESTIC WATER RISER DIAGRAM - CENTRAL w ...a.3 ..,,,-. co NONEF 2 � SECTOR D SECTOR C Q I— U 0 o ti RH-1 RH-1 ....r I = C.) C) I ROOF (1) O. r ` M � V 'd - I I ' .., L t#i — CM LC) �—.• .,..� Lo Cid 4-., .i 1 I X3/4" rm." i 1 1 I 2" CW 3"CW i---2" HW 2" HW I 3/4" RHW I SET @ 1.5 GPM 3/4" RHW SECOND FLOOR -I TO BUILDING A SET @0.5GPM—.,c- MONO IMO MOO OM. - _ , ./=Mb __ - -IMMO 01•10111. MEM MOM - MOM_ - __ OMNI _ T— — —4 — __ — — 17.-- OEM MEM 2"CW 1 , 2„CW 3/4", 1" 1-1/211 1"t 1"" 1-1/4" 110 0� 0j 0 0 1-1/4" HW 1 I ` -2"HW p'al) _ ., _& i 7 _ i _ _ , - ` 1- - —.1_........ _ - - _ ' 1/2" RHW 3/4"RHW 1 _ --- 1 •_t.- ' --- i _ — �_ --- _ I _-- r---- - - —V _ — _—_ L -— - i -i r I 1-1/2" 2"CW 3/4"HW _ tt '1/2 : : 2"CW c�� 2-112"CW 3"CW 3/4" 3/4" 314" TO MECHANICAL 3/4" '�/-3/4" .., 3/4" 1/2" 1/2" 314" 1/2" 3/4" 3/4" 314" 1-1/2" HW 0 1-112" HW 1-1/2" HW I SET @ 0.5 G'M key plan III ROOM , [ I 3/4" RHW ;IX 3/4" RHW 3/4" RHW , 1 1 :-/ 1/2" I 1 11 0 I I I 48 I I I 1 1 . 1 1 L1 II II II I I II r I II 1I WC-2 WC-2 WC-1 WC-1 WC-1 WC-1 L-1 L-1 L-1 L-1 L-1 L-1 I I P501 I Q fs]� 2 '�t ;--3 --SET @ 1.5 GPM phase Bid & Permit Set TP-1 DA ,I�l, 1--r-Efi - ( ( ( II it I I I c'2� 1-1/2" CW I I -1 WAP-1 ___ _. - #_ _ "' __� 1 MAIN SOV k.S-1 L_1 EVVG-101 3/4" "W I I 16 36 16 4040, (a, 66 2" 3/4"- date 02.09.18 g 1/2" RHW I FIRST FLOOR I revisions – 0a4 ____ – – – – – -_-___I i i I 1 I \'''(-2"CW 1 MOO WI. - _\ _ _ 3/4" HW gI I Z 314" 2" CW 3/4"— U..1 ! 1 co 1-1/2"N 1/2"-6.1. 3/4" a n Cr. I 1 ,--10 WB-1 VVC-1 LI U 1 WC-2 WC-2 I TP-1 VVC-1 WC-1 V1 -1 VVC-1 L_1 L-11 LLL I Lit ; LL-11 Lit project# 'I G054 L-A L_ 1 _ _� L_ RISER DIAGRAMS - � 3/4" P I s ' _ ' SH-1 - 1"(TYP) ---' - - --+- 1/2"(TYP) PLUMBING 2 0 LOWER LEVEL Lc)LI— d'J 0 DOMESTIC WATER RISER DIAGRAM -WEST - 6 . 0 3 .0 ,5- NONE o au TERMINATE WTH TURN DOWN ELBOW AND BUG SCREEN (TYP) n n 411•11•11,1111•M 01111.10 411111110 _ \ ROOF -,, ::::::___ ,-, BUILDING WALL--\\ 1" MPG -3/4"MPG 1 -597 MBH MPO 2 1/2"MPG-/-3 3/4"MPG-7) 3/4"MPG-1° --- 111- - - - -- --'7- ---'1 [2-1/2"MPG --2"MPG I e _ 7% ce..#0.......40.'"*""2"MPG ___, & 6"- IBI 2"MPG —N i I II I i i f I 1 CD CD CDull Olson Weekes - IBI Group *a' 7 1- .,- . Architects, Inc. < B-1 > < B-2 > < B-3 > < GINN-101 > <GWH-102 > < GWH-103> z-3"MPG 1,999 MBH 1,999 MBH 1,999 MBH 199 MBH 199 MBH 199 MBH 907 SW Stark Street Portland OR 97205 USA = V 6,594 MBH tel 503 226 6950 fax 503 273 9192 0 (TYP) c www.dowa-ibigroup.com www.ibigroup.com MAU-1 . DRIP LEG v----- -------- r T------- —-- - --.-a 3/4"G fILiFe f-41f1-6 110- 4 IP4 (TYP) 150 MBH . u 164+-4 u fill1>r(1414-4) )114-9 ROOF u SECOND FLOOR kili;18:12 ,0-42-fr/7- BUILDING WALL ct\) PROT MPC PROVIDEWTH- ,/ A El p 1"G VENTLESS :::: REGULATOR -C, of-e ; 44 iii S C (TYP) o 6 \-" 3/4" MPG 'cl,S‘ P. CO TO KITCHEN 4110 EQUIPMENT CONNECT TO AUTOMATIC 1 EXPIRES 12-31-19 I (240 MBH) HOOD FIRE SUPPRESSION 90/90 MBH SYSTEM( :1) 0 CO '31 MPG - 1"G 60 MBH 40 c/- PROVIDE VENTLESS REGULATOR C _ r.1 (-9 U NEW GAS METER y @ 2PSI LI A 6,984 CFH @ 150'TDL (BY SERVING UTILITY) — .„......„,..--EENAllri.l.ZNil .Y KE RANGE Lec4,...0'''..-- SHUT OFF VALVE COMBI-OVEN CONNECTOR H IPCI . (DOUBLE) (TYP 3) .4...... -i1001,- 0 FIRST FLOOR II L4 Lwow ....° 0 U) 0 NOTES: 0 uo. ...= 1. PROVIDE TEST TEE PORT MINIMUM 10X PIPE DIAMETER DOWNSTREAM OF REGULATOR. C.) ... 15\ NATURAL GAS RISER DIAGRAM 2. PROVIDE REGULATOR AT GAS METER AND 2-1/2"NATURAL GAS SUPPLY PIPE BELOW GRADE CO 0 I`=f NONE 2-1/2"G-/- TO EMERGENCY GENERATOR(2,340 CFM @ 0.5 PSI).VERIFY EXACT LOCATION WTH CIVIL SITE DRAVVINGS. o n al% .....c fc _i as 0 0) — r" Ct = %.11 0 CD C -ff Ili Tij 65- = = 8 0I-- 1". S' 4 4...10 1 = c) c) w ,73 .. ,-. . a-EL enl-- CO CO "cr ..1- E wit War C/5 ........ ....•"""... • ON) 0 C') Cce3 a) s 1 0 0•'''0 C.) I-,0 LC) II— La? . _ F. —I r key plan phase Bid & Permit Set -.2 date 02.09.18 12 revisions ! al cni ci..) co ca. 4 z iii i 0 to E. . w project# 1 16054 c> RISER DIAGRAMS - c., cr) cb PLUMBING .....,..._ cu ...- .e ... .. "9: 0 ; -1-.3 • co c) . . • , .